Pulaski County, Mo., funds by Army, Department of
Listing $30,414,424.32 in stimulus funds from Army, Department of for Pulaski
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
GREENLEAF CONSTRUCTION CO., INC. | $8,516,959 | Work will include repair and modernization of a training barracks to include: furnishing all analyses, design, repair, and structural reinforcement to convert a standard barracks to an Advanced Individual Training (AIT) style barracks (Building 1028). | U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
KCI CONSTRUCTION COMPANY | $6,261,254 |
Building 817, 817, 818, 820 and 822 at Fort Leonard Wood, Missouri. Renovation and upgrade to three barracks, a dining facility and a headquarters office building (replace and restore all components to advanced individual training standard barracks).
This spending item is part of a $21,837,871 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
CSE CONSTRUCTION CO., INC. | $3,227,703 | As a part of construction on 38863, Repair Primary and Secondary Digester at Sewage treatment Plant, Ft. Leonard Wood, MO. Work includes hauling and disposing of sludge produced during construction duration. It also requires to empty the primary and sec | U.S. Army Corps of Engineers, except civil program financing | 3/19/2010 |
QUALITY SALES & SERVICE INC | $1,895,879 |
Building 817, 817, 818, 820 and 822 at Fort Leonard Wood, Missouri. Renovation and upgrade to three barracks, a dining facility and a headquarters office building (replace and restore all components to advanced individual training standard barracks).
This spending item is part of a $21,837,871 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
L. G. BARCUS AND SONS, INC. | $1,895,246 |
Replace Railroad Bridge 14.7-Ft. Leonard, MO- Pulaski County.
This spending item is part of a $1,898,179 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
BALKENBUSH MECHANICAL, INC | $1,383,780 | Provide Air Conditioning System for Gyms-600, 700, and 800 Areas. | Army, Department of | 3/31/2010 |
MERAMEC MECHANICAL, INC | $895,995 | Replace Boilers 600,700, & 800 areas Fort Leonard Wood, Mo | Army, Department of | 10/02/2010 |
MEYER ELECTRIC COMPANY, INC. | $689,950 |
The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to prepare a Site Survey, Type III Work Plan, and Repair Normal Power, A&B Tower, B-310 at General Leonard Wood Army Community Hospital. Project
This spending item is part of a $1,111,827 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 7/30/2009 |
BARTELS & MISSEY SIDING & INSULATION CO | $660,183 |
Renovation of Missouri National Guard Buildings at Ft. Leonard Wood, MO
This spending item is part of a $1,050,713 allocation.
See details
|
Army, Department of | 7/06/2009 |
WILLARD ASPHALT PAVING, INC. | $517,463 | COLD MILLING, REPLACE WITH 2 ASPHALT, AND PAINT PAVEMENT MARKING ON AIRSTRIP | Army, Department of | 8/06/2009 |
MONACO ENTERPRISES, INC. | $437,791 | Provide all items, personnel and equipment necessary to: replace existing D-500 fire alarm building transceivers and central processing system on Ft. Leanardwood and E 911 center with new wireless D-21 Transceiver central processing system; replace the BT | Army, Department of | 12/01/2009 |
J & J MAINTENANCE, INC. | $396,954 |
The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to prepare a Site Survey, Type III Work Plan, and Repair Normal Power, A&B Tower, B-310 at General Leonard Wood Army Community Hospital. Project
This spending item is part of a $1,111,827 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 7/30/2009 |
WILLARD ASPHALT PAVING, INC. | $386,694 | REPAIR SHOULDERS ON ROAD BY PROVIDING CRUSHED ROCK | Army, Department of | 8/05/2009 |
Pro Tile LLC | $295,761 |
Building 817, 817, 818, 820 and 822 at Fort Leonard Wood, Missouri. Renovation and upgrade to three barracks, a dining facility and a headquarters office building (replace and restore all components to advanced individual training standard barracks).
This spending item is part of a $21,837,871 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
WILLARD ASPHALT PAVING, INC. | $293,210 | COLD MILLING ASPHALT, REPLACE WITH 2 ASPHALT, PAINT STRIPE ROAD | Army, Department of | 8/05/2009 |
WILLARD ASPHALT PAVING, INC. | $236,716 | COLD MILLING ASPHALT,REPLACE WITH 2 ASPHALT, PAINT STRIPE ROAD | Army, Department of | 8/05/2009 |
IKE & ASSOCIATES, INC. | $209,650 | This project consists of upgrading the interior of Chapels #637 and #843, located on Fort Leonard Wood, Mo. Both of the areas concerned in this project will be in use during the progress of the work. The Contractor is responsible for coordination of th | Army, Department of | 3/31/2010 |
WILLARD ASPHALT PAVING, INC. | $202,500 | LAY AND PROVIDE CRUSHED ROCK ON SHOULDERS OF ROAD | Army, Department of | 8/05/2009 |
Spartan Services LLC | $200,400 |
Renovation of Missouri National Guard Buildings at Ft. Leonard Wood, MO
This spending item is part of a $1,050,713 allocation.
See details
|
Army, Department of | 7/06/2009 |
WILLARD ASPHALT PAVING, INC. | $182,153 | MILL ASPHALT/REPLACE WITH 2 ASPHALT AND STRIPE STREET | Army, Department of | 8/05/2009 |
WILLARD ASPHALT PAVING, INC. | $156,069 | COLD MILLING,REPLACE WITH 2 OF ASPHALT AND PAINT STRIPE ROAD | Army, Department of | 8/05/2009 |
WILLARD ASPHALT PAVING, INC. | $140,474 | 2 ASPHALT WEARING COURSE, COLD MILLING OF ASPHALT AND PAINT STRIPING | Army, Department of | 8/05/2009 |
PARAGON-WMC JV 2-2007 | $130,210 |
As part of the construction program at Fort Leonard Wood, we will replace High Temperature Boiler #2, servicing the 1,000 area of Fort Leonard Wood, MO. This 40 year old boiler provides heating and hot water for up to 1,600 uniform personnel training to
This spending item is part of a $2,058,110 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |
WILLARD ASPHALT PAVING, INC. | $122,342 | COLD MILLING OF ASPHALT, REPLACE WITH 2 OF ASPHALT, PAINT STRIPING/PARKING STALL LINES ON PARKING LOT | Army, Department of | 8/04/2009 |
UNIVERSAL MECHANICAL, LLC | $120,800 | Replace High Temp. Exchanger Heating System With Boilder at Bldg. #5400 | Army, Department of | 12/03/2009 |
WILLARD ASPHALT PAVING, INC. | $108,680 | 4 ASPHALT TO BE LAID ON MISC ROADS | Army, Department of | 8/05/2009 |
WILLARD ASPHALT PAVING, INC. | $91,258 | COLD MILLING, REPLACE WITH 2 OF ASPHALT, AND PAINT STRIPE ROAD | Army, Department of | 8/05/2009 |
AMERICAN ROOFING & METAL CO., INC. | $84,290 |
Bldg 843 roof repair including: Remove 89SQS membrane, ballast & flashings; Remove/Replace 8,800SF sheathing; Remove/Replace 345BF structural lumber; install 92SQS asphalt shingles; install 800LF fascia & soffit; install 185LF ridge vent; install 2SQS EP
This spending item is part of a $90,005 allocation.
See details
|
Army, Department of | 12/18/2009 |
LACLEDE ELECTRIC COOPERATIVE | $78,907 |
ELECTRICAL UTILITY SERVICE CONNECTION CHARGE TO UPGRADE TRANSFORMERS TO PROVIDE AIR CONDITIONING SYSTEMS FOR GYMS - 600, 700 & 800 AREAS; PROJECT NUMBER 38842
This spending item is part of a $93,907 allocation.
See details
|
Army, Department of | 5/05/2010 |
Questec Constructors, Inc. | $69,150 |
Renovation of Missouri National Guard Buildings at Ft. Leonard Wood, MO
This spending item is part of a $1,050,713 allocation.
See details
|
Army, Department of | 7/06/2009 |
WILLARD ASPHALT PAVING, INC. | $66,132 | COLD MILLING AND REPLACE WITH 2 OF ASPHALT | Army, Department of | 8/05/2009 |
WILLARD ASPHALT PAVING, INC. | $62,602 | COLD MILLING, REPLACE WITH 2 ASPHALT, PAINT STRIPING RD | Army, Department of | 8/05/2009 |
CURTISS MANES SCHULTE INC | $54,700 | Repair exterior of chaples 450,637,742,843, and 1712 | Army, Department of | 4/30/2010 |
KIM'S CARPET L.L.C. | $51,900 |
Renovation of Missouri National Guard Buildings at Ft. Leonard Wood, MO
This spending item is part of a $1,050,713 allocation.
See details
|
Army, Department of | 7/06/2009 |
CONTROLCO, INC. | $49,500 | Project # 38866-Upgrade BACNET digital Control | Army, Department of | 3/05/2010 |
Ballard Electric LLC | $42,680 |
Renovation of Missouri National Guard Buildings at Ft. Leonard Wood, MO
This spending item is part of a $1,050,713 allocation.
See details
|
Army, Department of | 7/06/2009 |
WILLARD ASPHALT PAVING, INC. | $36,294 | MIIL ASPHALT AND REPLACE WITH 2 OF ASPHALT | Army, Department of | 8/04/2009 |
SAFEWAY VAN LINES OF WAYNESVILLE INC | $34,293 |
Building 817, 817, 818, 820 and 822 at Fort Leonard Wood, Missouri. Renovation and upgrade to three barracks, a dining facility and a headquarters office building (replace and restore all components to advanced individual training standard barracks).
This spending item is part of a $21,837,871 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
ACME ERECTORS, INC. | $26,400 |
Renovation of Missouri National Guard Buildings at Ft. Leonard Wood, MO
This spending item is part of a $1,050,713 allocation.
See details
|
Army, Department of | 7/06/2009 |
MOAB CONSTRUCTION CO., INC. | $25,634 | Bldg. 450 roof repair including: install 2SQS asphalt shingles; install 637LF fascia & soffit; install 726LF gutters & downspouts | Army, Department of | 12/18/2009 |
MOAB CONSTRUCTION CO., INC. | $22,393 | Bldg 742 roof repair including: Remove/Replace 190BF structural lumber; install 2SQS asphalt shingles; install 577LF soffit & fascia; install 570LF gutters & downspouts | Army, Department of | 12/18/2009 |
MOAB CONSTRUCTION CO., INC. | $22,393 | Bldg 637 roof repair including: Remove/Replace 190BF structural lumber; install 2SQS asphalt shingles; install 577LF soffit & fascia; install 570LF gutters & downspouts | Army, Department of | 12/18/2009 |
CE MEYER LLC | $15,000 |
ELECTRICAL UTILITY SERVICE CONNECTION CHARGE TO UPGRADE TRANSFORMERS TO PROVIDE AIR CONDITIONING SYSTEMS FOR GYMS - 600, 700 & 800 AREAS; PROJECT NUMBER 38842
This spending item is part of a $93,907 allocation.
See details
|
Army, Department of | 5/05/2010 |
NATIVE AMERICAN SERVICES CORP. | $10,366 |
REPLACE TWO CAST IRON SECTION BOILERS.
This spending item is part of a $58,826 allocation.
See details
|
Army, Department of | 12/03/2009 |
MOAB CONSTRUCTION CO., INC. | $5,715 |
Bldg 843 roof repair including: Remove 89SQS membrane, ballast & flashings; Remove/Replace 8,800SF sheathing; Remove/Replace 345BF structural lumber; install 92SQS asphalt shingles; install 800LF fascia & soffit; install 185LF ridge vent; install 2SQS EP
This spending item is part of a $90,005 allocation.
See details
|
Army, Department of | 12/18/2009 |
PARAGON-WMC JV 2-2007 | $0 |
As part of Recovery Project #35708 at Fort Leonard Wood we will replace High Temperature Boiler #1, B-1021 servicing the 1,000 area of Fort Leonard Wood, Missouri. This 40 year old boiler provides heating and hot water for up to 1,600 uniform personnel t
This spending item is part of a $1,927,900 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/30/2009 |