St. Louis (City) County, Mo., funds by Army, Department of
Listing $1,888,587.65 in stimulus funds from Army, Department of for St. Louis (City)
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $1,534,000 | This work consists of providing one cutterhead hydraulic dredge and attendant plant to perform channel maintenance dredging and environmental dredging in side channels and chutes on the upper Mississippi River Miles 583.0 to 0.0, the Illinois River Miles | Army, Department of | 6/19/2009 |
Miller Contracting Services, Inc. | $167,884 |
Building 817, 817, 818, 820 and 822 at Fort Leonard Wood, Missouri. Renovation and upgrade to three barracks, a dining facility and a headquarters office building (replace and restore all components to advanced individual training standard barracks).
This spending item is part of a $21,837,871 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
JD Kutter Insurance | $124,316 |
Building 817, 817, 818, 820 and 822 at Fort Leonard Wood, Missouri. Renovation and upgrade to three barracks, a dining facility and a headquarters office building (replace and restore all components to advanced individual training standard barracks).
This spending item is part of a $21,837,871 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
JD Kutter Insurance | $59,134 |
Building 817, 817, 818, 820 and 822 at Fort Leonard Wood, Missouri. Renovation and upgrade to three barracks, a dining facility and a headquarters office building (replace and restore all components to advanced individual training standard barracks).
This spending item is part of a $21,837,871 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |
W. W. GRAINGER, INC. | $2,974 | Miscellaneous Construction materials - EXTENSION CORDS AND FLANGE WEDGE IN DIFFERENT SIZES FOR THE MELVIN PRICE LOCK AND DAM GATE REPAIR MOD | Army, Department of | 7/01/2009 |
MASSEY EQUIPMENT CO. | $280 |
Building 817, 817, 818, 820 and 822 at Fort Leonard Wood, Missouri. Renovation and upgrade to three barracks, a dining facility and a headquarters office building (replace and restore all components to advanced individual training standard barracks).
This spending item is part of a $21,837,871 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 12/30/2009 |