St. Louis (City) County, Mo., funds by General Services Administration
Listing $90,978,041.64 in stimulus funds from General Services Administration for St. Louis (City)
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
HOF CONSTRUCTION, INC. | $10,718,280 |
The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an
This spending item is part of a $26,645,547 allocation.
See details
|
Public Buildings Service | 3/17/2010 |
SUPERIOR WATERPROOFING AND RESTORATION COMPANY, INC. | $10,178,585 |
The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an
This spending item is part of a $26,645,547 allocation.
See details
|
Public Buildings Service | 3/17/2010 |
HOF CONSTRUCTION, INC. | $9,200,116 |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration
This spending item is part of a $13,957,903 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
STRONG TOWER CONSTRUCTION, LLC | $5,223,311 |
The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an
This spending item is part of a $26,645,547 allocation.
See details
|
Public Buildings Service | 3/17/2010 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS | $5,145,512 |
Renovated Building 110 at Goodfellow Complex, (4300 Goodfellow Blvd St. Louis, MO. ) for the Social Security Administration. The project was completed and the building turned over for use as administrative offices, storage and shell spaces for future ada
This spending item is part of a $12,656,510 allocation.
See details
|
Public Buildings Service | 12/14/2009 |
H.B.D. CONSTRUCTION, INC. | $4,840,928 |
Renovated Building 110 at Goodfellow Complex, (4300 Goodfellow Blvd St. Louis, MO. ) for the Social Security Administration. The project was completed and the building turned over for use as administrative offices, storage and shell spaces for future ada
This spending item is part of a $12,656,510 allocation.
See details
|
Public Buildings Service | 12/14/2009 |
Bates Utility Co., Inc. | $3,848,526 |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration
This spending item is part of a $13,957,903 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
HELLMUTH, OBATA & KASSABAUM, INC. | $3,650,000 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
HANENKAMP ELECTRIC COMPANY | $3,492,678 |
Renovated Building 110 at Goodfellow Complex, (4300 Goodfellow Blvd St. Louis, MO. ) for the Social Security Administration. The project was completed and the building turned over for use as administrative offices, storage and shell spaces for future ada
This spending item is part of a $12,656,510 allocation.
See details
|
Public Buildings Service | 12/14/2009 |
AIR MASTERS CORPORATION | $2,850,000 |
This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit
This spending item is part of a $5,188,089 allocation.
See details
|
Public Buildings Service | 9/04/2009 |
J. E. NOVACK CONSTRUCTION CO. | $2,797,361 |
This award includes Construction Manager as Constructor (CMc) Services for the Robert A. Young American Recovery and Reinvestment Act Mechanical Project at the Federal Building. CMc services for this project include attending design review meetings at the
This spending item is part of a $10,312,343 allocation.
See details
|
Public Buildings Service | 3/26/2009 |
TEAM FOUR INC | $2,452,686 |
RAY ARRA project is classified as a Building Modernization, requiring the project to achieve LEED Silver certification. The Robert A. Young (RAY) Federal Building, located in the downtown St. Louis Central Business District, was built in 1933 as a Termina
This spending item is part of a $2,719,222 allocation.
See details
|
Public Buildings Service | 6/13/2012 |
K-TECH CORP. | $2,275,450 |
This award includes Construction Manager as Constructor (CMc) Services for the Robert A. Young American Recovery and Reinvestment Act Mechanical Project at the Federal Building. CMc services for this project include attending design review meetings at the
This spending item is part of a $10,312,343 allocation.
See details
|
Public Buildings Service | 3/26/2009 |
RL CAMPBELL MANAGEMENT SERVICES, INC. | $2,212,352 |
ARRA Roof Replacements for bldgs 105L,105F,105E,141c,108A,122B,108B, 4300 Goodfellow .ST. Louis
This spending item is part of a $2,720,340 allocation.
See details
|
Public Buildings Service | 12/30/2009 |
HOF CONSTRUCTION, INC. | $1,969,461 |
This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit
This spending item is part of a $5,188,089 allocation.
See details
|
Public Buildings Service | 9/04/2009 |
EATON ENERGY SOLUTIONS, INC. | $1,714,505 | Advaned Energy Managment Control Systems upgrades and utility metering for the Charles Evans Whittaker Courthouse in Kansas City, MO; the Army Publication Center in Overland, MO; multiple buildings in the Goodfellow Federal Center in St. Louis, MO; | Public Buildings Service | 8/04/2010 |
TEAM FOUR INC | $1,585,991 |
A/E Services under ARRA funding for the Robert A. Young Federal Building in St. Louis, MO include: new advance metering, total building re-commissioning/retro-commissioning assistance, window replacement, fa+?ade repair and restoration, cafeteria remodel
This spending item is part of a $1,619,823 allocation.
See details
|
Public Buildings Service | 3/23/2011 |
TARLTON CORPORATION | $1,428,337 | ARRA Building 110 Renovation Track Shed Seismic Upgrades | Public Buildings Service | 8/26/2010 |
TENG & ASSOCIATES, INC. | $1,308,177 | Provide Pre-Design Services to develop a concept for sanitary and storm sewer separation and detention to comply with Metropolitan Sewer District requirements. Scope to include related landscape work, architectural work to replace two building connectors | Public Buildings Service | 1/21/2010 |
JACOBS PROJECT MANAGEMENT CO. | $1,003,718 | During the Preconstruction Phase, obtain information from the Government database and perform the following tasks: a) Attend and be prepared to comment on bi-weekly design meetings (every two weeks) starting in Mid Sep. 2009 through Feb. 2010. b) Review t | Public Buildings Service | 9/23/2009 |
Gates Manufacturing Company, Inc | $946,745 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
TRIVERS ASSOCIATES, INC | $933,495 |
MOD12 - Contract Administration for Renovation of San Antonio Post Office & Courthouse MOD14 - Design of temporary space for tenants who must move during selected construction phases. Also, design for lease space for four new tenants moving into the buil
This spending item is part of a $1,967,809 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
J. E. NOVACK CONSTRUCTION CO. | $665,022 |
This award includes Construction Manager as Constructor (CMc) Services for the High Performance Green Building at Thomas Eagleton Federal Courthouse. CMc services for this project include attending design review meetings at the kick-off, as well as 50%, 9
This spending item is part of a $3,557,841 allocation.
See details
|
Public Buildings Service | 7/15/2009 |
JACOBS PROJECT MANAGEMENT CO. | $598,773 | GOODFELLOW SANITARY AND STORM SEWER PROJECT - The Federal Center at Goodfellow sanitary and storm system is to be separated and reconstructed to meet local Metropolitan Sewer District (MSD) drainage regulations. Underground detention facilities are to be | Public Buildings Service | 7/29/2009 |
JACOBS PROJECT MANAGEMENT CO. | $501,071 | ARRA RAY Mechanical Upgrades at the Robert A. Young Federal Building located on 1222 Spruce St., St. Louis, MO 63103. This project will make general modifications to the Mechanical Environmental Systems, Removal and replacement of computer room air condit | Public Buildings Service | 3/08/2010 |
JACOBS PROJECT MANAGEMENT CO. | $478,661 | Provide Pre-Design and Design Review Servicesfor the building system modifications to meet NARA 2009 requirements for the VA file storage space located in Building 104 of Goodfellow Federal Complex. ARRA VA AT BLDG. 104, 4300 GOODFELLOW, ST. LOUIS, MO ARR | Public Buildings Service | 9/16/2009 |
ENGINEERED FIRE PROTECTION INC | $474,700 |
Renovated Building 110 at Goodfellow Complex, (4300 Goodfellow Blvd St. Louis, MO. ) for the Social Security Administration. The project was completed and the building turned over for use as administrative offices, storage and shell spaces for future ada
This spending item is part of a $12,656,510 allocation.
See details
|
Public Buildings Service | 12/14/2009 |
JOHNSON ROOFING & CONSTRUCTION, INC. | $443,781 |
Mansonry and Exterior Repairs on Federal Center Building 102E,103E,103F,105L
This spending item is part of a $783,682 allocation.
See details
|
Public Buildings Service | 12/14/2009 |
N. B. WEST CONTRACTING COMPANY | $400,512 |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration
This spending item is part of a $13,957,903 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
HOF CONSTRUCTION, INC. | $386,207 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
K-TECH CORP. | $351,804 |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration
This spending item is part of a $13,957,903 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
B & K TUCKPOINTING CO. | $339,901 |
Mansonry and Exterior Repairs on Federal Center Building 102E,103E,103F,105L
This spending item is part of a $783,682 allocation.
See details
|
Public Buildings Service | 12/14/2009 |
TENG & ASSOCIATES, INC. | $328,345 | Robert A. Young Federal Building, Neal Smith Federal Building, Sioux City Courthouse: conduct onsite Retro-Commissioning, Energy Audits, Energy Analysis Calculations, Generate a list of potential ARRA funded projects validated as a 'go/no-go' based on ene | Public Buildings Service | 7/27/2009 |
JOHNSON ROOFING & CONSTRUCTION, INC. | $323,988 |
ARRA Roof Replacements for bldgs 105L,105F,105E,141c,108A,122B,108B, 4300 Goodfellow .ST. Louis
This spending item is part of a $2,720,340 allocation.
See details
|
Public Buildings Service | 12/30/2009 |
AMEC E&I, INC | $302,300 |
The purpose of this task is to support by creating and documenting the processes, standards, and architectural artifacts necessary to achieve the vision of the Comprehensive Loan Program (CLP). This is derived from the American Recovery and Reinvestment
This spending item is part of a $4,864,849 allocation.
See details
|
Office of the Federal Acquisition Service | 9/29/2010 |
TEAM FOUR INC | $301,924 |
A/E Services under ARRA for the Federal Center in St. Louis, MO Bldg. 104 VA include: new advanced metering; 1st floor re-commissioning/retro-commissioning, new high efficiency chillers to cool the building; new high efficiency chilled water; condenser w
This spending item is part of a $424,948 allocation.
See details
|
Public Buildings Service | 8/24/2010 |
EDM INCORPORATED | $298,178 |
Eagleton Courthouse High Perf - Lighting improvement: A high-performance lighting replacement project will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants. The project will include the fo
This spending item is part of a $484,608 allocation.
See details
|
Public Buildings Service | 3/03/2011 |
POWERTECH ELECTRIC INC | $296,619 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
GOLTERMAN & SABO, INC. | $264,388 |
The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an
This spending item is part of a $26,645,547 allocation.
See details
|
Public Buildings Service | 3/17/2010 |
EATON ENERGY SOLUTIONS, INC. | $259,534 | The scope of work includes five primary elements for two locations including the Thomas F Eagleton Courthouse in St. Louis, MO and the North Platte Federal Building in North Platte, NE. The five elements are: On-site building Energy Managment Control Sys | Public Buildings Service | 6/03/2009 |
K-Tech Corp. | $240,000 |
This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit
This spending item is part of a $5,188,089 allocation.
See details
|
Public Buildings Service | 9/04/2009 |
TEKSYSTEMS, INC. | $233,996 |
The purpose of this task is to support RD in three major areas: fulfilling RDG??s reporting requirements under ARRA, supporting RD in the planning and management of the Comprehensive Loan Program (CLP) modernization initiative, and establishing a Requirem
This spending item is part of a $6,120,538 allocation.
See details
|
Office of the Federal Acquisition Service | 8/24/2010 |
TEKSYSTEMS, INC. | $218,278 |
The purpose of this task is to support RD in three major areas: fulfilling RDG??s reporting requirements under ARRA, supporting RD in the planning and management of the Comprehensive Loan Program (CLP) modernization initiative, and establishing a Requirem
This spending item is part of a $6,120,538 allocation.
See details
|
Office of the Federal Acquisition Service | 8/24/2010 |
Kaemmerlen Parts and Service, Inc. | $215,784 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
TEAM FOUR INC | $184,682 |
Eagleton Courthouse High Perf - Lighting improvement: A high-performance lighting replacement project will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants. The project will include the fo
This spending item is part of a $484,608 allocation.
See details
|
Public Buildings Service | 3/03/2011 |
B & K TUCKPOINTING CO. | $184,000 |
ARRA Roof Replacements for bldgs 105L,105F,105E,141c,108A,122B,108B, 4300 Goodfellow .ST. Louis
This spending item is part of a $2,720,340 allocation.
See details
|
Public Buildings Service | 12/30/2009 |
JACOBS PROJECT MANAGEMENT CO. | $157,289 | Provide Building Commissioning for the building system modifications to meet NARA 2009 requirements for the Veteran's Administration (VA) file storage space located in Building 104 of Goodfellow Federal Complex. ARRA VA AT BLDG. 104, 4300 GOODFELLOW, ST. | Public Buildings Service | 1/27/2011 |
JACOBS PROJECT MANAGEMENT CO. | $156,146 | This project makes high performance green building improvements to this vacant building to match up with the Social Security Administrations (SSA) mission-driven, Congressionally-mandated, Recovery Act-related project. SSA needs to be up and running quick | Public Buildings Service | 6/23/2010 |
R. F. MEEH CO. | $153,685 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
JACOBS PROJECT MANAGEMENT CO. | $130,708 | ARRA High Performance Green Building - Eagleton Building This project will upgrade lighting controls, Install dimming ballasts, Install occupancy sensors, Re-lamp light fixtures from 32w to 28w, Replace stairwell lighting; Install harmonic cancelation tra | Public Buildings Service | 8/26/2009 |
SAFETY TEMPS LTD. | $121,000 |
The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an
This spending item is part of a $26,645,547 allocation.
See details
|
Public Buildings Service | 3/17/2010 |
JACOBS PROJECT MANAGEMENT CO. | $118,663 | This project makes High Performance Green building improvements to this vacant building to match up with the Social Security Administrations (SSA) mission-driven, Congressionally-mandated, Recovery Act-related project. SSA needs to be up and running quick | Public Buildings Service | 2/16/2010 |
LAKESIDE ROOFING COMPANY | $110,688 |
The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an
This spending item is part of a $26,645,547 allocation.
See details
|
Public Buildings Service | 3/17/2010 |
JACOBS PROJECT MANAGEMENT CO. | $90,491 | Construction Management (CM) Services for approximately 1-month of Pre-Construction Services and 8-months of CM Services which will include; site office and associated home office support tor contract coordination, scheduling support and CM Services inclu | Public Buildings Service | 7/30/2009 |
FLOORING SYSTEMS, INC. | $84,805 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
JOHNSON ROOFING & CONSTRUCTION, INC. | $82,923 |
Replace roof on bldgs 102E,103E,104F,106, 4300 Goodfellow, St. Louis
This spending item is part of a $1,584,752 allocation.
See details
|
Public Buildings Service | 12/30/2009 |
HAWKINS CONSTRUCTION & FLAT WORK CONTRACTING CO., INC | $80,045 |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration
This spending item is part of a $13,957,903 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
TEAM FOUR INC | $79,235 |
The Cafeteria design was completed 2008, and ?shelved? due to lack of funding. The RAY building received funds under the American Recovery and Reinvestment Act of 2009, and the cafeteria was part of that scope. Because of the ?shelving?, there were some
This spending item is part of a $136,186 allocation.
See details
|
Public Buildings Service | 6/23/2009 |
TEKSYSTEMS, INC. | $79,016 |
The purpose of this task is to support by creating and documenting the processes, standards, and architectural artifacts necessary to achieve the vision of the Comprehensive Loan Program (CLP). This is derived from the American Recovery and Reinvestment
This spending item is part of a $4,864,849 allocation.
See details
|
Office of the Federal Acquisition Service | 9/29/2010 |
Knaust Drywall, Inc | $74,400 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
Acoustical Ceiling Specialists, LLC | $66,780 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
JACOBS FACILITIES INC. | $64,460 | Construction Management (Agency) Services for Construction of new federal Courthouse in Billings, Montana. Project will provide Construction Management (CM) Services to assist in development of a solicitation for Design-Build project for a new US Federal | Public Buildings Service | 4/17/2009 |
JACOBS ENGINEERING GROUP INC. | $59,901 | Develop a Storm Water Site Master Plan with sustainable strategies for the entire Federal Center campus at 4300 Goodfellow in St. Louis MO. The site includes 62 acres of land and 12 significant buildings. The workis to include, but not limited to:a. Inves | Public Buildings Service | 11/04/2009 |
SIEMENS INDUSTRY, INC. | $58,160 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
DAVID MASON & ASSOCIATES, INC. | $58,000 |
CMa Services for Department of State Facility in Denver Colorado Preconstruction, Construction and Closeout Phase Services in Denver Federal Center. 100,000 sf, $60 million facility will have expansion capabilities for future. Jacobs services include Desi
This spending item is part of a $2,725,558 allocation.
See details
|
Public Buildings Service | 2/09/2010 |
TEAM FOUR INC | $55,914 |
Provide Design Services for approximately 29,000 s.f of the VA Office/Mailroom space located in building 104 of Goodfellow Federal Complex. This project will include, but not limited to, demolition, new walls and ceiling, painting, restroom upgrade, mecha
This spending item is part of a $56,164 allocation.
See details
|
Public Buildings Service | 12/16/2009 |
K-Tech Corp. | $55,200 |
This award includes Construction Manager as Constructor (CMc) Services for the High Performance Green Building at Thomas Eagleton Federal Courthouse. CMc services for this project include attending design review meetings at the kick-off, as well as 50%, 9
This spending item is part of a $3,557,841 allocation.
See details
|
Public Buildings Service | 7/15/2009 |
FEDSERV INDUSTRIES, INC. | $52,535 | Provide maintenance personnel to support the RAY ARRA Mech Project @ the Robert A. Young Federal Building, 1222 Spruce St., St. Louis, MO 63103. Construction work is being performed after hours. | Public Buildings Service | 1/27/2011 |
SCHNEIDER ELECTRIC USA, INC. | $49,900 | ADVANCED METERS SOFTWARE COMMUNICATION INTEGRATION FOR GOODFELLOW FEDERAL COMPLEX IN ST LOUIS MISSOURI, U.S. ARMY PUBLICATIONS CENTER IN OVERLAND MISSOURI, AND CHARLES EVANS WHITTAKER U.S. COURTHOUSE IN KANAS CITY MISSOURI. INTRODUCTORY AND ADMINISTRATIVE | Public Buildings Service | 9/20/2010 |
TEAM FOUR INC | $49,892 | The Purpose of this study is to determine if a renewable energy system is feasible considering: the RAY building and impacts to it, the climate, the life of the system, the up front (initial) costs, potential savings due to reduced energy purchases, and c | Public Buildings Service | 4/22/2009 |
JACOBS PROJECT MANAGEMENT CO. | $47,736 | This ARRA project is Design-Build and will replace the stone coping and the roofs on Buildings 10SL, lO5F, lO5E, 141C, 108A, 122B and 108B of the Goodfellow federal complex.The project is for approximately 12 months of construction management which will i | Public Buildings Service | 4/12/2010 |
JACOBS PROJECT MANAGEMENT CO. | $47,736 | ARRA Repair of Copings and Roofs at Goodfellow Federal Complex. This ARRA project is Design-Build and will replace the stone coping and the roofs on Buildings BI02E, 103E, 104F and 106 of the Goodfellow federal complex. The project is for approximately 12 | Public Buildings Service | 4/09/2010 |
COLLINS & HERMANN, INC. | $47,507 |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration
This spending item is part of a $13,957,903 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
JACOBS PROJECT MANAGEMENT CO. | $43,601 | This project makes seismic upgrades required to meet current codes to and existing building that was recently upgraded with High Performance Green Building components.. ARRA BUILDING #110 RENOVATION AT GOODFELLOW FEDERAL COMPLEX, ST. LOUIS, MO ARRA WO53 1 | Public Buildings Service | 9/30/2010 |
WESTON EID INC | $40,620 |
Provide seismic design for the Track Shed side of Building 110. The design will provide columns to independently support the track shed from the basement floor through the dock/basement roof structure. Provide mechanical design for the Track Shed side of
This spending item is part of a $128,354 allocation.
See details
|
Public Buildings Service | 4/26/2010 |
Imperial Ornamental Metal Co., Inc. | $37,150 |
This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit
This spending item is part of a $5,188,089 allocation.
See details
|
Public Buildings Service | 9/04/2009 |
Niehaus Construction Services, Inc. | $33,720 |
This award includes Construction Manager as Constructor (CMc) Services for the High Performance Green Building at Thomas Eagleton Federal Courthouse. CMc services for this project include attending design review meetings at the kick-off, as well as 50%, 9
This spending item is part of a $3,557,841 allocation.
See details
|
Public Buildings Service | 7/15/2009 |
EDM INCORPORATED | $32,730 |
A/E Services under ARRA Limbaugh Courthouse Mech & Arch. include: Provide HVAC modifications to the existing atrium. This work will be the base bid for the construction contract; Provide Pyramic or similar coating to the entire roof at the Courthouse;
This spending item is part of a $65,512 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
J. F. AHERN CO. | $31,508 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
EDM INCORPORATED | $30,811 |
The Cafeteria design was completed 2008, and ?shelved? due to lack of funding. The RAY building received funds under the American Recovery and Reinvestment Act of 2009, and the cafeteria was part of that scope. Because of the ?shelving?, there were some
This spending item is part of a $136,186 allocation.
See details
|
Public Buildings Service | 6/23/2009 |
A To Z Laminating Specialists, Inc. | $30,549 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
Feit Plumbing Co Inc | $28,900 |
This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit
This spending item is part of a $5,188,089 allocation.
See details
|
Public Buildings Service | 9/04/2009 |
LANDESIGN, L.L.C. | $28,018 |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration
This spending item is part of a $13,957,903 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
ENGINEERED FIRE PROTECTION INC | $27,055 |
This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit
This spending item is part of a $5,188,089 allocation.
See details
|
Public Buildings Service | 9/04/2009 |
DESCO SYSTEMS INC | $26,905 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
FLOORING SYSTEMS, INC. | $26,795 |
The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an
This spending item is part of a $26,645,547 allocation.
See details
|
Public Buildings Service | 3/17/2010 |
JACOBS PROJECT MANAGEMENT CO. | $25,908 | This ARRA project is Design-Build and will provide necessary masonry repairs and tuckpointing on the buildings of 103F, 102E, 103E and 105L of the Goodfellow federal complex.The project is for approximately 4 months of construction management which will i | Public Buildings Service | 4/12/2010 |
CONCRETE CORING COMPANY OF ST. LOUIS, INC. | $25,043 |
This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit
This spending item is part of a $5,188,089 allocation.
See details
|
Public Buildings Service | 9/04/2009 |
KENNEDY ASSOCIATES/ARCHITECTS, INC. | $23,000 |
Provide architectural, and engineering services for Extra Field Investigation (EFI), Design and Post Contract Construction Services (Option 1) related to the evaluation of approximately 20,000 square feet of existing courtroom, office, open space and supp
This spending item is part of a $231,970 allocation.
See details
|
Public Buildings Service | 9/22/2009 |
PRO-ALARM LLC | $20,000 | Procurement and installation of exterior video security cameras for Building 110 on the Federal Center Complex at 4300 Goodfellow, St. Louis, MO. All work has been completed. | Public Buildings Service | 6/14/2010 |
H & G SALES, INC | $18,325 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
EDM INCORPORATED | $15,108 |
A/E Services under ARRA funding for the Robert A. Young Federal Building in St. Louis, MO include: new advance metering, total building re-commissioning/retro-commissioning assistance, window replacement, fa+?ade repair and restoration, cafeteria remodel
This spending item is part of a $1,619,823 allocation.
See details
|
Public Buildings Service | 3/23/2011 |
EDM INCORPORATED | $14,759 |
Federal Center - Sewer System
This spending item is part of a $26,588 allocation.
See details
|
Public Buildings Service | 4/22/2009 |
EDM INCORPORATED | $14,213 |
A/E Services under ARRA for the Federal Center in St. Louis, MO Bldg. 104 VA include: new advanced metering; 1st floor re-commissioning/retro-commissioning, new high efficiency chillers to cool the building; new high efficiency chilled water; condenser w
This spending item is part of a $424,948 allocation.
See details
|
Public Buildings Service | 8/24/2010 |
KENNEDY ASSOCIATES/ARCHITECTS, INC. | $12,000 |
Renovation of GSA's PBS Headquarters for Region I on the 10th and 11th floors at the Thomas P. O'Neill Building.
This spending item is part of a $843,238 allocation.
See details
|
Public Buildings Service | 10/13/2009 |
TEAM FOUR INC | $11,829 |
Federal Center - Sewer System
This spending item is part of a $26,588 allocation.
See details
|
Public Buildings Service | 4/22/2009 |
BAZAN PAINTING CO. | $10,480 |
This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit
This spending item is part of a $5,188,089 allocation.
See details
|
Public Buildings Service | 9/04/2009 |
BAZAN PAINTING CO. | $9,339 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
A B C Masonry, Inc | $7,670 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
GOLTERMAN & SABO, INC. | $7,416 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
BRK ELECTRICAL CONTRACTORS, LLC | $7,200 | The purpose of the contract was to provide 120v power for the new A/V equipment installed for the new Social Security Administration training rooms and multi-purpose room. The A/V equipment was installed on another GSA contract. | Public Buildings Service | 6/28/2010 |
The McClure Corporation | $5,400 |
Provide seismic design for the Track Shed side of Building 110. The design will provide columns to independently support the track shed from the basement floor through the dock/basement roof structure. Provide mechanical design for the Track Shed side of
This spending item is part of a $128,354 allocation.
See details
|
Public Buildings Service | 4/26/2010 |
STANLEY SECURITY SOLUTIONS, INC. | $5,115 | As part of the ARRA funded project for the buildout of High Performance Green Building (HPGB) space for SSA at the Federal Center, Building 110 at 4300 Goodfellow, in St Louis, MO: spplied 208 cores and keys for the door throughout the building. | Public Buildings Service | 7/16/2010 |
ENVIROHEALTH TECHNOLOGIES INC | $4,475 | Provide sampling and analysis to determine total airborne concentration of dust and, if applicable, crystalline silica on the child care center's play deck at the Robert A. Young Federal Building, 1222 Spruce, St. Louis, MO. | Public Buildings Service | 4/05/2011 |
SIMPLEXGRINNELL LP | $4,151 | As part of the ARRA funded project for the buildout of High Performance Green Building(HPGB) space for SSA at the Federal Center, Building 110 at 4300 Goodfellow, in Saint Louis,MO; performed fire allarm system repair services related to construction work | Public Buildings Service | 7/16/2010 |
Sebco Companies, Inc. | $3,765 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
Manhattan Glass Company | $3,177 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
COLLINS & HERMANN, INC. | $2,500 |
The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an
This spending item is part of a $26,645,547 allocation.
See details
|
Public Buildings Service | 3/17/2010 |
Architectural Signing Associates, Inc. | $1,572 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
EDM INCORPORATED | $1,549 |
RAY ARRA project is classified as a Building Modernization, requiring the project to achieve LEED Silver certification. The Robert A. Young (RAY) Federal Building, located in the downtown St. Louis Central Business District, was built in 1933 as a Termina
This spending item is part of a $2,719,222 allocation.
See details
|
Public Buildings Service | 6/13/2012 |
PARADIGM SOLUTIONS CORPORATION | $1,514 | Building 103; Switchgear Modification: Add a second set of internal CT's and wiring to a separate shorting block for GSA use inside of the new main switchboards A and B. Contractor to provide a complete system to the shorting blocks. | Public Buildings Service | 4/08/2011 |
Imperial Ornamental Metal Co., Inc. | $1,375 |
When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration
This spending item is part of a $13,957,903 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
Sunshine Drapery Co., Inc. | $895 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
Weber Fire and Safety Equipment Co. | $426 |
The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is
This spending item is part of a $2,424,731 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
OKE-THOMAS+ASSOCIATES, INC. | $0 |
Renovated Building 110 at Goodfellow Complex, (4300 Goodfellow Blvd St. Louis, MO. ) for the Social Security Administration. The project was completed and the building turned over for use as administrative offices, storage and shell spaces for future ada
This spending item is part of a $12,656,510 allocation.
See details
|
Public Buildings Service | 12/14/2009 |