Missoula County, Mont., funds by Agriculture, Department of
Listing $34,895,702.05 in stimulus funds from Agriculture, Department of for Missoula
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MULTIPLE RECIPIENTS | $10,965,524 | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Rural Housing Service | 9/30/2009 |
MULTIPLE RECIPIENTS | $8,411,966 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 9/30/2009 |
MONTANA CONSERVATION CORP | $1,165,500 | Recovery Act of 2009: Capital Improvement and Maintenance Montana Conservation Corps members will complete needed deferred maintenance on trails located across the Clearwater National forest in North Idaho County. These activities accomplish the mutual benefit objectives of MCC and the agency to prorovide job tra... Show more | Forest Service | 10/29/2009 |
TRIPLE TREE, INC. | $903,333 |
Work includes, but is not limited to, reshaping and compacting road subgrade, reconditioning the roadbed, re-establishing native road surface, installing culverst, placing riprap, and all incidental work necessary to complete the project in accordance wit
This spending item is part of a $984,559 allocation.
See details
|
Forest Service | 3/12/2009 |
A.G.C., INC. | $839,180 | The Forest Service has a requirement for paving at four locations in the Lolo National Forest: Lake Alva Campground paving, Plains Ranger Station paving, Seeley Lake Campground paving, and parking lot grading and paving for the Superior Ranger Station. Pa | Forest Service | 6/14/2010 |
RML INCORPORATED | $552,868 | Road #901 Gravel Resurfacing. | Forest Service | 8/26/2010 |
LATIGO CONSTRUCTION INC. | $471,178 | Roadway excavation, road reconditioning, multi-plate installation w/concrete footings,culverts, signs, roadside brushing | Forest Service | 11/10/2009 |
PYRAMID MOUNTAIN LUMBER, INC. | $450,115 |
Recovery Act of 2009: Wildland Fire Management This project will provide forest restoration and wildfire fuels hazard reduction treatments to forested state (DNRC, Montana Correctional Enterprises, Fish Wildlife and Parks, etc.) and non-industrial private lands (NIPF) primarily within the identified d W... Show more
This spending item is part of a $3,615,430 allocation.
See details
|
Forest Service | 7/29/2009 |
MILLER CREEK REFORESTATION INC | $428,540 |
Recovery Act of 2009: Wildland Fire Management This project will provide forest restoration and wildfire fuels hazard reduction treatments to forested state (DNRC, Montana Correctional Enterprises, Fish Wildlife and Parks, etc.) and non-industrial private lands (NIPF) primarily within the identified d W... Show more
This spending item is part of a $3,615,430 allocation.
See details
|
Forest Service | 7/29/2009 |
DJ&A, P.C. | $423,474 | Shields River Construction Observation. The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction staking, support and inspection services to the Gov't for the Shields River Road reconstruction pr | Forest Service | 6/12/2009 |
SWAN VALLEY ECO SYSTEM MANAGEMENT & LEARNING CENTER | $404,000 |
Recovery Act of 2009: Wildland Fire Management Project consists of four subprograms: Lake County Forest Stewardship ($426,500), Swan Valley Stewardship ($426,500), Lake County Hazardous Fuels ($84,000), & Flathead County Hazardous Fuels ($50,000). All awarded grants will follow DNRC approved spendining... Show more
This spending item is part of a $987,000 allocation.
See details
|
Forest Service | 7/29/2009 |
FIX PAINTING COMPANY | $402,700 | Painting of Administrative Sites on the Lolo National Forest | Forest Service | 6/01/2010 |
CAMAS CREEK ENTERPRISES, INC. | $398,442 |
Recovery Act of 2009: Wildland Fire Management This project will provide forest restoration and wildfire fuels hazard reduction treatments to forested state (DNRC, Montana Correctional Enterprises, Fish Wildlife and Parks, etc.) and non-industrial private lands (NIPF) primarily within the identified d W... Show more
This spending item is part of a $3,615,430 allocation.
See details
|
Forest Service | 7/29/2009 |
TRIPLE TREE, INC. | $379,690 | Re-establishing the native material surface along with furnishing and placing crushed aggregate on road #365 and #19243 | Forest Service | 2/10/2010 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $296,000 | Recovery Act of 2009: Wildland Fire Management The Northwest Montana Forest Pest Management grant funds ($296,000) will provide funding for forest health restoration activities in Flathead, Lincoln, Lake and Sanders Counties. Project funds will be spread between state and non-industrial private foreres... Show more | Forest Service | 7/29/2009 |
MORRISON-MAIERLE, INC. | $269,999 | Construction support services for ARRA projects on the Kootenai National Forest in Montana. Construction support services includes preparation of construction contract packages, performance of construction inspections, review of shop drawings and submitta | Forest Service | 5/03/2010 |
B C CONCRETE INC | $261,189 | vault toilets | Forest Service | 12/17/2009 |
DJ&A, P.C. | $250,000 | This contract provided construction inspection services on the Shoshone & Bonner County Roads on the Idaho Panhandle National Forest. | Forest Service | 2/12/2010 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $240,260 |
Recovery Act of 2009: Wildland Fire Management Project consists of two subprograms: Sanders County Forest Stewardship Grant ($897,300) and the Sanders County Forest Restoration/Fuels Mitigation Grant ($166,700). The Sanders County Forest Stewardship Grant ($897,300) will provide forest restoration n a... Show more
This spending item is part of a $1,064,000 allocation.
See details
|
Forest Service | 7/29/2009 |
RAY'S HEATING, PLUMBING, ELECTRIC INC | $236,690 | Provide energy heat loss and heat gain analysis report. Provide professional mechanical engineering design and drafting, professional installation, balancing, testing, startup and independent commission of Water Source Heat Pumps system for the Powell Ran | Forest Service | 9/21/2010 |
ADVANCED ENVIRONMENTAL TECHNOLOGY, INC. | $226,243 | Provide labor and material to replace forced air furnaces and water heaters in various administrative buildings on the Lolo NF. | Forest Service | 12/24/2009 |
MIKE KESLER ENTERPRISES, INC. | $222,350 | This project consists of reconditioning and furnish/placement of crushed aggregate to a 6? depth on 5.64 Miles of exisitng road. | Forest Service | 4/29/2010 |
DJ&A, P.C. | $210,631 | Quartz-Cottonwood, Idaho Panhandle National Forest - Final design and construction documents for the reconstruction of National Forest System Roads 239, 334, and 416 on the Panhandle National Forest. | Forest Service | 1/27/2010 |
DJ&A, P.C. | $182,882 | Quartz-Cottonwood Road Design. Requisition to DJ&A to include site visit, survey and design of the Quartz-Cottonwood Road system involving portions of Roads 416, 334, and 239. The existing roadway is a narrow single lane loop road with three primary acce | Forest Service | 9/29/2009 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $181,598 |
Recovery Act of 2009: Wildland Fire Management This project will provide forest restoration and wildfire fuels hazard reduction treatments to forested state (DNRC, Montana Correctional Enterprises, Fish Wildlife and Parks, etc.) and non-industrial private lands (NIPF) primarily within the identified d W... Show more
This spending item is part of a $3,615,430 allocation.
See details
|
Forest Service | 7/29/2009 |
MONTANA NORTHWEST CO | $179,569 | Mark, Post and Maintain boundary between private and NFSL. Marking and posting of National Forest Boundaries.Maintenance of previously marked boundary. | Forest Service | 8/13/2010 |
WESTERN RECLAMATION, LLC | $165,474 | Frenchtown Culvert Replacement | Forest Service | 12/15/2009 |
WESTERN RECLAMATION LLC | $165,474 | Culvert Replacement | Forest Service | 12/15/2009 |
BITTER ROOT RESOURCE CONSERVATION & DEVELOPMENT AREA INC | $165,454 | Recovery Act of 2009: Capital Improvement and Maintenance The purpose of the award is to work cooperatively on the public lands managed by the Clearwater National Forest, provide conservation leadership training and work as a liaison with CORs for trails and backcountry recreation and wilderness projojects, and to... Show more | Forest Service | 2/18/2010 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $164,232 |
Recovery Act of 2009: Wildland Fire Management The Wildfire Rehab and Restoration funding will be utilized by the Department of Natural Resources and Conservation to meet the following goals: ? Provide employment for forestry and wildfire restoration professionals through contracts for post-wildfirere ... Show more
This spending item is part of a $538,000 allocation.
See details
|
Forest Service | 7/29/2009 |
DJ&A, P.C. | $162,565 | The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction support, inspection services, and contract preparation to the Gov't for the following projects, to ensure construction of the projects are co | Forest Service | 11/02/2009 |
MORRISON-MAIERLE, INC. | $151,581 | enigneering for culvert replacement, trailhead construction, river survey, campground design, road decommissioning, and trail bridge design within Kootenia NF | Forest Service | 10/23/2009 |
ADVANCED ENVIRONMENTAL TECHNOLOGY, INC. | $149,963 | Forest Wide - Rental Cabin Construction/Maintenance | Forest Service | 5/26/2010 |
LES SCHLEGEL ENTERPRISES, INC. | $148,544 | Culvert replacements on Flathead National Forest | Forest Service | 5/27/2010 |
MONTANA CONSERVATION CORP | $144,000 | Recovery Act of 2009: Capital Improvement and Maintenance Montana Conservation Corps members will complete needed deferred maintenance on trails located on the Bitterroot National Forest. These activities accomplish the mutual benefit objectives of MCC and the agency to provide job training and educucation for yo... Show more | Forest Service | 4/09/2010 |
HALL WOOD PROCESSING INC | $142,650 |
Recovery Act of 2009: Wildland Fire Management This project will provide forest restoration and wildfire fuels hazard reduction treatments to forested state (DNRC, Montana Correctional Enterprises, Fish Wildlife and Parks, etc.) and non-industrial private lands (NIPF) primarily within the identified d W... Show more
This spending item is part of a $3,615,430 allocation.
See details
|
Forest Service | 7/29/2009 |
ROCKY MOUNTAIN ELK FOUNDATION, INC. | $137,974 | Recovery Act of 2009: Wildland Fire Management This award is a cooperative agreement between Rocky Mountain Elk Foundation and the Bitterroot National forest to enhance wildlife habitat, manage the timber resource and improve forest health. | Forest Service | 9/03/2009 |
DJ&A, P.C. | $123,236 | This contract is to provide GPS locations for Mt. Hood National Forest trails. | Forest Service | 5/28/2010 |
MORRISON-MAIERLE, INC. | $122,971 | Developed PS&E packages for six trailheads in the Kootenai National Forest and for nine road-stream crossing sites in the Kootenai National Forest. | Forest Service | 12/04/2009 |
DJ&A, P.C. | $118,229 | Hungry Horse Reservoir Westside Road Pavement Resurfacing. This design project included the survey and design of the Westside Reservoir Road along the Hungry Horse Reservoir. The existing roadway was narrow and substandard in many areas and needed to b | Forest Service | 10/23/2009 |
KELLY LOGGING, INC. | $107,710 |
FUELS REDUCTION-this project tasks us with the removal of timber to thin the forest and reduce the risk of catastrophic fires.
This spending item is part of a $118,256 allocation.
See details
|
Forest Service | 9/08/2010 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $106,510 |
Recovery Act of 2009: Wildland Fire Management There are two subprograms: Flathead Forest Stewardship ($897,500) & Energy Conservation Landscaping ($89,500). The Flathead Forest Stewardship Grant will provide forest restoration & wildfire fuels hazard reduction treatments to forested state (DNRC, Fisish... Show more
This spending item is part of a $987,000 allocation.
See details
|
Forest Service | 7/29/2009 |
RML INCORPORATED | $103,708 | Meadow restoration, West Fork Corral Creek culvert replacement. | Forest Service | 6/24/2010 |
DJ&A, P.C. | $100,551 | The work for this project will consist of furnishing qualified personnel and necessary equipment and materials to provide construction staking, support and inspection services to the Gov't for the 10 culvert installations and 3.4 miles of road surfacing t | Forest Service | 6/11/2009 |
A&E ARCHITECTS, P.C. | $98,316 |
Design Services for Camp Crook District Ranger Station and Residences at Camp Crook, South Dakota.
This spending item is part of a $183,444 allocation.
See details
|
Forest Service | 11/05/2009 |
DJ&A, P.C. | $97,157 | Construction inspector services for decomissioning/bridge inspection - Westside Zone. | Forest Service | 5/11/2010 |
B C CONCRETE INC | $95,932 | vault toilets | Forest Service | 2/08/2010 |
GULF SIDE CONSTRUCTION LLC | $84,866 | Route Marking, Lolo National Forest | Forest Service | 5/20/2010 |
DJ&A, P.C. | $82,403 | Flathead NF AOP Culvert and Bridge Replacement Designs. The intent of this project is to design replacement structures to provide for aquatic organism passage (AOP) and improve hydraulic capacity for seven culverts and design a bridge replacement for a | Forest Service | 8/08/2009 |
OTTMAN FORESTRY CONSULTANTS, INC. | $77,397 |
Recovery Act of 2009: Wildland Fire Management This project will provide forest restoration and wildfire fuels hazard reduction treatments to forested state (DNRC, Montana Correctional Enterprises, Fish Wildlife and Parks, etc.) and non-industrial private lands (NIPF) primarily within the identified d W... Show more
This spending item is part of a $3,615,430 allocation.
See details
|
Forest Service | 7/29/2009 |
Montana Forestland Svc Pllc | $77,293 |
Recovery Act of 2009: Wildland Fire Management This project will provide forest restoration and wildfire fuels hazard reduction treatments to forested state (DNRC, Montana Correctional Enterprises, Fish Wildlife and Parks, etc.) and non-industrial private lands (NIPF) primarily within the identified d W... Show more
This spending item is part of a $3,615,430 allocation.
See details
|
Forest Service | 7/29/2009 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $75,000 |
Recovery Act of 2009: Wildland Fire Management Project consists of two subprograms: Lincoln County Fuels Mitigation ($520,000) and Lincoln County Urban Forest Enhancement ($288,000). The Lincoln County Fuels Mitigation funding ($520,000) will provide wildfire fuels hazard reduction treatments on nonon... Show more
This spending item is part of a $808,000 allocation.
See details
|
Forest Service | 7/29/2009 |
BC CONCRETE, INC. | $74,923 | Supply and install 4 vault toilets and one pumphouse for the Bitterroot national forest. | Forest Service | 4/26/2010 |
GREAT WEST ENGINEERING, INC. | $74,200 | S&D services for surfacing of the Superior RD employee parking area, resurfacing of the Seeley and Lake Alva CG's, and the resurfacing and repair of the Plains RD roads and parking areas. | Forest Service | 2/23/2010 |
MONTANA CONSERVATION CORP | $74,000 | Recovery Act of 2009: Capital Improvement and Maintenance Montana Conservation Corps members will complete needed deferred maintenance on trails located on the Missoula RD on the LoLo National Forest.. These activities accomplish the mutual benefit objectives of MCC and the agency to provide job traraining and ed... Show more | Forest Service | 2/18/2010 |
DJ&A, P.C. | $72,837 | This contract is for construction survey and staking on the Flathead National Forest - West Side Hungry Horse Road Reconstruction Project. | Forest Service | 6/15/2010 |
LWF EXCAVATING | $72,706 | Trail brushing and cleaning. Support activities for forestry. | Forest Service | 3/31/2010 |
MORRISON-MAIERLE, INC. | $70,591 | Designed 3 roadway bridges and surrounding areas | Forest Service | 10/20/2009 |
BLACKFOOT SLATE & STONE, INC. | $68,992 | OHV Trail Rehab on Missoula Road on Lolo Nationa Forest | Forest Service | 6/15/2010 |
DJ&A, P.C. | $66,385 | Work to include site visit, construction line staking, field generated construction log for road decommissioning, preliminary design, final design, supplemental specifications, drawings, and construction estimates for decommissioning approximately 45.8 mi | Forest Service | 10/15/2009 |
PETERSEN TRUCKING, INCORPORATED | $54,631 |
Recovery Act of 2009: Capital Improvement and Maintenance The Bitterroot National Forest desires to expand the boat ramp facility at Lake Como High Impact Recreation Area (HIRA) located approximately 5 miles north of Darby, Montana. The existing boat ramp is unable to handle the boat use occurring a at the site. ... Show more
This spending item is part of a $165,328 allocation.
See details
|
Forest Service | 5/13/2010 |
ROSCOE STEEL AND CULVERT CO. | $53,385 |
Supply of Ramona Bridge aka 25 Mile Creek Bridge to Wenatchee National Forest Chelan Ranger District, Chelan, WA to include (1) 21' x 55' HL93 Modular Bridge, (2) 18x30x25'-0 sills with backwalls, load rating signage, and freight to job site.
This spending item is part of a $67,384 allocation.
See details
|
Forest Service | 4/09/2010 |
DJ&A, P.C. | $51,833 | This contract furnished qualified personnel and necessary equipment and materials to provide construction support and inspection services for the Gov't for projects as specified by the Forest. | Forest Service | 7/12/2010 |
CAMAS CREEK ENTERPRISES, INC. | $51,055 |
Recovery Act of 2009: Wildland Fire Management There are two subprograms: Flathead Forest Stewardship ($897,500) & Energy Conservation Landscaping ($89,500). The Flathead Forest Stewardship Grant will provide forest restoration & wildfire fuels hazard reduction treatments to forested state (DNRC, Fisish... Show more
This spending item is part of a $987,000 allocation.
See details
|
Forest Service | 7/29/2009 |
DJ&A, P.C. | $50,000 | Recovery funded construction inspection services on the Nez Perce National Forest. | Forest Service | 5/23/2010 |
MORRISON-MAIERLE, INC. | $49,987 | This project is for final design of a bridge over the Blackfoot River at the Nevada-Ogden Road. | Forest Service | 8/06/2009 |
UNIVERSITY OF MONTANA SYSTEM | $49,718 | Recovery Act of 2009: Wildland Fire Management The objective of this project is to conduct a time and motion study on mobile fast pyrolysis units to evaluate their productivity and financial feasibility for in-woods conversion of biomass into bio-oil and boichar. The productivity, financial, and ecocon... Show more | Forest Service | 9/23/2009 |
DJ&A, P.C. | $49,518 | This contract provided reconstruction staking on Big Creek Road on the Idaho Panhandle National Forest. | Forest Service | 7/15/2010 |
DJ&A, P.C. | $48,311 | Hiawatha Trail Engineering. This task order is for the inspection and preliminary engineering services for future repairs to Dominon Creek Trestle, Dominion Creek Tunnel #19, and other miscellaneous features of the Old Milwaukee Railroad Grade. | Forest Service | 10/19/2009 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $48,000 |
Recovery Act of 2009: Wildland Fire Management Project consists of four subprograms: Lake County Forest Stewardship ($426,500), Swan Valley Stewardship ($426,500), Lake County Hazardous Fuels ($84,000), & Flathead County Hazardous Fuels ($50,000). All awarded grants will follow DNRC approved spendining... Show more
This spending item is part of a $987,000 allocation.
See details
|
Forest Service | 7/29/2009 |
DJ&A, P.C. | $46,436 | This scope of work is for complete engineering design for future repairs to Dominion Creek Trestle, Dominion Creek Tunnel #19 and portions of the Old Milwaukee Railroad grade in Mineral County, Montana. Services included contract-ready construction draw | Forest Service | 1/12/2010 |
MORRISON-MAIERLE, INC. | $44,402 | McGillivray Complex Design | Forest Service | 2/23/2010 |
MORRISON-MAIERLE, INC. | $44,000 | Contract Preparation Services for the Bitterroot National Forest in Montana and Idaho. | Forest Service | 9/04/2009 |
DJ&A, P.C. | $43,034 |
This is the final report.
This spending item is part of a $47,576 allocation.
See details
|
Forest Service | 10/21/2009 |
A&E ARCHITECTS, P.C. | $41,210 |
To prepare design and construction documents for the Lolo Pass Visitor Center Rehabilitation.
This spending item is part of a $59,550 allocation.
See details
|
Forest Service | 3/04/2010 |
OLSON, JAY | $39,183 | Temporary position for civil engineering tech to do design work on the Superior Ranger Dist of the Lolo Natl Forest. | Forest Service | 2/01/2010 |
OLSON, JAY | $39,183 | Civil Engineering Tech to do inspection work on the Superior Ranger District of the Lolo Natl Forest. | Forest Service | 8/31/2010 |
MORRISON-MAIERLE, INC. | $38,688 | Construction support services for the Bitterroot National Forest in Montana and Idaho. Construction support services includes assembly of construction contract packages, construction inspections and reporting to the CO and COR assigned to various construc | Forest Service | 4/01/2010 |
UP FRONT CONSTRUCTION LLC | $37,283 | Powell Ranger Station Window and door replacement | Forest Service | 8/11/2010 |
DJ&A, P.C. | $37,163 | Hyalite Guardrail Construction. The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction stkaing, support and inspection services to the Gov't for the Hyalite Road #62 Guardrail Placement proj | Forest Service | 6/12/2009 |
MORRISON-MAIERLE, INC. | $36,437 | engineer removal of failing septic collection and treatment system and replacement with new sewer collection piping and pressure dosed drainfield | Forest Service | 11/03/2009 |
JAMES M EVANS BASIC CARPENTRY LLC | $35,866 | removal of old roofing material and installation of new roofing material on 5 historic buildings in Kootenia National forest | Forest Service | 4/14/2010 |
COUNTY OF MISSOULA | $35,000 | Recovery Act of 2009: Capital Improvement and Maintenance The USFS has agreed to reimburse Missoula County for the USFS' share of actuall expenses incurred to reconstruct and resurface Forest Hills Drive to Missoula County standards. The USFS share of this project shall not exceed $35,000 and shall m make payment ... Show more | Forest Service | 12/23/2009 |
MONTANA FOOD BANK NETWORK INC | $35,000 |
Emergency Food Assistance Program (Administrative Costs) ARRA - TEFAP Admin - To help supplement the diets of low income persons by making funds available to States for storage, processing and distribution costs incurred by State agencies and local organizations in providing food assistance to needy y persons.... Show more
This spending item is part of a $234,447 allocation.
See details
|
Food and Nutrition Service | 3/09/2009 |
DJ&A, P.C. | $32,637 | Using the 90% completed plans from 2005, update all drawings to current standards, complete a bridge design at Big Creek, complete a hydraulic survey and mapping, hydraulic analysis of the sites, and AOP design for two stream crossings at an unnamed creek | Forest Service | 12/23/2009 |
A&E ARCHITECTS, P.C. | $32,620 |
Clearwater Energy Study-Task 1 Energy survey for Powell, Canyon & Kelly sites; Task 2 Generator study & alternative for Canyon & Kelly site, Task 3 Develop alternative energy solutions for Powell, Canyon, & Kelly sites, Mini-hydro and PV @ Powell, PV @ Ke
This spending item is part of a $304,457 allocation.
See details
|
Forest Service | 5/10/2010 |
MORRISON-MAIERLE, INC. | $31,375 | final design of Nevada Ogden Bridge | Forest Service | 12/21/2009 |
WOODSIDE, RAYMOND R | $30,000 | I was hired to pack food,tools and other equiptment on mules into the Scapegoat Wilderness in Montana for trail crews working for the United States Forest Service. | Forest Service | 4/13/2010 |
MONTANA FOOD BANK NETWORK INC | $30,000 |
Emergency Food Assistance Program (Administrative Costs) ARRA - TEFAP Admin - To help supplement the diets of low income persons by making funds available to States for storage, processing and distribution costs incurred by State agencies and local organizations in providing food assistance to needy y persons.... Show more
This spending item is part of a $234,447 allocation.
See details
|
Food and Nutrition Service | 3/09/2009 |
MORRISON-MAIERLE, INC. | $29,900 | design and engineer bridge over Logan Creek | Forest Service | 10/23/2009 |
HOLMAN CONSULTING ENGINEERS, P.C. | $29,770 | laboratory testing of gravel | Forest Service | 6/24/2010 |
HOLMAN CONSULTING ENGINEERS, P.C. | $29,770 | Quality Control and Inspection | Forest Service | 6/24/2010 |
DJ&A, P.C. | $27,871 | Red Pines Decommissioning. Site visit, Construction line staking, field generated construction log for road decommissioning, preliminary design, final design, supplemental specifications, drawings and construction estimates for decommissioning approxima | Forest Service | 10/22/2009 |
OLSON, JAY | $25,920 | Work on the Superior Ranger Dist. of the US Natl Forest Svc. Additional modification of $539.21 added on 10/26/10. | Forest Service | 4/01/2010 |
MORRISON-MAIERLE, INC. | $25,000 | Construction support services for the Nevada-Ogden Bridge project located in the Helena National Forest in Montana. Construction support services includes submittal review, shop drawing review, site visit to the supplier during the concrete pre-casting an | Forest Service | 5/29/2010 |
MORRISON-MAIERLE, INC. | $24,984 | Engineering design services for creation of the PS&E pacakge for a water line extension to the Osprey Campground in the Idaho Panhandle National Forest in Idaho. | Forest Service | 9/15/2009 |
DJ&A, P.C. | $24,351 | The scope of work is for intermittent construction support for a contract to perform repairs to Dominion Creek Trestle, Dominion Creek Tunnel #19 and portions of the Old Milwaukee Railroad grade in Mineral County, Montana. | Forest Service | 5/29/2010 |
DJ&A, P.C. | $24,146 | Requisition to DJ&A to include site visit, survey, parking capacity study, preliminary design, design alternatives, final design, supplemental specifications, drawings and construction cost estimates, (PS&E). Work to be accomplished includes increasing p | Forest Service | 9/29/2009 |
MONTANA CONSERVATION CORP | $24,000 | Recovery Act of 2009: Capital Improvement and Maintenance Montana Conservation Corps members will complete needed deferred maintenance on trails located on the 9-Mile Ranger District of the LoLo National Forest. These activities accomplish the mutual benefit objectives of MCC and the agency to provivide job train... Show more | Forest Service | 2/22/2010 |
DJ&A, P.C. | $23,000 | Road 950 Repairs. Complete a survey and design package, including cost estimate and specifications, for the stream crossing reconstruction on Road #950, South Fork Falls Creek. Consider various designs to allow for fish passage; such as a bridge with g | Forest Service | 10/29/2009 |
WOODSIDE, RAYMOND R | $22,650 | Trail clearing in the Scapegoat Wilderness | Forest Service | 5/06/2010 |
E.C. THINNING LLC | $22,644 | THINNING | Forest Service | 12/02/2009 |
WOODSIDE, RAYMOND R | $22,560 | This job included clearing trails of logs, sticks and rocks for the United States Forest Service in the Scapegoat Wilderness of Montana. The amount I billed and the amount of the original bid amount are not the same because some of the mileages on the bi | Forest Service | 5/06/2010 |
MORRISON-MAIERLE, INC. | $22,174 | DRILLING AT MCGILLIVRAY CAMPGROUND | Forest Service | 12/21/2009 |
MORRISON-MAIERLE, INC. | $21,254 | Preparation of PS&E packages for two bridge sites that include both a concrete and steel bridge option for each site. The two sites are in the Kootenai National Forest in Montana. | Forest Service | 1/27/2010 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $21,000 |
Recovery Act of 2009: Wildland Fire Management The Flathead County Fuels grant funding ($506,000) will provide wildfire fuels hazard reduction treatments to non-industrial private lands (NIPF) within Flathead County. Target areas include the interface around communities of Marion, Whitefish, Kalispepel... Show more
This spending item is part of a $506,000 allocation.
See details
|
Forest Service | 7/29/2009 |
KLB EXHIBITS | $20,500 | RECOVERY INTERPRETIVE SIGN REPLACEMENTS, LOLO NF | Forest Service | 4/15/2010 |
B C CONCRETE INC | $20,225 | Build and deliver a precast concrete utility building for the USFS Musselshell work center. | Forest Service | 7/06/2010 |
DJ&A, P.C. | $20,000 | The work consists of furnishing qualified personnel and necessary equipment and materials to provide construction support, inspection services for the Gov't for projects as specificied by the Forest. | Forest Service | 12/04/2009 |
DJ&A, P.C. | $19,928 | This contract will provide construction management/program manager services for the Malheur National Forest. | Forest Service | 8/03/2010 |
DJ&A, P.C. | $18,253 | Fedar Creek Bridge Replacement | Forest Service | 8/06/2009 |
KLB EXHIBITS | $18,108 | Interpretive Sign Fabrication | Forest Service | 8/10/2010 |
HARRINGTON CONSTRUCTION INC | $17,825 | Ninemile OHV Rehabilitation-Placement of large barrier boulders in 8 different locations in the Ninemile Ranger District. Also the retrieval and removal of an abandoned vehicle on a Forest Service road and the removal of a stock loading ramp in the Ninemi | Forest Service | 6/15/2010 |
DJ&A, P.C. | $17,690 | Road 152 Repairs. Complete a survey and design package, including cost estimate and specifications, for the reconstruction of a site failure located on Road #152. The road has washed out and needs to be redesigned considering the site?s drainage issues | Forest Service | 10/29/2009 |
BROSIOUS CARPET & FLOORS, INC. | $16,950 | new Carpeting for Powell Ranger District | Forest Service | 3/16/2010 |
E.C. THINNING LLC | $16,750 | Thinning & Pruning | Forest Service | 8/10/2010 |
A&E ARCHITECTS, P.C. | $16,689 |
To prepare design and construction documents for the Historic Woods Cabin.
This spending item is part of a $24,609 allocation.
See details
|
Forest Service | 2/11/2010 |
BEAUDETTE TOM R & DEBBIE A | $16,495 |
Design Services for Camp Crook District Ranger Station and Residences at Camp Crook, South Dakota.
This spending item is part of a $183,444 allocation.
See details
|
Forest Service | 11/05/2009 |
A&E ARCHITECTS, P.C. | $16,196 |
To provide inspection and construction administration services on a Time & Material basis for the Lolo Pass Visitor's Center.
This spending item is part of a $23,028 allocation.
See details
|
Forest Service | 8/20/2010 |
MORRISON-MAIERLE, INC. | $16,134 | design removal and replacement of 2 culverts on Dominion Creef within the Lolo NF | Forest Service | 10/22/2009 |
OLSON, JAY | $15,235 | Civil Engineering Tech. to assist in preparation of trail construction contracts and do design work on the Plains Thompson Falls Ranger District of the Lolo Natl Forest. | Forest Service | 9/04/2009 |
MORRISON-MAIERLE INC | $14,815 | USFS ARRA Road Site Visits | Forest Service | 8/08/2009 |
MONTANA CONSERVATION CORP | $14,000 | Recovery Act of 2009: Capital Improvement and Maintenance Montana Conservation Corps members will complete needed deferred maintenance on the Little Granite Creek trail in the Hell's Canyon National Recreation Area. These activities accomplish the mutual benefit objectives of MCC and the agency to p provide job t... Show more | Forest Service | 4/14/2010 |
B C CONCRETE INC | $12,700 | Concrete utility building. | Forest Service | 1/29/2010 |
HAUSANRUFE | $12,194 | FENCE CONSTUCTION | Forest Service | 3/17/2010 |
DJ&A, P.C. | $12,115 | Jordan Creek Bridge historical scanning work on the Idaho Panhandle National Forest. | Forest Service | 6/05/2010 |
A&E ARCHITECTS, P.C. | $11,788 | Site Visit and Conceptual Design | Forest Service | 9/01/2009 |
Pacific Hide & Fur Depot | $11,579 |
Supply of Ramona Bridge aka 25 Mile Creek Bridge to Wenatchee National Forest Chelan Ranger District, Chelan, WA to include (1) 21' x 55' HL93 Modular Bridge, (2) 18x30x25'-0 sills with backwalls, load rating signage, and freight to job site.
This spending item is part of a $67,384 allocation.
See details
|
Forest Service | 4/09/2010 |
VISION, INC. | $11,359 | 210 ea 40x22 varied maps and 80 ea 40x26 varied interpretive posters. Digitally printed on vinyl with EcoSol UV resistant ink and laminated. The information presented on these maps & interpretive posters included. Maps - (70x) North Selway-Bitterroot Wild | Forest Service | 9/09/2010 |
MOUNTAIN VIEW SALES & CONTRACTING LLC | $9,895 | roadside brushing | Forest Service | 9/03/2009 |
B & N WEED CONTROL INCORPORATED | $9,428 | For spraying weeds along roadsides on the Lolo National Forest. | Forest Service | 3/25/2010 |
DJ&A, P.C. | $8,827 | Replacement of the existing dock systems at Smith, Brush and Sinclair Lakes with new commercially supplied low maintenance dock systems. Project is located on the Bonners Ferry Ranger District of the Idaho Panhandle National Forests. Consultant will dev | Forest Service | 9/02/2009 |
B C CONCRETE INC | $8,432 | Supply parts for latrines in Bitterroot National Forest. | Forest Service | 6/11/2010 |
FISH, WILDLIFE AND PARKS, MONTANA DEPARTMENT OF | $8,113 | Provide genetic analyses of trout in Kootenai National Forest in Montana | Forest Service | 8/19/2009 |
CONDON SIGN SHOP INC | $8,021 | ARRA Signs | Forest Service | 10/08/2009 |
OLSON, JAY | $7,957 | Windows & doors maintenance work. | Forest Service | 2/17/2010 |
MORRISON-MAIERLE, INC. | $6,863 | Engineering design services for the design of a kiosk structure to be used at trailheads in the Kootenai National Forest in Montana | Forest Service | 3/25/2010 |
BEAUDETTE TOM R & DEBBIE A | $6,832 |
To provide inspection and construction administration services on a Time & Material basis for the Lolo Pass Visitor's Center.
This spending item is part of a $23,028 allocation.
See details
|
Forest Service | 8/20/2010 |
BC CONCRETE, INC. | $6,653 | Build and deliver a vault and floor slab for a vault toilet. | Forest Service | 8/02/2010 |
BC CONCRETE, INC. | $6,640 | Build vault and floor slab for a vault toilet. | Forest Service | 8/03/2010 |
MORRISON-MAIERLE INC | $6,469 | Site Visits for Kootenai National Forest Recreation Sites | Forest Service | 8/20/2009 |
CLAGETT, ADAM CONSTRUCTION | $6,398 | Spray, foam insulation in the Powell Ranger Station's Attic & Crawlspace. | Forest Service | 7/28/2010 |
OLSON, JAY | $6,000 | Temporary Services-Civil Engineering Techs | Forest Service | 8/12/2009 |
DJ&A, P.C. | $5,574 | Roman Nose Trail Bridge. A site visit was completed to discuss design alternatives, take field measurements and verify dimensions fo final design. During the site visit elevation control (TBM) was established and positioning for the new bridge structu | Forest Service | 9/02/2009 |
OTTMAN FORESTRY CONSULTANTS, INC. | $5,000 |
Recovery Act of 2009: Wildland Fire Management There are two subprograms: Flathead Forest Stewardship ($897,500) & Energy Conservation Landscaping ($89,500). The Flathead Forest Stewardship Grant will provide forest restoration & wildfire fuels hazard reduction treatments to forested state (DNRC, Fisish... Show more
This spending item is part of a $987,000 allocation.
See details
|
Forest Service | 7/29/2009 |
WATSON, KENT & ASSOCIATES | $4,856 |
Design Services for Camp Crook District Ranger Station and Residences at Camp Crook, South Dakota.
This spending item is part of a $183,444 allocation.
See details
|
Forest Service | 11/05/2009 |
MULTIPLE RECIPIENTS | $4,669 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 4/30/2010 |
OLSON, JAY | $4,500 | Hire an experienced trail designer. | Forest Service | 10/28/2009 |
OLSON, JAY | $4,500 | Hire an experienced trail designer to help with trail design for ARRA stimulus projects. | Forest Service | 10/28/2009 |
DJ&A, P.C. | $4,369 | This contract is to provide construction staking for the Taft Trailhead parking lot expansion on the Idaho Panhandle Nationa Forest. | Forest Service | 6/21/2010 |
BEAUDETTE TOM R & DEBBIE A | $4,322 |
To prepare design and construction documents for the Historic Woods Cabin.
This spending item is part of a $24,609 allocation.
See details
|
Forest Service | 2/11/2010 |
DJ&A, P.C. | $4,007 | Kalispell Boat Launch Facility | Forest Service | 8/05/2009 |
DJ&A, P.C. | $3,998 | This Task Order is to provide a topographic site survey for a stock pile located on the Lolo National Forest Superior Ranger District. | Forest Service | 8/03/2010 |
MORRISON-MAIERLE, INC. | $3,598 | design temorary shoring for Lolo Pass Visitor Center | Forest Service | 12/21/2009 |
OLSON, JAY | $3,545 | Temp worker for trail sign field inventory and replacement sign requisition. | Forest Service | 10/28/2009 |
BEAUDETTE TOM R & DEBBIE A | $3,321 |
To provide inspection and construction administration services on a Time and Material basis for the Camp Crook project in SD.
This spending item is part of a $125,000 allocation.
See details
|
Forest Service | 3/22/2010 |
MULTIPLE RECIPIENTS | $3,209 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 5/31/2010 |
HOLMAN CONSULTING ENGINEERS, P.C. | $3,200 | Gravel crushing support services | Forest Service | 7/12/2010 |
OLSON, JAY | $3,062 | Carpentry maintenance project . | Forest Service | 3/08/2010 |
GREAT WEST ENGINEERING, INC. | $2,900 | This task order is for site visits to Seeley Lake Campground, Lake Alva Campground, the Plains Ranger Station and the Superior Ranger Station in order to develop costs to survey and design the surfacing of these sites. | Forest Service | 2/05/2010 |
OLSON, JAY | $2,777 | Weitas Window project. | Forest Service | 7/14/2010 |
MONLUX, STEPHEN | $2,470 | Engineering Services | Forest Service | 1/29/2010 |
BEAUDETTE TOM R & DEBBIE A | $2,420 |
Supply of Ramona Bridge aka 25 Mile Creek Bridge to Wenatchee National Forest Chelan Ranger District, Chelan, WA to include (1) 21' x 55' HL93 Modular Bridge, (2) 18x30x25'-0 sills with backwalls, load rating signage, and freight to job site.
This spending item is part of a $67,384 allocation.
See details
|
Forest Service | 4/09/2010 |
HARRINGTON CONSTRUCTION INC | $2,175 | Additional work for the Houle Creek/Kreis Pond Rock Placement under OHV Trail Rehabilitation, Lolo National Forest | Forest Service | 8/30/2010 |
DJ&A, P.C. | $1,948 | This was originally contracted in 2004. DJ&A was currently contracted using ARRA funding to expand the scope of work to include design, detailing, supplemental specifications and costing for replacement of nail laminated bridge deck with a glued laminat | Forest Service | 2/05/2010 |
MULTIPLE RECIPIENTS | $1,611 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 10/31/2010 |
ARLIE & MILDRED FOOR 1977 TRUST | $1,602 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 10/23/2010 |
HOLMAN CONSULTING ENGINEERS, P.C. | $1,250 | laboratory tests of gravel | Forest Service | 2/12/2010 |
DJ&A, P.C. | $1,101 |
LIDAR mapping of the West Side Hungry Horse Road for design purposes.
This spending item is part of a $13,711 allocation.
See details
|
Forest Service | 8/08/2009 |
MULTIPLE RECIPIENTS | $911 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 10/31/2010 |
JOANNE E MANCHESTER TRUST | $61 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 5/12/2010 |
MULTIPLE RECIPIENTS | $0 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 9/30/2010 |