Ravalli County, Mont., funds by Agriculture, Department of
Listing $20,310,183.06 in stimulus funds from Agriculture, Department of for Ravalli
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MULTIPLE RECIPIENTS | $6,437,408 | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Rural Housing Service | 7/31/2009 |
MULTIPLE RECIPIENTS | $2,108,454 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 2/28/2010 |
GERANIOS ENTERPRISES, INC | $1,968,570 | Forest Wide Facilities Maintenance for the Bitterroot National Forest: Stevensville Ranger Station, Darby Ranger Station , Sula Ranger Station and West Fork Ranger Station. Stevensville Ranger Station: Residence with Garage and Garage/Shop Building-Wind | Forest Service | 4/01/2010 |
R & R CONNER, INC | $1,123,436 | FUEL REDUCTION ACTIVITIES ON BITTERROOT NATIONAL FOREST. * HELICOPTER YARDING * LEAVE TREE PROTECTION * LIGHT SLASHING | Forest Service | 7/10/2009 |
WESTERN RECLAMATION, LLC | $632,900 | Reconstruct Existing Gravel Road | Forest Service | 3/15/2010 |
WESTERN RECLAMATION LLC | $607,501 | Road Reconstruction | Forest Service | 3/15/2010 |
WESTERN RECLAMATION LLC | $607,200 | Road Upgrades | Forest Service | 3/24/2010 |
PRICE CONTRACTING, INC. | $462,827 | Restore the South Zone Bridge, replace the Cliff Creek Bridge No. 326-3.2, and do repairs to the treated timber bridges on Frazier Creek Bridge No. 326-2.1, Manhattan Creek No. 326-7.0, Ward Creek No. 326-9.0, Adair Creek Bridge No. 1268-4.8, Little NF Cl | Forest Service | 3/12/2010 |
PRICE CONTRACTING, INC. | $456,272 | Route of the Hiawatha Facilities Improvements: Taft Trailhead: The work consists of expansion of the parking lot at the east portal of the Taft Tunnel including excavation, grading, placing treated timber wheelstops and commercial-source aggregate surfa | Forest Service | 5/28/2010 |
TRIPLE TREE, INC. | $433,673 | Re-establish cushion material to specified depth on native surface roads, using mobile rock milling equiptment to manufacture cushion from in-place boulders and bed rock in the road surface. The work also includes replacement of ditch refief culverts and | Forest Service | 9/30/2009 |
TRIPLE TREE, INC. | $433,673 | Re-establish cushion material to specified depth on native surface roads, using mobile rock milling equiptment to manufacture cushion from in-place boulders and bed rock in the road surface. The work also includes replacement of ditch refief culverts and | Forest Service | 9/30/2009 |
PRICE CONTRACTING, INC. | $337,145 | The intent of the contract is to remove an existing corregated steel pipe at Larson Creek on Road No. 247 in the Clearwater National Forest and replace with a concrete bridge. This includes removing and disposing of an existing culvert, structural excava | Forest Service | 6/09/2010 |
PRICE CONTRACTING, INC. | $330,450 | This project consists of 2 sub-projects - Goat Creek North and Goat Creek South. Goat Creek North: This project consists of removing an exisitng 82 x 60 x 57' corrugated metal pipe arch, then constructing a new bottomless 22' span, 6'11 rise x 72' long | Forest Service | 6/25/2010 |
CALLISON TRUCKING AND EXCAVATION | $230,971 |
Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $391,546 allocation.
See details
|
Forest Service | 5/19/2010 |
Callison Trucking and Excavation | $230,971 |
Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $393,246 allocation.
See details
|
Forest Service | 5/19/2010 |
PRICE CONTRACTING, INC. | $208,930 | Replacing a old deficient treated-timber bridge with a 2-lane, 54' concrete bridge. | Forest Service | 5/18/2010 |
T & T CONTRACTING INC | $207,560 |
The intent of this project is to reconstruct portions of Big Creek Roads 264 and 2354, resurface the road with crushed aggregate surfacing, and replace existing drainage structures with new structures that allow for Aquatic Organism Passage (AOP). This p
This spending item is part of a $951,697 allocation.
See details
|
Forest Service | 7/08/2010 |
TRIPLE TREE, INC. | $186,525 |
Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6 layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of 2
This spending item is part of a $335,864 allocation.
See details
|
Forest Service | 7/06/2010 |
TRIPLE TREE, INC. | $186,525 |
Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6' layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of
This spending item is part of a $335,864 allocation.
See details
|
Forest Service | 7/06/2010 |
PRICE CONTRACTING, INC. | $184,570 | Work includes, but is not limited, to removing an existing deficient bridge structure, and replacing it with a weathering-steel and timber bridge. Project also includes removal and disposal of existing bridge structure, delivery and erection of new bridg | Forest Service | 5/18/2010 |
PRICE CONTRACTING, INC. | $162,770 | This project consists of removing an existing 60 x 54' culvert, then constructing a new bottomless 18' span, 5'9 rise x 75' long, steel structural plate arch. Work includes culvert removal, construction of a new bottomless 18' span, 5'9 rise x 75' long, | Forest Service | 6/25/2010 |
R & R CONNER, INC | $154,057 | GRAVEL CRUSH AND STOCKPILE IN | Forest Service | 6/17/2010 |
RBC SAND AND GRAVEL, INC. | $145,810 | Gravel Crushing & Stock piling of material | Forest Service | 12/22/2009 |
PRICE CONTRACTING, INC. | $143,420 | This project consists of removing an existing 80 x 61' and a 72 x 65' culvert, then constructing a new bottomless 20' span, 8'3 rise x 66' long, steel structural plate arch. Work includes culvert removal, construction of a new bottomless 20' x 8'3 x 66' | Forest Service | 6/25/2010 |
TRIPLE TREE, INC. | $139,500 |
The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation.
See details
|
Forest Service | 5/04/2010 |
TRIPLE TREE, INC. | $139,500 |
The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation.
See details
|
Forest Service | 5/04/2010 |
TRIPLE TREE, INC. | $126,315 |
Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $393,246 allocation.
See details
|
Forest Service | 5/19/2010 |
TRIPLE TREE, INC. | $126,315 |
Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $391,546 allocation.
See details
|
Forest Service | 5/19/2010 |
Callison Trucking and Excavation | $115,311 |
Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6' layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of
This spending item is part of a $335,864 allocation.
See details
|
Forest Service | 7/06/2010 |
Callison Trucking and Excavation | $115,311 |
Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6 layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of 2
This spending item is part of a $335,864 allocation.
See details
|
Forest Service | 7/06/2010 |
Callison Trucking and Excavation | $100,000 |
The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation.
See details
|
Forest Service | 5/04/2010 |
ALLAN PROBST | $94,777 | TAS :: 12 1102::TAS RECOVERY Swift Creek Bridge per solicitation AG-82B1-S-10-02633 | Forest Service | 5/18/2010 |
B & N WEED CONTROL INCORPORATED | $94,244 | this money was used to spray herbicides on roadsides and forest openings on the Bitterroot National Forest in Montana. | Forest Service | 11/05/2009 |
TRINITY VENTURES LLC | $82,837 |
The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation.
See details
|
Forest Service | 5/04/2010 |
TRINITY VENTURES LLC | $81,226 |
Work includes, but is not limited to, reshaping and compacting road subgrade, reconditioning the roadbed, re-establishing native road surface, installing culverst, placing riprap, and all incidental work necessary to complete the project in accordance wit
This spending item is part of a $984,559 allocation.
See details
|
Forest Service | 3/12/2009 |
CALLISON TRUCKING AND EXCAVATION | $78,000 |
The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation.
See details
|
Forest Service | 5/04/2010 |
T & T CONTRACTING INC | $72,500 | Crushing and Stockpiling | Forest Service | 12/22/2009 |
TRIPLE TREE, INC. | $66,643 |
The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation.
See details
|
Forest Service | 5/04/2010 |
HUMAN INTERACTIVE PRODUCTS, INC. | $65,626 | Seed and Vegetation Collection / Hand collection of seed of various native plant species on forest lands to create a seed bank (stored seed) for use in future re-vegetation projects on the National Forest. | Forest Service | 8/02/2010 |
TRINITY VENTURES LLC | $60,837 |
The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation.
See details
|
Forest Service | 5/04/2010 |
TRIPLE TREE, INC. | $60,500 |
The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation.
See details
|
Forest Service | 5/04/2010 |
HUMAN INTERACTIVE PRODUCTS, INC. | $53,488 |
Removal of invasive non-native species along State Highway Evacuation Route
This spending item is part of a $410,072 allocation.
See details
|
Forest Service | 7/20/2010 |
R & R CONNER, INC | $48,794 | CRUSHING AND STOCKPILING AGGREGATE | Forest Service | 12/22/2009 |
BEAR CREEK OUTFITTERS LLC | $44,400 | Recovery deferred trail maintance | Forest Service | 9/16/2010 |
SUNELCO, INC | $41,374 | Rural Business Enterprise Grants - ARRA Funds will be used to provide technical assistance to create a strategic marketing plan and for certifying two projected new hires and two exising employees through the North American Board of Certified Energy Practitioners (NABCEP). | Rural Business Cooperative Service | 8/26/2009 |
RICK WEMPLE OUTFITTING, INC. | $40,355 | Trail Maintenance - 2 year contract, remaining balance paid upon completion of 2011 work yet to be done. Continued in 2011 after trails open up for remaining balance of contract. Estimated start, June 20, 2011. | Forest Service | 5/24/2010 |
TRINITY VENTURES LLC | $35,960 |
Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $393,246 allocation.
See details
|
Forest Service | 5/19/2010 |
BOULANDGER, SCOTT D | $35,111 | NORTHWEST MONTANA COUNTIES TRAIL MAINTENANCE AND RECONSTRUCTION | Forest Service | 5/24/2010 |
TRINITY VENTURES LLC | $34,260 |
Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $391,546 allocation.
See details
|
Forest Service | 5/19/2010 |
TRINITY VENTURES LLC | $34,028 |
Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6' layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of
This spending item is part of a $335,864 allocation.
See details
|
Forest Service | 7/06/2010 |
TRINITY VENTURES LLC | $34,028 |
Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6 layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of 2
This spending item is part of a $335,864 allocation.
See details
|
Forest Service | 7/06/2010 |
WESTERN PROCESSING INC | $30,620 | Bitterroot Roadside Brushing Bitterroot National Forest Mechanical Roadside Brushing Task Order AG-82B1-D-10-0080 Period of Performance: May 24,2011 to September 30,2011 | Forest Service | 2/17/2010 |
FIVE BEARS OUTFITTERS | $30,150 | ARRA Recipient, Recovery Deferred Trail Maintenance | Forest Service | 9/17/2010 |
TOWN OF DARBY | $29,000 | Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA | Rural Housing Service | 6/02/2009 |
B & N WEED CONTROL INCORPORATED | $23,000 | Apply herbicides to kill noxiouus weeds on roadsides and trails on national forest land in MT. | Forest Service | 8/31/2010 |
FIVE BEARS OUTFITTERS | $22,800 | Deferred Trail Maintenance, Clearwater National Forest | Forest Service | 4/14/2010 |
CALLISON TRUCKING AND EXCAVATION | $20,589 |
The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation.
See details
|
Forest Service | 5/04/2010 |
TIMBERLAND FORESTRY SERVICES, LLC | $20,088 | old trailhead information signs'removal & disposal; and installation of replacement trailhead information sign frames & signboards which were supplied by the Forest. | Forest Service | 5/26/2010 |
TOWN OF DARBY | $20,000 | Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA | Rural Housing Service | 6/02/2009 |
TRINITY VENTURES LLC | $18,597 |
The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation.
See details
|
Forest Service | 5/04/2010 |
CALLISON TRUCKING AND EXCAVATION | $16,500 |
The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation.
See details
|
Forest Service | 5/04/2010 |
MORRIS HONEY COMPANY INC | $15,387 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 5/26/2010 |
ENVIRONMENTAL QUALITY, MONTANA DEPARTMENT OF | $13,217 |
Recovery Act of 2009: Capital Improvement and Maintenance The Bitterroot National Forest desires to expand the boat ramp facility at Lake Como High Impact Recreation Area (HIRA) located approximately 5 miles north of Darby, Montana. The existing boat ramp is unable to handle the boat use occurring a at the site. ... Show more
This spending item is part of a $165,328 allocation.
See details
|
Forest Service | 5/13/2010 |
ACCURATE OUTFITTERS | $12,346 | Recovery packing service contract for trail hitches accomplished by MCC crew. Responsible for packing MCC crews, tools and gear to designated sites and then returning to assist in packing them back out. Mules are used to pack the gear for the crews. Awa | Forest Service | 5/27/2010 |
MULTIPLE RECIPIENTS | $9,931 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 10/31/2010 |
TRINITY VENTURES LLC | $8,365 |
The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation.
See details
|
Forest Service | 5/04/2010 |
WESTERN PROCESSING INC | $7,774 | AG-82B1-D-10-0211 Bitterroot Roadside Brushing Bitterroot National Forest Hamilton, Montana 16.4 miles | Forest Service | 7/19/2010 |
BITTERROOT SPRAYING LLC | $5,750 | Herbicide application | Forest Service | 11/25/2009 |
MULTIPLE RECIPIENTS | $1,647 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 5/31/2010 |
MULTIPLE RECIPIENTS | $1,046 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 6/30/2010 |
MULTIPLE RECIPIENTS | $361 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 4/30/2010 |
MULTIPLE RECIPIENTS | $161 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 10/31/2010 |
MULTIPLE RECIPIENTS | $0 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 6/30/2010 |
RAVALLI COUNTY ECONOMIC DEVELOPMENT AUTHORITY | $0 |
Rural Business Enterprise Grants - ARRA Funds will be used to provide technical assistance to create a strategic marketing plan and for certifying two projected new hires and two exising employees through the North American Board of Certified Energy Practitioners (NABCEP).
This spending item is part of a $33,295 allocation.
See details
|
Rural Business Cooperative Service | 8/26/2009 |