Ravalli County, Mont., funds by Agriculture, Department of

Listing $20,310,183.06 in stimulus funds from Agriculture, Department of for Ravalli

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MULTIPLE RECIPIENTS $6,437,408 Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA Rural Housing Service 7/31/2009
MULTIPLE RECIPIENTS $2,108,454 Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA Rural Housing Service 2/28/2010
GERANIOS ENTERPRISES, INC $1,968,570 Forest Wide Facilities Maintenance for the Bitterroot National Forest: Stevensville Ranger Station, Darby Ranger Station , Sula Ranger Station and West Fork Ranger Station. Stevensville Ranger Station: Residence with Garage and Garage/Shop Building-Wind Forest Service 4/01/2010
R & R CONNER, INC $1,123,436 FUEL REDUCTION ACTIVITIES ON BITTERROOT NATIONAL FOREST. * HELICOPTER YARDING * LEAVE TREE PROTECTION * LIGHT SLASHING Forest Service 7/10/2009
WESTERN RECLAMATION, LLC $632,900 Reconstruct Existing Gravel Road Forest Service 3/15/2010
WESTERN RECLAMATION LLC $607,501 Road Reconstruction Forest Service 3/15/2010
WESTERN RECLAMATION LLC $607,200 Road Upgrades Forest Service 3/24/2010
PRICE CONTRACTING, INC. $462,827 Restore the South Zone Bridge, replace the Cliff Creek Bridge No. 326-3.2, and do repairs to the treated timber bridges on Frazier Creek Bridge No. 326-2.1, Manhattan Creek No. 326-7.0, Ward Creek No. 326-9.0, Adair Creek Bridge No. 1268-4.8, Little NF Cl Forest Service 3/12/2010
PRICE CONTRACTING, INC. $456,272 Route of the Hiawatha Facilities Improvements: Taft Trailhead: The work consists of expansion of the parking lot at the east portal of the Taft Tunnel including excavation, grading, placing treated timber wheelstops and commercial-source aggregate surfa Forest Service 5/28/2010
TRIPLE TREE, INC. $433,673 Re-establish cushion material to specified depth on native surface roads, using mobile rock milling equiptment to manufacture cushion from in-place boulders and bed rock in the road surface. The work also includes replacement of ditch refief culverts and Forest Service 9/30/2009
TRIPLE TREE, INC. $433,673 Re-establish cushion material to specified depth on native surface roads, using mobile rock milling equiptment to manufacture cushion from in-place boulders and bed rock in the road surface. The work also includes replacement of ditch refief culverts and Forest Service 9/30/2009
PRICE CONTRACTING, INC. $337,145 The intent of the contract is to remove an existing corregated steel pipe at Larson Creek on Road No. 247 in the Clearwater National Forest and replace with a concrete bridge. This includes removing and disposing of an existing culvert, structural excava Forest Service 6/09/2010
PRICE CONTRACTING, INC. $330,450 This project consists of 2 sub-projects - Goat Creek North and Goat Creek South. Goat Creek North: This project consists of removing an exisitng 82 x 60 x 57' corrugated metal pipe arch, then constructing a new bottomless 22' span, 6'11 rise x 72' long Forest Service 6/25/2010
CALLISON TRUCKING AND EXCAVATION $230,971 Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $391,546 allocation. See details
Forest Service 5/19/2010
Callison Trucking and Excavation $230,971 Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $393,246 allocation. See details
Forest Service 5/19/2010
PRICE CONTRACTING, INC. $208,930 Replacing a old deficient treated-timber bridge with a 2-lane, 54' concrete bridge. Forest Service 5/18/2010
T & T CONTRACTING INC $207,560 The intent of this project is to reconstruct portions of Big Creek Roads 264 and 2354, resurface the road with crushed aggregate surfacing, and replace existing drainage structures with new structures that allow for Aquatic Organism Passage (AOP). This p
This spending item is part of a $951,697 allocation. See details
Forest Service 7/08/2010
TRIPLE TREE, INC. $186,525 Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6 layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of 2
This spending item is part of a $335,864 allocation. See details
Forest Service 7/06/2010
TRIPLE TREE, INC. $186,525 Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6' layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of
This spending item is part of a $335,864 allocation. See details
Forest Service 7/06/2010
PRICE CONTRACTING, INC. $184,570 Work includes, but is not limited, to removing an existing deficient bridge structure, and replacing it with a weathering-steel and timber bridge. Project also includes removal and disposal of existing bridge structure, delivery and erection of new bridg Forest Service 5/18/2010
PRICE CONTRACTING, INC. $162,770 This project consists of removing an existing 60 x 54' culvert, then constructing a new bottomless 18' span, 5'9 rise x 75' long, steel structural plate arch. Work includes culvert removal, construction of a new bottomless 18' span, 5'9 rise x 75' long, Forest Service 6/25/2010
R & R CONNER, INC $154,057 GRAVEL CRUSH AND STOCKPILE IN Forest Service 6/17/2010
RBC SAND AND GRAVEL, INC. $145,810 Gravel Crushing & Stock piling of material Forest Service 12/22/2009
PRICE CONTRACTING, INC. $143,420 This project consists of removing an existing 80 x 61' and a 72 x 65' culvert, then constructing a new bottomless 20' span, 8'3 rise x 66' long, steel structural plate arch. Work includes culvert removal, construction of a new bottomless 20' x 8'3 x 66' Forest Service 6/25/2010
TRIPLE TREE, INC. $139,500 The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation. See details
Forest Service 5/04/2010
TRIPLE TREE, INC. $139,500 The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation. See details
Forest Service 5/04/2010
TRIPLE TREE, INC. $126,315 Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $393,246 allocation. See details
Forest Service 5/19/2010
TRIPLE TREE, INC. $126,315 Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $391,546 allocation. See details
Forest Service 5/19/2010
Callison Trucking and Excavation $115,311 Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6' layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of
This spending item is part of a $335,864 allocation. See details
Forest Service 7/06/2010
Callison Trucking and Excavation $115,311 Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6 layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of 2
This spending item is part of a $335,864 allocation. See details
Forest Service 7/06/2010
Callison Trucking and Excavation $100,000 The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation. See details
Forest Service 5/04/2010
ALLAN PROBST $94,777 TAS :: 12 1102::TAS RECOVERY Swift Creek Bridge per solicitation AG-82B1-S-10-02633 Forest Service 5/18/2010
B & N WEED CONTROL INCORPORATED $94,244 this money was used to spray herbicides on roadsides and forest openings on the Bitterroot National Forest in Montana. Forest Service 11/05/2009
TRINITY VENTURES LLC $82,837 The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation. See details
Forest Service 5/04/2010
TRINITY VENTURES LLC $81,226 Work includes, but is not limited to, reshaping and compacting road subgrade, reconditioning the roadbed, re-establishing native road surface, installing culverst, placing riprap, and all incidental work necessary to complete the project in accordance wit
This spending item is part of a $984,559 allocation. See details
Forest Service 3/12/2009
CALLISON TRUCKING AND EXCAVATION $78,000 The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation. See details
Forest Service 5/04/2010
T & T CONTRACTING INC $72,500 Crushing and Stockpiling Forest Service 12/22/2009
TRIPLE TREE, INC. $66,643 The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation. See details
Forest Service 5/04/2010
HUMAN INTERACTIVE PRODUCTS, INC. $65,626 Seed and Vegetation Collection / Hand collection of seed of various native plant species on forest lands to create a seed bank (stored seed) for use in future re-vegetation projects on the National Forest. Forest Service 8/02/2010
TRINITY VENTURES LLC $60,837 The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate
This spending item is part of a $300,337 allocation. See details
Forest Service 5/04/2010
TRIPLE TREE, INC. $60,500 The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation. See details
Forest Service 5/04/2010
HUMAN INTERACTIVE PRODUCTS, INC. $53,488 Removal of invasive non-native species along State Highway Evacuation Route
This spending item is part of a $410,072 allocation. See details
Forest Service 7/20/2010
R & R CONNER, INC $48,794 CRUSHING AND STOCKPILING AGGREGATE Forest Service 12/22/2009
BEAR CREEK OUTFITTERS LLC $44,400 Recovery deferred trail maintance Forest Service 9/16/2010
SUNELCO, INC $41,374 Rural Business Enterprise Grants - ARRA Funds will be used to provide technical assistance to create a strategic marketing plan and for certifying two projected new hires and two exising employees through the North American Board of Certified Energy Practitioners (NABCEP). Rural Business Cooperative Service 8/26/2009
RICK WEMPLE OUTFITTING, INC. $40,355 Trail Maintenance - 2 year contract, remaining balance paid upon completion of 2011 work yet to be done. Continued in 2011 after trails open up for remaining balance of contract. Estimated start, June 20, 2011. Forest Service 5/24/2010
TRINITY VENTURES LLC $35,960 Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $393,246 allocation. See details
Forest Service 5/19/2010
BOULANDGER, SCOTT D $35,111 NORTHWEST MONTANA COUNTIES TRAIL MAINTENANCE AND RECONSTRUCTION Forest Service 5/24/2010
TRINITY VENTURES LLC $34,260 Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec
This spending item is part of a $391,546 allocation. See details
Forest Service 5/19/2010
TRINITY VENTURES LLC $34,028 Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6' layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of
This spending item is part of a $335,864 allocation. See details
Forest Service 7/06/2010
TRINITY VENTURES LLC $34,028 Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6 layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of 2
This spending item is part of a $335,864 allocation. See details
Forest Service 7/06/2010
WESTERN PROCESSING INC $30,620 Bitterroot Roadside Brushing Bitterroot National Forest Mechanical Roadside Brushing Task Order AG-82B1-D-10-0080 Period of Performance: May 24,2011 to September 30,2011 Forest Service 2/17/2010
FIVE BEARS OUTFITTERS $30,150 ARRA Recipient, Recovery Deferred Trail Maintenance Forest Service 9/17/2010
TOWN OF DARBY $29,000 Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA Rural Housing Service 6/02/2009
B & N WEED CONTROL INCORPORATED $23,000 Apply herbicides to kill noxiouus weeds on roadsides and trails on national forest land in MT. Forest Service 8/31/2010
FIVE BEARS OUTFITTERS $22,800 Deferred Trail Maintenance, Clearwater National Forest Forest Service 4/14/2010
CALLISON TRUCKING AND EXCAVATION $20,589 The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation. See details
Forest Service 5/04/2010
TIMBERLAND FORESTRY SERVICES, LLC $20,088 old trailhead information signs'removal & disposal; and installation of replacement trailhead information sign frames & signboards which were supplied by the Forest. Forest Service 5/26/2010
TOWN OF DARBY $20,000 Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA Rural Housing Service 6/02/2009
TRINITY VENTURES LLC $18,597 The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation. See details
Forest Service 5/04/2010
CALLISON TRUCKING AND EXCAVATION $16,500 The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation. See details
Forest Service 5/04/2010
MORRIS HONEY COMPANY INC $15,387 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 5/26/2010
ENVIRONMENTAL QUALITY, MONTANA DEPARTMENT OF $13,217 Recovery Act of 2009: Capital Improvement and Maintenance The Bitterroot National Forest desires to expand the boat ramp facility at Lake Como High Impact Recreation Area (HIRA) located approximately 5 miles north of Darby, Montana. The existing boat ramp is unable to handle the boat use occurring a... Show more
This spending item is part of a $165,328 allocation. See details
Forest Service 5/13/2010
ACCURATE OUTFITTERS $12,346 Recovery packing service contract for trail hitches accomplished by MCC crew. Responsible for packing MCC crews, tools and gear to designated sites and then returning to assist in packing them back out. Mules are used to pack the gear for the crews. Awa Forest Service 5/27/2010
MULTIPLE RECIPIENTS $9,931 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 10/31/2010
TRINITY VENTURES LLC $8,365 The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru
This spending item is part of a $95,597 allocation. See details
Forest Service 5/04/2010
WESTERN PROCESSING INC $7,774 AG-82B1-D-10-0211 Bitterroot Roadside Brushing Bitterroot National Forest Hamilton, Montana 16.4 miles Forest Service 7/19/2010
BITTERROOT SPRAYING LLC $5,750 Herbicide application Forest Service 11/25/2009
MULTIPLE RECIPIENTS $1,647 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 5/31/2010
MULTIPLE RECIPIENTS $1,046 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 6/30/2010
MULTIPLE RECIPIENTS $361 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 4/30/2010
MULTIPLE RECIPIENTS $161 Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) Farm Service Agency 10/31/2010
MULTIPLE RECIPIENTS $0 Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA Rural Housing Service 6/30/2010
RAVALLI COUNTY ECONOMIC DEVELOPMENT AUTHORITY $0 Rural Business Enterprise Grants - ARRA Funds will be used to provide technical assistance to create a strategic marketing plan and for certifying two projected new hires and two exising employees through the North American Board of Certified Energy Practitioners (NABCEP).
This spending item is part of a $33,295 allocation. See details
Rural Business Cooperative Service 8/26/2009