Hillsborough County, N.H., funds by Transportation, Department of
Listing $29,319,368.03 in stimulus funds from Transportation, Department of for Hillsborough
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $9,615,509 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 3/12/2009 |
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $4,110,519 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 6/05/2009 |
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $3,009,237 | Highway Planning and Construction Highway Infrastructure Investment Grant: Available for Use in Any Area (flexible) | Federal Highway Administration | 4/14/2009 |
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $2,118,692 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 12/15/2009 |
NASHUA, CITY OF (INC) | $1,623,000 |
Airport Improvement Program Airport Development for New Hampshire Block Grant (ARRA 2009) including funds for the following locations/projects: Laconia Municipal Airport to rehabilitate the terminal apron in the amount of $835,420; Dillant-Hopkins Airport to rehabilitate the termin
This spending item is part of a $3,559,920 allocation.
See details
|
Federal Aviation Administration | 5/20/2009 |
NASHUA, CITY OF (INC) | $1,417,282 | Federal Transit_Formula Grants Invest in publid transportation by purchasing new trolley busses, rehabilitating busses, performing preventive maintenance on existing busses, and the rehab/renovation of the innercity bus terminal. Acquired support vehicles. Purchases software upgrades | Federal Transit Administration | 6/16/2009 |
NASHUA, CITY OF (INC) | $1,417,282 | Federal Transit_Formula Grants Invest in public transportation by purchasing new trolley buses, rehabilitating buses, performing preventive maintenance on existing buses, and the rehabilitation/renovation of the innercity bus terminal. Acquired support vehicles. Purchased software up | Federal Transit Administration | 6/19/2009 |
CMGC BUILDING CORP. | $978,552 |
Air Route Traffic Control Center (ARTCC) Curtain Wall and Elevator Replacement Design-Build Projects . The project provides for the Phase 1 Design, Pre-Construction, Procurement and Construction Services for the Administration Wing Curtain Wall and Elevat
This spending item is part of a $21,264,979 allocation.
See details
|
Federal Aviation Administration | 3/25/2009 |
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $973,593 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 12/15/2009 |
VANASSE HANGEN BRUSTLIN INC | $743,652 |
High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants Rehabilitation of approximately 30 miles of track for the expansion of the current Amtrak Downeaster service from Boston, Massachusetts to Portland, Maine with the expansion to Brunswick,Maine and a station stotop in Freeport, Maine.... Show more
This spending item is part of a $38,385,495 allocation.
See details
|
Federal Railroad Administration | 6/11/2010 |
MANCHESTER, CITY OF | $740,934 | Airport Improvement Program The acquisition of a 3000-Gallon Aircraft Rescue and Firefighting Vehicle at Manchester-Boston Regional Airport (MHT) will provide the most effective firefighting capabilities to the Aircraft Rescue and Firefighting crews at our airport. This new ARFF ve | Federal Aviation Administration | 9/11/2009 |
Town of Bennington | $601,600 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 5/15/2009 |
MANCHESTER, CITY OF | $500,282 | Federal Transit_Formula Grants Federal grant for seven projects: Bus Wash, Support vehicle, Phone system, Security camera system, AVL equipment on vehicles, Bicycle racks on vehicles, Administrative building improvements, and operating subsidy. | Federal Transit Administration | 7/24/2009 |
Northern Building Products, Inc. | $388,903 |
Air Route Traffic Control Center (ARTCC) Curtain Wall and Elevator Replacement Design-Build Projects . The project provides for the Phase 1 Design, Pre-Construction, Procurement and Construction Services for the Administration Wing Curtain Wall and Elevat
This spending item is part of a $21,264,979 allocation.
See details
|
Federal Aviation Administration | 3/25/2009 |
LITCHFIELD, TOWN OF | $372,477 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 6/26/2009 |
Town of Hudson | $357,000 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 6/11/2009 |
Town of Hillsborough | $150,045 | Highway Planning and Construction Highway Infrastructure Investment Grants | Federal Highway Administration | 8/26/2009 |
OTIS ELEVATOR COMPANY | $140,000 |
Air Route Traffic Control Center (ARTCC) Curtain Wall and Elevator Replacement Design-Build Projects . The project provides for the Phase 1 Design, Pre-Construction, Procurement and Construction Services for the Administration Wing Curtain Wall and Elevat
This spending item is part of a $21,264,979 allocation.
See details
|
Federal Aviation Administration | 3/25/2009 |
APPLIED ENVIRONMENTAL, INC. | $57,667 |
This project involves environmental services to support air quality monitoring during asbestos abatement activities at air traffic facilities nationwide. This project has been awarded under Contract DTFA0102C0016, Modification 791. The initial Modificatio
This spending item is part of a $849,074 allocation.
See details
|
Federal Aviation Administration | 12/08/2009 |
TURNSTONE CORP | $3,142 | Bonding Assistance Program DBE AMERICAN REINVESTMENT AND RECOVERY ACT OF 2009 BONDING ASSISTANCE REIMBURSABLE FEE PROGRAM | Office of the Secretary of Transportation | 8/31/2010 |
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $0 |
Highway Planning and Construction Highway Infrastructure Investment Grants
This spending item is part of a $150,045 allocation.
See details
|
Federal Highway Administration | 8/26/2009 |
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $0 |
Highway Planning and Construction Highway Infrastructure Investment Grants
This spending item is part of a $372,477 allocation.
See details
|
Federal Highway Administration | 6/26/2009 |
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $0 |
Highway Planning and Construction Highway Infrastructure Investment Grants
This spending item is part of a $601,600 allocation.
See details
|
Federal Highway Administration | 5/15/2009 |
TRANSPORTATION, NEW HAMPSHIRE DEPARTMENT OF | $0 |
Highway Planning and Construction Highway Infrastructure Investment Grants
This spending item is part of a $357,000 allocation.
See details
|
Federal Highway Administration | 6/11/2009 |