Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Bernalillo County, N.M., funds by General Services Administration

Listing $21,127,209.05 in stimulus funds from General Services Administration for Bernalillo

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SERCO SERVICES INC. $6,255,270 Performing services that supporting the implementation of Indian Health Service Enterprise Performance Life Cycle project management initiative. Services taksed will involve activities on an individual project level and./or at ahigh level for Agency inves General Services Administration 8/18/2009
CNI INFORMATION TECHNOLOGY, LLC $5,442,163 Programing support for IHS Resource Patient Managment. Office of the Federal Acquisition Service 9/30/2009
AIC GENERAL CONTRACTORS, INC. $2,837,131 Project located in Albuquerque, NM Public Buildings Service 9/29/2011
CARDINAL ROOFING, INC. $1,394,549 Provide all design, management, labor, tools, material, and supervision for roof replacement at Federal Building at 421 Gold Avenue SW, Albuquerque, NM
This spending item is part of a $2,729,450 allocation. See details
Public Buildings Service 6/30/2010
FRONTIER WATERPROOFING, INC. $1,012,262 Provide all design, management, labor, tools, material, and supervision for roof replacement at Federal Building at 421 Gold Avenue SW, Albuquerque, NM
This spending item is part of a $2,729,450 allocation. See details
Public Buildings Service 6/30/2010
CNI INFORMATION TECHNOLOGY, LLC $685,244 Program Support for Indian Health Services : office of information technology. Office of the Federal Acquisition Service 7/20/2009
SANDIA MECHANICAL, LLC $468,521 Installation of energy savings measure in 21 General Services Administration Region 7 owned and operated buildings. This project involves the installation, repair and/or replacement on major HVAC equipment, domestic water fixtures, irrigation systems, bui
This spending item is part of a $24,965,059 allocation. See details
Public Buildings Service 8/30/2010
DATA NETWORKS, INC. $468,173 Support software development projects funded under the ARRA appropriation to IHS. Many software development projects are being executed under ARRA, and these projects will overwhelm the current capacity of the IHS OIT SQA staff, resulting in testing and General Services Administration 2/10/2010
Pascetti Steel $388,000 Construction of the new Mariposa Land Port of Entry at Nogales, Arizona. This project will expand the capacity of the new existing port operations. The current port will remain in operation as the new buildings and facilities are brought on line in phases
This spending item is part of a $130,901,718 allocation. See details
Public Buildings Service 3/18/2010
APPLIED RESEARCH ASSOCIATES, INC. $368,162 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
RIOS ASSOCIATES INC $337,649 Sustainable site project Public Buildings Service 1/28/2010
APPLIED RESEARCH ASSOCIATES, INC. $317,314 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
SACRED POWER, CORPORATION $300,000 Installation of energy savings measure in 21 General Services Administration Region 7 owned and operated buildings. This project involves the installation, repair and/or replacement on major HVAC equipment, domestic water fixtures, irrigation systems, bui
This spending item is part of a $24,965,059 allocation. See details
Public Buildings Service 8/30/2010
Peak Roofing, Inc. $207,139 Provide all design, management, labor, tools, material, and supervision for roof replacement at Federal Building at 421 Gold Avenue SW, Albuquerque, NM
This spending item is part of a $2,729,450 allocation. See details
Public Buildings Service 6/30/2010
APPLIED RESEARCH ASSOCIATES, INC. $127,802 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
WHPACIFIC, INC. $95,323 Provide Retro Commissioning services at the specificed locations - Albuquerque, NM; Gallup, NM; Las Cruces, NM; and Santa Fe, NM Public Buildings Service 8/27/2009
BEAUDIN GANZE CONSULTING ENGINEERS INC $70,350 Construction Management advisor services for the design and construction of the Columbus Land Port of Entry facility in Columbus, New Mexico. This project will provide increased capacity for both commercial, vehicular and pedestrian traffic, cross border
This spending item is part of a $229,723 allocation. See details
Public Buildings Service 7/24/2009
WHPACIFIC, INC. $52,908 Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation. See details
Public Buildings Service 8/12/2010
HARTMAN AND MAJEWSKI DESIGN GROUP, INC. $39,649 Construction Management advisor services for the design and construction of the Columbus Land Port of Entry facility in Columbus, New Mexico. This project will provide increased capacity for both commercial, vehicular and pedestrian traffic, cross border
This spending item is part of a $229,723 allocation. See details
Public Buildings Service 7/24/2009
APS ESTIMATING INC $37,770 Construction Management advisor services for the design and construction of the Columbus Land Port of Entry facility in Columbus, New Mexico. This project will provide increased capacity for both commercial, vehicular and pedestrian traffic, cross border
This spending item is part of a $229,723 allocation. See details
Public Buildings Service 7/24/2009
Underwood Sheet Metal, Inc. $37,000 Provide all design, management, labor, tools, material, and supervision for roof replacement at Federal Building at 421 Gold Avenue SW, Albuquerque, NM
This spending item is part of a $2,729,450 allocation. See details
Public Buildings Service 6/30/2010
LOPEZ ENGINEERING, INC. $34,379 Construction Management advisor services for the design and construction of the Columbus Land Port of Entry facility in Columbus, New Mexico. This project will provide increased capacity for both commercial, vehicular and pedestrian traffic, cross border
This spending item is part of a $229,723 allocation. See details
Public Buildings Service 7/24/2009
ARSED ENGINEERING GROUP $31,805 Construction Management advisor services for the design and construction of the Columbus Land Port of Entry facility in Columbus, New Mexico. This project will provide increased capacity for both commercial, vehicular and pedestrian traffic, cross border
This spending item is part of a $229,723 allocation. See details
Public Buildings Service 7/24/2009
QUIROGA-PFEIFFER ENGINEERING CORP $15,770 Construction Management advisor services for the design and construction of the Columbus Land Port of Entry facility in Columbus, New Mexico. This project will provide increased capacity for both commercial, vehicular and pedestrian traffic, cross border
This spending item is part of a $229,723 allocation. See details
Public Buildings Service 7/24/2009
APPLIED RESEARCH ASSOCIATES, INC. $15,293 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
ARSED ENGINEERING GROUP $14,660 Construction Management Advisor services for the design and construction of the partial port expansion and remodel at the Santa Teresa Land Port of Entry facility in Santa Teresa, New Mexico. The project includes a new dog kennel, export facility, additi
This spending item is part of a $747,775 allocation. See details
Public Buildings Service 9/21/2010
APPLIED RESEARCH ASSOCIATES, INC. $13,374 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
IMMIXTECHNOLOGY, INC. $12,210 OTHER COMPUTER RELATED SERVICES
This spending item is part of a $354,236 allocation. See details
General Services Administration 9/22/2009
APS ESTIMATING INC $8,797 Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation. See details
Public Buildings Service 8/12/2010
QUIROGA-PFEIFFER ENGINEERING CORP $8,372 Construction Management Advisor services for the design and construction of the partial port expansion and remodel at the Santa Teresa Land Port of Entry facility in Santa Teresa, New Mexico. The project includes a new dog kennel, export facility, additi
This spending item is part of a $747,775 allocation. See details
Public Buildings Service 9/21/2010
APS ESTIMATING INC $7,990 Construction Management Advisor services for the design and construction of the partial port expansion and remodel at the Santa Teresa Land Port of Entry facility in Santa Teresa, New Mexico. The project includes a new dog kennel, export facility, additi
This spending item is part of a $747,775 allocation. See details
Public Buildings Service 9/21/2010
APPLIED RESEARCH ASSOCIATES, INC. $7,915 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
APPLIED RESEARCH ASSOCIATES, INC. $7,459 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009
APPLIED RESEARCH ASSOCIATES, INC. $6,807 Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus.
This spending item is part of a $20,631,688 allocation. See details
Public Buildings Service 6/29/2009