Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Bernalillo County, N.M., funds by Energy, Department of

Listing $83,865,598.91 in stimulus funds from Energy, Department of for Bernalillo

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SANDIA CORPORATION $15,185,639 142727 - Concentrating Solar Power - National Solar Tower Testing Facility (NSTTF) Upgrade (Capital Equipment Project); Funds are provided for the Concentrating Solar Power Program and are used to upgrade the Molten Salt Facility instruments,valves, corr
This spending item is part of a $17,800,000 allocation. See details
Energy, Department of 8/13/2009
RMCI, INC. $9,229,996 Renewable Energy Research and Development The Incorporated County of Los Alamos, Department of Public Utilities (DPU) owns and operates the Abiquiu Hydroelectric Plant (FERC No. 7396) located in Rio Arriba County, New Mexico. The DPU objective, to construct a powerhouse addition to the existing h Golden Field Office 3/09/2010
CENTRAL NEW MEXICO HOUSING CORPORATION $8,365,735 Weatherization Assistance for Low-Income Persons Weatherization Assistance Program
This spending item is part of a $26,855,604 allocation. See details
Energy, Department of 3/31/2009
ALBUQUERQUE, CITY OF $5,051,200 Energy Efficiency and Conservation Block Grant Program (EECBG) CITY OF ALBUQUERQUE, NM ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT Energy, Department of 10/26/2009
SANDIA CORPORATION $5,000,000 Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
SANDIA CORPORATION $3,101,571 The funding will be used to support research infrastructure for the DOE Joint BioEnergy Institute (JBEI) Bioenergy Research Center. This funding will allow the addition of new imaging facilities and upgrading of existing facilities to substantially impro
This spending item is part of a $4,039,000 allocation. See details
Energy, Department of 7/28/2009
SANDIA CORPORATION $2,352,840 Geothermal Technologies Program Enhanced Geo Science R&D 1) CPS #20007 (Project-Base Technologies-144299) Design, develop, and field test highly integrated, high temperature data loggers using silicon on insulator and silicon carbide technologies. 2) CPS
This spending item is part of a $2,837,285 allocation. See details
Energy, Department of 9/29/2009
RAYTHEON COMPANY $2,268,141 Electricity Delivery and Energy Reliability, Research, Development and Analysis This project will demonstrate the commercial viability of EnerVaultG??s novel redox flow battery energy storage systems (BESS).
This spending item is part of a $4,764,284 allocation. See details
Energy, Department of 8/06/2010
SANDIA CORPORATION $2,175,381 Advanced Scientific Computing Research - Computational Partnerships (SciDAC-e) This research focuses on developing new methods for the analysis and reduction of complex multiscale networks under uncertainty, by combining computational singular perturbatio
This spending item is part of a $2,397,619 allocation. See details
Energy, Department of 8/13/2009
SANDIA CORPORATION $2,146,625 Basic Energy Sciences (BES) - Energy Frontier Research Centers (EFRC) Task 1) Materials Sciences of Actinides -This Project will support the Energy Frontier Research Center (EFRC) for Materials Science of Actinides, (lead institute is the University of N
This spending item is part of a $2,791,282 allocation. See details
Energy, Department of 8/06/2009
PUBLIC SERVICE COMPANY OF NEW MEXICO $1,923,237 Electricity Delivery and Energy Reliability, Research, Development and Analysis Project Objectives: G?? Demonstrate that intermittent, renewables-based distributed generation can be combined with storage to mitigate voltage fluctuations as well as enable peak shifting G?? Quantify and refine perform... Show more
This spending item is part of a $2,305,931 allocation. See details
Energy, Department of 10/29/2010
SANDIA CORPORATION $1,738,360 This is a National Energy Technology Laboratory (NETL) Inter-Entity Work Order to provide technical support for development of an integrated Energy-Water Decision Support System (DSS), pursue the formulation and development of the Energy-Water DSS through
This spending item is part of a $2,622,000 allocation. See details
Energy, Department of 6/29/2010
SANDIA CORPORATION $1,600,000 High Yield MOCVD Growth The overall objective of this multi-faceted two-year program is for Sandia National Laboratories to help Veeco and Philips Lumileds to develop high-volume epitaxial growth systems that provide a >4X reduction in HB-LED per-device c Energy, Department of 3/15/2010
United Drilling, Inc $1,592,305 Project Value: 2002070: Recovery Act Project Description of Work: RA-09-001 1. Installation of two groundwater characterization/monitoring wells (one well in FY 2009 and one in FY2011) in Pahute Mesa for the Underground Test Area (UGTA) project. The 2009
This spending item is part of a $33,850,358 allocation. See details
Office of Nuclear Security/National Nuclear Security Administration 6/04/2009
SANDIA CORPORATION $1,405,000 A comparative case study on the cost and benefits of flywheels, CAES, and battery technologies for grid support such as load shifting, wind farm diurnal operations, ramping control, frequency regulation services, and distributed energy storage.
This spending item is part of a $1,500,000 allocation. See details
Energy, Department of 6/15/2010
SANDIA CORPORATION $1,371,845 High Energy Battery Test Facility - Agreement #20839 ($1,200,000) These funds will be used for construction of the High Energy Battery Facility at Sandia National Laboratories. Agreement #20868 ($2,000,000) These funds will be used for capital equipment p
This spending item is part of a $4,200,000 allocation. See details
Energy, Department of 2/25/2010
SANDIA CORPORATION $1,344,400 Solid State Lighting - Sandia National Laboratories will perform the tests in the Semi-polar Indium Gallium Nitride (InGaN) Materials Technology for High External Quantum Efficiency (EQE) Green Light Emitting Diodes (LEDs) project under the FY09 call for
This spending item is part of a $1,680,000 allocation. See details
Energy, Department of 1/06/2010
GRAM, INCORPORATED $1,325,805 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
SANDIA CORPORATION $1,161,172 142694 - High Penetration Solar Deployment - DETL Upgrade (Capital Equipment Project); Capital equipment funds for Distributed Energy Technology Lab refurbishment to create additional space to conduct internal and industry-partnered R&D. 146080 - High Pen
This spending item is part of a $1,900,325 allocation. See details
Energy, Department of 8/13/2009
TPL, INC. $999,987 Office of Science Financial Assistance Program Capacitors represent a key component in many pulsed power systems, in particular power modulators for high energy accelerators. As switching technology improves, a need for improved capacitor performance has become more pronounced, as required for next ... Show more Office of Science 9/29/2010
TPL, INC. $999,987 Capacitors represent a key component in many pulsed power systems, in particular power modulators for high energy accelerators. As switching technology improves, a need for improved capacitor performance has become more pronounced, as required for next g Office of Science 9/29/2010
EBERLINE SERVICES, INC. $841,305 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
SANDIA CORPORATION $705,000 Enhance & Accelerate Federal Energy Management Program (FEMP) Service Functions to the Federal Government Sandia National Laboratories (SNL) will provide services in the following areas: Initial and/or feasibility of a particular technology; Project prior Energy, Department of 8/13/2009
PC SPECIALISTS, INC. $704,000 Basic Energy Sciences - Nanoscale Science Research Centers - (Project Code 2005040) Capital Equipment funds are provided to update, upgrade, or expand capabilities of the Center for Integrated Nanotechnologies (CINT) Facility to conduct leading-edge scien
This spending item is part of a $3,273,818 allocation. See details
Energy, Department of 7/02/2009
SANDIA CORPORATION $692,102 Inter-Entity Work Order issued by National Energy Technology Laboratory (NETL)for Energy Power Systems Fellowship Program workforce development to provide financial support to laboratory research staff to work at universities, and/or to university profess
This spending item is part of a $999,999 allocation. See details
Energy, Department of 9/21/2010
SANDIA CORPORATION $625,000 Fusion Energy Sciences - Plasma Science Centers: Perform plasma science research in areas of such wide scope and complexity that it would not be feasible for individual investigators or small groups to make progress, such as plasma turbulence, plasma comp Energy, Department of 9/16/2009
SANDIA CORPORATION $564,443 Basic Energy Sciences - Nanoscale Science Research Centers - (Project Code 2005040) Capital Equipment funds are provided to update, upgrade, or expand capabilities of the Center for Integrated Nanotechnologies (CINT) Facility to conduct leading-edge scien
This spending item is part of a $3,273,818 allocation. See details
Energy, Department of 7/02/2009
COUNTY OF BERNALILLO $500,000 Energy Efficiency and Conservation Block Grant Program (EECBG) This grant funds multiple energy efficiency and conservation projects across New Mexico. The projects are designed to reduce fossil fuel emissions; reduce total energy use, and improve energy efficiency while creating jobs.
This spending item is part of a $9,593,500 allocation. See details
Energy, Department of 2/02/2010
RIO METRO REGIONAL TRANSIT DISTRICT $492,600 State Energy Program This grant funds multiple energy efficiency and renewable energy projects across New Mexico. The projects are designed to reduce energy costs; reduce energy consumption; reduce reliance on imported energy; improve reliability of energy supplies; improve d
This spending item is part of a $31,821,000 allocation. See details
Energy, Department of 4/23/2009
COUNTY OF BERNALILLO $459,500 Energy Efficiency and Conservation Block Grant Program (EECBG) EECBG funding will provide for the replacement of aging HVAC systems and installation of direct digital controls. This facility, know as the Atrium, located at 6840 Second Street, NW, houses the Bernalillo County Fire Department. Expec... Show more Energy, Department of 10/02/2009
NEW MEXICO MORTGAGE FINANCE AUTHORITY (INC) $457,864 Weatherization Assistance for Low-Income Persons New Mexico Energy $MART Weatherization Training Center and Mobile Training Unit
This spending item is part of a $919,579 allocation. See details
Energy, Department of 9/23/2010
UNIVERSITY OF NEW MEXICO $450,000 Office of Science Financial Assistance Program In recent years, network bandwidth requirements have scaled multiple folds, pushing the need for the development of data exchange mechanisms at 100 Gb/s and beyond. The main objective of this project is to implement a high performance HyperTransport-enab... Show more Office of Science 9/29/2009
ENGINEERING CONSTRUCTORS, INC. $387,101 High Energy Battery Test Facility - Agreement #20839 ($1,200,000) These funds will be used for construction of the High Energy Battery Facility at Sandia National Laboratories. Agreement #20868 ($2,000,000) These funds will be used for capital equipment p
This spending item is part of a $4,200,000 allocation. See details
Energy, Department of 2/25/2010
ENERGY, MINERALS & NATURAL RESOURCES DEPARTMENT, NEW MEXICO $382,070 Electricity Delivery and Energy Reliability, Research, Development and Analysis Increase New Mexico's capacity to respond to energy emergencies with emerging technologies including a digital 'smart grid'. Energy, Department of 8/14/2009
SANDIA CORPORATION $330,000 Advanced Research and Projects Agency Energy Financial Assistance Program Accelerated Weathering for Carbon Sequestration. Project Identification Code: 2010000
This spending item is part of a $1,266,675 allocation. See details
Energy, Department of 7/16/2010
ABQ MANUFACTURING, INC. $324,270 142727 - Concentrating Solar Power - National Solar Tower Testing Facility (NSTTF) Upgrade (Capital Equipment Project); Funds are provided for the Concentrating Solar Power Program and are used to upgrade the Molten Salt Facility instruments,valves, corr
This spending item is part of a $17,800,000 allocation. See details
Energy, Department of 8/13/2009
EBERLINE SERVICES, INC. $294,943 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
TEF CONSTRUCTION INC $261,362 142727 - Concentrating Solar Power - National Solar Tower Testing Facility (NSTTF) Upgrade (Capital Equipment Project); Funds are provided for the Concentrating Solar Power Program and are used to upgrade the Molten Salt Facility instruments,valves, corr
This spending item is part of a $17,800,000 allocation. See details
Energy, Department of 8/13/2009
UNIVERSITY OF NEW MEXICO $260,000 The Recovery Act funds received by Brookhaven National Laboratory for the PHENIX Forward Vertex Detector have been provided as advance funding to optimize project execution thereby reducing the cost and schedule risk.
This spending item is part of a $967,000 allocation. See details
Energy, Department of 5/29/2009
EBERLINE SERVICES, INC. $258,517 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
SANDIA CORPORATION $250,000 Sandia National Laboratories will be working on the algae pond fluid dynamic modeling research with Sapphire. The mechanical design of an algae cultivation pond is a large determinant of its biomass productivity, capital cost and operating cost. For exa
This spending item is part of a $275,000 allocation. See details
Energy, Department of 3/04/2010
SANDIA CORPORATION $232,000 KJ/CH57/0/ARRA-2 Supplement entitled 'Enhancing Productivity of Materials Discovery Computations for Solar Fuels and Next Generation' to existing SciDAC project 'Perfonnance Engineering Research Center (PERC-3) SciDAC Center for Enabling Technology' to
This spending item is part of a $1,300,000 allocation. See details
Energy, Department of 8/24/2010
UNIVERSITY OF NEW MEXICO $230,000 State Energy Program This grant funds multiple energy efficiency and renewable energy projects across New Mexico. The projects are designed to reduce energy costs; reduce energy consumption; reduce reliance on imported energy; improve reliability of energy supplies; improve d
This spending item is part of a $31,821,000 allocation. See details
Energy, Department of 4/23/2009
SANDIA CORPORATION $223,000 Solar Reforming of CO2 to Produce Diesel Fuel, Sunexus - Sandia National Laboratories will develop solar reactor technologies to produce sygas from methane and CO2 waste streams. This development effort leverages Sandia's expertise in solar-driven reac Energy, Department of 2/25/2010
SANDIA CORPORATION $200,000 Public Service Company of New Mexico's Smart Grid Investment and Demonstration Project. SNL will conduct PV integration tests, assist in developing control algorithms, monitor field activities for efficiency, availability and reliability of energy storag Energy, Department of 8/16/2010
SANDIA CORPORATION $199,260 Federal Lab Support for Recovery Act Transactions SNL will provide direct Technical Assistance to the Energy Efficiency Conservation Block Grant (EECBG) Recovery Act recipients including assisting with developing and planning energy efficiency conservatio Energy, Department of 6/12/2009
Omicron Safety and Risk Technologies, Inc. $185,094 This project will clean-up a variety of radiological contaminated facilities and structures, all a result of non-defense nuclear studies and projects performed at Brookhaven (BNL). Completion of this project supports DOE's major priority of legacy footpr
This spending item is part of a $70,809,616 allocation. See details
Energy, Department of 4/16/2009
EBERLINE SERVICES, INC. $176,230 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
SANDIA CORPORATION $161,359 The Solar Energy Grid Integration Systems (SEGIS) Program focuses on development of advanced inverters, controllers, and other balance-of-system components for photovoltaic (PV) distributed power applications.
This spending item is part of a $4,802,666 allocation. See details
Energy, Department of 8/13/2009
OPTOMEC, INC. $150,000 Renewable Energy Research and Development In this program, we will enhance the Aerosol Jet technology to enable the production of fully printed collector lines by significantly increasing the material output of the system while continuing to reduce the width of printed lines to further reduce sha Energy, Department of 8/17/2009
MALOY MOBILE STORAGE, INC. $148,100 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC. $145,744 High Energy Battery Test Facility - Agreement #20839 ($1,200,000) These funds will be used for construction of the High Energy Battery Facility at Sandia National Laboratories. Agreement #20868 ($2,000,000) These funds will be used for capital equipment p
This spending item is part of a $4,200,000 allocation. See details
Energy, Department of 2/25/2010
UNIVERSITY OF NEW MEXICO $131,530 Electricity Delivery and Energy Reliability, Research, Development and Analysis Project Objectives: G?? Demonstrate that intermittent, renewables-based distributed generation can be combined with storage to mitigate voltage fluctuations as well as enable peak shifting G?? Quantify and refine perform... Show more
This spending item is part of a $2,305,931 allocation. See details
Energy, Department of 10/29/2010
UNIVERSITY OF NEW MEXICO $128,000 State Energy Program This grant funds multiple energy efficiency and renewable energy projects across New Mexico. The projects are designed to reduce energy costs; reduce energy consumption; reduce reliance on imported energy; improve reliability of energy supplies; improve d
This spending item is part of a $31,821,000 allocation. See details
Energy, Department of 4/23/2009
ENGINEERING CONSTRUCTORS, INC. $127,937 142694 - High Penetration Solar Deployment - DETL Upgrade (Capital Equipment Project); Capital equipment funds for Distributed Energy Technology Lab refurbishment to create additional space to conduct internal and industry-partnered R&D. 146080 - High Pen
This spending item is part of a $1,900,325 allocation. See details
Energy, Department of 8/13/2009
COMPA INDUSTRIES, INC. $121,111 Funded under the Nuclear Science Workforce award (Funding Opportunity Announcement 09-13, Applications of Nuclear Science & Technology), this project is a joint award to Los Alamos National Laboratory and Lawrence Livermore National Laboratory. Knowledge
This spending item is part of a $1,098,000 allocation. See details
Office of Science 9/23/2009
PUEBLO OF ISLETA $112,000 Energy Efficiency and Conservation Block Grant Program (EECBG) Pueblo of Isleta development, establishment, and implementation of an energy efficiency and energy conservation program Energy, Department of 3/05/2010
UNIVERSITY OF NEW MEXICO $110,000 Office of Science Financial Assistance Program Supplement to existing grant for equipment purchases. Office of Science 8/15/2010
Star Logistics, Inc. $104,460 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CVI LASER, LLC $103,500 Upon completion of the BELLA project, an experimental facility for advancing the development of laser plasma acceleration will be available with unprecedented capabilities. The research and development that will be made possible with the proposed BELLA sy
This spending item is part of a $19,218,000 allocation. See details
Energy, Department of 5/19/2009
CVI LASER, LLC $94,140 Upon completion of the BELLA project, an experimental facility for advancing the development of laser plasma acceleration will be available with unprecedented capabilities. The research and development that will be made possible with the proposed BELLA sy
This spending item is part of a $19,218,000 allocation. See details
Energy, Department of 5/19/2009
SANDIA CORPORATION $93,554 Wind Energy Technology R&D and Testing - Sandia will provide documentation on the generic wind turbine models that were developed as a collaberative effort by the Western Electricity Coordinating Council (WECC) Wind Generation Modeling Group. Follow-up ef Energy, Department of 1/27/2010
NFT INCORPORATED $86,235 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
TEF CONSTRUCTION INC $75,000 142727 - Concentrating Solar Power - National Solar Tower Testing Facility (NSTTF) Upgrade (Capital Equipment Project); Funds are provided for the Concentrating Solar Power Program and are used to upgrade the Molten Salt Facility instruments,valves, corr
This spending item is part of a $17,800,000 allocation. See details
Energy, Department of 8/13/2009
GRAM, INCORPORATED $69,865 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ORION INTERNATIONAL TECHNOLOGIES, INCORPORATED $67,200 Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation. See details
Energy, Department of 4/01/2009
QUALITY TRAILER SALES CORP. $64,920 Funds allocated by Savannah River Site Field Office to Department of Energy Carlsbad Field Office for the manufacturing of TRUPACT-III drums for Recovery Act in accordance with the approved statement of work accepted by A. Welton, Contracting Officer, Car
This spending item is part of a $12,000,000 allocation. See details
Energy, Department of 8/03/2010
QUALITY TRAILER SALES CORP. $64,620 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
SANDIA CORPORATION $63,553 Reviewers for ARPA-E Solicitations. This work authorization covers expenses for SNL employees to review thirty proposals submitted for the ARPA-E program. The SNL employees will work during the performance periods as noted on the work authorizations. Th Energy, Department of 8/06/2009
CE2 CORPORATION, INC. $59,740 Provide non-personal administrative office support services for the OBS/MOCSD organization under the American Recovery and Reinvestment Act (ARRA). Also provide other administrative support including all administrative tasks to support the ARRA-related a Energy, Department of 4/27/2010
NFT INCORPORATED $58,916 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
UNIVERSITY OF NEW MEXICO $53,462 Office of Science Financial Assistance Program We have committed our silicon detector laboratory to R&D, followed by prototyping and then production quality assurance, for the ATLAS upgrades including characterization of planar p-type and 3D silicon sensors. These require studies of strip, pixel, an... Show more Office of Science 3/01/2010
CROSS CONNECTION, INC. $50,296 High Energy Battery Test Facility - Agreement #20839 ($1,200,000) These funds will be used for construction of the High Energy Battery Facility at Sandia National Laboratories. Agreement #20868 ($2,000,000) These funds will be used for capital equipment p
This spending item is part of a $4,200,000 allocation. See details
Energy, Department of 2/25/2010
MANSURE, ARTHUR $50,000 Renewable Energy Research and Development Project began with a review and updating of past Energy Return On Energy Investment work on geothermal energy which were based on Input/Output analysis. Then process analysis has been applied to provide an up to date, defensible, documented determination Golden Field Office 1/29/2010
SANDIA CORPORATION $48,000 SNL Reviewers for Advanced Research Projects Agency-Energy (ARPA-E) This work authorization covers expenses for six (6) Sandia National Laboratories (SNL) employees to review proposals in support of the ARPA-E program (FOA # DE-FOA-0000065). The employee Energy, Department of 9/09/2009
GRAM, INCORPORATED $45,705 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
SANDIA CORPORATION $40,000 The receipt of economic stimulus (American Recovery Reinvestment Act - ARRA) funds necessitates additional financial oversight and control from the Department of Energy (DOE) to the Waste Isolation Pilot Plant (WIPP) participants. Due to reassignments and Carlsbad Field Office 6/01/2009
SANDIA CORPORATION $32,300 Doublet III-Deshape (DIII-D) Facility Upgrades: $75,000 is provided for the following purchases and work: 1) purchase of a Peripheral Component Interconnect (PCI) based computer data digitizer system with 32 independent wave form controllers for the Targe
This spending item is part of a $75,000 allocation. See details
Energy, Department of 8/07/2009
T-N-R Corporation of New Mexico, Inc. $32,144 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
COMPA INDUSTRIES, INC. $31,153 The DOE Office of Nuclear Physics develops scientific knowledge into the nature of matter and energy. The Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory is needed to make advances in relativistic heavy ions. Because the RHIC is a
This spending item is part of a $1,033,000 allocation. See details
Office of Science 7/30/2009
Star Logistics, Inc. $30,000 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
University of New Mexico $25,000 Sandia National Laboratories will be working on the algae pond fluid dynamic modeling research with Sapphire. The mechanical design of an algae cultivation pond is a large determinant of its biomass productivity, capital cost and operating cost. For exa
This spending item is part of a $275,000 allocation. See details
Energy, Department of 3/04/2010
CE2 CORPORATION, INC. $25,000 Administrative Analyst II Support to Assist with ARRA Related Activities Support management and staff personnel to perform activities related to ARRA related work. Prepare modifications for the Contracting Officer?s signature, complete Federal Procuremen Energy, Department of 9/30/2009
UNIVERSITY OF NEW MEXICO $22,000 Office of Science Financial Assistance Program We are developing algorithms for fast numerical integration of Maxwell/Vlasov systems in the accelerator context. We are working in the context of bunch compressors, but our goal is to have a general purpose code. This is very computationally intensive n... Show more Office of Science 5/15/2010
APS ESTIMATING INC $7,881 Conduct Recovery Act External Independent Review for the Savanah River Site (SRS) for the deactivation and decommissioning of the P and R reactors as requested by the DOE Office of Engineering and Construction Management.
This spending item is part of a $100,000 allocation. See details
Energy, Department of 9/21/2009
SANDIA CORPORATION $6,288 Smart Grid Investment Grant Program SNL will provide technical assistance to the Office of Electricity Delivery and Energy Reliability, specifically for the Smart Grid Investment Grant program as requested. Energy, Department of 8/13/2009
SANDIA CORPORATION $0 American Recovery Reinvestment Act (ARRA) 48C Tax Credits Applications Conduct both Independent Reviews and Merit Reviews for evaluating and selecting Aplications in response to IRS Notice 2009-72 titled Qualifying Advanced Energy Project Credit. Energy, Department of 11/06/2009