Eddy County, N.M., funds by Energy, Department of

Listing $124,115,337.79 in stimulus funds from Energy, Department of for Eddy

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
WASHINGTON TRU SOLUTIONS LLC $63,604,230 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
LOS ALAMOS NATIONAL SECURITY, LLC $8,936,291 This award accelerates work that has already been identified in the sites? baselines and disposition of a specific inventory of transuranic (TRU) waste. LANL is to provide technical support services to the DOE Carlsbad Field Office (CBFO) for this work. A
This spending item is part of a $11,651,000 allocation. See details
Energy, Department of 7/06/2009
TECHNICAL SPECIALISTS $6,803,414 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
VISIONARY SOLUTIONS, LLC $4,932,000 Additional equipment and personnel to support the Waste Isolation Pilot Plant (WIPP) Energy, Department of 4/15/2009
CONSTRUCTORS, INC. (N.S.L.) $4,524,348 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WASHINGTON TRU SOLUTIONS LLC $4,173,651 This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation. See details
Energy, Department of 4/13/2009
WASHINGTON TRU SOLUTIONS LLC $3,935,706 This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation. See details
Energy, Department of 4/13/2009
S.M. STOLLER CORPORATION, THE $2,743,030 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CDI CORP. $2,334,620 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $2,052,365 To accelerate the disposition of defense-generated transuranic (TRU) waste across the nation. Energy, Department of 3/04/2009
PORTAGE, INC. $1,685,842 Provide expert technical advice, support and assistance to the CBFO in the areas of QA, auditing and assessment, safety, nuclear safety, site ops, environmental and regulatory compliance, scientific and international programs and the performance demonstra
This spending item is part of a $1,946,125 allocation. See details
Energy, Department of 8/13/2010
WASHINGTON TRU SOLUTIONS LLC $1,592,634 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
WASHINGTON TRU SOLUTIONS LLC $1,505,778 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
WASHINGTON TRU SOLUTIONS LLC $1,461,419 Funds allocated by Savannah River Site Field Office to Department of Energy Carlsbad Field Office for the manufacturing of TRUPACT-III drums for Recovery Act in accordance with the approved statement of work accepted by A. Welton, Contracting Officer, Car
This spending item is part of a $12,000,000 allocation. See details
Energy, Department of 8/03/2010
WASHINGTON TRU SOLUTIONS LLC $1,164,561 This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation. See details
Energy, Department of 4/13/2009
EXCEL STAFFING COMPANIES $1,071,888 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CONSTRUCTORS, INC. (N.S.L.) $1,006,420 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
E2 CONSULTING ENGINEERS, INC. $880,161 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS ENERGY & CONSTRUCTION, INC. $858,765 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WASHINGTON TRU SOLUTIONS LLC $750,000 This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation. See details
Energy, Department of 4/13/2009
SANDIA CORPORATION $465,000 1) American Recovery and Reinvestment Act (ARRA) for Waste Isolation Pilot Plant (WIPP) Performance Assessment (PA) Computing Platform (Sandia National Laboratories (SNL) for Carlsbad Field Office) Statement of Work for Procurement of PA Computing Upgrade Energy, Department of 9/29/2009
URS ENERGY & CONSTRUCTION, INC. $427,839 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. $377,164 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
Process Management Company $375,713 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
PETTIGREW & ASSOCIATES PA $373,829 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
SKYLLA ENGINEERING LTD. $327,146 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
E2 CONSULTING ENGINEERS, INC. $325,571 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
S.M. STOLLER CORPORATION, THE $316,755 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. $289,609 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WESTWIND COMPUTER PRODUCTS, INC. $256,316 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS ENERGY & CONSTRUCTION, INC. $255,343 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
S.M. STOLLER CORPORATION, THE $240,819 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
S.M. STOLLER CORPORATION, THE $211,470 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
EXCEL STAFFING COMPANIES $203,021 Procurement and contract services. Energy, Department of 4/11/2011
RESOURCE MANAGEMENT INC $202,823 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CONSTRUCTORS, INC. (N.S.L.) $202,455 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CONTRACT ASSOCIATES, INC. $190,354 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
EXCEL STAFFING COMPANIES $184,496 Physical Scientist Services Energy, Department of 11/01/2010
THL CAPITAL INC. $170,328 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WINDSTREAM CORPORATION $154,866 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. $148,047 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
SANDIA CORPORATION $140,700 The receipt of economic stimulus (American Recovery Reinvestment Act - ARRA) funds necessitates additional financial oversight and control from the Department of Energy (DOE) to the Waste Isolation Pilot Plant (WIPP) participants. Due to reassignments and Energy, Department of 6/01/2009
URS ENERGY & CONSTRUCTION, INC. $132,090 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CABRERA SERVICES INC. $132,063 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
THL CAPITAL INC. $125,964 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
MCDONALD, DAVID $121,292 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CRSI CONCRETE RESTORATION SYSTEMS, INC. $114,712 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
EXCEL STAFFING COMPANIES $113,883 Contracting support and FOIA services. Energy, Department of 11/21/2010
THL CAPITAL INC. $108,970 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CITY OF CARLSBAD $107,800 Energy Efficiency and Conservation Block Grant Program (EECBG) Purchase energy efficient electric vehicles to be used in the Police Dept and Utilities Dept Energy, Department of 8/14/2009
CONTRACT ASSOCIATES, INC. $93,854 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS ENERGY & CONSTRUCTION, INC. $78,869 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
PETTIGREW & ASSOCIATES PA $78,465 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
S.M. STOLLER CORPORATION, THE $72,960 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. $69,651 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
EXCEL STAFFING COMPANIES $63,588 Administrative Assistant duties. Energy, Department of 11/29/2010
URS ENERGY & CONSTRUCTION, INC. $62,603 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WINDSTREAM CORPORATION $56,889 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WASHINGTON GOVERNMENT ENVIRONMENTAL SERVICES COMPANY LLC $55,000 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WASHINGTON GOVERNMENT ENVIRONMENTAL SERVICES COMPANY LLC $52,413 Funds allocated by Savannah River Site Field Office to Department of Energy Carlsbad Field Office for the manufacturing of TRUPACT-III drums for Recovery Act in accordance with the approved statement of work accepted by A. Welton, Contracting Officer, Car
This spending item is part of a $12,000,000 allocation. See details
Energy, Department of 8/03/2010
S.M. STOLLER CORPORATION, THE $49,745 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
TASCOSA OFFICE MACHINES, INC. $44,948 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
Marks Crane & Rigging Co.llp $44,688 Funds allocated by Savannah River Site Field Office to Department of Energy Carlsbad Field Office for the manufacturing of TRUPACT-III drums for Recovery Act in accordance with the approved statement of work accepted by A. Welton, Contracting Officer, Car
This spending item is part of a $12,000,000 allocation. See details
Energy, Department of 8/03/2010
CARRIAGA MACHINES & SUPPLY $44,325 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
S.M. STOLLER CORPORATION, THE $44,080 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
PHILLIPS MINING GEOTECHNICAL & GROUTING $41,080 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
S.M. STOLLER CORPORATION, THE $37,122 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. $34,984 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
CRSI CONCRETE RESTORATION SYSTEMS, INC. $34,816 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WESTWIND COMPUTER PRODUCTS, INC. $34,344 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS ENERGY & CONSTRUCTION, INC. $32,824 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. $31,173 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
INNOVATIVE CONTRACT STAFFING CORP. $30,183 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
HALL MACHINE AND WELDING CO., INC. $29,949 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
PROFESSIONAL VIDEO SYSTEMS INC $26,123 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
Premac, Inc. $26,052 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
WASHINGTON TRU SOLUTIONS LLC $24,028 Funds allocated through by Richland Operations Office to Department of Energy Payment and Collection (DOE-PAC) for the purchase of 212 standard waste boxes. Washington TRU Solutions, LLC is reporting this information in accordance with direction received
This spending item is part of a $448,623 allocation. See details
Energy, Department of 8/12/2009
WASHINGTON TRU SOLUTIONS LLC $7,018 Funds allocated through by Richland Operations Office to Department of Energy Payment and Collection (DOE-PAC) for the purchase of 60 standard waste boxes. Washington TRU Solutions, LLC is reporting this information in accordance with direction received
This spending item is part of a $130,100 allocation. See details
Energy, Department of 3/08/2010