Los Alamos County, N.M.
U.S. | New Mexico | Los Alamos | |
---|---|---|---|
Population | 308,745,538 | 2,059,179 | 18,031 |
Total recovery funding | $522,082,377,600 | $4,811,079,772 | $305,564,032 |
Funding per Capita | $1,691 | $2,336 | $16,947 |
Unemployment
7/2008 |
6.2 |
5.0 |
3.8 |
7/2009 |
+3.6
9.8 |
+2.8
7.8 |
-0.4
3.4 |
7/2010 |
-0.2
9.6 |
+1.1
8.9 |
+0.7
4.1 |
7/2011 |
-0.6
9.0 |
-0.9
8.0 |
-0.8
3.3 |
7/2012 |
-0.9
8.1 |
-0.6
7.4 |
+0.4
3.7 |
This site was updated in September 2012. It includes recipient-reported data through the second quarter of 2012, which was released in July 2012.
Important: This interactive database is not kept up-to-date and should be treated as a historical snapshot. As records may have changed since we stopped making updates, researchers and consultants wishing to use the data should check against original sources for accuracy before using any data published here.
Those wishing to download the data can find it at the ProPublica Data Store.
Funding by Federal Agency and Department
Click total to see spending list | ||
---|---|---|
Energy, Department of | $289,106,110 | |
Small Business Administration | $3,520,070 | |
Education, Department of | $3,337,590 | |
Transportation, Department of | $3,106,761 | |
Health and Human Services, Department of | $2,549,148 | |
National Science Foundation | $1,727,683 | |
Agriculture, Department of | $1,109,507 | |
Social Security Administration | $703,500 | |
State, Department of | $229,566 | |
Environmental Protection Agency | $150,000 | |
Interior, Department of | $24,097 |
Show more/fewer agencies
Projects
Stimulus contracts, grants and loans in Los Alamos County, N.M.
Data last updated on September 2012.
We have CSV files available for download. Sign up here.
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
PORTAGE, INC. | $50,926,614 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $50,234,627 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
TERRANEAR PMC LLC | $28,465,451 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $23,038,196 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $15,000,000 | Grant | Advanced Research and Projects Agency Energy Financial Assistance Program This project entails the development and demonstration of an innovative next generation membrane technology for selective and energy efficient carbon dioxide separation from power plant flue gas. We propose to develop gelled ioionic liquid membranes and com... Show more | Energy, Department of | 7/13/2010 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $11,059,482 | Contract |
Investment in this project will accelerate the demolition of three surplus building complexes (11 individual buildings) at the Portsmouth Gaseous Diffusion Plant, removal of estimated quantities of soil, and disposition of excess uranium material. This w
This spending item is part of a $110,200,000 allocation.
See details
|
Energy, Department of | 5/06/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $10,492,079 | Contract |
The National Alliance for Advanced Biofuels and Bioproducts (NAABB) was awarded $44 million in ARRA funding of which $10.5M of that goes to LANL. The overall goal of the NAABB consortium is to produce new technologies that can be implemented by our comme
This spending item is part of a $10,547,231 allocation.
See details
|
Energy, Department of | 2/27/2010 |
TERRANEAR PMC LLC | $10,388,646 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
NORTH WIND, INC. | $9,427,529 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $6,027,137 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
ARSEC ENVIRONMENTAL, LLC | $4,480,878 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
Pate Construction Co. Inc. | $3,310,070 | Insure | Surety Bond Guarantees Water & Sewer relocation and conduits. Los Alamos NM | Small Business Administration | 9/25/2009 |
INNOVATIVE TECHNICAL SOLUTIONS, INC. | $3,161,525 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
COMPA INDUSTRIES, INC. | $2,714,709 | Contract |
This award accelerates work that has already been identified in the sites? baselines and disposition of a specific inventory of transuranic (TRU) waste. LANL is to provide technical support services to the DOE Carlsbad Field Office (CBFO) for this work. A
This spending item is part of a $11,651,000 allocation.
See details
|
Energy, Department of | 7/06/2009 |
LOS ALAMOS PUBLIC SCHOOLS | $2,530,710 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and as applicable, early childhood education programs and services.
This spending item is part of a $260,436,399 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 6/10/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $2,500,000 | Contract | Nuclear fission is the most advanced energy source that does not directly emit CO2 gas, but has significant challenges relating to treatment and disposal of spent nuclear fuel. The potential benefit and impact of finding solutions to these issues is a rei | Energy, Department of | 3/31/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $2,500,000 | Contract | On initial proposal the PI planned to design & construct superconducting PBG cavities at 700 MHz, since this is the main operating frequency of LANL beamline. When PI started working with fabrication vendors, they concluded fabrication of PBG cavities at | Energy, Department of | 3/31/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $2,500,000 | Contract | Long-baseline neutrino experiments are being planned and operated in Asia, Europe and North America. The project actively being developed with the longest baseline is in the U.S., currently called the Long-Baseline Neutrino Experiment (LBNE). This project | Energy, Department of | 3/31/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $2,477,288 | Contract |
Arguably the largest climate impact on terrestrial ecosystems is regional scale vegetation mortality during droughts. There is now abundant evidence of widespread mortality events on all vegetated continents (Allen et al. in press), and model consensus th
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 3/31/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $2,474,865 | Contract |
The goal of this project is to demonstrate an accelerating gradient (Eacc) of 100 MV/m or higher at a quality factor (Q0) of 2 x 1010 or higher with a niobium SRF cavity coated with another higher-Tc superconductor. This will break through the anticipated
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 3/31/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $2,131,000 | Contract |
Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation.
See details
|
Energy, Department of / Office of Science | 5/22/2009 |
COMPA INDUSTRIES, INC. | $2,083,317 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
MCS LLC | $2,041,913 | Contract |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $2,000,000 | Contract | Large-scale injection of CO2 for sequestration will result in significant geomechanical stresses to the storage reservoir, to the caprock seal, to faults, and to well bore systems in the region. These stresses have the potential to cause CO2 and brine lea | Energy, Department of | 9/23/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $2,000,000 | Contract | The objective of the Carbon Capture Simulation Initiative (CCSI) is to utilize modeling and simulation, at all scales, to aid in the design of carbon capture technologies and decrease the time for subsequent scale-up of these technologies from bench and p | Energy, Department of | 9/23/2010 |
NORTH WIND, INC. | $1,983,732 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
INCORPORATED COUNTY OF LOS ALAMOS | $1,962,217 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 10/15/2009 |
PORTAGE, INC. | $1,811,368 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $1,500,000 | Contract | The objective of the National Advanced Biofuels Consortium (NABC) is to develop cost-effective technologies that supplement petroleum-derived fuels with advanced ?drop-in? biofuels that are compatible with today?s transportation infrastructure and are pro | Energy, Department of | 3/31/2010 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $1,277,212 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $1,264,060 | Contract |
This project is divided into three areas (1) replacing 8 of the LANL Isotope Program?s 1960-1980s vintage telemanipulators using $600K (capital) of the $1.3M project total (2) refurbishing 7 of the program?s 15 hot cell windows at $200K (operational) of t
This spending item is part of a $1,408,009 allocation.
See details
|
Energy, Department of / Office of Science | 7/26/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $1,244,789 | Contract |
This ARRA award project will develop and demonstrate an innovative polymer-based membrane technology for reducing the energy intensity and the greenhouse gas effect of processes used in the chemical-, fuels-, and power-production industries. Syngas (syn
This spending item is part of a $1,440,000 allocation.
See details
|
Energy, Department of | 9/15/2009 |
ARS INTERNATIONAL, INC. | $1,237,453 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $1,151,310 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
INCORPORATED COUNTY OF LOS ALAMOS | $1,144,544 | Grant |
Formula Grants for Other Than Urbanized Areas The New Mexico Department of Transportation invested the American Recovery and Reinvestment Act funds for Rural Transit Capital Assistance in the amount of $12,255,602 for 28 sub-grantees in 23 counties (Colfax, Valencia, Eddy, Curry, Rio Arriba, Union, G G... Show more
This spending item is part of a $12,255,602 allocation.
See details
|
Transportation, Department of / Federal Transit Administration | 6/25/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $1,138,450 | Contract | LANL's project will develop a multipurpose (simultaneous multiple physical parameter determination) acoustic sensor for downhole fluid monitoring in Enhanced Geothermal Systems reservoirs over typical ranges of pressures and temperatures and then demonstr | Energy, Department of | 9/29/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $1,000,000 | Contract | The ENDF (enhanced nuclear data file) library is an international, core nuclear reaction database containing evaluated (recommended) cross sections, spectra, angular distributions, fission product yields, thermal neutron scattering, photo-atomic and other | Energy, Department of / Office of Science | 9/23/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $1,000,000 | Grant |
Trans-NSF Recovery Act Reasearch Support The purpose of this ARRA award is to ameliorate prior budget reductions. Cumulative under funding of this 5-yr award led to the deferment of equipment replacement, preventive maintenance, projects and a reduction in DC magnet operations. The receipt of
This spending item is part of a $5,000,000 allocation.
See details
|
National Science Foundation | 8/03/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $976,889 | Contract |
Funded under the Nuclear Science Workforce award (Funding Opportunity Announcement 09-13, Applications of Nuclear Science & Technology), this project is a joint award to Los Alamos National Laboratory and Lawrence Livermore National Laboratory. Knowledge
This spending item is part of a $1,098,000 allocation.
See details
|
Energy, Department of / Office of Science | 9/23/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $967,665 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $966,957 | Contract | Assemble an integrated heat transfer fluid package. The first effort develops a molecular silicone heat transfer fluid stable at high temperatures (600C). The second thrust develops a latent heat storage mechanism utilizing chemical reactions for capturin | Energy, Department of | 1/27/2010 |
COMPA INDUSTRIES, INC. | $944,667 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $926,639 | Contract |
The DOE Office of Nuclear Physics develops scientific knowledge into the nature of matter and energy. The Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory is needed to make advances in relativistic heavy ions. Because the RHIC is a
This spending item is part of a $1,033,000 allocation.
See details
|
Energy, Department of / Office of Science | 7/30/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $914,085 | Contract |
Funded under the Nuclear Science Workforce award (Funding Opportunity Announcement 09-13, Applications of Nuclear Science & Technology), this project is a joint award to Los Alamos National Laboratory and Lawrence Livermore National Laboratory. The qualit
This spending item is part of a $1,005,000 allocation.
See details
|
Energy, Department of / Office of Science | 9/23/2009 |
INNOVATIVE TECHNICAL SOLUTIONS, INC. | $860,355 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $855,430 | Contract | Field tests (Fenton Hill, USA; Hijiori, Japan) strongly suggest that our ability to image fluid flow and temperature distribution in enhanced (engineered) geothermal reservoirs (EGS) needs to be dramatically improved to optimize the operation of injection | Energy, Department of | 9/29/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $836,490 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $819,587 | Contract |
Fabricate arrays of vertical Si nanowires with radial p-i-n single crystal geometries in a catalytic-metal-free approach. Our method combines top down dry etching to form the heavily doped nanowire core followed by single crystal chemical vapor deposition
This spending item is part of a $1,049,443 allocation.
See details
|
Energy, Department of | 1/27/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $816,477 | Grant |
Trans-NIH Recovery Act Research Support The function of millions of proteins remains unknown, and automated protein function prediction systems have a poor record of performance. We will test hypotheses about protein functional sites by validating high-throughput predictions derived from comput
This spending item is part of a $1,432,837 allocation.
See details
|
Health and Human Services, Department of / National Institutes of Health | 5/14/2009 |
LOS ALAMOS PUBLIC SCHOOLS | $777,612 | Grant |
Special Education Grants to States, Recovery Act Assist States in providing special education and related services to children with disabilities in accordance with Part B of the IDEA
This spending item is part of a $91,147,493 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 2/17/2009 |
MULTIPLE RECIPIENTS | $774,581 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture, Department of / Rural Housing Service | 5/31/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $730,160 | Contract | Broadly reactive human antibodies against influenza M2 for therapy and prophylaxisG? Influenza is a globally important pathogen responsible for intermittent lethal pandemics. Present vaccination strategies are mainly based on a trivalent vaccine created p | Health and Human Services, Department of / National Institutes of Health | 8/15/2009 |
MULTIPLE RECIPIENTS | $698,000 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 6/30/2009 |
TLI SOLUTIONS, INC. | $673,471 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $626,991 | Contract | Under this award, LANL will be producing Actinium-225 ( 225Ac ) from target irradiation at 100 MeV at the Los Alamos Neutron Science Center (LANSCE) Isotope Production facility and then reporting on the yield created by this process and the material?s pur | Energy, Department of / Office of Science | 9/02/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $622,735 | Contract |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $600,000 | Contract | Energy Frontier Research Centers are being established at locations across the country to encourage and accelerate basic research for transformative energy technologies of the future. EFRCs provide opportunity for universities, DOE laboratories, for-profi | Energy, Department of / Office of Science | 7/27/2009 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $582,069 | Contract |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
CLOVER LEAF ENVIRONMENTAL SOLUTIONS, INC. | $571,019 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
NMC, INC. | $555,091 | Grant |
Renewable Energy Research and Development Recovery Act - National Alliance for Advanced Biofuels and Bioproducts - An Algal Biofuels Research Consortium
This spending item is part of a $31,069,309 allocation.
See details
|
Energy, Department of | 1/28/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $500,000 | Contract | LANL will collaborate with the Missouri University Research Reactor (MURR) facility to provide students and researchers with a unique opportunity to train in reactor and accelerator production and research and development (R&D) in both tracer and bulk che | Energy, Department of / Office of Science | 9/02/2009 |
NFT INCORPORATED | $475,429 | Contract |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $455,653 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $443,846 | Contract | Riboswitch design principles: interplay between switching, ligand binding and foldingG? Riboswitches are recently discovered powerful noncoding RNAs that turn on or off gene expression, depending on the presence of a ligand. We will use an approach that | Health and Human Services, Department of / National Institutes of Health | 8/30/2009 |
EBERLINE SERVICES, INC. | $439,970 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
EBERLINE SERVICES, INC. | $439,746 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
INTERNATIONAL ENGINEERING SERVICES, INC. | $431,077 | Contract |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $429,726 | Contract | The scope of this project is to provide improvements in infrastructure for Innovative Confinement Concepts (ICC) by building a state-of-the-art digital framing camera on an existing project that will significantly improve their near-term chances of findin | Energy, Department of | 1/27/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $424,530 | Contract | This ARRA-funded project addresses the research topic area: Tracers and Tracer Interpretation to adapt or develop reservoir tracers and/or tracer interpretation techniques that provide information beyond well-to-well connectivity such as fracture surface | Energy, Department of | 9/25/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $413,000 | Contract | ARRA funding in the advanced technology subprogram of DOE/SC/High Energy Physics supports research and development (R&D) on technologies used for particle accelerators and detectors. This ARRA award has two main goals in the LANL program: one is to devel | Energy, Department of / Office of Science | 6/10/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $405,515 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $383,822 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
NMC, INC. | $382,428 | Grant | Trans-NSF Recovery Act Reasearch Support This project addresses the hypothesis that Rossby basin modes play a significant role in Pacific Decadal Variability (PDV). Baroclinic Rossby basin modes are natural oscillations of the ocean with very large spatial scales and periods of up to a decade or | National Science Foundation | 8/10/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $374,727 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $374,155 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
EBERLINE SERVICES, INC. | $367,774 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $343,000 | Contract |
Funding to ANL for research and development and expert technical analysis and review efforts associated with supporting the Topic A and B electrical interconnection industry awards by producing products for delivery in year three.
This spending item is part of a $4,000,000 allocation.
See details
|
Energy, Department of | 7/06/2010 |
ROBERT OCHOA | $324,280 | Contract | thinning and hand piling services in the Valles Caldera National Preserve. | Agriculture, Department of / Forest Service | 5/19/2010 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $323,952 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
NUCFIL, LLC | $306,778 | Contract |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
LOS ALAMOS PUBLIC SCHOOLS | $300,000 | Grant |
State Energy Program This grant funds multiple energy efficiency and renewable energy projects across New Mexico. The projects are designed to reduce energy costs; reduce energy consumption; reduce reliance on imported energy; improve reliability of energy supplies; improve d
This spending item is part of a $31,821,000 allocation.
See details
|
Energy, Department of | 4/23/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $239,641 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CE2 CORPORATION, INC. | $231,000 | Contract | The goal of this procurement is to provide technical and drilling services for the ARRA project at Los Alamos Site Office. The Contractor shall provide expert drilling subject matter expert (SME) support to provide technical oversight assistance for the d | Energy, Department of | 9/29/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $228,181 | Contract |
This project will clean-up a variety of radiological contaminated facilities and structures, all a result of non-defense nuclear studies and projects performed at Brookhaven (BNL). Completion of this project supports DOE's major priority of legacy footpr
This spending item is part of a $70,809,616 allocation.
See details
|
Energy, Department of | 4/16/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $222,000 | Grant |
Renewable Energy Research and Development The object of this project is to develop and demonstrate a new class of tracers that offer great promise for use in characterizing fracture networks in EGS reservoirs. From laboratory synthesis and testing through numerical modeling and field demonstratio
This spending item is part of a $890,059 allocation.
See details
|
Energy, Department of / Golden Field Office | 1/29/2010 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $220,658 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $210,841 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
BIG THOMPSON MESA LLC | $210,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 12/14/2010 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $210,000 | Contract |
Toxic and hazardous waste cleanup at Bethel Valley Burial Grounds (SWSA 1 and SWSA 3)
This spending item is part of a $14,912,999 allocation.
See details
|
Energy, Department of | 9/18/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $208,085 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $207,240 | Grant |
Renewable Energy Research and Development The scope of the project is to address the target specification of topic area 14, ?Supercritical Carbon Dioxide/Reservoir Rock Chemical Interactions? by developing a chemical and kinetic model that predicts mineral precipitation and dissolution within the
This spending item is part of a $944,707 allocation.
See details
|
Energy, Department of / Golden Field Office | 1/29/2010 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $202,350 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
NMC, INC. | $199,999 | Grant | Trans-NSF Recovery Act Reasearch Support Molecular motors are nanoscale machines capable of mechanical motion under energy input or external driving. Their importance for the future nanotechnological applications have been long anticipated. In fact, there are already prototypes of solar batterie | National Science Foundation | 8/25/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $199,646 | Contract | Risk assessment studies will be conducted using the LANL-developed software CO2-PENS with input data provided primarily by other members of the proposal partnership. Los Alamos will focus on developing a simplified computational framework with CO2-PENS t | Energy, Department of | 5/26/2010 |
COMPA INDUSTRIES, INC. | $192,534 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
CE2 CORPORATION, INC. | $188,090 | Contract | The goal of this procurement is to provide technical and drilling services for the ARRA project at Los Alamos Site Office. The Contractor shall provide expert drilling subject matter expert (SME) support to provide technical oversight assistance for the d | Energy, Department of / National Nuclear Security Administration Service Center | 9/29/2010 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $184,940 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $181,631 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CALDERA PHARMACEUTICALS, INC. | $178,915 | Grant | Trans-NIH Recovery Act Research Support Caldera Pharmaceuticals will complete the necessary steps to commercialize its XRflo system. In Phase I we demonstrated the feasibility of this technique to measure unlabeled protein interactions in a fluidic system. XRflo allows for real-time, direct, la | Health and Human Services, Department of / National Institutes of Health | 9/30/2009 |
CALDERA PHARMACEUTICALS, INC. | $178,915 | Grant | Trans-NIH Recovery Act Research Support Caldera Pharmaceuticals will complete the necessary steps to commercialize its XRflo system. | Health and Human Services, Department of / National Institutes of Health | 9/30/2009 |
H. & P., Inc. | $171,682 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $171,259 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $159,974 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $150,464 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
INCORPORATED COUNTY OF LOS ALAMOS | $150,000 | Grant |
Capitalization Grants for Clean Water State Revolving Funds The CWSRF ARRA Grants will provide funding to rural communities for the construction of wastewater treatment facilities which will protect water quality in New Mexico
This spending item is part of a $23,789,100 allocation.
See details
|
Environmental Protection Agency | 7/14/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $144,453 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $131,665 | Grant |
Trans-NIH Recovery Act Research Support Hepatitis B Virus (HBV) infects more than 2 billion people alive today and is responsible for over 1 million deaths caused by acute and chronic hepatitis and hepatocellular carcinoma every year. Although remarkable progress has been made in understanding
This spending item is part of a $474,364 allocation.
See details
|
Health and Human Services, Department of / National Institutes of Health | 7/17/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $122,762 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NEPTUNE AND COMPANY, INCORPORATED | $120,000 | Grant |
Trans-NSF Recovery Act Reasearch Support There is increasing evidence that ecological processes at high latitude are just as sensitive to the timing of events as to their magnitudes. In the boreal forest, moisture availability in summer affects both tree growth and the fire regime. Summers are b
This spending item is part of a $797,130 allocation.
See details
|
National Science Foundation | 6/25/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $115,990 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
HYTEC, INC | $114,783 | Contract | 1 - Varian Paxscan 2520 HiKV X-ray detector | State, Department of | 9/30/2009 |
HYTEC, INC | $114,783 | Contract | 1 - Varian Paxscan 2520 HiKV X-ray detector | State, Department of | 9/30/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $112,530 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $105,000 | Contract |
The Recovery Act funds received by Brookhaven National Laboratory for the PHENIX Forward Vertex Detector have been provided as advance funding to optimize project execution thereby reducing the cost and schedule risk.
This spending item is part of a $967,000 allocation.
See details
|
Energy, Department of | 5/29/2009 |
NORTH WIND, INC. | $104,879 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
INCORPORATED COUNTY OF LOS ALAMOS | $103,000 | Grant |
Energy Efficiency and Conservation Block Grant Program (EECBG) This grant funds multiple energy efficiency and conservation projects across New Mexico. The projects are designed to reduce fossil fuel emissions; reduce total energy use, and improve energy efficiency while creating jobs.
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 2/02/2010 |
LOS ALAMOS NATIONAL SECURITY, LLC | $102,002 | Contract | The Energy Efficiency and Conservation Block Grant program established block grants for every state and their top ten most-populated cities, top ten most-populated counties, and every Native American tribe/pueblo in the state. These funds were leveled usi | Energy, Department of | 7/06/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $101,920 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $100,223 | Contract |
The increased research capabilities afforded by a long baseline neutrino experiment (LBNE) will enable a world-class program in neutrino physics. This effort will protect high-tech jobs in the U.S. companies that specialize in developing. Manufacturing,
This spending item is part of a $6,000,000 allocation.
See details
|
Energy, Department of | 8/19/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $100,000 | Contract |
Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation.
See details
|
Energy, Department of / Office of Science | 5/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $100,000 | Contract |
ARRA Task Description Overall EEPs Technical Assistance to States - Identify regional needs and develop a strategy to respond to them. Provide assistance to the states with Section 410 compliance. State Technical Assistance ? provide specialized ass
This spending item is part of a $16,244,133 allocation.
See details
|
Energy, Department of | 12/09/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $99,061 | Contract | Los Alamos National Laboratory's (LANL) involvement in the proposal will primarily focus on the Phase I and Phase II activities associated with technical risk assessment as described in the Statement of Project Objectives. LANL will be contributing throu | Energy, Department of | 1/27/2010 |
Clover Leaf Enviromental | $98,557 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $94,600 | Contract |
WAS Number: KA/CH14/9/ARRA-3 Advanced Technology R&D Augmentation - The Advanced Technology subprogram of HEP supports research and development on technologies used for particle accelerators and detectors. New proposals or new tasks for existing grants a
This spending item is part of a $3,113,000 allocation.
See details
|
Energy, Department of / Office of Science | 6/05/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $93,468 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $90,664 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $87,234 | Contract |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ENVIRONMENTAL DIMENSIONS INC. | $76,829 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
STRATEGIC MANAGEMENT SOLUTIONS, LLC | $75,208 | Contract |
The DOE Office of Nuclear Physics develops scientific knowledge into the nature of matter and energy. The Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory is needed to make advances in relativistic heavy ions. Because the RHIC is a
This spending item is part of a $1,033,000 allocation.
See details
|
Energy, Department of / Office of Science | 7/30/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $69,170 | Grant |
Trans-NIH Recovery Act Research Support Our goal is to understand the regulation of ErbB signaling in endometrial and breast cancers, diseases where amplification of ErbB genes (EGFR, ErbB2, ErbB3) is associated with poor outcome. The composition of the UNM team is unique, with expertise in sig
This spending item is part of a $611,878 allocation.
See details
|
Health and Human Services, Department of / National Institutes of Health | 7/17/2009 |
MERRICK & COMPANY | $68,674 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
DENUKE CONTRACTING SERVICES, INC. | $55,421 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
B&D INDUSTRIES, INC. | $55,403 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
Curators of The University of Missouri | $54,512 | Contract |
This ARRA award project will develop and demonstrate an innovative polymer-based membrane technology for reducing the energy intensity and the greenhouse gas effect of processes used in the chemical-, fuels-, and power-production industries. Syngas (syn
This spending item is part of a $1,440,000 allocation.
See details
|
Energy, Department of | 9/15/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $53,858 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
A B C CONCRETE MFG. CO., INC. | $52,560 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $50,745 | Contract | Assemble an integrated heat transfer fluid package. | Energy, Department of | 1/27/2010 |
Clover Leaf Enviromental | $48,406 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $46,984 | Contract |
Investment in this project will accelerate the demolition of three surplus building complexes (11 individual buildings) at the Portsmouth Gaseous Diffusion Plant, removal of estimated quantities of soil, and disposition of excess uranium material. This w
This spending item is part of a $110,200,000 allocation.
See details
|
Energy, Department of | 5/06/2009 |
ENVIRONMENTAL DIMENSIONS INC. | $45,245 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
New Mexico Renewable Energy Transmission Authority | $45,000 | Grant |
State Energy Program This grant funds multiple energy efficiency and renewable energy projects across New Mexico. The projects are designed to reduce energy costs; reduce energy consumption; reduce reliance on imported energy; improve reliability of energy supplies; improve d
This spending item is part of a $31,821,000 allocation.
See details
|
Energy, Department of | 4/23/2009 |
KNH TECHNICAL RESOURCES, LLC | $42,294 | Contract |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $41,396 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $40,429 | Contract | he American Reinvestment and Recovery Act of 2009 (ARRA) authorizes the Department of Treasury to award $2.3 billion in tax credits for qualified investments in advanced energy projects. The Advanced Energy Manufacturing Tax Credit (MTC) was authorized | Energy, Department of | 10/30/2009 |
LOPEZ ENGINEERING, INC. | $40,166 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $39,305 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $34,075 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TLI SOLUTIONS, INC. | $32,089 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
WESTON SOLUTIONS, INC. | $32,072 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
DENUKE CONTRACTING SERVICES, INC. | $31,864 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS PUBLIC SCHOOLS | $29,268 | Grant |
Special Education - Preschool Grants, Recovery Act Assist States to make available special education and related services for children with disabilities age 3 through 5 years, and at a State's discretion, to 2 year old children with disabilities who will reach age three during the school year.
This spending item is part of a $3,401,589 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 2/17/2009 |
TECHNOLOGY MANAGEMENT CONSULTING SERVICES INC | $29,184 | Contract |
Proj Descrip & Objectives: This project includes the remediation of Material Disposal Area (MDA) B, and the installation of groundwater monitoring wells to meet Consent Order milestones required by the New Mexico Environmental Dept. (NMED). MDA B is an i
This spending item is part of a $150,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
Q Consultig Svc | $28,060 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
INTEGRATED TECHNOLOGIES CORPORATION | $26,924 | Contract |
Project Description & Objectives: This project includes D&D of a large number of inactive facilities at the LANL Delta Prime (DP) site. This workscope was planned in the LANL EM baseline to allow remediation of a consolidated Solid Waste Management Unit
This spending item is part of a $47,100,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $26,274 | Contract | DOEG??s Advanced Research Projects Agency-Energy (ARPA-E) focuses on technical high-risk, high-payoff concepts--technologies promising true energy transformationsG??that funds projects needed to bring the next generation of energy technologies to fruition | Energy, Department of | 1/27/2010 |
NMC, INC. | $25,256 | Grant |
Trans-NSF Recovery Act Reasearch Support This award is funded under the American Recovery and Reinvestment Act of 2009 (Public Law 111-5). A recent global census of surface loopers (drifter trajectories with a definite sense of rotation) has revealed some unexpected features of the distribution
This spending item is part of a $251,773 allocation.
See details
|
National Science Foundation | 6/04/2009 |
COMPA INDUSTRIES, INC. | $25,135 | Contract |
The goal of this project is to demonstrate an accelerating gradient (Eacc) of 100 MV/m or higher at a quality factor (Q0) of 2 x 1010 or higher with a niobium SRF cavity coated with another higher-Tc superconductor. This will break through the anticipated
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 3/31/2010 |
COMPA INDUSTRIES, INC. | $22,712 | Contract |
Arguably the largest climate impact on terrestrial ecosystems is regional scale vegetation mortality during droughts. There is now abundant evidence of widespread mortality events on all vegetated continents (Allen et al. in press), and model consensus th
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 3/31/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $22,000 | Grant | Conservation Activities by Youth Service Organizations This award funded services provided to NPS at Bandelier National Monument in Los Alamos, NM by the Student Conservation Association (SCA) program, a non-profit organization with a fifty-year record of recruiting, training and maintaining youth crcrews for c... Show more | Interior, Department of / National Park Service | 9/21/2009 |
LOS ALAMOS NATIONAL SECURITY, LLC | $6,105 | Contract | DOEG??s Advanced Research Projects Agency-Energy (ARPA-E) focuses on technical high-risk, high-payoff concepts--technologies promising true energy transformationsG??and funds projects to bring the next generation of energy technologies to fruition. ARPA | Energy, Department of | 9/15/2009 |
FRANK'S SUPPLY COMPANY INC. (NSL) | $6,000 | Contract | Carson National Forest rented a variety of construction equipment in April and May of 2010. | Agriculture, Department of / Forest Service | 9/15/2010 |
ANDREWS AND ANDERSON ARCHITECT PC | $2,097 | Contract |
This project consisted of an onsite Design Charette for Juniper Campground at Bandelier National Monument in New Mexico. Members from the A/E team travelled to the site to conduct the meeting in which discussions were held and to provide analysis of the
This spending item is part of a $41,043 allocation.
See details
|
Interior, Department of / National Park Service | 9/04/2009 |
MULTIPLE RECIPIENTS | $2,000 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 9/30/2009 |
LEROY EUGENE BRITTON ESTATE | $1,946 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 1/21/2011 |
MULTIPLE RECIPIENTS | $1,750 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 12/31/2009 |
MULTIPLE RECIPIENTS | $1,297 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/30/2010 |
MULTIPLE RECIPIENTS | $750 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 9/30/2010 |
MULTIPLE RECIPIENTS | $618 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/30/2010 |
MULTIPLE RECIPIENTS | $500 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 6/30/2010 |
MULTIPLE RECIPIENTS | $435 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/31/2010 |
MULTIPLE RECIPIENTS | $350 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 4/30/2010 |
MULTIPLE RECIPIENTS | $250 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 3/31/2010 |
MULTIPLE RECIPIENTS | $250 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 12/31/2010 |
TRANSPORTATION, NEW MEXICO DEPARTMENT OF | $0 | Grant |
Highway Planning and Construction Highway Infrastructure Investment Grants
This spending item is part of a $1,901,034 allocation.
See details
|
Transportation, Department of / Federal Highway Administration | 10/15/2009 |