New York County, N.Y., funds by General Services Administration
Listing $69,320,659.01 in stimulus funds from General Services Administration for New York
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
FOX INDUSTRIES, LTD. | $16,477,242 | Renovation of 26 Federal Plaza. Exterior renovation of Plaza Area with extensive repairs and remediation activities. Project Location, Jacob K. Javits Federal Building at 26 Federal Plaza, New York New York 10278 | Public Buildings Service | 6/16/2010 |
PHIFER, THOMAS & PARTNERS LLP | $10,397,494 | Architect-Engineer services for the San Juan FBI building - San Juan, Puerto Rico | Public Buildings Service | 3/31/2010 |
CAULDWELL-WINGATE COMPANY, LLC | $9,316,318 |
The Thurgood Marshall Courthouse infrastructure upgrade.
This spending item is part of a $64,000,000 allocation.
See details
|
Public Buildings Service | 4/15/2009 |
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. | $5,399,559 | install 5 energy efficient electric chillers , 26 Federal Plaza, NY,NY, cost outcome =$3,346,333.00 using Americian Recovery Reinvestment Act Award | Public Buildings Service | 1/21/2010 |
SYNTHESIS INC | $2,774,291 | This is a pre-design, design-build, start-up and testing services energy efficiency project. The project includes engineering, equipment, supervision, material and labor to replace the building automation system front end located in the building's baseme | Public Buildings Service | 3/29/2010 |
SYNTHESIS INC | $2,469,112 | Installed localized lighting controls for automatic lighting control in all common building areas and tenant spaces. Installed conduit, wiring, switches, timers, fixtures, sensors, override switches, remote power packs, and other required materials. | Public Buildings Service | 3/29/2010 |
WANK ADAMS SLAVIN ASSOCIATES LLP | $1,904,185 |
Recipient has been retained by the United States General Services Administration to analyze and design a solution to a chronic water-leakage problem existing at the Jacob K Javitz Federal Building located in Downtown Manhattan. Specifically, the outside
This spending item is part of a $1,940,395 allocation.
See details
|
Public Buildings Service | 8/26/2009 |
EYP MISSION CRITICAL FACILITIES, INC. | $1,612,578 |
The award requries the Lessor (Vertex Non-Profit Holdings, Inc.) to lease to the Government approximately 54,157 rentable square feet of office space, IT/Computing space and related support space within the I-79 Technology Park Research Center located at
This spending item is part of a $22,320,817 allocation.
See details
|
Public Buildings Service | 8/31/2010 |
SYNTHESIS INC | $924,940 | High-performance lighting replacement project which will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants. 1. Highly efficient overhead lighting fixtures. 2. Lower overhead lighting intensit | Public Buildings Service | 3/30/2010 |
GOSHOW ARCHITECTS, L.L.P. | $849,914 |
A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico.
This spending item is part of a $2,511,324 allocation.
See details
|
Public Buildings Service | 7/31/2009 |
JACOBS PROJECT MANAGEMENT CO. | $788,036 | The contractor shall provide engineering and commissioning expertise to conduct re-commissioning/retro-commissioning planning, identify energy and water conservation, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, a | Public Buildings Service | 8/14/2009 |
TRIO ASBESTOS REMOVAL CORP. | $751,888 | Performing Architectural Fa+?ade Study for roof, wall, and window assemblies to provide recommendations for future upgrades. Providing new energy efficient main entrance and loading dock doors. | Public Buildings Service | 3/29/2010 |
WSP FLACK + KURTZ, INC. | $749,084 |
Design services and Bridging Design documents as related to the modernization of the Rodino Federal Office Building in Newark, New Jersey. Specific deliverables include bridging design drawings, performance specifications, owners program requirements and
This spending item is part of a $4,252,522 allocation.
See details
|
Public Buildings Service | 7/06/2009 |
SIEGEL, ROBERT | $654,930 |
The purpose of the Pierre Federal Building project is to modernize the building by replacing the existing curtain wall system, mitigate water infiltration issues and repair stone soffit panel connections while updating the architectural appeal of the buil
This spending item is part of a $7,655,673 allocation.
See details
|
Public Buildings Service | 3/19/2010 |
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. | $641,570 | install lighting control system- 26 federal plaza, NY, NY-, cost of arra funding outcome is $0. no ivoices submitted | Public Buildings Service | 1/29/2010 |
JAY SHAPIRO & ASSOCIATES INC. | $627,257 | Construction Management Services for Building Systems Project at IRS Brookhaven Customer Service Center in Holtsville, NY. | Public Buildings Service | 6/23/2010 |
RICHARD MCELHINEY ARCHITECT, PLLC | $621,764 |
Design services and Bridging Design documents as related to the modernization of the Rodino Federal Office Building in Newark, New Jersey. Specific deliverables include bridging design drawings, performance specifications, owners program requirements and
This spending item is part of a $4,252,522 allocation.
See details
|
Public Buildings Service | 7/06/2009 |
THYSSENKRUPP ELEVATOR CORPORATION | $620,000 |
System Upgrade & Energy Conservation Measures Project at Newark, NJ VA Federal Building
This spending item is part of a $1,097,001 allocation.
See details
|
Public Buildings Service | 3/25/2010 |
WSP FLACK + KURTZ, INC. | $551,406 |
A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico.
This spending item is part of a $2,511,324 allocation.
See details
|
Public Buildings Service | 7/31/2009 |
KIMSOOJA STUDIO | $550,000 |
The Mariposa Land Port of Entry is a full service port inspecting privately operated vehicles, buses, pedestrians, and commercial vehicles. The Port is in the City of Nogales, Arizona immediately north of Nogales, Sonora, Mexico. The Mariposa Land Port of
This spending item is part of a $7,703,475 allocation.
See details
|
Public Buildings Service | 3/29/2010 |
DATTNER ARCHITECTS P.C. | $525,825 |
A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico.
This spending item is part of a $2,511,324 allocation.
See details
|
Public Buildings Service | 7/31/2009 |
INTEGRATED CONSTRUCTION ENTERPRISES, INC. | $515,248 | Perform Mechanical and Electrical Tune-up Revisions at the Alexander Hamilton Custom House, One Bowling Green, New York, New York | Public Buildings Service | 3/29/2010 |
MCDONOUGH BOLYARD PECK, INC. | $505,805 | McDonough Bolyard Peck, Inc. is to provide construction management services for all phases of the Jacob K. Javits Federal Building Plaza Reconstruction project in New York, NY from design through construction: design development, construction delivery, an | Public Buildings Service | 12/28/2009 |
JACOBS TECHNOLOGY INC. | $475,605 | The goal of this project is to identify Energy Conservation Measures (ECMs) that reduce energy consumption, develop scopes of work, then develop construction documentation, and implement the opportunities that will provide an energy savings. The final ste | Public Buildings Service | 6/07/2010 |
WSP FLACK + KURTZ, INC. | $473,252 |
Analyze and confirm specific energy conservation and renewable energy generation features to be included in the Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, New York
This spending item is part of a $917,352 allocation.
See details
|
Public Buildings Service | 11/17/2009 |
JACOBS TECHNOLOGY INC. | $434,276 | Provide services to prepare a scope of work and estimate package for the solicitation of design / build contracts for six federal buildings in Region 2. The contractor will attend a kick-off meeting, review reports and other relative background informatio | Public Buildings Service | 2/19/2010 |
WEIDLINGER ASSOCIATES, INC. | $382,805 |
This contract is a for Architectural/Engineering services for the design of a federal employee parking garage and a master plan for the San Juan, PR Federal Bureau of Investigations Field Office Consolidation project. The project as a whole will result i
This spending item is part of a $1,705,131 allocation.
See details
|
Public Buildings Service | 7/02/2009 |
CLIFFORD ROSS STUDIO LLC | $364,035 | Create stained glass art wall for Federal Courhouse in Austin, TX | Public Buildings Service | 7/24/2009 |
RICCIGREENE ARCHITECTS, P.C. | $332,239 |
Gensler has been awarded a contract through the GSA for design and design-related services for the 'Recovery' project entitled 'Repairs and Alterations to the Prince Jonah Kuhio Kalanianaole Federal Building and U.S. Courthouse located at 300 Ala Moana Bo
This spending item is part of a $32,457,801 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
WSP FLACK + KURTZ, INC. | $308,195 |
Continuing construction administration services for the renovation of Emanuel Celler Courthouse. **Although the stimulus money received did not provide full time employment for the job descriptions listed under Description of Jobs Created, it did provide
This spending item is part of a $765,756 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
RICHARD MCELHINEY ARCHITECT, PLLC | $297,521 |
A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico.
This spending item is part of a $2,511,324 allocation.
See details
|
Public Buildings Service | 7/31/2009 |
SIEMENS INDUSTRY, INC. | $290,000 |
Design and Implement Energy Conservation Measures at the U.S. Courthouse lcated at 500 Pearl Street, NY,NY.
This spending item is part of a $753,184 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
SIEGEL, ROBERT | $267,755 |
Design Build Contract for New Port of Entry, Van Buren, ME
This spending item is part of a $33,799,815 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
M.E.R.I.T. INVESTIGATIVE SERVICES, INC. | $258,308 |
Design and Implement Energy Conservation Measures at the U.S. Courthouse lcated at 500 Pearl Street, NY,NY.
This spending item is part of a $753,184 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
LANGAN ENGINEERING AND ENVIRONMENTAL SERVICES, INC. | $257,737 |
This contract is a for Architectural/Engineering services for the design of a federal employee parking garage and a master plan for the San Juan, PR Federal Bureau of Investigations Field Office Consolidation project. The project as a whole will result i
This spending item is part of a $1,705,131 allocation.
See details
|
Public Buildings Service | 7/02/2009 |
WSP FLACK + KURTZ, INC. | $245,336 |
Architectural and Engineering (Mechanical, Electrical, Plumbing) / Design Plans, Cost Estimate and Specifications for Lafayette Modernization Washington, DC. Construction Management.
This spending item is part of a $4,062,378 allocation.
See details
|
Public Buildings Service | 6/05/2009 |
Dewhurst Macfarlane and Partners P.C. | $238,217 |
GOALS: The purpose of the McCoy Federal Building Modernization Project is to create a state-ofG??the art working environment for Federal tenants in Jackson, minimize future vacancies, operational efficiency and economy in building systems and provide prog
This spending item is part of a $3,635,607 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
DAVIS LANGDON, INC. | $231,425 |
Construction Management and Commissioning Management Services for Phases 2 and 3 of the Modernization of the US Department of Commerce Headquarters in the Herbert C. Hoover Building in Washington, DC. The Herbert C. Hoover Systems Replacement project is a
This spending item is part of a $8,573,851 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
HORTON LEES BROGDEN LIGHTING DESIGN INC. | $225,866 |
Gensler has been awarded a contract through the GSA for design and design-related services for the 'Recovery' project entitled 'Repairs and Alterations to the Prince Jonah Kuhio Kalanianaole Federal Building and U.S. Courthouse located at 300 Ala Moana Bo
This spending item is part of a $32,457,801 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
KALLEN & LEMELSON, LLP | $213,856 |
This contract is a for Architectural/Engineering services for the design of a federal employee parking garage and a master plan for the San Juan, PR Federal Bureau of Investigations Field Office Consolidation project. The project as a whole will result i
This spending item is part of a $1,705,131 allocation.
See details
|
Public Buildings Service | 7/02/2009 |
RGBS ENTERPRISES, INC. | $200,057 |
Install Advanced Water Metering Integration at Various Locations NYC This is a design/ build project complete with survey and engineering. Provide surveying, engineering, equipment, supervision, material and labor for the installation of advanced water m
This spending item is part of a $294,507 allocation.
See details
|
Public Buildings Service | 9/22/2010 |
Integrated Conservation Resources, Inc | $200,000 |
Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201
This spending item is part of a $61,746,842 allocation.
See details
|
Public Buildings Service | 7/27/2009 |
ROBERT SILMAN ASSOCIATES, P.C. | $175,808 |
Design services and Bridging Design documents as related to the modernization of the Rodino Federal Office Building in Newark, New Jersey. Specific deliverables include bridging design drawings, performance specifications, owners program requirements and
This spending item is part of a $4,252,522 allocation.
See details
|
Public Buildings Service | 7/06/2009 |
HILLIER ARCHITECTURE | $173,775 | Post Design Architectural and Engineering construction administration services for the restoration of the 1930s steel windows at the William J. Nealon Federal Building and Courthouse in Scranton, PA. The base bid includes the restoration of the windows o | Public Buildings Service | 9/30/2010 |
VERA LUTTER LLC | $150,000 | Art in architecture for Edith Green windor wyatt federal building in Portland, Oregon. | Public Buildings Service | 1/20/2011 |
JACOBS TECHNOLOGY INC. | $149,718 | Jacobs is currently contracted to provide a deputy program analyst in the GSA Region 2 office to support the region with general and administrative functions, budget analysis, schedule analysis, GSA project controls system database population and manageme | Public Buildings Service | 10/22/2010 |
RGBS ENTERPRISES, INC. | $138,390 |
Install Advanced Metering at the US Mission to the United Nations Provide engineering, equipment, supervision, material and labor for the installation of advanced metering. Components include two (2) electrical meters, one (1) steam meter, one (1) domest
This spending item is part of a $186,240 allocation.
See details
|
Public Buildings Service | 8/20/2010 |
Israel Berger & Associates, Inc | $137,054 |
Design services and Bridging Design documents as related to the modernization of the Rodino Federal Office Building in Newark, New Jersey. Specific deliverables include bridging design drawings, performance specifications, owners program requirements and
This spending item is part of a $4,252,522 allocation.
See details
|
Public Buildings Service | 7/06/2009 |
ROLLINS, TIM | $135,000 | Public Art GSA Art and Architecture | Public Buildings Service | 9/27/2010 |
JACOBS TECHNOLOGY INC. | $117,033 | Jacobs is contracted to perform a project audit on the Thurgood Marshall Courthouse Modernization to ascertain if the project can be completed within the remaining funding and contract duration and if not, determine the funds and time needed to do so. In | Public Buildings Service | 10/26/2010 |
Brittashan Enterprises Corp | $115,000 |
Design and Implement Energy Conservation Measures at the U.S. Courthouse lcated at 500 Pearl Street, NY,NY.
This spending item is part of a $753,184 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
DOMINGO GONZALEZ ASSOCIATES | $107,980 |
Design services and Bridging Design documents as related to the modernization of the Rodino Federal Office Building in Newark, New Jersey. Specific deliverables include bridging design drawings, performance specifications, owners program requirements and
This spending item is part of a $4,252,522 allocation.
See details
|
Public Buildings Service | 7/06/2009 |
Tillotson Design Associates, Inc. | $103,488 |
GOALS: The purpose of the McCoy Federal Building Modernization Project is to create a state-ofG??the art working environment for Federal tenants in Jackson, minimize future vacancies, operational efficiency and economy in building systems and provide prog
This spending item is part of a $3,635,607 allocation.
See details
|
Public Buildings Service | 7/29/2009 |
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. | $94,000 | Howard St garage upgrades, replace lighting with energy efficient lighting for 5 floors. 98 fixtures.Cost outcome due to ARRA funds is 94,000. | Public Buildings Service | 12/30/2009 |
Eng-Wong, Taub & Associates, PA | $90,846 |
This contract is a for Architectural/Engineering services for the design of a federal employee parking garage and a master plan for the San Juan, PR Federal Bureau of Investigations Field Office Consolidation project. The project as a whole will result i
This spending item is part of a $1,705,131 allocation.
See details
|
Public Buildings Service | 7/02/2009 |
FARO WORLD INC | $87,144 | Design Concept for artwork to enhance the Federal Bureau of Investigation Consolidation Project in San Juan, Puerto Rico | Public Buildings Service | 9/30/2010 |
ATELIER TEN USA LLC | $86,355 |
Architectural and engineering lighting studies for the Sam Gibbons United States District Courthouse in Tampa, Florida
This spending item is part of a $128,061 allocation.
See details
|
Public Buildings Service | 11/30/2009 |
ACCU-COST CONSTRUCTION CONSULTANTS INC | $85,370 |
A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico.
This spending item is part of a $2,511,324 allocation.
See details
|
Public Buildings Service | 7/31/2009 |
HATCH MOTT MACDONALD NY INC. | $84,976 |
Design and Implement Energy Conservation Measures at the U.S. Courthouse lcated at 500 Pearl Street, NY,NY.
This spending item is part of a $753,184 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
WEIDLINGER ASSOCIATES, INC. | $80,000 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
JACOBS TECHNOLOGY INC. | $78,864 | Jacobs was contracted for commissioning services for the chiller replacement at Jacob K. Javits Federal Building at 26 Federal Plaza. Responsibilities include the development of Owner objectives, the development of a commissioning plan, population and man | Public Buildings Service | 9/10/2010 |
WEIDLINGER ASSOCIATES, INC. | $70,195 |
Design services and Bridging Design documents as related to the modernization of the Rodino Federal Office Building in Newark, New Jersey. Specific deliverables include bridging design drawings, performance specifications, owners program requirements and
This spending item is part of a $4,252,522 allocation.
See details
|
Public Buildings Service | 7/06/2009 |
CANTOR SEINUK GROUP, INC., THE | $69,712 |
A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico.
This spending item is part of a $2,511,324 allocation.
See details
|
Public Buildings Service | 7/31/2009 |
ACCU-COST CONSTRUCTION CONSULTANTS INC | $65,109 |
This contract is a for Architectural/Engineering services for the design of a federal employee parking garage and a master plan for the San Juan, PR Federal Bureau of Investigations Field Office Consolidation project. The project as a whole will result i
This spending item is part of a $1,705,131 allocation.
See details
|
Public Buildings Service | 7/02/2009 |
CANTOR SEINUK GROUP, INC., THE | $58,914 |
Analyze and confirm specific energy conservation and renewable energy generation features to be included in the Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, New York
This spending item is part of a $917,352 allocation.
See details
|
Public Buildings Service | 11/17/2009 |
WEIDLINGER ASSOCIATES, INC. | $57,100 |
Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation.
See details
|
Public Buildings Service | 6/28/2010 |
ESTEBAN A & CO INC | $53,340 |
Design services and Bridging Design documents as related to the modernization of the Rodino Federal Office Building in Newark, New Jersey. Specific deliverables include bridging design drawings, performance specifications, owners program requirements and
This spending item is part of a $4,252,522 allocation.
See details
|
Public Buildings Service | 7/06/2009 |
LANGAN ENGINEERING AND ENVIRONMENTAL SERVICES, INC. | $51,662 |
A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico.
This spending item is part of a $2,511,324 allocation.
See details
|
Public Buildings Service | 7/31/2009 |
WEIDLINGER ASSOCIATES, INC. | $50,313 |
Continuing construction administration services for the renovation of Emanuel Celler Courthouse. **Although the stimulus money received did not provide full time employment for the job descriptions listed under Description of Jobs Created, it did provide
This spending item is part of a $765,756 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
SPIRAX SARCO, INC. | $48,850 |
Install Advanced Water Metering Integration at Various Locations NYC This is a design/ build project complete with survey and engineering. Provide surveying, engineering, equipment, supervision, material and labor for the installation of advanced water m
This spending item is part of a $294,507 allocation.
See details
|
Public Buildings Service | 9/22/2010 |
WSP FLACK + KURTZ, INC. | $47,100 |
Construction Management Agent and Commissioning Agent services for Galveston United States Post Office/Courthouse repairs & alterations. (TX0081ZZ located at 601 Rosenberg St., Galveston, TX 77550). Recovery & historic preservation of the Federal Office
This spending item is part of a $365,043 allocation.
See details
|
Public Buildings Service | 3/04/2010 |
DOMINGO GONZALEZ ASSOCIATES | $46,948 |
A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico.
This spending item is part of a $2,511,324 allocation.
See details
|
Public Buildings Service | 7/31/2009 |
Shelter Electric | $45,600 |
Install Advanced Water Metering Integration at Various Locations NYC This is a design/ build project complete with survey and engineering. Provide surveying, engineering, equipment, supervision, material and labor for the installation of advanced water m
This spending item is part of a $294,507 allocation.
See details
|
Public Buildings Service | 9/22/2010 |
EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS, P.C. | $44,580 |
Design services for High Performance Green Building-Limited Scope (HPGB-LS). Building tune-up project to include a report/study that results from the recommissioning balance/controls optimization efforts and provide minor fixes, replacements, and adjustme
This spending item is part of a $913,669 allocation.
See details
|
Public Buildings Service | 11/17/2009 |
EVERGREENE ARCHITECTURAL ARTS, INC. | $41,636 |
Richard Sheppard Arnold U.S. Courthouse, Little Rock, AR. Upgrade of life-safety systems, and realign and upgrade tenant space. This is the last phase of a 3-phase renovation program and will include, but not limited to the following work: extend the new
This spending item is part of a $6,950,000 allocation.
See details
|
Public Buildings Service | 7/27/2009 |
B & H FOTO & ELECTRONICS CORP. | $38,535 | Order has not shipped yet. | Public Buildings Service | 6/06/2011 |
Concost Associates Inc | $36,210 |
Recipient has been retained by the United States General Services Administration to analyze and design a solution to a chronic water-leakage problem existing at the Jacob K Javitz Federal Building located in Downtown Manhattan. Specifically, the outside
This spending item is part of a $1,940,395 allocation.
See details
|
Public Buildings Service | 8/26/2009 |
LCOR ASSET MANAGEMENT LTD | $36,048 | Installation of carbon filters at 26 Federal Plaza to mitigate the odor emanating from the waterproofing project on the plaza . | Public Buildings Service | 8/29/2011 |
212/HARAKAWA INC. | $34,106 |
Continuing construction administration services for the renovation of Emanuel Celler Courthouse. **Although the stimulus money received did not provide full time employment for the job descriptions listed under Description of Jobs Created, it did provide
This spending item is part of a $765,756 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
Shelter Electric | $32,476 |
Install Advanced Metering at the US Mission to the United Nations Provide engineering, equipment, supervision, material and labor for the installation of advanced metering. Components include two (2) electrical meters, one (1) steam meter, one (1) domest
This spending item is part of a $186,240 allocation.
See details
|
Public Buildings Service | 8/20/2010 |
EVANS HEINTGES ARCHITECTS, PLLC | $31,430 |
Continuing construction administration services for the renovation of Emanuel Celler Courthouse. **Although the stimulus money received did not provide full time employment for the job descriptions listed under Description of Jobs Created, it did provide
This spending item is part of a $765,756 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
EVERGREENE ARCHITECTURAL ARTS, INC. | $30,329 |
Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation.
See details
|
Public Buildings Service | 6/28/2010 |
ACCU-COST CONSTRUCTION CONSULTANTS INC | $28,058 |
Analyze and confirm specific energy conservation and renewable energy generation features to be included in the Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, New York
This spending item is part of a $917,352 allocation.
See details
|
Public Buildings Service | 11/17/2009 |
LANGAN ENGINEERING AND ENVIRONMENTAL SERVICES, INC. | $21,932 |
Analyze and confirm specific energy conservation and renewable energy generation features to be included in the Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, New York
This spending item is part of a $917,352 allocation.
See details
|
Public Buildings Service | 11/17/2009 |
CLASSIC ENVIRONMENTAL, INC. | $19,190 | PROJECT MONITORING/AIR SAMPLING FOR THE ABATEMENT OF 10 ELECTRICAL CLOSETS AT 26 FEDERAL PLAZA, NY, NY | Public Buildings Service | 12/14/2011 |
SPIRAX SARCO, INC. | $15,374 |
Install Advanced Metering at the US Mission to the United Nations Provide engineering, equipment, supervision, material and labor for the installation of advanced metering. Components include two (2) electrical meters, one (1) steam meter, one (1) domest
This spending item is part of a $186,240 allocation.
See details
|
Public Buildings Service | 8/20/2010 |
FEDCAP REHABILITATION SERVICES, INC. | $12,788 | Provide labor to dipsoe of furniture,cabinets, ETC out of room B-48, Sub-basement, INS & CIS rooms | Public Buildings Service | 4/06/2010 |
STYLO CONSTRUCTION CORPORATION | $12,696 | This contract consited of the removal of damaged sheetrock and replacing it, the cleaning and painting of walls, the removal of vinyl floor tile and the installation of new tile and cove base. It also consisted of the installation of electrical outlets a | Public Buildings Service | 4/06/2010 |
SURVEILLANCE ENTERPRISES INC. | $11,980 | PROVIDE AND INSTALL SECURITY EQUIPMENT INCLUDING 4 READERS | Public Buildings Service | 7/12/2010 |
SURROUNDART | $11,074 | Reinstallation of laning murals on walls, New York City | Public Buildings Service | 9/07/2010 |
CLASSIC ENVIRONMENTAL, INC. | $10,971 | Project monitoring and sampling for asbestos pipe elbow insulation removal in garage of 26 Federal Plaza, New York, New York | Public Buildings Service | 9/26/2011 |
STRATUS CORPORATION | $10,400 | Project Monitoring for Asbestos at 26 Federal Plaza New York, NY | Public Buildings Service | 1/18/2011 |
L B & B ASSOCIATES INC. | $9,796 | Miscellaneous projects at Moynihan Building | Public Buildings Service | 4/13/2010 |
RGBS ENTERPRISES, INC. | $9,532 | FBI Cooling Tower at 26 Federal Plaza - Contract #GS-02P-11-PJ-P-0110 - Provide engineering, equipment, supervision, material and labor for the installation of one flow meter FBI (Federal Bureau of Investigations)Cooling Tower at 26 Federal Plaza and all | Public Buildings Service | 6/13/2011 |
STRATUS CORPORATION | $9,189 | Project Monitoring, air and wipe sampling for the duration of the lead cleaning of both firing ranges in 26 Federal Plaza | Public Buildings Service | 4/21/2011 |
CLASSIC ENVIRONMENTAL, INC. | $7,105 | AMBIENT AIR SAMPLING CONDUCTED BASEMENT ROOMS AS DESIGNATED IN CONTRACT OF 26 FEDERAL PLAZA AND 1 FEDERAL PLAZA | Public Buildings Service | 1/17/2012 |
CRS-CORPORTE RELOCATION SYSTEMS INC | $4,921 | Move stored items from 26 Federal Plaza - Room B48 to 201 Varick Street. | Public Buildings Service | 4/16/2010 |
EVERGREENE ARCHITECTURAL ARTS, INC. | $4,500 |
Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation.
See details
|
Public Buildings Service | 6/28/2010 |
FEDCAP REHABILITATION SERVICES, INC. | $3,744 | PROVIDE LABOR TO MOVE CABINETS AND EMPTY GUN CASES OUT OF FPS ROOM 1&2 ALSO CLEAN OUT OUT ROOM B-114B | Public Buildings Service | 4/06/2010 |
STYLO CONSTRUCTION CORPORATION | $2,460 | To construct a new wall. Prime and paint the wall. Install new cove base. | Public Buildings Service | 4/12/2010 |
RRC-HILLMANN JV | $2,071 | Asbestos and Lead Survey Screening to include sampling and Project Monitoring for the Lafayette Plaza garage area entrance, and CIT Stairwell A. Deliverable to determine if and amount of lead or asbestos present. | Public Buildings Service | 10/18/2010 |
STRATUS CORPORATION | $1,814 | Lead in Air Monitoring at 26 Federal Plaza New York, NY (Garage) | Public Buildings Service | 3/03/2011 |
STRATUS CORPORATION | $1,719 | Project monitoing/Competent Persons for Asbestos Consulting at 1 Federal Plaza New York, NY | Public Buildings Service | 12/03/2010 |
RRC-HILLMANN JV | $1,275 | Duch Shaft Sampling and Limited Asbestos Investigation and Lead Screening Services. | Public Buildings Service | 11/18/2010 |
CLASSIC ENVIRONMENTAL, INC. | $742 | Industrial Hygienist services to perform air sampling at the IRS, Holtsville, New York | Public Buildings Service | 9/21/2011 |
STRATUS CORPORATION | $716 | Sampling at 26 Federal Plaza. Collect samples of waterproofing | Public Buildings Service | 5/04/2011 |
RRC-HILLMANN JV | $687 | Lead screening survey to include sampling to determine if lead present at DHS Firing Range, 26 Federal Plaza, New York, NY. | Public Buildings Service | 2/15/2011 |