Steuben County, N.Y., funds by Department of Veterans Affairs
Listing $7,839,964.16 in stimulus funds from Department of Veterans Affairs for Steuben
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
B R CONSTRUCTION LLC | $2,047,000 | This project will upgrade the electrical distribution for the Veterans Administration Medical Center in Bath, NY. The Project includes construction of new medium voltage ductbank, manhole and cable systems to serve the existing campus buildings. The new | Department of Veterans Affairs | 2/02/2010 |
FREY & CAMPBELL, INC. | $1,197,619 |
demolition and removal of existing structures, and furnish labor and materials and perform work to Upgrade the HVAC Systems at the Building 92
This spending item is part of a $2,001,437 allocation.
See details
|
Department of Veterans Affairs | 9/28/2009 |
ROBERT F. HYLAND & SONS, LLC | $1,169,119 |
Furhish all tools,labor and materials to complete the work to develop building # 17 at the Bath,VA into a print shop.Work involves renovating approximately 4896 s.f of existing building and building a new 1680 sf 2 story addition to provide an acessible
This spending item is part of a $1,200,000 allocation.
See details
|
Department of Veterans Affairs | 5/21/2010 |
PETERSON AFFILIATES INC | $810,072 | Replacement of drainage system in building 76. | Department of Veterans Affairs | 1/28/2010 |
FREY & CAMPBELL, INC. | $584,500 |
Order number 528C050048 is for the replacement of existing heating system and includes moficifations to existing fire protection system, electrical system and asbestos abatement along with associated renovations to existing structure to facilitate access
This spending item is part of a $1,418,806 allocation.
See details
|
Department of Veterans Affairs | 10/22/2009 |
KEUKA CONSTRUCTION CORPORATION | $433,675 |
Order number 528C050048 is for the replacement of existing heating system and includes moficifations to existing fire protection system, electrical system and asbestos abatement along with associated renovations to existing structure to facilitate access
This spending item is part of a $1,418,806 allocation.
See details
|
Department of Veterans Affairs | 10/22/2009 |
ROBERT F. HYLAND & SONS, LLC | $376,210 |
Furnish all tools, labor and materials to complete the work to develop building # 17 at the Bath,VA into a print shop.Work involves renovating approximately 4896 s.f of existing building (Renovation Phase) and building a new 1680 sf 2 story addition to p
This spending item is part of a $1,267,870 allocation.
See details
|
Department of Veterans Affairs | 5/21/2010 |
E B ATLAS STEEL CORP | $311,474 |
demolition and removal of existing structures, and furnish labor and materials and perform work to Upgrade the HVAC Systems at the Building 92
This spending item is part of a $2,001,437 allocation.
See details
|
Department of Veterans Affairs | 9/28/2009 |
NORTHERN DREAMS CONSTRUCTION, INC. | $267,817 |
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for electrical upgrades and related work as required by drawings and specifications
This spending item is part of a $1,633,095 allocation.
See details
|
Department of Veterans Affairs | 7/30/2010 |
Doug Gross Construction Inc | $168,000 |
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for electrical upgrades and related work as required by drawings and specifications
This spending item is part of a $1,633,095 allocation.
See details
|
Department of Veterans Affairs | 7/30/2010 |
FREY & CAMPBELL, INC. | $155,800 |
Renovations to existing Building 39 Chapel was completed in October 2010
This spending item is part of a $319,000 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
KEUKA CONSTRUCTION CORPORATION | $103,105 |
Renovations to existing Building 39 Chapel was completed in October 2010
This spending item is part of a $319,000 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
SPD Corp. | $85,650 |
demolition and removal of existing structures, and furnish labor and materials and perform work to Upgrade the HVAC Systems at the Building 92
This spending item is part of a $2,001,437 allocation.
See details
|
Department of Veterans Affairs | 9/28/2009 |
BLACKMON-FARRELL ELECTRIC, INC | $73,000 |
Electrical distrbution system in Building 41 @ the VA Medical Center, Bath, NY
This spending item is part of a $99,773 allocation.
See details
|
Department of Veterans Affairs | 10/14/2009 |
VETERAN ENTERPRISES CO., INC. | $26,773 |
Electrical distrbution system in Building 41 @ the VA Medical Center, Bath, NY
This spending item is part of a $99,773 allocation.
See details
|
Department of Veterans Affairs | 10/14/2009 |
Corning Carpet & Tile Inc | $25,500 |
Renovations to existing Building 39 Chapel was completed in October 2010
This spending item is part of a $319,000 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
Corning Carpet & Tile Inc | $4,650 |
Order number 528C050048 is for the replacement of existing heating system and includes moficifations to existing fire protection system, electrical system and asbestos abatement along with associated renovations to existing structure to facilitate access
This spending item is part of a $1,418,806 allocation.
See details
|
Department of Veterans Affairs | 10/22/2009 |
ARSENAL CONTRACTING LLC | $0 |
demolition and removal of existing structures, and furnish labor and materials and perform work to Upgrade the HVAC Systems at the Building 92
This spending item is part of a $2,001,437 allocation.
See details
|
Department of Veterans Affairs | 9/28/2009 |