Pembina County, N.D.
U.S. | North Dakota | Pembina | |
---|---|---|---|
Population | 308,745,538 | 672,591 | 7,420 |
Total recovery funding | $522,082,377,600 | $1,628,705,667 | $36,888,301 |
Funding per Capita | $1,691 | $2,422 | $4,971 |
Unemployment
7/2008 |
6.2 |
3.2 |
5.6 |
7/2009 |
+3.6
9.8 |
+0.8
4.0 |
+0.7
6.3 |
7/2010 |
-0.2
9.6 |
-0.5
3.5 |
-0.2
6.1 |
7/2011 |
-0.6
9.0 |
-0.1
3.4 |
+0.9
7.0 |
7/2012 |
-0.9
8.1 |
-0.5
2.9 |
-0.7
6.3 |
This site was updated in September 2012. It includes recipient-reported data through the second quarter of 2012, which was released in July 2012.
Important: This interactive database is not kept up-to-date and should be treated as a historical snapshot. As records may have changed since we stopped making updates, researchers and consultants wishing to use the data should check against original sources for accuracy before using any data published here.
Those wishing to download the data can find it at the ProPublica Data Store.
Funding by Federal Agency and Department
Click total to see spending list | ||
---|---|---|
U.S. Army Corps of Engineers | $16,259,976 | |
Agriculture, Department of | $8,726,357 | |
Transportation, Department of | $4,158,114 | |
General Services Administration | $3,152,881 | |
Environmental Protection Agency | $2,014,181 | |
Education, Department of | $1,439,840 | |
Social Security Administration | $414,750 | |
Small Business Administration | $360,000 | |
Energy, Department of | $277,455 | |
Department of the Air Force | $84,747 |
Projects
Stimulus contracts, grants and loans in Pembina County, N.D.
Data last updated on September 2012.
We have CSV files available for download. Sign up here.
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
COLSTRIP ELECTRIC INC | $2,964,039 | Contract | The contract award is for the design, engineering and construction of a 1.0MW Nordic Wind Turbine at the Pembina Border Crossing Station in Pembina, ND. | General Services Administration / Public Buildings Service | 9/14/2010 |
INNOVATIVE TECHNICAL SOLUTIONS, INC. | $2,710,600 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
INNOVATIVE TECHNICAL SOLUTIONS, INC. | $2,330,622 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
DRAYTON, CITY OF | $1,547,000 | Grant |
Capitalization Grants for Clean Water State Revolving Funds Administration of Clean Water State Revolving Loan Fund (CWSRF) projects using funds provided under the American Recovery and Reinvestment Act (ARRA) of 2009. The following types of projects will be funded with CWSRF ARRA funds: wastewaterer treatment pla... Show more
This spending item is part of a $16,639,100 allocation.
See details
|
Environmental Protection Agency | 5/26/2009 |
TRANSPORTATION, NORTH DAKOTA DEPT OF | $1,454,818 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 9/17/2009 |
J NEIL HANSON | $1,299,500 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/15/2009 |
TRANSPORTATION, NORTH DAKOTA DEPT OF | $1,279,443 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 9/17/2009 |
C. L. LINFOOT CO. | $1,253,383 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
C. L. LINFOOT CO. | $1,249,149 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
TRANSPORTATION, NORTH DAKOTA DEPT OF | $1,127,031 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 9/17/2009 |
AL JOHNSON | $1,119,410 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 8/04/2010 |
MOORHEAD ELECTRIC, INC. | $1,005,467 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
MOORHEAD ELECTRIC, INC. | $975,164 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
VEIT & COMPANY, INC. | $743,817 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
CHARLES SCHUSTER | $612,300 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/24/2009 |
VEIT & COMPANY, INC. | $554,186 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
STRATA CORPORATION | $551,692 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
STRATA CORPORATION | $502,987 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
EA SCHULTZ | $490,721 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
REUBEN JOHNSON & SON INC | $490,043 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
REUBEN JOHNSON & SON INC | $489,819 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
CITY OF CAVALIER | $467,181 | Grant |
Capitalization Grants for Clean Water State Revolving Funds Administration of Clean Water State Revolving Loan Fund (CWSRF) projects using funds provided under the American Recovery and Reinvestment Act (ARRA) of 2009. The following types of projects will be funded with CWSRF ARRA funds: wastewaterer treatment pla... Show more
This spending item is part of a $16,639,100 allocation.
See details
|
Environmental Protection Agency | 5/26/2009 |
Pembina School District 1 | $442,484 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
MULTIPLE RECIPIENTS | $413,000 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 6/30/2009 |
LEO STELLON | $402,960 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 11/19/2009 |
CS DUBOIS CONSTRUCTION, INC. | $400,802 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
Fullerton Building Systems, Inc. | $388,729 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
Fullerton Building Systems, Inc. | $369,879 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
Cavalier School District 6 | $357,779 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
WILWAND FARMS | $356,500 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/15/2009 |
TIMOTHY WILWAND | $356,500 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 1/11/2010 |
CHRISTENSON FARMS INC | $320,832 | Contract | Emergency Watershed Protection - Flood Plain Easement | Agriculture, Department of / Natural Resources Conservation Service | 9/14/2009 |
CHRISTENSON FARMS INC | $312,110 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/16/2009 |
DAKOTA SERVICES, INC | $300,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 9/21/2009 |
PEMBINA, COUNTY OF | $296,823 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 5/12/2009 |
CHERYL ASKEW | $293,250 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/24/2009 |
CAREN J WOINAROWICZ | $264,500 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/14/2009 |
MULTIPLE RECIPIENTS | $248,078 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture, Department of / Rural Housing Service | 8/31/2009 |
DARRELL WARNER | $241,500 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/14/2009 |
Pembina Special Education Cooperative | $231,831 | Grant |
Special Education Grants to States, Recovery Act Assist States in providing special education and related services to children with disabilities in accordance with Part B of the IDEA.
This spending item is part of a $26,552,439 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 2/17/2009 |
JOHNSON FARMS | $229,310 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/16/2009 |
DUSTIN WILSON | $220,800 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/14/2009 |
LONGTIN FARM | $188,830 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/15/2009 |
TIMOTHY WILWAND | $184,000 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/14/2009 |
Bordertown Construction, Inc. | $176,503 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
WALHALLA CITY OF | $166,000 | Loan | Unknown Business and Industry Loans - ARRA | Agriculture, Department of / Rural Business Cooperative Service | 5/10/2010 |
MOORHEAD ELECTRIC, INC. | $154,170 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
V RYAN FITZSIMONDS FARMS | $153,112 | Contract | EWP-FPE | Agriculture, Department of / Natural Resources Conservation Service | 9/02/2010 |
Bordertown Construction, Inc. | $146,101 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
MOORHEAD ELECTRIC, INC. | $145,000 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
ULTEIG ENGINEERS, INC. | $141,961 | Contract | Provide construction management and project management services for design build of 1MW wind turbine at Pembina LPOE in Pembina, North Dakota | General Services Administration / Public Buildings Service | 9/27/2010 |
Cullen Insulation | $141,034 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
Cullen Insulation | $140,054 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
LONGTIN FARM | $135,378 | Grant | Watershed Protection and Flood Prevention 99 year lease | Agriculture, Department of / Natural Resources Conservation Service | 3/01/2010 |
NORTHLAND GLASS AND GLAZING, LLC | $132,318 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
NORTHLAND GLASS AND GLAZING, LLC | $132,138 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
MICHAEL ROY STELLON | $131,100 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 8/26/2009 |
LONGTIN FARM | $130,073 | Contract | Flood Easement | Agriculture, Department of / Natural Resources Conservation Service | 10/10/2010 |
MULTIPLE RECIPIENTS | $125,000 | Loan | Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY | Agriculture, Department of / Farm Service Agency | 3/12/2009 |
LONGTIN FARM | $121,816 | Contract | natural flood plain | Agriculture, Department of / Natural Resources Conservation Service | 10/10/2010 |
J NEIL HANSON | $113,520 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 4/01/2010 |
PEMBINA, COUNTY OF | $109,760 | Grant |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of the EECBG Program is to: reduce fossil fuel emissions, reduce total energy use, and improve energy efficiency. The funds will be used for: 1. An education campaign across the state to educate citizens about the benefits o of energy efficien... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of / Golden Field Office | 9/28/2009 |
NORTH BORDER SCHOOL DISTRICT 100 | $98,344 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards
This spending item is part of a $27,437,105 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
Drayton School District 19 | $98,087 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
JOHNSON FARMS | $97,060 | Direct P | Emergency Watershed Protection Program Flood Plain Easements, Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/16/2009 |
P & E AUTOMATION, INC. | $84,747 | Contract | Advanced metering | Department of the Air Force | 5/12/2009 |
St Thomas School District 43 | $83,756 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
CITY OF CAVALIER | $81,750 | Grant |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of the EECBG Program is to: reduce fossil fuel emissions, reduce total energy use, and improve energy efficiency. The funds will be used for: 1. An education campaign across the state to educate citizens about the benefits o of energy efficien... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of / Golden Field Office | 9/28/2009 |
Cavalier School District 6 | $78,516 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards
This spending item is part of a $27,437,105 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
JOST CONSTRUCTION, INC. | $76,208 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
JOST CONSTRUCTION, INC. | $75,175 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
AL JOHNSON | $71,218 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/23/2010 |
MULTIPLE RECIPIENTS | $71,018 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 7/31/2010 |
MULTIPLE RECIPIENTS | $70,428 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/30/2010 |
MULTIPLE RECIPIENTS | $68,200 | Loan | Farm Operating Loans DIRECT OPERATING LOAN | Agriculture, Department of / Farm Service Agency | 3/12/2009 |
JOHNSON FARMS | $64,991 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/22/2010 |
CITY OF CAVALIER | $62,500 | Grant |
State Energy Program The North Dakota State Energy Program (NDSEP) goal is to improve energy efficiency and reduce the rate of energy demand growth. NDSEP promotes energy conservation, works to reduce energy demand growth rates and implements program activities to reduce im
This spending item is part of a $24,585,000 allocation.
See details
|
Energy, Department of | 4/21/2009 |
MULTIPLE RECIPIENTS | $62,216 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/31/2010 |
PIT STOP 44 | $60,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 5/04/2009 |
PREMIER MECHANICAL CONTRACTORS, INC. | $58,695 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
MIKE AUSTFJORD & SONS INC | $56,336 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
MULTIPLE RECIPIENTS | $54,705 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 10/31/2010 |
FISCHER LAND SURVEYING | $49,276 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
PRODUCTION SPECIALTIES CORPORATION | $48,281 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
PRODUCTION SPECIALTIES CORPORATION | $48,281 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
CHARLES SCHUSTER | $47,304 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/18/2010 |
DRAYTON SCHOOL DISTRICT 19 | $41,521 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards
This spending item is part of a $27,437,105 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
FISCHER LAND SURVEYING | $40,546 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
PREMIER MECHANICAL CONTRACTORS, INC. | $39,786 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
READEL FARMS | $36,816 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/28/2010 |
POTOMAC-HUDSON ENGINEERING, INC. | $34,723 | Contract | GSA is funding a project that involves the construction and operation of a wind turbine at the Pembina Port of Entry located in Pembina County, North Dakota. The Pembina DOE intends to power its facility with an onsite government owned wind turbine syste | General Services Administration / Public Buildings Service | 2/24/2010 |
DOWL, LLC | $34,685 | Contract |
This project is for the design and construction of a new U.S. Land Port of Entry at Walhalla, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommuni
This spending item is part of a $7,846,962 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
AL JOHNSON | $33,920 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/22/2010 |
MULTIPLE RECIPIENTS | $32,192 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/30/2010 |
DOWL, LLC | $31,820 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
TIMOTHY WILWAND | $30,280 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 4/01/2010 |
Woodside Industries | $26,510 | Contract |
This project includes the design and construction of a U.S. Land Port of Entry (LPOE) using the Small Port standard layout for the port building. Additional support facilities, roadways, and instrastructure are required based on the final approved layout
This spending item is part of a $8,413,014 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
LEO STELLON | $25,384 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/04/2010 |
CHRISTENSON FARMS INC | $24,405 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/12/2010 |
CAREN J WOINAROWICZ | $23,460 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/12/2010 |
WALHALLA, CITY OF | $23,445 | Grant |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of the EECBG Program is to: reduce fossil fuel emissions, reduce total energy use, and improve energy efficiency. The funds will be used for: 1. An education campaign across the state to educate citizens about the benefits o of energy efficien... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of / Golden Field Office | 9/28/2009 |
AL JOHNSON | $19,208 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/22/2010 |
JOHNSON FARMS | $16,760 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 4/01/2010 |
ULTEIG ENGINEERS, INC. | $15,207 | Contract | Cadastral and easement land survey | Agriculture, Department of / Natural Resources Conservation Service | 9/19/2010 |
DUSTIN WILSON | $13,830 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 5/04/2010 |
V R FITZSIMONDS FARMS | $13,272 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/22/2010 |
TIMOTHY WILWAND | $13,023 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/22/2010 |
MIDWEST UNDERGROUND TECHNOLOGY, INC. | $12,159 | Contract | Provide pre-engineering design study services to provide site analysis and wind turbine selection for the placement of a wind energy conversion system at the Pembina Port of Entry Land Crossing Facility in Pembina, ND. | General Services Administration / Public Buildings Service | 4/13/2010 |
TIMOTHY WILWAND | $11,340 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/17/2010 |
MICHAEL ROY STELLON | $10,912 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/08/2010 |
MULTIPLE RECIPIENTS | $10,074 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/31/2010 |
ULTEIG ENGINEERS, INC. | $9,773 | Contract | Cadastral and easement land survey | Agriculture, Department of / Natural Resources Conservation Service | 9/19/2010 |
ULTEIG ENGINEERS, INC. | $9,541 | Contract | Cadastral and easement land survey | Agriculture, Department of / Natural Resources Conservation Service | 9/19/2010 |
TIMOTHY WILWAND | $9,413 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/22/2010 |
ULTEIG ENGINEERS, INC. | $9,266 | Contract | Cadastral and easement land survey | Agriculture, Department of / Natural Resources Conservation Service | 9/19/2010 |
Pembina Special Education Cooperative | $7,522 | Grant |
Special Education - Preschool Grants, Recovery Act Assist States to make available special education and related services for children with disabilities age 3 through 5 years, and at a State's discretion, to 2 year old children with disabilities who will reach age three during the school year.
This spending item is part of a $861,549 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 2/17/2009 |
JOHNSON FARMS | $6,688 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/23/2010 |
DARRELL WARNER | $5,680 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/23/2010 |
MULTIPLE RECIPIENTS | $4,300 | Loan | Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY | Agriculture, Department of / Farm Service Agency | 3/23/2009 |
LONGTIN FARM | $2,423 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 9/22/2010 |
MULTIPLE RECIPIENTS | $2,015 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/30/2010 |
LONGTIN FARM | $1,472 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 6/28/2010 |
LONGTIN FARM | $1,472 | Direct P | Emergency Watershed Protection Program Flood Plain Easements Recovery Act | Agriculture, Department of / Natural Resources Conservation Service | 3/03/2010 |
MULTIPLE RECIPIENTS | $1,250 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 9/30/2009 |
MULTIPLE RECIPIENTS | $700 | Loan | Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY | Agriculture, Department of / Farm Service Agency | 3/23/2009 |
MULTIPLE RECIPIENTS | $250 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 3/31/2010 |
MULTIPLE RECIPIENTS | $250 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 12/31/2010 |
R & J OLSON FARMS | $12 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/12/2010 |
TRANSPORTATION, NORTH DAKOTA DEPT OF | $0 | Grant |
Highway Planning and Construction Highway Infrastructure Investment Grants
This spending item is part of a $296,823 allocation.
See details
|
Transportation, Department of / Federal Highway Administration | 5/12/2009 |