Cuyahoga County, Ohio, funds by National Aeronautics and Space Administration
Listing $21,119,599.11 in stimulus funds from National Aeronautics and Space Administration for Cuyahoga
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
JACOBS TECHNOLOGY INC. | $6,053,598 |
This project provides for the replacement of the existing refrigeration plant of the GRC Building No. 9 with a new refrigeration plant to be housed in a new building adjacent. The new building shall be known as GRC Building No. 170. The new refrigeratio
This spending item is part of a $17,560,784 allocation.
See details
|
National Aeronautics and Space Administration | 3/05/2010 |
NORTH BAY CONSTRUCTION INCORPORATED | $3,815,352 |
This project provides for the replacement of the existing refrigeration plant of the GRC Building No. 9 with a new refrigeration plant to be housed in a new building adjacent. The new building shall be known as GRC Building No. 170. The new refrigeratio
This spending item is part of a $17,560,784 allocation.
See details
|
National Aeronautics and Space Administration | 3/05/2010 |
RJ RUNGE COMPANY, INC | $2,013,549 |
This project provides for the replacement of the existing refrigeration plant of the GRC Building No. 9 with a new refrigeration plant to be housed in a new building adjacent. The new building shall be known as GRC Building No. 170. The new refrigeratio
This spending item is part of a $17,560,784 allocation.
See details
|
National Aeronautics and Space Administration | 3/05/2010 |
NORTH BAY CONSTRUCTION INCORPORATED | $1,947,969 |
Install mechanical and controls systems for Phase 2 of the Engine Icing Capability Enhancement Project. The Phase 2 Scope of Work shall include: Construction and modification of PSL-3 plenum structure; fabrication and installation of a plenum transition a
This spending item is part of a $2,698,415 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
NORTH BAY CONSTRUCTION INCORPORATED | $802,835 |
Install mechanical systems that represent a portion of the larger Engine Icing Capability Enhancement Project. The support systems include installation of equipment, piping, instrumentation, controls, power distribution and associated structural supports
This spending item is part of a $1,894,969 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
ASRC AEROSPACE CORP | $648,979 |
Recovery Act, Ultra HighBypass Turbine-Powered Simulator Fan Model
This spending item is part of a $1,179,991 allocation.
See details
|
National Aeronautics and Space Administration | 3/03/2010 |
FEDERAL NETWORK SYSTEMS LLC | $558,965 |
Recovery Act - Unmanned Aircraft Systems (UAS) in the NAS/NextGen Engineering Support.
This spending item is part of a $924,617 allocation.
See details
|
National Aeronautics and Space Administration | 2/01/2010 |
ASRC AEROSPACE CORP | $395,344 |
Recovery Act, Advanced Subsonic Combustion Rig Plenum Redesign and Fabrication
This spending item is part of a $1,070,630 allocation.
See details
|
National Aeronautics and Space Administration | 2/25/2010 |
SIERRA LOBO, INC. | $387,762 |
Test Support of the Low-Boom External Compression Supersonic Inlet Test
This spending item is part of a $732,087 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
EDARCH-ERIE JV | $364,650 |
Install mechanical and controls systems for Phase 2 of the Engine Icing Capability Enhancement Project. The Phase 2 Scope of Work shall include: Construction and modification of PSL-3 plenum structure; fabrication and installation of a plenum transition a
This spending item is part of a $2,698,415 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
EDARCH-ERIE JV | $359,145 |
Install mechanical systems that represent a portion of the larger Engine Icing Capability Enhancement Project. The support systems include installation of equipment, piping, instrumentation, controls, power distribution and associated structural supports
This spending item is part of a $1,894,969 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
ANALEX CORPORATION | $339,162 |
Recovery Act - Operational Requirements and Analysis Support for Unmanned Aircraft Systems Access in the NextGen
This spending item is part of a $399,381 allocation.
See details
|
National Aeronautics and Space Administration | 1/27/2010 |
SIERRA LOBO, INC. | $323,675 |
Ultra High Bypass Drive Rig Refurbishment
This spending item is part of a $749,996 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
SIERRA LOBO, INC. | $283,059 |
Testing Support of the Rolls-Royce Highly Variable Cycle (HVC) Nozzle
This spending item is part of a $655,758 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
AP SOLUTIONS, INC. | $271,288 |
Recovery Act, Ultra HighBypass Turbine-Powered Simulator Fan Model
This spending item is part of a $1,179,991 allocation.
See details
|
National Aeronautics and Space Administration | 3/03/2010 |
JACOBS TECHNOLOGY INC. | $253,619 |
Test Support of the Low-Boom External Compression Supersonic Inlet Test
This spending item is part of a $732,087 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
ASRC AEROSPACE CORP | $245,832 |
Recovery Act, Advanced Subsonic Combuster Rig (ASCR) Alternate Fuels Design
This spending item is part of a $299,993 allocation.
See details
|
National Aeronautics and Space Administration | 2/25/2010 |
WYLE INFORMATION SYSTEMS, LLC | $241,500 |
Recovery Act - Unmanned Aircraft Systems (UAS) in the NAS/NextGen Engineering Support.
This spending item is part of a $924,617 allocation.
See details
|
National Aeronautics and Space Administration | 2/01/2010 |
JACOBS TECHNOLOGY INC. | $216,813 |
Testing Support of the Rolls-Royce Highly Variable Cycle (HVC) Nozzle
This spending item is part of a $655,758 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
ASRC AEROSPACE CORP | $200,000 |
Ultra High Bypass Drive Rig Refurbishment
This spending item is part of a $749,996 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
JACOBS TECHNOLOGY INC. | $159,583 |
Ultra High Bypass Drive Rig Refurbishment
This spending item is part of a $749,996 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
DB CONSULTING GROUP, INC. | $124,152 |
Recovery Act - Unmanned Aircraft Systems (UAS) in the NAS/NextGen Engineering Support.
This spending item is part of a $924,617 allocation.
See details
|
National Aeronautics and Space Administration | 2/01/2010 |
N&R ENGNERING MGT SUPPORT SVCS | $97,980 | Development of Turbofan engine simulations and controlers in the MATLAB/Simulink environment | National Aeronautics and Space Administration | 4/19/2010 |
GILCREST ELECTRIC AND SUPPLY COMPANY | $90,706 |
Test Support of the Low-Boom External Compression Supersonic Inlet Test
This spending item is part of a $732,087 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
PRECISION ENVIRONMENTAL COMPANY | $89,334 |
Install mechanical and controls systems for Phase 2 of the Engine Icing Capability Enhancement Project. The Phase 2 Scope of Work shall include: Construction and modification of PSL-3 plenum structure; fabrication and installation of a plenum transition a
This spending item is part of a $2,698,415 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
JACOBS TECHNOLOGY INC. | $83,530 |
NNC10CA16C Mod 1 is to add temperature control loop to secondary loop piping
This spending item is part of a $788,200 allocation.
See details
|
National Aeronautics and Space Administration | 3/25/2010 |
ASRC AEROSPACE CORP | $83,474 | Recovery Act - Artificial Ice Shape Design for Loss-of-Control Prevention and Mitigation Studies. | National Aeronautics and Space Administration | 3/22/2010 |
GILCREST ELECTRIC AND SUPPLY COMPANY | $82,617 |
Fabrication and Testing of 500¢ª C Integrated Electronic Capacitors for Wireless Sensing Applications
This spending item is part of a $200,251 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
SIERRA LOBO, INC. | $74,925 | The PSL Engine Icing project has the objective of making modifications to the existing test cell PSL-3 located in Building 125 to add capabilities to perform icing tests in this test cell. | National Aeronautics and Space Administration | 5/18/2010 |
GILCREST ELECTRIC AND SUPPLY COMPANY | $73,886 |
Testing Support of the Rolls-Royce Highly Variable Cycle (HVC) Nozzle
This spending item is part of a $655,758 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
ASRC AEROSPACE CORP | $69,982 | Recovery Act, Advanced Control System Support for Aerospace Propulsion | National Aeronautics and Space Administration | 3/23/2010 |
JACOBS TECHNOLOGY INC. | $62,002 |
Fabrication and Testing of 500¢ª C Integrated Electronic Capacitors for Wireless Sensing Applications
This spending item is part of a $200,251 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
ASRC AEROSPACE CORP | $60,219 |
Recovery Act - Operational Requirements and Analysis Support for Unmanned Aircraft Systems Access in the NextGen
This spending item is part of a $399,381 allocation.
See details
|
National Aeronautics and Space Administration | 1/27/2010 |
SIERRA LOBO, INC. | $55,632 |
Fabrication and Testing of 500¢ª C Integrated Electronic Capacitors for Wireless Sensing Applications
This spending item is part of a $200,251 allocation.
See details
|
National Aeronautics and Space Administration | 12/29/2009 |
21st Century Concrete Construction Inc. | $52,953 |
This project provides for the replacement of the existing refrigeration plant of the GRC Building No. 9 with a new refrigeration plant to be housed in a new building adjacent. The new building shall be known as GRC Building No. 170. The new refrigeratio
This spending item is part of a $17,560,784 allocation.
See details
|
National Aeronautics and Space Administration | 3/05/2010 |
CRESCENT ELECTRIC SUPPLY COMPANY | $51,613 |
Recovery Act, Advanced Subsonic Combuster Rig (ASCR) Alternate Fuels Design
This spending item is part of a $299,993 allocation.
See details
|
National Aeronautics and Space Administration | 2/25/2010 |
KEITHLEY INSTRUMENTS, INC. | $29,439 |
TOTAL AND SPECTRAL IRRADIANCE SENSOR (TSIS) project: We will design, build, test, calibrate & deliver the TSIS instrument to Northrop Grumman Space Technology Corp., for inclusion on the National Polar-Orbiting Operational Environmental Satellite System
This spending item is part of a $26,307,665 allocation.
See details
|
National Aeronautics and Space Administration | 8/31/2009 |
21st Century Concrete Construction Inc. | $25,950 |
Install mechanical systems that represent a portion of the larger Engine Icing Capability Enhancement Project. The support systems include installation of equipment, piping, instrumentation, controls, power distribution and associated structural supports
This spending item is part of a $1,894,969 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
PRECISION ENVIRONMENTAL COMPANY | $10,490 |
Install mechanical systems that represent a portion of the larger Engine Icing Capability Enhancement Project. The support systems include installation of equipment, piping, instrumentation, controls, power distribution and associated structural supports
This spending item is part of a $1,894,969 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
PPW BUILDERS, INC. | $7,713 |
Install mechanical and controls systems for Phase 2 of the Engine Icing Capability Enhancement Project. The Phase 2 Scope of Work shall include: Construction and modification of PSL-3 plenum structure; fabrication and installation of a plenum transition a
This spending item is part of a $2,698,415 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
Solar Testing Laboratories, Inc. | $3,500 |
Install mechanical and controls systems for Phase 2 of the Engine Icing Capability Enhancement Project. The Phase 2 Scope of Work shall include: Construction and modification of PSL-3 plenum structure; fabrication and installation of a plenum transition a
This spending item is part of a $2,698,415 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
Protech Staffing Solutions, LLC | $2,548 |
Recovery Act, Advanced Subsonic Combuster Rig (ASCR) Alternate Fuels Design
This spending item is part of a $299,993 allocation.
See details
|
National Aeronautics and Space Administration | 2/25/2010 |
Solar Testing Laboratories, Inc. | $2,275 |
Install mechanical systems that represent a portion of the larger Engine Icing Capability Enhancement Project. The support systems include installation of equipment, piping, instrumentation, controls, power distribution and associated structural supports
This spending item is part of a $1,894,969 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |
GREAT LAKES FENCE CO INC | $2,000 |
Install mechanical systems that represent a portion of the larger Engine Icing Capability Enhancement Project. The support systems include installation of equipment, piping, instrumentation, controls, power distribution and associated structural supports
This spending item is part of a $1,894,969 allocation.
See details
|
National Aeronautics and Space Administration | 1/04/2010 |