Ross County, Ohio, funds by Department of Veterans Affairs
Listing $11,017,032.54 in stimulus funds from Department of Veterans Affairs for Ross
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ARMSTRONG ELEVATOR COMPANY | $1,100,000 | RECOVERY - REPLACE ELEVATORS 2009 | Department of Veterans Affairs | 1/04/2010 |
JJW CONSTRUCTION, LLC | $898,300 | Recovery (Addition) Improve Access Building #9 | Department of Veterans Affairs | 7/26/2010 |
ADVANCE MECHANICAL PLUMBING & HEATING | $793,382 |
Project is to remove and replace 8 steam supply and 6 condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids
This spending item is part of a $1,576,211 allocation.
See details
|
Department of Veterans Affairs | 10/22/2009 |
PDW, INC. | $790,647 | Upgrade Therapeduic Exercise Gymnasium | Department of Veterans Affairs | 8/16/2010 |
PDW, INC. | $790,647 | Upgrade therapeduic Exercise Gymnasium | Department of Veterans Affairs | 8/16/2010 |
PDW, INC. | $749,000 | Upgrade Therapeduic Exercise Gymnasium | Department of Veterans Affairs | 8/16/2010 |
Advance Mechanical Plumbing & Heating | $612,310 |
Project is to remove and replace steam supply and condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids wit
This spending item is part of a $1,346,355 allocation.
See details
|
Department of Veterans Affairs | 9/13/2010 |
CALVARY CONTRACTING, INC. | $602,531 |
Project is to remove and replace steam supply and condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids wit
This spending item is part of a $1,346,355 allocation.
See details
|
Department of Veterans Affairs | 9/13/2010 |
CALVARY CONTRACTING, INC. | $521,956 |
Project is to remove and replace 8 steam supply and 6 condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids
This spending item is part of a $1,576,211 allocation.
See details
|
Department of Veterans Affairs | 10/22/2009 |
PDW, INC. | $468,582 | Replace Finishes Lower level BLDG 27 | Department of Veterans Affairs | 8/16/2010 |
PDW, INC. | $468,582 | Replace finishes lower level BLDG 27 | Department of Veterans Affairs | 8/16/2010 |
PDW, INC. | $447,000 | Replace Finishes Lower Level BLDG 27, | Department of Veterans Affairs | 8/16/2010 |
PIEDMONT CONTRACTING & DESIGN, INC. | $391,445 | Completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor, materials and equipment necessary to perform work for project R538-09-104, entitled Recovery Renovate Basement Building 24 at the | Department of Veterans Affairs | 10/01/2009 |
ADVANCED MECHANICAL SERVICES INC | $348,000 |
Physical Therapy: Project is to replace the existing HVAC system; scrape and paint ceiling and wall; includes cutting new access holes for new ductwork, patching/infilling holes for removed ductwork; removing and replacing platform grating and handrails
This spending item is part of a $702,338 allocation.
See details
|
Department of Veterans Affairs | 9/28/2009 |
CALVARY CONTRACTING, INC. | $326,878 |
Renovation of Basement Bldg 24. Consist of renovation of approx 10-11,000 sq ft which includes HVAC, plumbing, electrical, ceilings, wallcoverings, flooring, tile, painting, doors and hardware, and finishes.
This spending item is part of a $431,787 allocation.
See details
|
Department of Veterans Affairs | 5/20/2011 |
ENERGY ENGINEERING & CONSULTING SERVICES LLC | $325,783 | Energy Engineering & Consulting Services, LLC will provide retro-commissioning (RetroCx) services for the purpose of establishing and altering HVAC and related energy-using systems to proper operational capabilities for fully functional health care facili | Department of Veterans Affairs | 3/15/2010 |
CALVARY CONTRACTING, INC. | $233,411 |
Recovery (Addition) Replace Finishes, Lower Level Bldg 26
This spending item is part of a $530,356 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
Gillum Brothers Excavating | $183,600 |
Project is to remove and replace 8 steam supply and 6 condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids
This spending item is part of a $1,576,211 allocation.
See details
|
Department of Veterans Affairs | 10/22/2009 |
CALVARY CONTRACTING, INC. | $171,446 |
Physical Therapy: Project is to replace the existing HVAC system; scrape and paint ceiling and wall; includes cutting new access holes for new ductwork, patching/infilling holes for removed ductwork; removing and replacing platform grating and handrails
This spending item is part of a $702,338 allocation.
See details
|
Department of Veterans Affairs | 9/28/2009 |
CHAPEL ELECTRIC CO LLC | $150,492 |
Physical Therapy: Project is to replace the existing HVAC system; scrape and paint ceiling and wall; includes cutting new access holes for new ductwork, patching/infilling holes for removed ductwork; removing and replacing platform grating and handrails
This spending item is part of a $702,338 allocation.
See details
|
Department of Veterans Affairs | 9/28/2009 |
ADVANCED MECHANICAL SERVICES INC | $105,000 |
Recovery (Addition) Replace Finishes, Lower Level Bldg 26
This spending item is part of a $530,356 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
Gillum Brothers Excavating | $78,860 |
Project is to remove and replace steam supply and condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids wit
This spending item is part of a $1,346,355 allocation.
See details
|
Department of Veterans Affairs | 9/13/2010 |
HINA ENVIRONMENTAL SOLUTIONS LLC | $77,274 |
Project is to remove and replace 8 steam supply and 6 condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids
This spending item is part of a $1,576,211 allocation.
See details
|
Department of Veterans Affairs | 10/22/2009 |
Advance Mechanical Plumbing & Heating | $59,756 |
Recovery (Addition) Replace Finishes, Lower Level Bldg 26
This spending item is part of a $530,356 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
CHAPEL ELECTRIC CO LLC | $52,654 |
Project is to remove and replace steam supply and condensate lines by excavation and removal of the concrete lids; cut and remove piping in sections; where required abate asbestos insulated pipes; form and pour new lids; clean tunnels and set new lids wit
This spending item is part of a $1,346,355 allocation.
See details
|
Department of Veterans Affairs | 9/13/2010 |
Spectra Contract Flooring | $43,089 |
Recovery (Addition) Replace Finishes, Lower Level Bldg 26
This spending item is part of a $530,356 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
COMBS INTERIOR SPECIALTIES, INC. | $39,100 |
Recovery (Addition) Replace Finishes, Lower Level Bldg 26
This spending item is part of a $530,356 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
ADVANCED MECHANICAL SERVICES INC | $37,775 |
Renovation of Basement Bldg 24. Consist of renovation of approx 10-11,000 sq ft which includes HVAC, plumbing, electrical, ceilings, wallcoverings, flooring, tile, painting, doors and hardware, and finishes.
This spending item is part of a $431,787 allocation.
See details
|
Department of Veterans Affairs | 5/20/2011 |
OMEGA INDUSTRIAL ELECTRIC | $29,750 |
Recovery (Addition) Replace Finishes, Lower Level Bldg 26
This spending item is part of a $530,356 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
Mega Painting | $27,100 |
Physical Therapy: Project is to replace the existing HVAC system; scrape and paint ceiling and wall; includes cutting new access holes for new ductwork, patching/infilling holes for removed ductwork; removing and replacing platform grating and handrails
This spending item is part of a $702,338 allocation.
See details
|
Department of Veterans Affairs | 9/28/2009 |
Carpetland, Inc. | $21,885 |
Renovation of Basement Bldg 24. Consist of renovation of approx 10-11,000 sq ft which includes HVAC, plumbing, electrical, ceilings, wallcoverings, flooring, tile, painting, doors and hardware, and finishes.
This spending item is part of a $431,787 allocation.
See details
|
Department of Veterans Affairs | 5/20/2011 |
Central Fire Protection Co, Inc. | $18,914 |
Renovation of Basement Bldg 24. Consist of renovation of approx 10-11,000 sq ft which includes HVAC, plumbing, electrical, ceilings, wallcoverings, flooring, tile, painting, doors and hardware, and finishes.
This spending item is part of a $431,787 allocation.
See details
|
Department of Veterans Affairs | 5/20/2011 |
Mega Painting | $15,000 |
Renovation of Basement Bldg 24. Consist of renovation of approx 10-11,000 sq ft which includes HVAC, plumbing, electrical, ceilings, wallcoverings, flooring, tile, painting, doors and hardware, and finishes.
This spending item is part of a $431,787 allocation.
See details
|
Department of Veterans Affairs | 5/20/2011 |
Mega Painting | $12,000 |
Recovery (Addition) Replace Finishes, Lower Level Bldg 26
This spending item is part of a $530,356 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
OMEGA INDUSTRIAL ELECTRIC | $11,335 |
Renovation of Basement Bldg 24. Consist of renovation of approx 10-11,000 sq ft which includes HVAC, plumbing, electrical, ceilings, wallcoverings, flooring, tile, painting, doors and hardware, and finishes.
This spending item is part of a $431,787 allocation.
See details
|
Department of Veterans Affairs | 5/20/2011 |
Dayton Fire Protection, Inc. | $8,250 |
Recovery (Addition) Replace Finishes, Lower Level Bldg 26
This spending item is part of a $530,356 allocation.
See details
|
Department of Veterans Affairs | 3/31/2010 |
FLESHMAN RAYMOND L | $5,300 |
Physical Therapy: Project is to replace the existing HVAC system; scrape and paint ceiling and wall; includes cutting new access holes for new ductwork, patching/infilling holes for removed ductwork; removing and replacing platform grating and handrails
This spending item is part of a $702,338 allocation.