Grant County, Ore., funds by Agriculture, Department of
Listing $15,834,773.20 in stimulus funds from Agriculture, Department of for Grant
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
OCHOCO LUMBER COMPANY | $4,890,000 |
Recovery Act of 2009: Wildland Fire Management Award Title: ARRA - Wood Fuel Pellet Facility in Grant and Harney Counties, Oregon Development of a compressed wood fuel facility within the boundaries of Grant and Harney Counties, Oregon, including design, permitting and installation of equipment. Thehe ... Show more
This spending item is part of a $5,000,000 allocation.
See details
|
Forest Service | 9/18/2009 |
MULTIPLE RECIPIENTS | $686,128 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 3/31/2009 |
O'RORKE LOGGING INC | $663,996 | This job is a biomass project. We fell smaller trees to be skidded and loaded onto log trucks and hauled to mills in Elgin and Pilot Rock. We hand cut some smaller biomass and piled it. Also hired a sub contractor to cut along 2 roads and chip small brush | Forest Service | 12/22/2009 |
HIGH DESERT AGGREGATE & PAVING, INC. | $521,968 | FSR 3618 & 3620 subgrade stabilization and paving of 2.1 miles of road. Project begins at the North end near Magone Lake campground. Work will consist of excavating material and constructing embankments. Project consists of pulverizing the Bituminous Surf | Forest Service | 6/21/2010 |
MULTIPLE RECIPIENTS | $488,772 | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Rural Housing Service | 8/31/2009 |
A A A THUNDERDERBOLT FIRE SERVICE INC | $426,614 | Canyon Fuels Reduction treatment by tree thinning & hand piling, Blue Mt. Ranger District, Projects 3, 4 & 5 | Forest Service | 5/07/2010 |
PROFESSIONAL HEATING & COOLING INC | $420,750 | Installation of Energy Efficient heating, ventialtion, and air conditioning systems in 28 locations for Malhuer National Forest. All labor, materials, supplies, and equiptment required to perform this award is included. | Forest Service | 7/13/2010 |
WHITE SHIELD, INC. | $420,012 | Lead based paint abatement and painting project at Mahleur National Forest Building Sites | Forest Service | 7/02/2010 |
WATTERSON LOGGING | $381,346 | County Road 18 Biomass removal. Malheur National Forest.To improve forest health and to lower fuel levels to reduce risk of catastrophic fire's. | Forest Service | 6/30/2010 |
IRON TRIANGLE LLC | $373,971 | The end result of this contract is that trees are thinned to the desired spacing or basal area and less than 5 tons per acre of fuel loading remains on the treatment unit. All useable fuel material shall be cut, processed/bunched or bucked, and removed on | Forest Service | 6/30/2010 |
ENGLE CONTRACTING, LLC | $369,228 | Biomass Removal | Forest Service | 12/22/2009 |
KRIEGE LOGGING LLC | $369,109 | MALHEUR STEWARTSHIP COLABERATED TASK ORDER 7, RD 1. LOGGING UNIT PER CONTRACT. CUTTING TREES, SKIDDING TREES TO LANDING, DELIMBING TREES, LOADING LOGS ONTO TRUCKS AND HAULING LOGS TO MILL. | Forest Service | 6/30/2010 |
WINEGAR EXCAVATING INC | $307,844 | Minor constructed features and accessibility upgrades on the Malheur National Forest Campgrounds are being upgraded to include american disabilities act accessable picnic tables, firerings,fencing,gravel and blading of campgrounds | Forest Service | 5/27/2010 |
MOUNT SAINT HELENS REFORESTATION INC | $299,584 | Eagle Roost Thin/Hand Pile/Burn--tree branch pickup by hand | Forest Service | 2/10/2010 |
Oak Hill Roofing & Sheet Metal Services LLC | $294,548 |
Roof Replacements Forest Wide, Malheur National Forest
This spending item is part of a $340,942 allocation.
See details
|
Forest Service | 6/02/2010 |
GRAYBACK FORESTRY, INC. | $258,091 | Idaho Cr. Plantation thinning and hand piling of trees that need to be cut to improve growth | Forest Service | 6/02/2010 |
HARNEY ROCK & PAVING CO. | $247,976 | This project consists of applying a chip seal to Forest Road 17 which is 11.13 miles long and is a double lane road with an existing asphalt paved surface 28' wide. | Forest Service | 6/03/2010 |
GAHLSDORF LOGGING, INC | $211,288 | Knox Biomass Removal Stewardship Contract | Forest Service | 12/22/2009 |
LANE CONTRACTORS, INC. | $175,635 | Installation of Energy-Efficient windows | Forest Service | 6/24/2010 |
HIGH DESERT AGGREGATE & PAVING, INC. | $173,243 | Project 2 consists of applying a single layer asphalt surface treatment (chip seal)to a 6.40 mile long segment of Forest Road 15, which is a double lane road with an existing asphalt paved surface 24 feet wide. Project 3 consists of applying a single laye | Forest Service | 6/03/2010 |
GAHLSDORF LOGGING INC. | $168,677 |
Thinning and removal of BioMass Materials.
This spending item is part of a $224,253 allocation.
See details
|
Forest Service | 12/22/2009 |
CUTTING EDGE FORESTRY, INC. | $164,710 | CANYON FUELS REDUCTION PROJECT 2; BLUE MOUNTAIN RANGER DISTRICT-PRECOMMERCIAL THINNING, HAND PILING SLASH, AND BURNING OF SLASH PILES ON THE MALHUER N.F. | Forest Service | 5/07/2010 |
GRAYBACK FORESTRY, INC. | $164,165 | Thin and treat slash on Malheur NF by cutting trees and piling the cut trees into piles | Forest Service | 2/16/2010 |
GRAYBACK FORESTRY, INC. | $159,848 | Canyon Fuels Reduction, Poject #1 cutting down trees and brush no one wants, piling it into piles and burning it with diesel, gas and matches. | Forest Service | 5/07/2010 |
IRON TRIANGLE LLC | $158,228 | All fuel material shall be cut, processed/bunched or bucked, and removed on all treatment units so that remainging non-usable fuel loads are less than 5-10 tons per acre, excluding material left as wildlife logs. Fuel material shall be transported with a | Forest Service | 12/09/2009 |
GRAYBACK FORESTRY, INC. | $157,340 | thinning and hand pile Malheur NF | Forest Service | 12/18/2009 |
BACKLUND LOGGING CO | $150,100 | Hand slash piling on the Knox timber sale and FR16 of the Prairie City Ranger District of the Malheur National Forest | Forest Service | 8/23/2010 |
IRON TRIANGLE LLC | $149,255 | Project includes, but is not limited to reconstructing an existing parking lot and boat ramp, removing an existing vault toilet, installing a new vault toilet, constructing a simulated face concrete retaining wall, constructing a new AOA trail from the pa | Forest Service | 7/29/2010 |
BACKLUND LOGGING CO | $145,950 | Delivery order for 417 acres of handpiling over 12 miles along Grant County Road #18 | Forest Service | 9/09/2010 |
MILLER TIMBER SERVICES INC | $144,658 |
Cutting down trees and hauling to milling facilities as well as roadside brushing
This spending item is part of a $288,585 allocation.
See details
|
Forest Service | 12/22/2009 |
GRAYBACK FORESTRY, INC. | $138,395 | Thinning and hand piling on the Malheur NF of trees and brush by cutting down with chainsaws to improve tree growth and reduce fire hazard | Forest Service | 9/10/2010 |
EASTERN OREGON ENVIRONMENTAL RECOVERY LLC | $134,722 | Install new potable water systems in three forest Service Guard Station in Eastern Oregon. | Forest Service | 6/20/2010 |
MOORE & HUECKMAN | $128,868 | thinning and grapple piling and burning of 2 units | Forest Service | 2/16/2010 |
HANSEN, MARK | $108,018 | 1059 ACRES OF GRAPPLE PILLING CUT THINNING SLASH | Forest Service | 9/29/2009 |
3B'S FORESTRY, INCORPORATED | $100,614 | Precommercial Thinning: Pre-commercial thinning is performed before trees reach merchantable size, which is typically around 4.5 to 8 inches dbh (diameter at breast height, measured at 4.5 ft. above the ground). The objective of a pre-commercial thinning | Forest Service | 12/04/2009 |
Oak Hill Roofing & Sheet Metal Services LLC | $97,340 |
Fire Lookout Catwalk Replacement, Roof Replacement, Floor Replacement - Malheur National Forest
This spending item is part of a $104,592 allocation.
See details
|
Forest Service | 8/31/2010 |
POWER PRO INC | $97,174 | Communications Project to install new upgraded phone lines. | Forest Service | 6/23/2010 |
A A A THUNDERDERBOLT FIRE SERVICE INC | $96,494 | Prairie City Ranger District Thin and Treat - Project #1 | Forest Service | 2/05/2010 |
WINSTON CORPORATION | $87,000 | Painting of Historical Builings in Mahleur National Forest | Forest Service | 6/14/2010 |
POWER PRO INC | $84,650 | SUPPLY AND INSTALL AN ABOVE GROUND FUEL TANKS AT CROW FLAR GUARD STATION AND BLUE MOUNTAIN WORK CENTER. INSTALLATION INCLUDES, BUT IS NOT LIMITED TO, POURING A CONCRETE SLAB, INSTALL BOLLARDS, CONNECTING TO A POWER SOURCE. | Forest Service | 3/25/2010 |
L D PERRY INC | $84,208 | Recovery-Solar water system upgrades at Big Creek and Yellow Jacket campgrounds, John Day, OR. | Forest Service | 6/07/2010 |
WAGGONER, RONALD W. | $79,875 | Silvies Biomass/Gold Removal. The projected volume was more than the volume that was actually removed. Therefore the amount of award reflects the decrease. | Forest Service | 12/09/2009 |
BROWNING CONTRACTING, LLC | $74,055 | Prairie City Ranger District Thin & Treat | Forest Service | 2/16/2010 |
IRON TRIANGLE LLC | $72,877 | Biomass removal | Forest Service | 12/09/2009 |
3B'S FORESTRY, INCORPORATED | $72,450 | Precommercial Thinning Pre-commercial thinning is performed before trees reach merchantable size, which is typically around 4.5 to 8 inches dbh (diameter at breast height, measured at 4.5 ft. above the ground). The objective of a pre-commercial thinning | Forest Service | 12/11/2009 |
WINEGAR EXCAVATING INC | $65,546 | Water Distribution System at the Crane Prairie Guard Station | Forest Service | 6/21/2010 |
EASTERN OREGON ENVIRONMENTAL RECOVERY LLC | $63,746 | Install new potable water system at Forest Service Guard station. | Forest Service | 6/08/2010 |
MARCIEL WELL DRILLING & PUMPS | $62,710 | Malheur National Forest - Drill new domestic water wells at Crane Prairie and Crow Flat Guard Stations | Forest Service | 5/18/2010 |
GRAYBACK FORESTRY, INC. | $57,717 | Thin, pile, burn Malheur NF by cutting down trees and brush that no one wants, piling it into piles and then burning it with gas, diesel and matches | Forest Service | 12/04/2009 |
STONE ECOSURVEYS LLC | $56,362 | Expected outcome is a complete species list for several project areas in Malheur National Forest. | Forest Service | 8/10/2010 |
Tommy Reedy | $55,576 |
Thinning and removal of BioMass Materials.
This spending item is part of a $224,253 allocation.
See details
|
Forest Service | 12/22/2009 |
HENDERSON LOGGING, INC | $55,256 | Roadside maintanence and brushing task orders 4 & 5 of several roads in the Malheur National Forest. Award includes clearing roadside brush to designated distances along several miles of Malheur National Forest roads. | Forest Service | 12/02/2009 |
GRAY BEAR CONSTRUCTION CO. | $46,394 |
Roof Replacements Forest Wide, Malheur National Forest
This spending item is part of a $340,942 allocation.
See details
|
Forest Service | 6/02/2010 |
EASTERN OREGON STEWARDSHIP SERVICES CORP | $35,898 | Collection and mapping native seed for the Malheur National Forest | Forest Service | 7/29/2010 |
TRAINING EMPLOYMENT CONSORTIUM | $33,283 |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Forest Service | 4/02/2009 |
TRAINING EMPLOYMENT CONSORTIUM | $31,530 |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Forest Service | 4/02/2009 |
MONUMENT SCHOOL DISTRICT | $31,323 |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Forest Service | 4/02/2009 |
TRAINING EMPLOYMENT CONSORTIUM | $31,256 |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Forest Service | 4/02/2009 |
TRAINING EMPLOYMENT CONSORTIUM | $29,935 |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Forest Service | 4/02/2009 |
BRIAN BROOKS | $28,911 | Stand Exams. Timber and ground vegetation data collection using GPS navigation to install random plots. Tree species, diameters, heights, and damages are recorded for each tree on plot. Trees per acre and volume can be calculated from this data. | Forest Service | 3/08/2010 |
TRAINING EMPLOYMENT CONSORTIUM | $25,293 |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Forest Service | 4/02/2009 |
NRC ENVIRONMENTAL SERVICES INC. | $23,520 |
Underground Heating Oil Tank Removals and remediation for nine locations.
This spending item is part of a $28,091 allocation.
See details
|
Forest Service | 2/11/2010 |
CAREX WORKING GROUP, L.L.C. | $20,000 | Recovery Act of 2009: Wildland Fire Management Willow and Cottonwood Inventory of the Malheur National Forest - conduct an inventory of willow and cottonwood species on the Malheur National Forest while retaining and creating employment opportunities that might not otherwise be available. This projejec... Show more | Forest Service | 2/18/2010 |
MCALLISTER, MICHAEL L | $17,335 | TAS::12 1118::TAS RECOVERY - MALHEUR NATIONAL FOREST 2010 STAND EXAM 5 (DEARDORF-BIG COW), OREGON | Forest Service | 3/08/2010 |
A A A THUNDERDERBOLT FIRE SERVICE INC | $11,130 | Emigrant Creek District, Project 17, Stand management, thinning and pullback of conifers in the Malhuer National Forest | Forest Service | 8/11/2010 |
A A A THUNDERDERBOLT FIRE SERVICE INC | $10,815 | STAND DENSITY MANAGEMENT - PINE SPRINGS 207 & 209 THINNING AND PULLBACK OF CONIFERS | Forest Service | 8/11/2010 |
HUECKMAN, TODD | $10,395 | Thinning and Chipping of resulting slash in a Ponderosa Pine and Douglas Fir seed orchard. | Forest Service | 5/27/2010 |
SISKIYOU BIOSURVEY LLC | $10,350 | Manual collection of wild seed of native grass, shrub and forb species in support of habitat restoration activities | Forest Service | 8/02/2010 |
GRAY BEAR CONSTRUCTION CO. | $7,252 |
Fire Lookout Catwalk Replacement, Roof Replacement, Floor Replacement - Malheur National Forest
This spending item is part of a $104,592 allocation.
See details
|
Forest Service | 8/31/2010 |
MULTIPLE RECIPIENTS | $5,015 | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Farm Service Agency | 11/30/2010 |
WHITE SHIELD, INC. | $4,571 |
Underground Heating Oil Tank Removals and remediation for nine locations.
This spending item is part of a $28,091 allocation.
See details
|
Forest Service | 2/11/2010 |
A A A THUNDERDERBOLT FIRE SERVICE INC | $3,880 | Malheur National Forest, Blue Mountain Ranger District, Plantation Maintenance, Lower Middle Fork Thinning and Handpiling | Forest Service | 9/24/2010 |
MULTIPLE RECIPIENTS | $0 | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Rural Housing Service | 6/30/2010 |