Multnomah County, Ore., funds by Department of Veterans Affairs
Listing $14,589,617.11 in stimulus funds from Department of Veterans Affairs for Multnomah
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SCHNEIDER ELECTRIC USA, INC. | $6,019,769 |
Replacement and installation of emergency generators.
This spending item is part of a $6,550,502 allocation.
See details
|
Department of Veterans Affairs | 6/11/2010 |
GRAY BEAR CONSTRUCTION CO. | $929,426 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
COLAMETTE CONSTRUCTION COMPANY | $547,388 | VA BLDG 16 RETAINING WALL | Department of Veterans Affairs | 3/31/2010 |
SKYTEK LLC | $495,546 | Renovation of Phlembotomy Lab of Bldg 100 @ Portland Va Medical Center | Department of Veterans Affairs | 10/28/2009 |
BRADFORD CONSULTING ENGINEERS, INC. | $414,600 |
Replacement and installation of emergency generators.
This spending item is part of a $6,550,502 allocation.
See details
|
Department of Veterans Affairs | 6/11/2010 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $396,142 | INSTALLATION OF A OVERHEAD PAGING SYSTEM IN PORTLAND AND VANCOUVER CAMPUSES OF PVAMC | Department of Veterans Affairs | 9/08/2009 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $396,142 | DESIGN/BUILD OVERHEAD PAGING | Department of Veterans Affairs | 8/26/2009 |
FIRST ELECTRIC COMPANY | $355,100 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
ARJOHUNTLEIGH INC | $336,832 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $299,147 | DESIGN/BUILD WOMEN'S CLINIC | Department of Veterans Affairs | 9/30/2009 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $299,147 | DESIGN/BUILD TENANT IMPROVEMENT | Department of Veterans Affairs | 9/30/2009 |
COLAMETTE CONSTRUCTION COMPANY | $288,040 | RENOVATE MRI BUILDING | Department of Veterans Affairs | 1/04/2010 |
SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC. | $259,265 | Design, Engineering and Installation of Access Control Security System | Department of Veterans Affairs | 3/03/2010 |
SKYTEK LLC | $244,344 | Renovation of Building 16 Basement at Portland OR to office, conference room, and support spaces. | Department of Veterans Affairs | 6/25/2010 |
ANDERSON & DABROWSKI ARCHITECTS | $230,188 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
TEMP-CONTROL MECHANICAL CORPORATION | $186,450 |
UPGRADE MEDICAL GAS SYSTEM AT BUILDING 1 - VAMC ROSEBURG
This spending item is part of a $257,000 allocation.
See details
|
Department of Veterans Affairs | 9/08/2009 |
OH PLANNING + DESIGN, ARCHITECTURE, LLC | $175,243 | Feasibility study to excavate the basement of the existing hospital while maintaining operations. The result may result in expansion space to the hospital. | Department of Veterans Affairs | 3/31/2010 |
Skyline Interiors Inc | $175,218 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $172,901 | DESIGN/BUILD SPECT CT | Department of Veterans Affairs | 9/30/2009 |
APEX TECHNOLOGY AND CONSTRUCTION CO | $172,901 | All nessacary labor and euipment to build a Spect CT | Department of Veterans Affairs | 9/08/2009 |
GRAY BEAR CONSTRUCTION CO. | $164,660 |
Installation of Ambulatory Surge Chiller at the Department of Veterans Affairs, Portland VA Medical Center, Portland, Oregon.
This spending item is part of a $197,381 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
Commercial Refrigeration, Inc. | $142,950 |
Furnish and install all labor, material, supervision, and equipment necessary to accomplish the repair of Dietetic Freezers as specified in bid item 1 of the general requirements referenced in the statement of work and section 01 00 00. Change Order No. 1
This spending item is part of a $201,442 allocation.
See details
|
Department of Veterans Affairs | 1/29/2010 |
COLAMETTE CONSTRUCTION COMPANY | $141,713 | RENOVATE THEATRE RESTROOMS | Department of Veterans Affairs | 9/14/2009 |
COLAMETTE CONSTRUCTION COMPANY | $141,713 | RENOVATE THEATRE RESTROOMS | Department of Veterans Affairs | 9/14/2009 |
Contract Flooring Consultants, LLC | $118,377 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
ARCTIC SHEET METAL, INC. | $117,387 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
GRAY BEAR CONSTRUCTION CO. | $106,922 |
Remodel Surgical Waiting Area and Patient Exam Rooms at the Department of Veterans Affairs, Portland VA Medical Center, Portland, Oregon.
This spending item is part of a $137,884 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
GLEN/MAR CONSTRUCTION, INC. | $91,755 | To improve road surfaces at the Willamette National Cemetery. | Department of Veterans Affairs | 7/07/2009 |
Sterling Construction Company | $89,389 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
Dynalectric Company | $89,275 |
Replacement and installation of emergency generators.
This spending item is part of a $6,550,502 allocation.
See details
|
Department of Veterans Affairs | 6/11/2010 |
BURTON CONSTRUCTION, INC. | $85,731 |
Replace Portland Oregon Department of Veterans affairs Building 16 broof. Remove existing roof, extend to old parapet, insulate new extended adn repair any damage to existing. Install all new roof jacks on existing penetrations, install continuous gutte
This spending item is part of a $180,590 allocation.
See details
|
Department of Veterans Affairs | 2/01/2010 |
GRAY BEAR CONSTRUCTION CO. | $84,166 |
Provide all necessary labor, supervision, materials, and equipment to complete the work as described in the Specifications and Drawings for solicitation VA-260-RA-0509 and Deduct Alternate number 1.k. Places of performance are the campuses of the Portland
This spending item is part of a $132,496 allocation.
See details
|
Department of Veterans Affairs | 9/30/2009 |
All About Roofs LLC | $74,742 |
Replace Portland Oregon Department of Veterans affairs Building 16 broof. Remove existing roof, extend to old parapet, insulate new extended adn repair any damage to existing. Install all new roof jacks on existing penetrations, install continuous gutte
This spending item is part of a $180,590 allocation.
See details
|
Department of Veterans Affairs | 2/01/2010 |
HARPER HOUF PETERSON RIGHELLIS INC. | $73,470 | Project # 648-08-182 Building 16 Lot Wall, for the Portland VA Medical Center Campus Portland, Oregon | Department of Veterans Affairs | 9/29/2009 |
Stellar Corp Construction | $67,160 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
COLAMETTE CONSTRUCTION COMPANY | $61,777 | VA REROOF AND ELEVATOR HANDRAIL | Department of Veterans Affairs | 8/28/2009 |
ESC AUTOMATION INC. | $61,768 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
GRAY BEAR CONSTRUCTION CO. | $58,492 |
Furnish and install all labor, material, supervision, and equipment necessary to accomplish the repair of Dietetic Freezers as specified in bid item 1 of the general requirements referenced in the statement of work and section 01 00 00. Change Order No. 1
This spending item is part of a $201,442 allocation.
See details
|
Department of Veterans Affairs | 1/29/2010 |
Faustrollean Fixture Co., Inc. | $56,320 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
BENSON INDUSTRIES LLC | $54,800 |
Provide all necessary labor, supervision, materials, and equipment to add automatic door openers to four (4) double doors serving the wards in Building 100 of the Portland VA Medical Center in Portland, Oregon.
This spending item is part of a $94,759 allocation.
See details
|
Department of Veterans Affairs | 9/30/2009 |
BEARCOM OPERATING LP | $48,330 |
Provide all necessary labor, supervision, materials, and equipment to complete the work as described in the Specifications and Drawings for solicitation VA-260-RA-0509 and Deduct Alternate number 1.k. Places of performance are the campuses of the Portland
This spending item is part of a $132,496 allocation.
See details
|
Department of Veterans Affairs | 9/30/2009 |
G A Bovero Tile & Marble Inc | $42,037 |
Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of project # 648-09-142 'Renovate Inpatient Wards, Phase I'.
This spending item is part of a $2,579,202 allocation.
See details
|
Department of Veterans Affairs | 4/23/2010 |
GRAY BEAR CONSTRUCTION CO. | $39,959 |
Provide all necessary labor, supervision, materials, and equipment to add automatic door openers to four (4) double doors serving the wards in Building 100 of the Portland VA Medical Center in Portland, Oregon.
This spending item is part of a $94,759 allocation.
See details
|
Department of Veterans Affairs | 9/30/2009 |
ESC AUTOMATION INC. | $32,721 |
Installation of Ambulatory Surge Chiller at the Department of Veterans Affairs, Portland VA Medical Center, Portland, Oregon.
This spending item is part of a $197,381 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
SKYLINE INTERIORS INC | $30,962 |
Remodel Surgical Waiting Area and Patient Exam Rooms at the Department of Veterans Affairs, Portland VA Medical Center, Portland, Oregon.
This spending item is part of a $137,884 allocation.
See details
|
Department of Veterans Affairs | 9/29/2009 |
BRADFORD CONSULTING ENGINEERS, INC. | $29,460 | Renovation of Building 16 Basement at the Portland VA Medical Center | Department of Veterans Affairs | 9/30/2009 |
BMWC CONSTRUCTORS, INC. | $26,858 |
Replacement and installation of emergency generators.
This spending item is part of a $6,550,502 allocation.
See details
|
Department of Veterans Affairs | 6/11/2010 |
GLEN/MAR CONSTRUCTION, INC. | $18,072 |
To improve road surface at VA National Cemetery.
This spending item is part of a $91,755 allocation.
See details
|
Department of Veterans Affairs | 7/07/2009 |
WILLIAM WILSON ARCHITECTS P.C. | $17,500 |
Design Build Outpatinet Pharmacy
This spending item is part of a $90,610 allocation.
See details
|
Department of Veterans Affairs | 12/10/2009 |
BELFOR ENVIRONMENTAL, INC. | $15,770 |
Replace Portland Oregon Department of Veterans affairs Building 16 broof. Remove existing roof, extend to old parapet, insulate new extended adn repair any damage to existing. Install all new roof jacks on existing penetrations, install continuous gutte
This spending item is part of a $180,590 allocation.
See details
|
Department of Veterans Affairs | 2/01/2010 |
RIDER LEVETT BUCKNALL LTD. | $7,245 |
Remodel Building 85, Second Floor
This spending item is part of a $93,498 allocation.
See details
|
Department of Veterans Affairs | 8/26/2009 |
KNIFE RIVER CORPORATION - NORTHWEST | $2,000 |
Replace Portland Oregon Department of Veterans affairs Building 16 broof. Remove existing roof, extend to old parapet, insulate new extended adn repair any damage to existing. Install all new roof jacks on existing penetrations, install continuous gutte
This spending item is part of a $180,590 allocation.
See details
|
Department of Veterans Affairs | 2/01/2010 |
PHOENIX ELECTRIC COMPANY, LLC | $1,531 |
Replace Portland Oregon Department of Veterans affairs Building 16 broof. Remove existing roof, extend to old parapet, insulate new extended adn repair any damage to existing. Install all new roof jacks on existing penetrations, install continuous gutte
This spending item is part of a $180,590 allocation.
See details
|
Department of Veterans Affairs | 2/01/2010 |
HOFFMAN SOUTHWEST CORP. | $816 |
Replace Portland Oregon Department of Veterans affairs Building 16 broof. Remove existing roof, extend to old parapet, insulate new extended adn repair any damage to existing. Install all new roof jacks on existing penetrations, install continuous gutte
This spending item is part of a $180,590 allocation.
See details
|
Department of Veterans Affairs | 2/01/2010 |