Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Multnomah County, Ore., funds by General Services Administration

Listing $170,668,514.90 in stimulus funds from General Services Administration for Multnomah

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
HOWARD S WRIGHT COMPANIES OREGON JOINT VENTURE $51,498,227 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
MCKINSTRY CO., LLC $27,449,928 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
BENSON INDUSTRIES LLC $18,369,645 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
Dynalectric Company $9,869,952 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
ALLEN BRADBURY CONSTRUCTION LLC $7,669,341 Provide/install: 911 Building, Portland, OR: Boiler 9, 905 Solomon Building, Portland, OR: Boiler and Domestic water heater. 911 Building: Portland, OR: Replacement Chillers, 905 Building: Portland, OR: Terrace Roof, 911 Fountain, 905 Bldg, Portland OR: Public Buildings Service 3/26/2010
LEASE CRUTCHER LEWIS, LLC $5,615,303 Award funding to cover costs of Veterns Benefits Association tenant Improvement build-out design, construction, and commissioning on floors 2, 3, & 4 of in newly construction LEED Platinum certified highrise. Design and construction to achieve LEED Silve Public Buildings Service 1/27/2010
SERA ARCHITECTS, INC. $5,586,430 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
LEASE CRUTCHER LEWIS, LLC $5,097,455 Award funding to cover costs of IRS Temporary tenant Improvement build-out design, construction, and commissioning on floors 10, 11, 12 & a portion of 13 in a new LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold. Public Buildings Service 1/27/2010
LEASE CRUTCHER LEWIS, LLC $4,637,791 Award funding to cover costs of IRS Permanent Call Site tenant Improvement build-out design, construction, and commissioning on floors 7, 8, & 9 in newly a construction LEED Platinum certified highrise. Design and construction currently tracking for LEE Public Buildings Service 1/27/2010
LEASE CRUTCHER LEWIS, LLC $3,022,820 Award funding to cover costs of DEA tenant Improvement build-out design, construction, and commissioning on floors 5 & 6 in a newly construction LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold. Substantial comp Public Buildings Service 1/27/2010
OTIS ELEVATOR COMPANY $2,930,752 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
GLEN/MAR CONSTRUCTION, INC. $2,491,228 New weather-tite and energy efficient roofing systems adding decades of service life to building. Public Buildings Service 3/01/2010
ALLIANCE INDUSTRIAL GROUP, INC. $2,428,729 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
OR-CONGRESS CENTER LIMITED PARTNERSHIP $2,005,338 This is a final payment torward the approved portion of the Tenant Improvement for the aforementioned lease. The amount in this the final billing is $181,423.82. Public Buildings Service 3/18/2010
CASCADE ACOUSTICS, INC $1,641,837 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
STANTEC CONSULTING SERVICES INC. $1,520,536 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
PAE CONSULTING ENGINEERS, INC. $1,171,907 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
GLUMAC $1,148,205 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
OREGON TRADES WOMEN, INC $1,041,211 Oregon Tradeswomen, Incoroporated works in conjuunction with the Portland metro area's union registered construction apprenticeship programs, as well as with several majuor contrator associations to provide successful pre-apprenticeship training and place Public Buildings Service 9/22/2009
DDG INC $1,005,527 The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui General Services Administration 8/11/2010
MACHINEWORKS, LLC $915,451 Government issued two (2) Notices to Proceeds in the amout of $762,200 and $209,805 to be applied to the Tenant Improvments in the amout of $972,005 to be reimbursed to the Lessor. Included in the totals above are the following alternates: 1) Art Glass u Public Buildings Service 7/21/2010
JOHNSON CONTROLS, INC. $765,887 Energy Efficiency Upgrades at the BPA 905 and GSA 911 Buildings, 905 and 911 NE 11th Street, Portland Oregon, 97232, including BAS upgrade and replacement of multiple direct digital controllers (DDC)
This spending item is part of a $959,985 allocation. See details
Public Buildings Service 6/29/2010
LEASE CRUTCHER LEWIS, LLC $753,327 Award funding to cover costs of Armed Forces Recruiting USMC tenant Improvement build-out design, construction, and commissioning on a portion of floor 6 in newly construction LEED Platinum certified highrise. Design and construction currently tracking f Public Buildings Service 4/21/2010
CUTLER ANDERSON ARCHITECTS $724,402 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
SPACESAVER STORAGE SYSTEMS, INC. $712,873 High Density Mobile Storage System with Automatic Safety System for the Veterans Benefit Administration General Services Administration 6/11/2010
KPFF, INC. $703,435 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
Raimore LLC $603,895 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
JOHNSON PROJECT SOLUTIONS, INC. $539,751 Tenant Improvement Final Billing - for the construction of the necessary improvements for the USDA office space per SFO No. 90R2099 and all included special requirements Public Buildings Service 11/30/2010
GBD ARCHITECTS INCORPORATED $479,739 Award funding to cover costs of Veterns Benefits Association tenant Improvement build-out design, construction, and commissioning on floors 2, 3, & 4 of in newly construction LEED Platinum certified highrise. Design and construction to achieve LEED Silve
This spending item is part of a $4,538,904 allocation. See details
Public Buildings Service 1/27/2010
LEASE CRUTCHER LEWIS, LLC $418,140 Award funding to cover costs of USDA Office of Inspector General tenant Improvement build-out design, construction, and commissioning on floor 6 in a newly construction LEED Platinum certified highrise. Design and construction application for LEED Gold c Public Buildings Service 1/27/2010
SYSTEC GROUP LLC $403,072 Products and services required to perform file conversion and relocation of Personal Identifiable Information (PII). Approximately 90,000 records were converted by the creation and application of new color-coded end tab labels. Records were also audited General Services Administration 8/24/2010
AMERICAN SYSTEMS CORPORATION $368,090 DEA Portland, OR VoIP Services
This spending item is part of a $411,006 allocation. See details
General Services Administration 5/14/2010
INTERFACE ENGINEERING, INC. $332,369 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
GBD ARCHITECTS INCORPORATED $311,300 Award funding to cover costs of DEA tenant Improvement build-out design, construction, and commissioning on floors 5 & 6 in a newly construction LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold. Substantial comp
This spending item is part of a $2,587,257 allocation. See details
Public Buildings Service 1/27/2010
DDG INC $298,368 The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui General Services Administration 8/19/2010
Venetian Terrazzo Co Llc. $287,756 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
GBD ARCHITECTS INCORPORATED $283,377 Award funding to cover costs of IRS Temporary tenant Improvement build-out design, construction, and commissioning on floors 10, 11, 12 & a portion of 13 in a new LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold.
This spending item is part of a $3,776,921 allocation. See details
Public Buildings Service 1/27/2010
SIEMENS INDUSTRY INC. $279,794 Hatfield Federal Courthouse Portland, Oregon. Upgrade or replace the existing Lighting Controls System and the Building Automation System (BAS), including system presentation and installation of the new components/equipmentmaterials, including labor and s
This spending item is part of a $336,088 allocation. See details
Public Buildings Service 6/30/2010
GBD ARCHITECTS INCORPORATED $278,765 Award funding to cover costs of IRS Permanent Call Site tenant Improvement build-out design, construction, and commissioning on floors 7, 8, & 9 in newly a construction LEED Platinum certified highrise. Design and construction currently tracking for LEE
This spending item is part of a $3,329,826 allocation. See details
Public Buildings Service 1/27/2010
DDG INC $260,991 The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui General Services Administration 8/27/2010
HEALTH SERVICES GROUP INC $231,732 At the Government's request, Health Services Group, Inc. contracted with ZGF Architects and Ashforth Construction to plan and build out space for Federal Mediation Concilliatory Services on the 9th floor of 601 SW Second Ave, Portland, OR. Public Buildings Service 8/24/2010
AEGIS ENGINEERING, PLLC $227,158 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
Laras Construction LLC $222,634 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
DIVERSE WORKS, INC. $211,867 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
Morrow Meadows Corporation $194,098 Energy Efficiency Upgrades at the BPA 905 and GSA 911 Buildings, 905 and 911 NE 11th Street, Portland Oregon, 97232, including BAS upgrade and replacement of multiple direct digital controllers (DDC)
This spending item is part of a $959,985 allocation. See details
Public Buildings Service 6/29/2010
APSI CONSTRUCTION MANAGEMENT $193,237 The purpose of the award is to provide oversight and documentation of the design and construction process. The location of the award is BPA 905 ? GSA 911 Buildings in Portland, Oregon. The outcome of the award is the replacement of the roofing material
This spending item is part of a $287,537 allocation. See details
Public Buildings Service 7/23/2010
ATELIER DREISEITL LLC $189,282 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
DDG INC $184,154 The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui General Services Administration 10/08/2010
NORTHWEST CASCADE, INC. $146,160 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
DDG INC $132,743 The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui General Services Administration 9/13/2010
WESTERN REBAR, INC. $130,109 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
NORTHWEST TOWER CRANE SERVICE, INC. $129,490 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
HUSER INTEGRATED TECHNOLOGIES, LLC $124,963 Project Support for Edith Green Wendell Wyatt Modernization. While building out new tenant spaces, various scope gaps have been identified. The purpose of this contract is to fill those scope gaps. This may include and is not limited to total or partia
This spending item is part of a $302,268 allocation. See details
Public Buildings Service 9/29/2010
Dynalectric Company $119,239 Project Support for Edith Green Wendell Wyatt Modernization. While building out new tenant spaces, various scope gaps have been identified. The purpose of this contract is to fill those scope gaps. This may include and is not limited to total or partia
This spending item is part of a $302,268 allocation. See details
Public Buildings Service 9/29/2010
SALTER, CHARLES M ASSOCIATES INC $105,131 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
CHEROKEE CONSTRUCTION SERVICES, LLC $96,139 Historical renovation of room 701 at Gus Solomon Courthouse, Portland, Oregon. Public Buildings Service 6/29/2011
MARK, MELVIN CONSTRUCTION COMPANY, INC $94,856 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $90,800 Art Conservation Services (Sculpture). Inspection of sculptures at Federal Building in Portland, Oregon. Design and execute plan for protection, removal and conservation treatment. Public Buildings Service 8/03/2010
ART ANDERSON ASSOCIATES, INC. $80,927 Construction Management Assist Services at the Gus J. Soloman U.S. Courthouse @ 620 S.W. Main Street Portland, Oregon 97205-3037 Public Buildings Service 3/09/2010
SIEMENS INDUSTRY, INC. $80,498 ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation. See details
Public Buildings Service 3/22/2010
OMNI INTERIORS INC $73,715 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
WEIDLINGER ASSOCIATES, INC. $73,176 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
Professional Roof Consultant $70,480 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
Rdh Building Sciences Inc $69,000 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
DDG INC $66,755 The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui General Services Administration 8/20/2010
CARLSON TESTING INC $64,400 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
GBD ARCHITECTS INCORPORATED $62,764 Award funding to cover costs of Armed Forces Recruiting USMC tenant Improvement build-out design, construction, and commissioning on a portion of floor 6 in newly construction LEED Platinum certified highrise. Design and construction currently tracking f
This spending item is part of a $601,369 allocation. See details
Public Buildings Service 4/21/2010
HOWARD S. WRIGHT CONSTRUCTORS LP $62,075 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
SMITHS DETECTION, INC $59,620 Manufacturer/Contractor to provide security equipment (i.e., Multizone Walk-Through Metal Detector, Hand-held Metal Detector, Hi-SCAN 5030si X-ray System, and related software and roller tables) to the Veterans Benefit Administration located in Portland, General Services Administration 7/09/2010
LANPACIFIC, INC. $58,066 Project Support for Edith Green Wendell Wyatt Modernization. While building out new tenant spaces, various scope gaps have been identified. The purpose of this contract is to fill those scope gaps. This may include and is not limited to total or partia
This spending item is part of a $302,268 allocation. See details
Public Buildings Service 9/29/2010
TKC INTEGRATION SERVICES, LLC $57,666 Telecom closet equipment General Services Administration 7/21/2010
GROUND WATER SOLUTIONS, INC $57,253 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
INTERFACE ENGINEERING, INC. $54,481 Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation. See details
Public Buildings Service 8/12/2010
PACIFIC STATIONERY & PRINTING COMPANY $51,153 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
RIDER LEVETT BUCKNALL LTD. $48,480 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
PIONEER WATERPROOFING COMPANY, INC. $45,370 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
MAYER REED $43,510 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
WORLDWIDE INFORMATION NETWORK SYSTEMS $42,915 DEA Portland, OR VoIP Services
This spending item is part of a $411,006 allocation. See details
General Services Administration 5/14/2010
GBD ARCHITECTS INCORPORATED $39,909 Award funding to cover costs of USDA Office of Inspector General tenant Improvement build-out design, construction, and commissioning on floor 6 in a newly construction LEED Platinum certified highrise. Design and construction application for LEED Gold c
This spending item is part of a $348,900 allocation. See details
Public Buildings Service 1/27/2010
TOTAL SYSTEM SERVICES, INC. $37,859 Escorting on Various sites in Portland Oregon, And Washington funded by ARRA Public Buildings Service 11/30/2010
Tractel North America Inc $35,000 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
CHRISTENSON ELECTRIC, INC. $34,310 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
NATIONAL RELOCATION SERVICES, INC. $30,309 Disassemble and relocate furniture from 1220 Southwest 3rd Street (old location) to 100 Southwest Main Street (new location). Specify, provide and install additional new product required to complete installation at new location. Project successfully com Public Buildings Service 8/19/2010
Faison Construction $29,187 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
INTEGRATED POWER SYSTEMS, INC. $28,839 UPS relocation and rental for IRS in support of the EGWW Modernization. Public Buildings Service 8/23/2010
Nakano Associates $26,969 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $26,920 Art Conservation Services (Sculpture). Inspection of sculptures at Federal Building in Portland, Oregon. Design and execute plan for protection, removal and conservation treatment. Public Buildings Service 8/27/2010
Dynalectric Company $24,900 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
EATON CORPORATION $22,209 Provide two (2) GE AK-2A-50 used circuit breakers in rebuildable condition and conduct Class 1 reconditioning of two (2) GE AK-1A-50 circuit breakers for the 911 Federal Building, Portland, OR. ACT/PDN No: PJ1L00111 Public Buildings Service 2/14/2011
HAS PAINTING $20,740 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
NETCOMPLIANCE ENVIRONMENTAL SERVICES, LLC $20,460 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
DDG INC $20,187 The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui General Services Administration 7/30/2010
HDL COMPANY, LLC $19,340 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
MAYER REED $19,197 Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation. See details
Public Buildings Service 8/12/2010
DDG INC $18,296 The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operationally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui General Services Administration 8/03/2011
BRUNDAGE-BONE CONCRETE PUMPING, INC. $17,000 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
NORTHWEST GEOTECHNICAL CONSULTANTS, INC. $16,758 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
PACIFIC BUSINESS SYSTEMS OF OREGON, INCORPORATED $15,400 Relocate Times-Two Cabinets, OPLA, AFR Marines Public Buildings Service 8/23/2010
TREECOLOGY INC $14,103 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
D & F Plumbing Co Inc $13,767 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
HEERY INTERNATIONAL, INC. $13,206 Provide quality control (QC) inspections and testing of work performed by others in Portland, OR. Systems inspected and tested include lighting controls and HVAC controls. Heery's scope of work includes development of a testing plan, review of project Public Buildings Service 5/06/2011
Air Rite Control Inc $12,897 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
OR-CONGRESS CENTER LIMITED PARTNERSHIP $12,496 This is the final payment torward the approved portion of the Tenant Improvement for the aforementioned lease. The amount in this the final billing is $12,495.89. Public Buildings Service 4/18/2010
LERCH BATES INC. $12,360 Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation. See details
Public Buildings Service 5/01/2009
CHRISTENSON ELECTRIC, INC. $11,642 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
TELECO TELEPHONE COMPANY, INC. $11,170 Shipped 45) M6320 Digital telephones to General Services Administration / Public Building Services (either or) Southern Service Center 620 SW Main Rm 108 Portland Or. Total cost $11,170.00 Public Buildings Service 8/19/2010
KNOLL, INC. $11,141 Manufacture and delivery of Knoll Office for Portland, Oregon using ARA Funds.. Public Buildings Service 8/04/2010
EHS-INTERNATIONAL, INC. $8,054 Provided professional environmental and hazardous materials pre-demolition abatement construction administration consulting services. Review and respond to the abatement contractor's work plan and submittals and evaluate compliance with regulatory requir Public Buildings Service 8/04/2011
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $7,464 Art Conservation Services (Sculpture). Inspection of sculptures at Federal Building in Portland, Oregon. Design and execute plan for protection, removal and conservation treatment. Public Buildings Service 9/17/2010
4m Floor Covering Inc $7,437 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
KPFF, INC. $7,000 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
ACCURATE CONCRETE CUTTING, INC. $6,936 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
ALCANTAR & ASSOCIATES LLC $5,850 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
OFFICE AUTOMATION GROUP $5,595 Portland Or. Relocate phone system and networking gear to Marine Corps Recruting Station headquarters in Portland. Public Buildings Service 8/23/2010
BASIC FIRE PROTECTION, INC. $4,930 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
PROTEC INC. $4,910 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
Tractel North America Inc $4,860 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
TOTAL SYSTEM SERVICES, INC. $3,921 Installation of Charcoal Filters and Relocation of Pneumatics System at the 911 Federal Building Portland, Oregon Public Buildings Service 11/21/2010
SENTINEL TECHNOLOGIES, INC. $3,597 Move information technology hardware from the United Stated Railroad Retirement Board Portland office 1220 SE 3rf Ave Portland OR, to 1025 SW 6th Ave Portland OR. Public Buildings Service 8/04/2010
OMNI INTERIORS INC $2,380 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
BASIC FIRE PROTECTION, INC. $2,178 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
NORTHWEST GEOTECHNICAL CONSULTANTS, INC. $1,500 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
I-TEN ASSOCIATES, INC. $1,500 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
CHRISTENSON ELECTRIC, INC. $1,175 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
CHRISTENSON ELECTRIC, INC. $1,135 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
CHRISTENSON ELECTRIC, INC. $625 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
OMNI INTERIORS INC $610 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
K P F F Inc $500 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
4m Floor Covering Inc $375 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
CHRISTENSON ELECTRIC, INC. $373 5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation. See details
Public Buildings Service 7/21/2010
CHEROKEE GENERAL CORPORATION $0 Hatfield Federal Courthouse Portland, Oregon. Upgrade or replace the existing Lighting Controls System and the Building Automation System (BAS), including system presentation and installation of the new components/equipmentmaterials, including labor and s
This spending item is part of a $336,088 allocation. See details
Public Buildings Service 6/30/2010
TWO MAIN DEVELOPMENT LLC $0 Award funding to cover costs of USDA Office of Inspector General tenant Improvement build-out design, construction, and commissioning on floor 6 in a newly construction LEED Platinum certified highrise. Design and construction application for LEED Gold c
This spending item is part of a $348,900 allocation. See details
Public Buildings Service 1/27/2010
TWO MAIN DEVELOPMENT LLC $0 Award funding to cover costs of Armed Forces Recruiting USMC tenant Improvement build-out design, construction, and commissioning on a portion of floor 6 in newly construction LEED Platinum certified highrise. Design and construction currently tracking f
This spending item is part of a $601,369 allocation. See details
Public Buildings Service 4/21/2010
FOX TOWER LLC $0 Tenant Improvement Final Billing - for the construction of the necessary improvements for the USDA office space per SFO No. 90R2099 and all included special requirements
This spending item is part of a $59,173 allocation. See details
Public Buildings Service 11/30/2010
TWO MAIN DEVELOPMENT LLC $0 Award funding to cover costs of IRS Temporary tenant Improvement build-out design, construction, and commissioning on floors 10, 11, 12 & a portion of 13 in a new LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold.
This spending item is part of a $3,776,921 allocation. See details
Public Buildings Service 1/27/2010
TWO MAIN DEVELOPMENT LLC $0 Award funding to cover costs of IRS Permanent Call Site tenant Improvement build-out design, construction, and commissioning on floors 7, 8, & 9 in newly a construction LEED Platinum certified highrise. Design and construction currently tracking for LEE
This spending item is part of a $3,329,826 allocation. See details
Public Buildings Service 1/27/2010
TWO MAIN DEVELOPMENT LLC $0 Award funding to cover costs of DEA tenant Improvement build-out design, construction, and commissioning on floors 5 & 6 in a newly construction LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold. Substantial comp
This spending item is part of a $2,587,257 allocation. See details
Public Buildings Service 1/27/2010
TWO MAIN DEVELOPMENT LLC $0 Award funding to cover costs of Veterns Benefits Association tenant Improvement build-out design, construction, and commissioning on floors 2, 3, & 4 of in newly construction LEED Platinum certified highrise. Design and construction to achieve LEED Silve
This spending item is part of a $4,538,904 allocation. See details
Public Buildings Service 1/27/2010