Multnomah County, Ore., funds by General Services Administration
Listing $170,668,514.90 in stimulus funds from General Services Administration for Multnomah
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
HOWARD S WRIGHT COMPANIES OREGON JOINT VENTURE | $51,498,227 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
MCKINSTRY CO., LLC | $27,449,928 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
BENSON INDUSTRIES LLC | $18,369,645 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
Dynalectric Company | $9,869,952 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
ALLEN BRADBURY CONSTRUCTION LLC | $7,669,341 | Provide/install: 911 Building, Portland, OR: Boiler 9, 905 Solomon Building, Portland, OR: Boiler and Domestic water heater. 911 Building: Portland, OR: Replacement Chillers, 905 Building: Portland, OR: Terrace Roof, 911 Fountain, 905 Bldg, Portland OR: | Public Buildings Service | 3/26/2010 |
LEASE CRUTCHER LEWIS, LLC | $5,615,303 | Award funding to cover costs of Veterns Benefits Association tenant Improvement build-out design, construction, and commissioning on floors 2, 3, & 4 of in newly construction LEED Platinum certified highrise. Design and construction to achieve LEED Silve | Public Buildings Service | 1/27/2010 |
SERA ARCHITECTS, INC. | $5,586,430 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
LEASE CRUTCHER LEWIS, LLC | $5,097,455 | Award funding to cover costs of IRS Temporary tenant Improvement build-out design, construction, and commissioning on floors 10, 11, 12 & a portion of 13 in a new LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold. | Public Buildings Service | 1/27/2010 |
LEASE CRUTCHER LEWIS, LLC | $4,637,791 | Award funding to cover costs of IRS Permanent Call Site tenant Improvement build-out design, construction, and commissioning on floors 7, 8, & 9 in newly a construction LEED Platinum certified highrise. Design and construction currently tracking for LEE | Public Buildings Service | 1/27/2010 |
LEASE CRUTCHER LEWIS, LLC | $3,022,820 | Award funding to cover costs of DEA tenant Improvement build-out design, construction, and commissioning on floors 5 & 6 in a newly construction LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold. Substantial comp | Public Buildings Service | 1/27/2010 |
OTIS ELEVATOR COMPANY | $2,930,752 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
GLEN/MAR CONSTRUCTION, INC. | $2,491,228 | New weather-tite and energy efficient roofing systems adding decades of service life to building. | Public Buildings Service | 3/01/2010 |
ALLIANCE INDUSTRIAL GROUP, INC. | $2,428,729 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
OR-CONGRESS CENTER LIMITED PARTNERSHIP | $2,005,338 | This is a final payment torward the approved portion of the Tenant Improvement for the aforementioned lease. The amount in this the final billing is $181,423.82. | Public Buildings Service | 3/18/2010 |
CASCADE ACOUSTICS, INC | $1,641,837 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
STANTEC CONSULTING SERVICES INC. | $1,520,536 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
PAE CONSULTING ENGINEERS, INC. | $1,171,907 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
GLUMAC | $1,148,205 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
OREGON TRADES WOMEN, INC | $1,041,211 | Oregon Tradeswomen, Incoroporated works in conjuunction with the Portland metro area's union registered construction apprenticeship programs, as well as with several majuor contrator associations to provide successful pre-apprenticeship training and place | Public Buildings Service | 9/22/2009 |
DDG INC | $1,005,527 | The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui | General Services Administration | 8/11/2010 |
MACHINEWORKS, LLC | $915,451 | Government issued two (2) Notices to Proceeds in the amout of $762,200 and $209,805 to be applied to the Tenant Improvments in the amout of $972,005 to be reimbursed to the Lessor. Included in the totals above are the following alternates: 1) Art Glass u | Public Buildings Service | 7/21/2010 |
JOHNSON CONTROLS, INC. | $765,887 |
Energy Efficiency Upgrades at the BPA 905 and GSA 911 Buildings, 905 and 911 NE 11th Street, Portland Oregon, 97232, including BAS upgrade and replacement of multiple direct digital controllers (DDC)
This spending item is part of a $959,985 allocation.
See details
|
Public Buildings Service | 6/29/2010 |
LEASE CRUTCHER LEWIS, LLC | $753,327 | Award funding to cover costs of Armed Forces Recruiting USMC tenant Improvement build-out design, construction, and commissioning on a portion of floor 6 in newly construction LEED Platinum certified highrise. Design and construction currently tracking f | Public Buildings Service | 4/21/2010 |
CUTLER ANDERSON ARCHITECTS | $724,402 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
SPACESAVER STORAGE SYSTEMS, INC. | $712,873 | High Density Mobile Storage System with Automatic Safety System for the Veterans Benefit Administration | General Services Administration | 6/11/2010 |
KPFF, INC. | $703,435 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
Raimore LLC | $603,895 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
JOHNSON PROJECT SOLUTIONS, INC. | $539,751 | Tenant Improvement Final Billing - for the construction of the necessary improvements for the USDA office space per SFO No. 90R2099 and all included special requirements | Public Buildings Service | 11/30/2010 |
GBD ARCHITECTS INCORPORATED | $479,739 |
Award funding to cover costs of Veterns Benefits Association tenant Improvement build-out design, construction, and commissioning on floors 2, 3, & 4 of in newly construction LEED Platinum certified highrise. Design and construction to achieve LEED Silve
This spending item is part of a $4,538,904 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
LEASE CRUTCHER LEWIS, LLC | $418,140 | Award funding to cover costs of USDA Office of Inspector General tenant Improvement build-out design, construction, and commissioning on floor 6 in a newly construction LEED Platinum certified highrise. Design and construction application for LEED Gold c | Public Buildings Service | 1/27/2010 |
SYSTEC GROUP LLC | $403,072 | Products and services required to perform file conversion and relocation of Personal Identifiable Information (PII). Approximately 90,000 records were converted by the creation and application of new color-coded end tab labels. Records were also audited | General Services Administration | 8/24/2010 |
AMERICAN SYSTEMS CORPORATION | $368,090 |
DEA Portland, OR VoIP Services
This spending item is part of a $411,006 allocation.
See details
|
General Services Administration | 5/14/2010 |
INTERFACE ENGINEERING, INC. | $332,369 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
GBD ARCHITECTS INCORPORATED | $311,300 |
Award funding to cover costs of DEA tenant Improvement build-out design, construction, and commissioning on floors 5 & 6 in a newly construction LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold. Substantial comp
This spending item is part of a $2,587,257 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
DDG INC | $298,368 | The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui | General Services Administration | 8/19/2010 |
Venetian Terrazzo Co Llc. | $287,756 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
GBD ARCHITECTS INCORPORATED | $283,377 |
Award funding to cover costs of IRS Temporary tenant Improvement build-out design, construction, and commissioning on floors 10, 11, 12 & a portion of 13 in a new LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold.
This spending item is part of a $3,776,921 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
SIEMENS INDUSTRY INC. | $279,794 |
Hatfield Federal Courthouse Portland, Oregon. Upgrade or replace the existing Lighting Controls System and the Building Automation System (BAS), including system presentation and installation of the new components/equipmentmaterials, including labor and s
This spending item is part of a $336,088 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
GBD ARCHITECTS INCORPORATED | $278,765 |
Award funding to cover costs of IRS Permanent Call Site tenant Improvement build-out design, construction, and commissioning on floors 7, 8, & 9 in newly a construction LEED Platinum certified highrise. Design and construction currently tracking for LEE
This spending item is part of a $3,329,826 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
DDG INC | $260,991 | The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui | General Services Administration | 8/27/2010 |
HEALTH SERVICES GROUP INC | $231,732 | At the Government's request, Health Services Group, Inc. contracted with ZGF Architects and Ashforth Construction to plan and build out space for Federal Mediation Concilliatory Services on the 9th floor of 601 SW Second Ave, Portland, OR. | Public Buildings Service | 8/24/2010 |
AEGIS ENGINEERING, PLLC | $227,158 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
Laras Construction LLC | $222,634 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
DIVERSE WORKS, INC. | $211,867 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
Morrow Meadows Corporation | $194,098 |
Energy Efficiency Upgrades at the BPA 905 and GSA 911 Buildings, 905 and 911 NE 11th Street, Portland Oregon, 97232, including BAS upgrade and replacement of multiple direct digital controllers (DDC)
This spending item is part of a $959,985 allocation.
See details
|
Public Buildings Service | 6/29/2010 |
APSI CONSTRUCTION MANAGEMENT | $193,237 |
The purpose of the award is to provide oversight and documentation of the design and construction process. The location of the award is BPA 905 ? GSA 911 Buildings in Portland, Oregon. The outcome of the award is the replacement of the roofing material
This spending item is part of a $287,537 allocation.
See details
|
Public Buildings Service | 7/23/2010 |
ATELIER DREISEITL LLC | $189,282 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
DDG INC | $184,154 | The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui | General Services Administration | 10/08/2010 |
NORTHWEST CASCADE, INC. | $146,160 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
DDG INC | $132,743 | The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui | General Services Administration | 9/13/2010 |
WESTERN REBAR, INC. | $130,109 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
NORTHWEST TOWER CRANE SERVICE, INC. | $129,490 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
HUSER INTEGRATED TECHNOLOGIES, LLC | $124,963 |
Project Support for Edith Green Wendell Wyatt Modernization. While building out new tenant spaces, various scope gaps have been identified. The purpose of this contract is to fill those scope gaps. This may include and is not limited to total or partia
This spending item is part of a $302,268 allocation.
See details
|
Public Buildings Service | 9/29/2010 |
Dynalectric Company | $119,239 |
Project Support for Edith Green Wendell Wyatt Modernization. While building out new tenant spaces, various scope gaps have been identified. The purpose of this contract is to fill those scope gaps. This may include and is not limited to total or partia
This spending item is part of a $302,268 allocation.
See details
|
Public Buildings Service | 9/29/2010 |
SALTER, CHARLES M ASSOCIATES INC | $105,131 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
CHEROKEE CONSTRUCTION SERVICES, LLC | $96,139 | Historical renovation of room 701 at Gus Solomon Courthouse, Portland, Oregon. | Public Buildings Service | 6/29/2011 |
MARK, MELVIN CONSTRUCTION COMPANY, INC | $94,856 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $90,800 | Art Conservation Services (Sculpture). Inspection of sculptures at Federal Building in Portland, Oregon. Design and execute plan for protection, removal and conservation treatment. | Public Buildings Service | 8/03/2010 |
ART ANDERSON ASSOCIATES, INC. | $80,927 | Construction Management Assist Services at the Gus J. Soloman U.S. Courthouse @ 620 S.W. Main Street Portland, Oregon 97205-3037 | Public Buildings Service | 3/09/2010 |
SIEMENS INDUSTRY, INC. | $80,498 |
ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
OMNI INTERIORS INC | $73,715 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
WEIDLINGER ASSOCIATES, INC. | $73,176 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
Professional Roof Consultant | $70,480 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
Rdh Building Sciences Inc | $69,000 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
DDG INC | $66,755 | The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui | General Services Administration | 8/20/2010 |
CARLSON TESTING INC | $64,400 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
GBD ARCHITECTS INCORPORATED | $62,764 |
Award funding to cover costs of Armed Forces Recruiting USMC tenant Improvement build-out design, construction, and commissioning on a portion of floor 6 in newly construction LEED Platinum certified highrise. Design and construction currently tracking f
This spending item is part of a $601,369 allocation.
See details
|
Public Buildings Service | 4/21/2010 |
HOWARD S. WRIGHT CONSTRUCTORS LP | $62,075 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
SMITHS DETECTION, INC | $59,620 | Manufacturer/Contractor to provide security equipment (i.e., Multizone Walk-Through Metal Detector, Hand-held Metal Detector, Hi-SCAN 5030si X-ray System, and related software and roller tables) to the Veterans Benefit Administration located in Portland, | General Services Administration | 7/09/2010 |
LANPACIFIC, INC. | $58,066 |
Project Support for Edith Green Wendell Wyatt Modernization. While building out new tenant spaces, various scope gaps have been identified. The purpose of this contract is to fill those scope gaps. This may include and is not limited to total or partia
This spending item is part of a $302,268 allocation.
See details
|
Public Buildings Service | 9/29/2010 |
TKC INTEGRATION SERVICES, LLC | $57,666 | Telecom closet equipment | General Services Administration | 7/21/2010 |
GROUND WATER SOLUTIONS, INC | $57,253 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
INTERFACE ENGINEERING, INC. | $54,481 |
Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
PACIFIC STATIONERY & PRINTING COMPANY | $51,153 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
RIDER LEVETT BUCKNALL LTD. | $48,480 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
PIONEER WATERPROOFING COMPANY, INC. | $45,370 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
MAYER REED | $43,510 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
WORLDWIDE INFORMATION NETWORK SYSTEMS | $42,915 |
DEA Portland, OR VoIP Services
This spending item is part of a $411,006 allocation.
See details
|
General Services Administration | 5/14/2010 |
GBD ARCHITECTS INCORPORATED | $39,909 |
Award funding to cover costs of USDA Office of Inspector General tenant Improvement build-out design, construction, and commissioning on floor 6 in a newly construction LEED Platinum certified highrise. Design and construction application for LEED Gold c
This spending item is part of a $348,900 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
TOTAL SYSTEM SERVICES, INC. | $37,859 | Escorting on Various sites in Portland Oregon, And Washington funded by ARRA | Public Buildings Service | 11/30/2010 |
Tractel North America Inc | $35,000 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
CHRISTENSON ELECTRIC, INC. | $34,310 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
NATIONAL RELOCATION SERVICES, INC. | $30,309 | Disassemble and relocate furniture from 1220 Southwest 3rd Street (old location) to 100 Southwest Main Street (new location). Specify, provide and install additional new product required to complete installation at new location. Project successfully com | Public Buildings Service | 8/19/2010 |
Faison Construction | $29,187 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
INTEGRATED POWER SYSTEMS, INC. | $28,839 | UPS relocation and rental for IRS in support of the EGWW Modernization. | Public Buildings Service | 8/23/2010 |
Nakano Associates | $26,969 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $26,920 | Art Conservation Services (Sculpture). Inspection of sculptures at Federal Building in Portland, Oregon. Design and execute plan for protection, removal and conservation treatment. | Public Buildings Service | 8/27/2010 |
Dynalectric Company | $24,900 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
EATON CORPORATION | $22,209 | Provide two (2) GE AK-2A-50 used circuit breakers in rebuildable condition and conduct Class 1 reconditioning of two (2) GE AK-1A-50 circuit breakers for the 911 Federal Building, Portland, OR. ACT/PDN No: PJ1L00111 | Public Buildings Service | 2/14/2011 |
HAS PAINTING | $20,740 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
NETCOMPLIANCE ENVIRONMENTAL SERVICES, LLC | $20,460 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
DDG INC | $20,187 | The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operatoinally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui | General Services Administration | 7/30/2010 |
HDL COMPANY, LLC | $19,340 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
MAYER REED | $19,197 |
Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
DDG INC | $18,296 | The ARRA money was received in order to modernize an existing 30-year old federal facility into an economically and operationally efficient high performance green building. This comprehensive modernization project included replacement and upgrades to bui | General Services Administration | 8/03/2011 |
BRUNDAGE-BONE CONCRETE PUMPING, INC. | $17,000 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
NORTHWEST GEOTECHNICAL CONSULTANTS, INC. | $16,758 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
PACIFIC BUSINESS SYSTEMS OF OREGON, INCORPORATED | $15,400 | Relocate Times-Two Cabinets, OPLA, AFR Marines | Public Buildings Service | 8/23/2010 |
TREECOLOGY INC | $14,103 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
D & F Plumbing Co Inc | $13,767 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
HEERY INTERNATIONAL, INC. | $13,206 | Provide quality control (QC) inspections and testing of work performed by others in Portland, OR. Systems inspected and tested include lighting controls and HVAC controls. Heery's scope of work includes development of a testing plan, review of project | Public Buildings Service | 5/06/2011 |
Air Rite Control Inc | $12,897 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
OR-CONGRESS CENTER LIMITED PARTNERSHIP | $12,496 | This is the final payment torward the approved portion of the Tenant Improvement for the aforementioned lease. The amount in this the final billing is $12,495.89. | Public Buildings Service | 4/18/2010 |
LERCH BATES INC. | $12,360 |
Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio
This spending item is part of a $12,092,236 allocation.
See details
|
Public Buildings Service | 5/01/2009 |
CHRISTENSON ELECTRIC, INC. | $11,642 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
TELECO TELEPHONE COMPANY, INC. | $11,170 | Shipped 45) M6320 Digital telephones to General Services Administration / Public Building Services (either or) Southern Service Center 620 SW Main Rm 108 Portland Or. Total cost $11,170.00 | Public Buildings Service | 8/19/2010 |
KNOLL, INC. | $11,141 | Manufacture and delivery of Knoll Office for Portland, Oregon using ARA Funds.. | Public Buildings Service | 8/04/2010 |
EHS-INTERNATIONAL, INC. | $8,054 | Provided professional environmental and hazardous materials pre-demolition abatement construction administration consulting services. Review and respond to the abatement contractor's work plan and submittals and evaluate compliance with regulatory requir | Public Buildings Service | 8/04/2011 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $7,464 | Art Conservation Services (Sculpture). Inspection of sculptures at Federal Building in Portland, Oregon. Design and execute plan for protection, removal and conservation treatment. | Public Buildings Service | 9/17/2010 |
4m Floor Covering Inc | $7,437 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
KPFF, INC. | $7,000 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
ACCURATE CONCRETE CUTTING, INC. | $6,936 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
ALCANTAR & ASSOCIATES LLC | $5,850 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
OFFICE AUTOMATION GROUP | $5,595 | Portland Or. Relocate phone system and networking gear to Marine Corps Recruting Station headquarters in Portland. | Public Buildings Service | 8/23/2010 |
BASIC FIRE PROTECTION, INC. | $4,930 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
PROTEC INC. | $4,910 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
Tractel North America Inc | $4,860 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
TOTAL SYSTEM SERVICES, INC. | $3,921 | Installation of Charcoal Filters and Relocation of Pneumatics System at the 911 Federal Building Portland, Oregon | Public Buildings Service | 11/21/2010 |
SENTINEL TECHNOLOGIES, INC. | $3,597 | Move information technology hardware from the United Stated Railroad Retirement Board Portland office 1220 SE 3rf Ave Portland OR, to 1025 SW 6th Ave Portland OR. | Public Buildings Service | 8/04/2010 |
OMNI INTERIORS INC | $2,380 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
BASIC FIRE PROTECTION, INC. | $2,178 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
NORTHWEST GEOTECHNICAL CONSULTANTS, INC. | $1,500 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
I-TEN ASSOCIATES, INC. | $1,500 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
CHRISTENSON ELECTRIC, INC. | $1,175 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
CHRISTENSON ELECTRIC, INC. | $1,135 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
CHRISTENSON ELECTRIC, INC. | $625 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
OMNI INTERIORS INC | $610 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
K P F F Inc | $500 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
4m Floor Covering Inc | $375 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
CHRISTENSON ELECTRIC, INC. | $373 |
5000 sq.ft. tenant imporvement in commercial office builidng
This spending item is part of a $305,681 allocation.
See details
|
Public Buildings Service | 7/21/2010 |
CHEROKEE GENERAL CORPORATION | $0 |
Hatfield Federal Courthouse Portland, Oregon. Upgrade or replace the existing Lighting Controls System and the Building Automation System (BAS), including system presentation and installation of the new components/equipmentmaterials, including labor and s
This spending item is part of a $336,088 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
TWO MAIN DEVELOPMENT LLC | $0 |
Award funding to cover costs of USDA Office of Inspector General tenant Improvement build-out design, construction, and commissioning on floor 6 in a newly construction LEED Platinum certified highrise. Design and construction application for LEED Gold c
This spending item is part of a $348,900 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
TWO MAIN DEVELOPMENT LLC | $0 |
Award funding to cover costs of Armed Forces Recruiting USMC tenant Improvement build-out design, construction, and commissioning on a portion of floor 6 in newly construction LEED Platinum certified highrise. Design and construction currently tracking f
This spending item is part of a $601,369 allocation.
See details
|
Public Buildings Service | 4/21/2010 |
FOX TOWER LLC | $0 |
Tenant Improvement Final Billing - for the construction of the necessary improvements for the USDA office space per SFO No. 90R2099 and all included special requirements
This spending item is part of a $59,173 allocation.
See details
|
Public Buildings Service | 11/30/2010 |
TWO MAIN DEVELOPMENT LLC | $0 |
Award funding to cover costs of IRS Temporary tenant Improvement build-out design, construction, and commissioning on floors 10, 11, 12 & a portion of 13 in a new LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold.
This spending item is part of a $3,776,921 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
TWO MAIN DEVELOPMENT LLC | $0 |
Award funding to cover costs of IRS Permanent Call Site tenant Improvement build-out design, construction, and commissioning on floors 7, 8, & 9 in newly a construction LEED Platinum certified highrise. Design and construction currently tracking for LEE
This spending item is part of a $3,329,826 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
TWO MAIN DEVELOPMENT LLC | $0 |
Award funding to cover costs of DEA tenant Improvement build-out design, construction, and commissioning on floors 5 & 6 in a newly construction LEED Platinum certified highrise. Design and construction currently tracking for LEED Gold. Substantial comp
This spending item is part of a $2,587,257 allocation.
See details
|
Public Buildings Service | 1/27/2010 |
TWO MAIN DEVELOPMENT LLC | $0 |
Award funding to cover costs of Veterns Benefits Association tenant Improvement build-out design, construction, and commissioning on floors 2, 3, & 4 of in newly construction LEED Platinum certified highrise. Design and construction to achieve LEED Silve
This spending item is part of a $4,538,904 allocation.
See details
|
Public Buildings Service | 1/27/2010 |