Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Washington County, Ore., funds by Interior, Department of

Listing $3,154,598.45 in stimulus funds from Interior, Department of for Washington

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
GHD INC. $1,019,866 Design of LEED Certified headquarters/visitor center for the Kealia Pond National Wildlife Refuge in Maui, Hawaii U.S. Fish and Wildlife Service 5/15/2009
GHD INC. $553,674 Engineering design of fish passage and screening improvements for Grain Camp, Busse, and Sod House diversion dams at Malheur National Wildlife Refuge. Services included development of construction documents, consultation with Refuge and permitting agenci U.S. Fish and Wildlife Service 10/07/2009
CIPHER SYSTEMS, INC. $287,381 The scope of this contract will be to provide the required 24) continuous stream Silt Density Index (SDI) Analyzers to support the Yuma Desalting Plant and Water Quality Improvement Center (WQIC) and (24) Spare Kits. The contractor shall furnish all contr
This spending item is part of a $1,040,929 allocation. See details
Bureau of Reclamation 4/30/2010
TETRA TECH, INC. $205,786 Comprehensive Energy & Water Evaluation Study - U.S. Fish and Wildlife Service, Region Eight. This study includes evaluations for multiple complexes within the states of California, and Nevada. U.S. Fish and Wildlife Service 10/08/2009
TETRA TECH, INC. $195,653 Comprehensive Energy & Water Evaluation Study - U.S. Fish and Wildlife Service, Region One. This study includes evaluations for multiple complexes within the states of Oregon, Washington, Idaho, and the Pacific Islands. U.S. Fish and Wildlife Service 10/07/2009
TETRA TECH, INC. $133,759 A-E Services in support of Water Pumps and motors - condition assessment and rehabilitation, at Warm Springs National Fish Hatchery. This task has been amended to include construction administration(CA). These CA work-effort tasks are in progress and ar U.S. Fish and Wildlife Service 10/08/2009
WALKING POINT FARMS LLC $119,793 SEED FOR BURNS DIST OFFICE Bureau of Land Management 5/21/2010
HEERY INTERNATIONAL, INC. $113,439 Award - Energy Audits & Commissioning for VC at Death Valley National Park National Park Service 6/28/2010
HEERY INTERNATIONAL, INC. $83,791 First call order from National Parks Services Blanket Purchase Agreement for Commissioing and Energy related services. This call order is to perform Energy and Water Audits at SEKI Sequoia / Kings Canyon National Park located in California. National Park Service 2/23/2010
HEERY INTERNATIONAL, INC. $83,606 First call order from National Parks Services Blanket Purchase Agreement for Commissioing and Energy related services. This call order is to perform Energy and Water Audits at two National parks, Danali and Glacier Bay located in Alaska. National Park Service 2/22/2010
TETRA TECH, INC. $70,675 Spring Creek National Fish Hatchery Repair Water Pumps and Motors. U.S. Fish and Wildlife Service 9/29/2009
TETRA TECH, INC. $52,927 Construction Observation/Inspection of a new pre-engineered metail building shop facility and HVAC replacements a various buildings - Ruby Lake National Wildlife Refuge, U.S. Fish and Wildlife Service. U.S. Fish and Wildlife Service 3/26/2010
TETRA TECH, INC. $52,800 Comprehensive Energy & Water Evaluation Study - U.S. Fish and Wildlife Service, Region One. This study includes evaluations for multiple complexes within the states of Oregon, Washington, Idaho, and the Pacific Islands. U.S. Fish and Wildlife Service 3/26/2010
BENGE CONSTRUCTION CO. $31,546 South Rim Drive-C1574105006. Rehabilatation of 1.4 miles of radway in Yellowstone National Park WY. The work includes 26,000sy asphalt milling, 26,000sy asphalt paving, 2.8 miles shoulder grading, traffic control, and striping.
This spending item is part of a $992,969 allocation. See details
National Park Service 4/19/2010
DAVID EVANS AND ASSOCIATES, INC. $26,887 We provide Professional Engineering services for assisting the US Fish and Wildlife Service (USFWS) in completion of a Design Build (DB) Contract, for the relocation of the 25kV transmission line across the tidal marshlands within the Bandon Marsh Nationa
This spending item is part of a $198,313 allocation. See details
U.S. Fish and Wildlife Service 11/09/2009
HEERY INTERNATIONAL, INC. $26,186 First call order from National Parks Services Blanket Purchase Agreement for Commissioing and Energy related services. This call order is to perform Energy and Water Audits at Mesa Verde National Park located in Colorado. National Park Service 2/23/2010
MARUGG, MICHAEL $24,900 A 12-inch diameter, approximately 300 foot long drain line at the Dennis Pond of the Tualatin River National Wildlife Refuge has failed, requiring removal and replacement. Constructed in 1974, the pond captures storm water runoff and drainage from imperv
This spending item is part of a $41,912 allocation. See details
U.S. Fish and Wildlife Service 8/25/2009
NORTHERN MANAGEMENT SERVICES, INC. $24,280 The purpose of this project is to install Tier I energy upgrade to various buildings at the Tualatin River NWR> The scope of the work includes: installing new entrance doors, windows and insulation to two residence quarters and installing high efficiency
This spending item is part of a $36,550 allocation. See details
U.S. Fish and Wildlife Service 6/30/2010
NORTHERN MANAGEMENT SERVICES, INC. $17,012 A 12-inch diameter, approximately 300 foot long drain line at the Dennis Pond of the Tualatin River National Wildlife Refuge has failed, requiring removal and replacement. Constructed in 1974, the pond captures storm water runoff and drainage from imperv
This spending item is part of a $41,912 allocation. See details
U.S. Fish and Wildlife Service 8/25/2009
TETRA TECH, INC. $16,000 Nisqually National Wildlife Refuge; Peer Value Analysis for Project to Construct Boardwalk Replacement for Brown Farm Dike Trail, Phase 1 U.S. Fish and Wildlife Service 8/17/2009
PERMAPOST PRODUCTS COMPANY $12,934 BRIDGES, FIXED AND FLOATING National Park Service 8/20/2009
UNITED SUBCONTRACTORS, INC. $1,203 Relocate existing house. New 725 S.F. living structure designed as a 'Zero Energy' unit using SIPS. An additional 625 S.F. support space is attached. An air-to-air heat exchanger will be installed on this super-tight house. Includes a Photvolotaic sy
This spending item is part of a $294,528 allocation. See details
National Park Service 4/30/2010
CARLSON TESTING INC $500 ON-SITE FIELD ENGINEERING SERVICES DURING CONSTRUCTION OF THE EMERGENCY SERVICES FIRE MANAGEMENT BUILDING AND C-CAMP UTILITIES, DENALI NATIONAL PARK AND PRESERVE, ALASKA
This spending item is part of a $506,540 allocation. See details
National Park Service 3/15/2010