Allegheny County, Pa., funds by General Services Administration
Listing $4,096,546.43 in stimulus funds from General Services Administration for Allegheny
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
EAGLE DESIGN, INC. | $902,817 | Lighting and Lighting Controls Replacement - Replacement of lighting and lighting controls throughout the stairwells of the building with energy saving bi-level fixtures. Replacement of parking lighting fixtures with LED fixtures on the basement and trac | Public Buildings Service | 8/30/2010 |
BURCHICK CONSTRUCTION COMPANY, INC. | $609,581 |
Remove existing flooring system and replace with new lightweight concrete, floor coverings, cover base, and paint Post Office space on the 2nd floor of the Pittsburgh Post Office/Courthouse
This spending item is part of a $627,351 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
BURCHICK CONSTRUCTION COMPANY, INC. | $595,922 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
Project Development Group, Inc. | $515,629 |
'PS58 - Scope of work includes demolition, removal, and disposal of existing Heating, Ventilation and Air Conditioning ductwork, installation and appunenances on Floors 5, 6, 8, 1 South and Passenger Elevator Lobbies in conjunction with the ''Recovery'' U
This spending item is part of a $13,128,830 allocation.
See details
|
Public Buildings Service | 5/29/2009 |
CONSTELLATION ENERGY PROJECTS & SERVICES GROUP, INC | $425,597 | Install ION Enterprise Energy Management system compatable Smart meters to monitor/report the facility's utility usage at the following locations: Electrical meter, natural gas meter, and water meter at Erie Federal Courthouse, in Erie, PA; electrical me | Public Buildings Service | 8/19/2010 |
URS GROUP, INC | $280,791 | Provide construction over-sight for the replacement of the Post Office floor, a revolving door and light fixtures. | Public Buildings Service | 8/12/2010 |
DCK NORTH AMERICA, LLC | $250,000 | Stage 2 preconstruction design of the new federal office building for the San Juan Federal Bureau of Investigation (FBI) field office and new child care center. (San Juan, Puerto Rico) | Public Buildings Service | 9/07/2010 |
Franco | $144,000 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
River City Glass, Inc. | $132,250 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
SHALOM BARANES ASSOCIATES P C | $77,536 | Construction Administration services for the north lobby revolving door of the Pittsburgh Post Office and US Courthouse. | Public Buildings Service | 8/02/2010 |
Vincent Allen Inc | $60,000 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
OUDENS & KNOOP ARCHITECTS, P.C. | $36,422 | Construction Phase Services for US Postal office in Pittsburgh, PA. Beginning Close-out work. | Public Buildings Service | 8/12/2010 |
UNION ELECTRIC CONSTRUCTION, INC. | $22,420 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
BLT CONTRACTING, INC | $17,770 |
Remove existing flooring system and replace with new lightweight concrete, floor coverings, cover base, and paint Post Office space on the 2nd floor of the Pittsburgh Post Office/Courthouse
This spending item is part of a $627,351 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
Gunning Incorporated | $8,500 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
T. D. PATRINOS PAINTING & CONTRACTING CO. | $5,000 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
Keystone Metals, Inc. | $4,834 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
WILSON 5 SERVICE COMPANY, INC. | $3,600 | Project is in support of a steam shutdown and start up ofr the advanced metering project at the federal courthouse in Pittspurgh PA. | Public Buildings Service | 1/10/2011 |
BLT CONTRACTING, INC | $2,480 |
Renovate North & South Lobby entrances and North Lobby area, including brass/bronze restoration, limestone restoration, revolving door replacement, and painting at the Pittsburgh Post Office/Courthouse
This spending item is part of a $975,406 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
WILSON 5 SERVICE COMPANY, INC. | $1,398 | Provide 2 technician to shut down the winter steam and turn back on in coordination with the advance metering project from the region. Work was performed at the Moore head Federal building 1000 Liberty Ave.Pittsburgh PA. | Public Buildings Service | 11/24/2010 |