San Juan, P.R., funds by General Services Administration
Listing $65,485,745.45 in stimulus funds from General Services Administration for San Juan
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
PRECISION FABRICATORS, INC. | $27,137,030 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
H B A CONTRACTORS INC | $13,785,437 |
New Federal Parking Garage, located in 150 Chardon Street, San Juan, Puerto Rico, 00918. The project includes but is not limited to the following work: 1. A new open 4 level parking structure with approximately 500 parking spaces, site work including new
This spending item is part of a $20,561,938 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
JACOBS TECHNOLOGY INC. | $6,891,261 | CM services for Clemente Ruiz Nazario Courthouse and Federico Degetau Federal Office Building The project is a High Performance Green Building Modernization. The scope of the work for the building includes the following: Redesign and replacement of HVAC s | Public Buildings Service | 9/04/2009 |
Cue & Lopez Construction, Inc. | $4,690,000 |
New Federal Parking Garage, located in 150 Chardon Street, San Juan, Puerto Rico, 00918. The project includes but is not limited to the following work: 1. A new open 4 level parking structure with approximately 500 parking spaces, site work including new
This spending item is part of a $20,561,938 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
JMP INTERIORES DE PUERTO RICO, INC. | $2,834,092 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
EL DIA INC | $2,525,183 | The U.S. Government is interested in leasing approximately 62,260 rentable square feet of office and related space. The rentable space shall yield approximately 54,142 ANSI/BOMA Office Area to 56,850 ANSI/BOMA Office Area available for use by tenant for p | General Services Administration | 12/16/2009 |
INTEGRATED ENVIRONMENTAL SOLUTIONS, INC. | $1,615,158 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
AMERICAN AGENCIES CO INC | $824,859 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
GRUZEN SAMTON ARCHITECTS PLANNERS & INTERIOR DESIGNERS LLP | $673,104 |
This contract is a for Architectural/Engineering services for the design of a federal employee parking garage and a master plan for the San Juan, PR Federal Bureau of Investigations Field Office Consolidation project. The project as a whole will result i
This spending item is part of a $1,705,131 allocation.
See details
|
Public Buildings Service | 7/02/2009 |
UNIVERSAL FIRE SPRINKLER COMPANY INC | $661,786 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
ADVISORY ENVIRONMENTAL TECHNOLOGIES, INC. | $591,577 | Provide project monitoring, project monitor/competent person, phase contrast microscopy lab analysis (6 hrs TAT) and transmission electron microscopy lab analysis (24 hrs TAT) for the HPGB modernization of Nazario Courthouse & Degetau FOB, Hato Rey, PR. T | Public Buildings Service | 9/13/2010 |
HEERY INTERNATIONAL, INC. | $588,574 |
Heery International is providing Construction Manager as Agent services for the Federal Bureau of Investigations (FBI) Office Consolidation Project for Construction Management Services for the Master Plan & Garage Design for a new Federal Employee Parking
This spending item is part of a $1,059,077 allocation.
See details
|
Public Buildings Service | 10/23/2009 |
FIRST PROJECTS | $525,651 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
DARMANIN TRANSPORTATION COMPANY INC. | $421,401 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
TORCON, INC. | $250,000 | American Recovery & Reinvestment Act (ARRA) for the Design & Construction Services for the New Federal Office Building for the San Juan Federal Bureau of Investigation (FBI) Field Office and New Child Care Center - Stage 2 Design Review Services | Public Buildings Service | 9/07/2010 |
WALSH PUERTO RICO HEERY JOINT VENTURE | $250,000 | The project consists of pre-construction services for the purpose of assisting the GSA in controlling the design, budget, and schedule for the new FBI Field Office, Parking Garage and Child Care Center in Hato Rey, San Juan, Puerto Rico. The pre-construct | Public Buildings Service | 9/07/2010 |
CONTECH OF P R, INC | $183,155 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
DEYA ELEVATOR SERVICE INC | $178,000 |
New Federal Parking Garage, located in 150 Chardon Street, San Juan, Puerto Rico, 00918. The project includes but is not limited to the following work: 1. A new open 4 level parking structure with approximately 500 parking spaces, site work including new
This spending item is part of a $20,561,938 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
RMA ARCHITECTS PSC | $129,464 | Provide peer review of design and construction documents and field observation for VA San Juan Regional Office relocation at Guaynabo,PR Outcome: Sustainable interior reform of 60,000 square feet for the new offices of the Veterans Administration | Public Buildings Service | 2/03/2010 |
BUILDING MECHANICAL SERVICES CORP | $129,358 | Lighting Controls and Temperature controls at Jose V. Toledo US Courthouse and Federal Building Office, Old San Juan, PR, and installation of electrical and water metering system | Public Buildings Service | 3/16/2010 |
RMA ARCHITECTS PSC | $126,162 | The project includes replacement of fixtures at the Courthouse public bathrooms to reduce water comsuption0 and minor improvement to the Air Conditioning System for additional energy savings. The project major scope includes the full evaluation of the US | Public Buildings Service | 1/27/2010 |
PAONESSA ALFOMBRAS, INC | $120,492 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
F & R CONSTRUCTION GROUP, INC. | $110,496 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
HILLDRUP COMPANIES, INC. | $80,810 | 1. Packing, loading, and relocate 185 employees and approximately 67,000 files to the new location at the El Nuevo Dia Bldg. a. Includes: i. All packing materials ii. Equipment & resources iii. Complete packing and loading and assembly of the files. | Public Buildings Service | 6/29/2010 |
DZINE | $42,500 | GSA Arts and Architecture Grant Program. This grant will completely fund the design, fabrication andproduction of a one of a kind sculptural art piece where the lost art of Mundillo is tributed. This project will provide a historical documentation of the | Public Buildings Service | 10/05/2010 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $22,499 | Conservation treatment of sculpture at the Federal Building in Puerto Rico. | Public Buildings Service | 6/15/2010 |
Triple Force Security, Corp. | $21,952 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
RMA ARCHITECTS PSC | $16,252 | Energy Conservation Measures for Jose V. Toledo Federal Building and courthouse | Public Buildings Service | 1/26/2010 |
Caribbean Painting Contractors Inc | $15,748 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
COLLABORATIVE TRAINING CONSULTANTS | $14,850 | Partnering Services for the High Performance Green Building Modernization and Other alteration work for the Nazario Courthouse and the Degetau Federal Office Building, Hate Rey, PR | Public Buildings Service | 6/02/2010 |
RICOH PUERTO RICO, INC | $10,704 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $6,512 | Art Conservation Services for Sculpture. | Public Buildings Service | 1/22/2010 |
AERIAL / ARCHITECTURAL PHOTOGRAPHY INC | $5,640 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
BEST FIRE TECH CORP | $3,702 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
RICOH PUERTO RICO, INC | $1,998 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
SAN JUAN CABLE LLC | $338 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |
GMTS CORP | $0 |
During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation.
See details
|
Public Buildings Service | 5/06/2010 |