San Juan, P.R., funds by General Services Administration

Listing $65,485,745.45 in stimulus funds from General Services Administration for San Juan

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
PRECISION FABRICATORS, INC. $27,137,030 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
H B A CONTRACTORS INC $13,785,437 New Federal Parking Garage, located in 150 Chardon Street, San Juan, Puerto Rico, 00918. The project includes but is not limited to the following work: 1. A new open 4 level parking structure with approximately 500 parking spaces, site work including new
This spending item is part of a $20,561,938 allocation. See details
Public Buildings Service 3/30/2010
JACOBS TECHNOLOGY INC. $6,891,261 CM services for Clemente Ruiz Nazario Courthouse and Federico Degetau Federal Office Building The project is a High Performance Green Building Modernization. The scope of the work for the building includes the following: Redesign and replacement of HVAC s Public Buildings Service 9/04/2009
Cue & Lopez Construction, Inc. $4,690,000 New Federal Parking Garage, located in 150 Chardon Street, San Juan, Puerto Rico, 00918. The project includes but is not limited to the following work: 1. A new open 4 level parking structure with approximately 500 parking spaces, site work including new
This spending item is part of a $20,561,938 allocation. See details
Public Buildings Service 3/30/2010
JMP INTERIORES DE PUERTO RICO, INC. $2,834,092 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
EL DIA INC $2,525,183 The U.S. Government is interested in leasing approximately 62,260 rentable square feet of office and related space. The rentable space shall yield approximately 54,142 ANSI/BOMA Office Area to 56,850 ANSI/BOMA Office Area available for use by tenant for p General Services Administration 12/16/2009
INTEGRATED ENVIRONMENTAL SOLUTIONS, INC. $1,615,158 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
AMERICAN AGENCIES CO INC $824,859 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
GRUZEN SAMTON ARCHITECTS PLANNERS & INTERIOR DESIGNERS LLP $673,104 This contract is a for Architectural/Engineering services for the design of a federal employee parking garage and a master plan for the San Juan, PR Federal Bureau of Investigations Field Office Consolidation project. The project as a whole will result i
This spending item is part of a $1,705,131 allocation. See details
Public Buildings Service 7/02/2009
UNIVERSAL FIRE SPRINKLER COMPANY INC $661,786 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
ADVISORY ENVIRONMENTAL TECHNOLOGIES, INC. $591,577 Provide project monitoring, project monitor/competent person, phase contrast microscopy lab analysis (6 hrs TAT) and transmission electron microscopy lab analysis (24 hrs TAT) for the HPGB modernization of Nazario Courthouse & Degetau FOB, Hato Rey, PR. T Public Buildings Service 9/13/2010
HEERY INTERNATIONAL, INC. $588,574 Heery International is providing Construction Manager as Agent services for the Federal Bureau of Investigations (FBI) Office Consolidation Project for Construction Management Services for the Master Plan & Garage Design for a new Federal Employee Parking
This spending item is part of a $1,059,077 allocation. See details
Public Buildings Service 10/23/2009
FIRST PROJECTS $525,651 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
DARMANIN TRANSPORTATION COMPANY INC. $421,401 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
TORCON, INC. $250,000 American Recovery & Reinvestment Act (ARRA) for the Design & Construction Services for the New Federal Office Building for the San Juan Federal Bureau of Investigation (FBI) Field Office and New Child Care Center - Stage 2 Design Review Services Public Buildings Service 9/07/2010
WALSH PUERTO RICO HEERY JOINT VENTURE $250,000 The project consists of pre-construction services for the purpose of assisting the GSA in controlling the design, budget, and schedule for the new FBI Field Office, Parking Garage and Child Care Center in Hato Rey, San Juan, Puerto Rico. The pre-construct Public Buildings Service 9/07/2010
CONTECH OF P R, INC $183,155 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
DEYA ELEVATOR SERVICE INC $178,000 New Federal Parking Garage, located in 150 Chardon Street, San Juan, Puerto Rico, 00918. The project includes but is not limited to the following work: 1. A new open 4 level parking structure with approximately 500 parking spaces, site work including new
This spending item is part of a $20,561,938 allocation. See details
Public Buildings Service 3/30/2010
RMA ARCHITECTS PSC $129,464 Provide peer review of design and construction documents and field observation for VA San Juan Regional Office relocation at Guaynabo,PR Outcome: Sustainable interior reform of 60,000 square feet for the new offices of the Veterans Administration Public Buildings Service 2/03/2010
BUILDING MECHANICAL SERVICES CORP $129,358 Lighting Controls and Temperature controls at Jose V. Toledo US Courthouse and Federal Building Office, Old San Juan, PR, and installation of electrical and water metering system Public Buildings Service 3/16/2010
RMA ARCHITECTS PSC $126,162 The project includes replacement of fixtures at the Courthouse public bathrooms to reduce water comsuption0 and minor improvement to the Air Conditioning System for additional energy savings. The project major scope includes the full evaluation of the US Public Buildings Service 1/27/2010
PAONESSA ALFOMBRAS, INC $120,492 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
F & R CONSTRUCTION GROUP, INC. $110,496 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
HILLDRUP COMPANIES, INC. $80,810 1. Packing, loading, and relocate 185 employees and approximately 67,000 files to the new location at the El Nuevo Dia Bldg. a. Includes: i. All packing materials ii. Equipment & resources iii. Complete packing and loading and assembly of the files. Public Buildings Service 6/29/2010
DZINE $42,500 GSA Arts and Architecture Grant Program. This grant will completely fund the design, fabrication andproduction of a one of a kind sculptural art piece where the lost art of Mundillo is tributed. This project will provide a historical documentation of the Public Buildings Service 10/05/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $22,499 Conservation treatment of sculpture at the Federal Building in Puerto Rico. Public Buildings Service 6/15/2010
Triple Force Security, Corp. $21,952 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
RMA ARCHITECTS PSC $16,252 Energy Conservation Measures for Jose V. Toledo Federal Building and courthouse Public Buildings Service 1/26/2010
Caribbean Painting Contractors Inc $15,748 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
COLLABORATIVE TRAINING CONSULTANTS $14,850 Partnering Services for the High Performance Green Building Modernization and Other alteration work for the Nazario Courthouse and the Degetau Federal Office Building, Hate Rey, PR Public Buildings Service 6/02/2010
RICOH PUERTO RICO, INC $10,704 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $6,512 Art Conservation Services for Sculpture. Public Buildings Service 1/22/2010
AERIAL / ARCHITECTURAL PHOTOGRAPHY INC $5,640 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
BEST FIRE TECH CORP $3,702 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
RICOH PUERTO RICO, INC $1,998 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
SAN JUAN CABLE LLC $338 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010
GMTS CORP $0 During this quarter we continued as the Prime Contractor reconstruction of the 2nd & 3rd Floor swing space(completing and moving into their swing space the Library, FCU and BRACS tenants) and the west mechanical boiler room at the Federal Office Building
This spending item is part of a $73,504,501 allocation. See details
Public Buildings Service 5/06/2010