Aiken County, S.C., funds by Energy, Department of
Listing $1,554,890,713.18 in stimulus funds from Energy, Department of for Aiken
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $512,372,333 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $273,923,752 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $162,488,771 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER REMEDIATION LLC | $92,754,133 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CHAMPION, INC. | $33,391,831 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BAKER CONCRETE CONSTRUCTION, INC | $17,488,581 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $16,100,644 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $15,115,835 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
E2 CONSULTING ENGINEERS, INC. | $13,655,363 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENERGYSOLUTIONS, LLC | $10,397,026 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCS LLC | $10,347,669 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
VALUE ADDED SOLUTIONS, INC. | $9,412,799 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GRAYCOR CONSTRUCTION COMPANY INC. | $7,992,888 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $7,823,238 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GRADESOUTH, INC. | $7,573,554 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $6,478,865 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASTRID CONTRACT TECHNICAL SERVICES, INC. | $6,069,222 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WASHINGTON TRU SOLUTIONS LLC | $6,006,471 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $5,574,638 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASTRID CONTRACT TECHNICAL SERVICES, INC. | $5,403,046 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CLEAN HARBORS ENVIRONMENTAL SERVICES, INC. | $5,348,500 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAREER PERSONNEL, INC. -- THE PROFESSIONAL DIFFERENCE | $5,085,213 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $5,028,131 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEL LABORATORIES, LLC | $4,822,556 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $4,699,304 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WEIRICH CONSULTING SERVICES INC | $4,579,599 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PERMA-FIX ENVIRONMENTAL SERVICES, INC. | $4,500,000 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NUCFIL, LLC | $4,400,184 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AIKEN/BARNWELL COUNTIES COMMUNITY ACTION AGENCY, INC. | $4,248,152 |
Weatherization Assistance for Low-Income Persons 'ARRA Supplemental Funding for Weatherization Assitance to Low-Income Persons: To reduce energy costs for low-income families, particularly for the elderly, people with disabilities, and children, by improving the energy efficiency of their homes whilele en... Show more
This spending item is part of a $58,892,771 allocation.
See details
|
Energy, Department of | 4/01/2009 |
PANGEA INC | $4,246,197 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
E2 CONSULTING ENGINEERS, INC. | $4,058,847 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $4,048,309 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORTH WIND REMEDIATION SERVICES, LLC | $4,024,697 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ARS INTERNATIONAL, INC. | $3,985,425 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AMERICAN DEMOLITION & NUCLEAR DECOMMISSIONING INCORPORATED | $3,982,430 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SATELLITE SHELTERS, INC. | $3,948,004 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
E2 CONSULTING ENGINEERS, INC. | $3,939,303 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TESTAMERICA LABORATORIES, INC. | $3,870,506 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $3,657,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ASTRID CONTRACT TECHNICAL SERVICES, INC. | $3,645,693 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAVANAGH SERVICES GROUP, INC. | $3,282,976 | Provide logistical activities in support of DOE-SR DUO drums management, planning, tracking, transfer,transportation, re-use and/or disposition. Preshipment support and transportation of waste DUO drums for disposal in Clive, UT. Prepare documentation and | Energy, Department of | 7/20/2009 |
PANGEA INC | $3,278,066 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AVISCO, INC. | $3,239,003 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAREER PERSONNEL, INC. -- THE PROFESSIONAL DIFFERENCE | $3,156,661 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
E2 CONSULTING ENGINEERS, INC. | $2,891,556 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
LAFARGE BUILDING MATERIALS INC. | $2,890,246 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BARR GROUP OF NASHVILLE, INC., THE | $2,885,789 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $2,768,356 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WEIRICH CONSULTING SERVICES INC | $2,750,898 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GRADESOUTH, INC. | $2,700,717 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAREER PERSONNEL, INC. -- THE PROFESSIONAL DIFFERENCE | $2,509,820 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
E2 CONSULTING ENGINEERS, INC. | $2,438,090 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNIVERSITY OF GEORGIA RESEARCH FOUNDATION, INC. | $2,428,958 |
Conservation Research and Development 500-SREL will organize a series of short courses on technical topics for SRS environmental professionals /501-SREL is developing an automated stream monitoring system that responds to transient flow conditions in a manner designed to evaluate the impact o
This spending item is part of a $2,597,000 allocation.
See details
|
Energy, Department of | 3/04/2009 |
DENUKE CONTRACTING SERVICES, INC. | $2,314,086 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $2,271,243 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BIERLEIN FIELD SERVICES, INC. | $2,164,817 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
QUEEN CITY INC | $2,153,144 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASTRID CONTRACT TECHNICAL SERVICES, INC. | $2,147,674 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $2,120,324 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TALASCEND, LLC | $2,096,891 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PANGEA INC | $1,935,314 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASTRID CONTRACT TECHNICAL SERVICES, INC. | $1,905,714 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TYLER CONSTRUCTION GROUP, INC. | $1,903,850 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TYLER CONSTRUCTION GROUP, INC. | $1,902,174 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
HUKARIASCENDENT, INC. | $1,817,833 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $1,723,418 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $1,709,605 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TALASCEND, LLC | $1,644,582 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PSI WATER SYSTEMS, INC. | $1,626,383 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WEIRICH CONSULTING SERVICES INC | $1,620,552 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASTRID CONTRACT TECHNICAL SERVICES, INC. | $1,588,703 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAREER PERSONNEL, INC. -- THE PROFESSIONAL DIFFERENCE | $1,507,612 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
RADIATION PROTECTION SYSTEMS, INC. | $1,463,127 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TOTAL SITE CONTAINMENT COMPANY, LLC | $1,456,012 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
E2 CONSULTING ENGINEERS, INC. | $1,436,277 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FOOTHILLS ENVIRONMENTAL, INC. | $1,411,001 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $1,389,500 | The Savannah River National Laboratory (SRNL) will provide direct technical assistance in the design, specification, integration, configuration, and deployment of a high fidelity, custom Data Acquisition System (DAS) for the Large Wind Turbine Drive Train | Energy, Department of | 6/01/2010 |
NORAMTEC CONSULTANTS AMERICAS INC. | $1,364,302 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONTRACT MANAGEMENT INC | $1,362,675 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STARRETTE TRUCKING COMPANY | $1,355,986 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NATIONAL ENGINEERING SERVICE CORPORATION | $1,330,405 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FUTURE UNLIMITED, INC. | $1,300,569 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Entegee, Inc | $1,298,983 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCS LLC | $1,297,512 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $1,280,000 | In support of HanfordG??s AY-102 Tank waste transfer to the WTP facility, SRNL will perform scaled testing to evaluate the batch consistency of the multi-batch transfer process to be used in transferring the waste. This is follow-up work to testing recen | Energy, Department of | 6/23/2009 |
TFE, INC | $1,273,647 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WEIRICH CONSULTING SERVICES INC | $1,266,432 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BARR GROUP OF NASHVILLE, INC., THE | $1,264,975 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TALASCEND, LLC | $1,259,572 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NEWPORT NEWS NUCLEAR INC. | $1,237,213 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Metrac, Inc. | $1,210,225 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $1,194,501 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WHITE, J A & ASSOCIATES INC | $1,193,973 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
KT SERVICES LLC | $1,189,510 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $1,100,000 | An Energy Frontier Research Center, Materials Science of Actinides, has been established to conduct transformative research in the actinide elements, particularly those having complex and nano-scale structures. This center, led by the University of Notre | Energy, Department of | 8/10/2009 |
TALASCEND, LLC | $1,083,566 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $1,080,374 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $1,072,192 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FLUOR CORPORATION | $1,064,704 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $1,035,810 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SKOLNIK INDUSTRIES, INC. | $1,023,605 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TALASCEND, LLC | $991,659 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NATIONAL ENGINEERING SERVICE CORPORATION | $990,207 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $989,529 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GOVERNMENT SCIENTIFIC SOURCE, INC. | $977,312 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TOXCO, INC. | $956,708 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAREER PERSONNEL, INC. -- THE PROFESSIONAL DIFFERENCE | $888,133 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $880,632 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EDWARDS SUPPLY COMPANY, INC. | $838,824 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAA SOLUTIONS, INC. | $812,258 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $803,709 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NFT INCORPORATED | $803,022 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
NATIONAL ENGINEERING SERVICE CORPORATION | $799,155 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
V J TECHNOLOGIES INC | $783,180 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
THOMSON ROOFING AND METAL COMPANY | $782,601 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Entegee, Inc | $780,280 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCS LLC | $750,707 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $750,305 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NEWPORT NEWS NUCLEAR INC. | $743,176 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TALASCEND, LLC | $742,013 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PERFORMANCE DEVELOPMENT CORPORATION | $734,802 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Metrac, Inc. | $726,965 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WEIRICH CONSULTING SERVICES INC | $720,547 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $717,519 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WHITE, J A & ASSOCIATES INC | $717,202 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Industries, Inc | $713,659 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASHMORE CONCRETE CONTRACTORS, INC. | $701,408 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
KAMO MANUFACTURING COMPANY, INC. | $696,031 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONSOLIDATED RIGGING AND MARINE SUPPLY COMPANY, | $692,494 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEM TECHNOLOGIES, INC. | $684,729 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NEW SOUTH ASSOCIATES, INC. | $682,928 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NATIONAL ENGINEERING SERVICE CORPORATION | $679,542 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NUCFIL, LLC | $664,179 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
CLEAN HARBORS ENVIRONMENTAL SERVICES, INC. | $661,048 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AIKEN, COUNTY OF | $646,100 | Energy Efficiency and Conservation Block Grant Program (EECBG) Building Energy Efficiency Program (BEEP) | Energy, Department of | 10/13/2009 |
FLUOR CORPORATION | $639,552 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CREATIVE ENERGY GROUP, INC, THE | $635,991 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CDI CORP. | $628,731 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CABRERA SERVICES INC. | $626,635 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PACKAGING RESEARCH AND DESIGN CORP | $621,759 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BOART LONGYEAR COMPANY | $619,292 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $608,918 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EGS INC. | $600,483 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PSI WATER SYSTEMS, INC. | $597,795 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $594,395 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TERRANEAR PMC LLC | $587,299 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GOVERNMENT SCIENTIFIC SOURCE, INC. | $587,057 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EGS INC. | $584,745 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AIKEN COUNTY SCHOOL DISTRICT | $584,513 |
State Energy Program During this quarter, we have made necessary adjustments to grant agreements to ensure completion within the grant period. All projects are complete, and we are processing all final payments for expenditures incurred during the period of performance. Unspe
This spending item is part of a $50,550,000 allocation.
See details
|
Energy, Department of | 4/20/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $569,679 |
In order to meet the needs of thermal management in parabolic trough solar applications, high temperature heat transfer fluids based on ionic liquid nanofluids will be investigated. During the three year period, IL nanofluids chemical properties will be c
This spending item is part of a $1,005,000 allocation.
See details
|
Energy, Department of | 5/11/2010 |
CONTROL SOLUTIONS GROUP LLC | $555,756 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $552,752 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
INDIAN EYES, LLC | $549,110 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $548,119 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BIG TOP TRAMPOLINE, INC. | $531,742 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $530,363 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ACTS OF SOUTH CAROLINA INC | $530,363 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
SAPERE CONSULTING INC | $528,070 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STRATEGIC PACKAGING SYSTEMS LLC | $519,379 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $518,515 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Miller Environmental, LLC | $515,477 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PORTER HOUSE INC | $514,000 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $513,374 | The development of economically viable, durable and long-lasting Lithium-ion (Li-ion) battery technologies has been identified by the U.S. Department of Energy as a key requirement for the electrification of vehicle transportation. One of the principal c | Energy, Department of | 4/05/2010 |
URS ENERGY & CONSTRUCTION, INC. | $509,082 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $498,664 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DIVERSIFIED SUPPLY, INC. | $497,746 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Southern Recruiters & Consultants | $492,301 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STARRETTE TRUCKING COMPANY | $488,899 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MAS CONSULTANTS INC | $487,724 | Provide support the DOE-SR, Assistant Manager for Nuclear Materials Stabilization Project Operations Division in performing oversight of TRU waste disposition work to be conducted in H and F Canyons. This includes reviewing Safety Basis documents, Techni | Energy, Department of | 9/30/2009 |
AVISCO, INC. | $485,390 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PROJECT SERVICES GROUP, LLC | $480,523 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WEIRICH CONSULTING SERVICES INC | $480,060 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNITED GLOBAL TECHNOLOGIES INC | $479,330 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TOTAL SITE CONTAINMENT COMPANY, LLC | $478,181 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
KNH TECHNICAL RESOURCES, LLC | $474,781 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
QUALITY INDUSTRIAL DISTRIBUTION, INC. | $474,571 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NATIONAL ENGINEERING SERVICE CORPORATION | $470,781 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Entegee, Inc | $459,662 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
HOWARD LUMBER COMPANY | $454,882 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PROFESSIONAL BUYERS ADVANTAGE, LLC | $451,131 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNION PROCESS INC. | $449,889 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $446,527 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $442,430 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
PERFORMANCE DEVELOPMENT CORPORATION | $441,385 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NATIONAL ENGINEERING SERVICE CORPORATION | $439,568 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MAS CONSULTANTS INC | $437,836 | Provide Health Physicist/Radiological Protection Engineer Support Services to the Department of Energy (DOE), Savannah River Operations Office (SR), in support of American Recovery and Reinvestment Act (ARRA) initiatives. This includes providing suppor | Energy, Department of | 8/28/2009 |
NEWPORT NEWS NUCLEAR INC. | $437,804 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $430,726 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Rcs Industries, Inc | $428,684 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Metrac, Inc. | $428,254 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCQ INC. | $427,552 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
W. W. GRAINGER, INC. | $424,326 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $422,690 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WHITE, J A & ASSOCIATES INC | $422,503 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $407,842 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
METRO ATLANTA UTILITY CONTRACTORS INC | $404,413 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $400,260 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $393,431 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FUTURE UNLIMITED, INC. | $391,641 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Three Rivers Solid Waste Authority | $390,000 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BARR GROUP OF NASHVILLE, INC., THE | $387,332 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $387,294 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
G, J&L, INC. | $386,827 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $385,229 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
S & R ELECTRIC, INC. | $382,586 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CREATIVE ENERGY GROUP, INC, THE | $382,030 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CDI CORP. | $377,669 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FLUOR CORPORATION | $376,760 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $375,000 |
'Argonne National Laboratory--Accelerated Cleanup of Surplus Nuclear Facilities Project (PIN 2002000) The scope of this project consists of three subprojects: 1) Decontamination (as required) and demolition of two rad-contaminated facilities and offsite
This spending item is part of a $79,000,000 allocation.
See details
|
Energy, Department of | 5/27/2009 |
AVISCO, INC. | $369,273 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
JANEICE PRODUCTS CO., INC. | $369,069 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $367,217 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BARLOWORLD HANDLING LLC | $364,444 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EGS INC. | $360,701 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MID ATLANTIC HEATER & CONTROL, INC. | $358,731 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Reliable Equipment Rental Inc. | $357,581 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $356,900 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $353,164 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
J G MASTERS INC | $352,990 | TAS Recovery (2) Contracts Specialoists to provide technical and administrative support to the Office of Acquisition Management to support the ARRA | Energy, Department of | 10/06/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $350,158 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PAULA F. PRICE ENTERPRISES, LLC | $350,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $350,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Microseeps Inc | $350,000 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $346,013 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
FORMS & SUPPLY, INC. | $346,012 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GOVERNMENT SCIENTIFIC SOURCE, INC. | $345,835 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $344,950 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LONGENECKER & ASSOCIATES, INC. | $344,473 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DSU STAFFING, INC. | $336,689 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAVANAGH SERVICES GROUP, INC. | $336,125 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASTRID CONTRACT TECHNICAL SERVICES, INC. | $334,123 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
CONTROL SOLUTIONS GROUP LLC | $333,835 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
METRO ATLANTA UTILITY CONTRACTORS INC | $333,204 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENSAFE INC. | $332,500 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $330,378 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MOBILE MINI, INC. | $329,899 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
INDIAN EYES, LLC | $329,842 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $329,737 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $329,672 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
GRADESOUTH, INC. | $328,630 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FLUOR CORPORATION | $324,000 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DILLON SUPPLY COMPANY | $317,484 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SOUTHLAND SOLUTIONS, INC. | $317,323 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STRATA G, LLC | $316,723 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BOART LONGYEAR COMPANY | $314,452 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
REDOX TECH, LLC | $313,458 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $313,020 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Miller Environmental, LLC | $309,640 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSOCIATED CONTAINER SALES & FABRICATION, INC | $306,868 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
G/O CORPORATION | $306,655 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SHEALY ELECTRICAL WHOLESALERS, INC. | $303,698 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SOUTH CAROLINA UNIVERSITIES RESEARCH AND EDUCATION FOUNDATION | $303,669 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $302,245 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
OLH INC | $301,995 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCS LLC | $298,269 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
VALUE ADDED SOLUTIONS, INC. | $296,741 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Southern Recruiters & Consultants | $296,218 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Southern Recruiters & Consultants | $295,718 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PROJECT SERVICES GROUP, LLC | $288,643 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNITED GLOBAL TECHNOLOGIES INC | $287,927 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $287,411 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LAFARGE BUILDING MATERIALS INC. | $287,100 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $284,036 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC. | $283,067 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $281,953 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
TFE, INC | $279,308 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $278,431 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
PANASONIC CORPORATION OF NORTH AMERICA | $278,025 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PAI CORPORATION | $276,755 | These field engineers supplement the Assistant Manager for Closure Projects (AMCP) and the Office of Safety and Quality Assurance (OS&QA) in ARRA oversight, by providing continuous independent monitoring of operations, maintenance, and construction. | Energy, Department of | 7/16/2010 |
AIKEN OFFICE SUPPLY & BOOK SHOP INC | $276,458 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $275,359 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AUTOMATION TECHNOLOGY, INC. | $273,985 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $273,848 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BAKERS WASTE EQUIPMENT, INC. | $271,020 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PROFESSIONAL BUYERS ADVANTAGE, LLC | $270,988 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $268,222 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EDWARDS SUPPLY COMPANY, INC. | $265,198 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MSE TECHNOLOGY APPLICATIONS, INC. | $263,651 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
RESPIREX NORTH AMERICA, INC | $263,000 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $262,657 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CAROLINA COMPUTERS, INC | $261,498 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
James McNeil | $260,351 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PERFORMANCE DEVELOPMENT CORPORATION | $260,019 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BAKERS WASTE EQUIPMENT, INC. | $257,287 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Industries, Inc | $252,538 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DAVIS & FLOYD, INC. | $251,288 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEL LABORATORIES, LLC | $251,288 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $249,983 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $248,548 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $247,655 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
RESPIREX NORTH AMERICA, INC | $247,126 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $244,414 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BLANCHARD MACHINERY COMPANY | $242,630 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
HEAVY IRON LLC | $242,500 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
OLH INC | $241,161 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DIVERSIFIED SUPPLY, INC. | $240,042 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STRATTON TRANSPORT AND CONTRACTING, INC. | $238,525 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STRATTON TRANSPORT AND CONTRACTING, INC. | $237,891 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $237,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LONGENECKER & ASSOCIATES, INC. | $236,211 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PAI CORPORATION | $236,062 | Provide field engineering services to Department of Energy Savannah River Field Office (DOE-SR). These field engineers supplement the Assistant Manager for Closure Projects (AMCP) and the Office of Safety and Quality Assurance (OS&QA) in ARRA oversight, | Energy, Department of | 9/30/2009 |
GOVERNMENT WORKS, INC. | $235,960 | 2002260-Program Direction - EM - Defense Environmental Management TAS recovery Management support services-Budget Analyst to provide support in performing budget analysis, cost performance tracking and reporting and budget review support fucntion under A | Energy, Department of | 9/30/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $232,910 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $17,745,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Rcs Corporation | $232,410 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
G, J&L, INC. | $232,361 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MC ELMURRAY, GARY L CONSTRUCTION CO INC | $230,904 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONCORD PROFESSIONAL SERVICES, INC. | $230,285 | Property Management Specialist | Energy, Department of | 9/21/2009 |
PARAGON DIE & ENGINEERING COMPANY | $230,208 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BETA SOUTH TECHNOLOGY, INC. | $229,038 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MDM SERVICES CORPORATION | $227,744 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $227,376 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $227,360 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Rcs Corporation | $226,152 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CREATIVE ENERGY GROUP, INC, THE | $225,054 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC | $225,000 |
Self-assembled Biomimetic Nanostructured Anti-Reflection coatings for Highly Efficient Crystalline Silicon Solar Cells will be fabricated on commerical silicon solar cell substrates and optimized for optical properties. The coatings will then be tested in
This spending item is part of a $300,000 allocation.
See details
|
Energy, Department of | 9/24/2009 |
FLUOR CORPORATION | $224,480 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CDI CORP. | $222,485 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MAS CONSULTANTS INC | $221,000 | Provide support to the DOE-SR, Assistant Manager for Closure Project (AMCP), in performing oversight of ARRA Operations, Maintenance, Construction and/or Project Oversight. This includes performing oversight and support functions for the ARRA project inc | Energy, Department of | 9/30/2009 |
TFE, INC | $219,637 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
GRADESOUTH, INC. | $215,048 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASTRID CONTRACT TECHNICAL SERVICES, INC. | $213,622 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EGS INC. | $212,489 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONCORD PROFESSIONAL SERVICES, INC. | $211,120 | One Recovery Financial Analyst | Energy, Department of | 9/21/2009 |
URS ENERGY & CONSTRUCTION, INC. | $210,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
SUPPRESSIONS SYSTEMS, INC. | $209,694 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TMW GLOBAL, LLC | $209,600 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Southern Recruiters & Consultants | $209,218 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MOTION INDUSTRIES, INC. | $208,682 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $208,077 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
SOUTHLAND SOLUTIONS, INC. | $206,353 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EXEMPLIS CORPORATION | $205,398 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCS LLC | $204,265 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
VALUE ADDED SOLUTIONS, INC. | $203,502 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
DSU STAFFING, INC. | $202,244 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENSAFE INC. | $199,728 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $199,552 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
KNH TECHNICAL RESOURCES, LLC | $199,280 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
DIVERSIFIED SUPPLY, INC. | $198,612 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PROFESSIONAL BUYERS ADVANTAGE, LLC | $197,387 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONTROL SOLUTIONS GROUP LLC | $196,662 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
J.A. STAFFORD CO. | $196,466 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AIKEN OFFICE SUPPLY & BOOK SHOP INC | $195,427 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $194,908 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CONCORD PROFESSIONAL SERVICES, INC. | $194,880 | Transparency Advocate | Energy, Department of | 9/15/2009 |
INDIAN EYES, LLC | $194,310 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $193,740 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
DILLON SUPPLY COMPANY | $193,489 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $190,100 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $188,433 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
County of Aiken | $187,244 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $186,401 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
URS ENERGY & CONSTRUCTION, INC. | $184,949 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
TFE, INC | $184,026 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MAS CONSULTANTS INC | $183,952 | Perform oversight and support of AMCP ARRA operations, maintenance, construction and/or project activities as assigned from the standpoint of public/personnel health and safety, nuclear and industrial safety, quality assurance, environmental protection, a | Energy, Department of | 9/13/2010 |
Miller Environmental, LLC | $182,408 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $182,194 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MULTI PHASE TECHNOLOGIES LLC | $181,956 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $181,224 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CONSOLIDATED RIGGING AND MARINE SUPPLY COMPANY, | $180,241 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $177,073 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
PAULA F. PRICE ENTERPRISES, LLC | $174,629 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CANBERRA INDUSTRIES, INC. | $174,425 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Southern Recruiters & Consultants | $174,207 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $173,400 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
UNIVERSITY OF GEORGIA RESEARCH FOUNDATION, INC. | $172,047 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $171,023 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CHICKASAW ADVISORY SERVICES, LLC | $170,758 | Labor rates for Contract Specialist and Procurement Tech positions | Energy, Department of | 9/30/2010 |
PROJECT SERVICES GROUP, LLC | $170,039 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNITED GLOBAL TECHNOLOGIES INC | $169,617 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENVISION CMOSXRAY LLC | $167,055 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PANASONIC CORPORATION OF NORTH AMERICA | $167,006 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AIKEN OFFICE SUPPLY & BOOK SHOP INC | $166,064 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SOUTH CAROLINA UNIVERSITIES RESEARCH AND EDUCATION FOUNDATION | $165,850 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
D&K DIVERSIFIED CONSULTING LLC | $165,502 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Viking Precision, Inc. | $164,825 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $164,111 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EDWARDS SUPPLY COMPANY, INC. | $161,997 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Lancs Industries Inc. | $161,684 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WEIRICH CONSULTING SERVICES INC | $161,191 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PROFESSIONAL BUYERS ADVANTAGE, LLC | $159,639 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TOTAL RELIANCE INDUSTRIAL, LLC | $159,495 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $158,010 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $157,500 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CAROLINA COMPUTERS, INC | $157,078 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $156,804 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $156,785 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
FORMS & SUPPLY, INC. | $155,507 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNITED GLOBAL TECHNOLOGIES INC | $154,976 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNITED GLOBAL TECHNOLOGIES INC | $153,858 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CHEROKEE STEEL SUPPLY, INC. | $153,435 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PAULA F. PRICE ENTERPRISES, LLC | $151,425 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
DAVIS & FLOYD, INC. | $150,945 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEL LABORATORIES, LLC | $150,945 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
COOK, JAMES R | $150,000 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MAS CONSULTANTS INC | $148,178 | Provide the services of a Recovery - ARRA Technical Coordinator to support DOE-SR Recovery Act Project Manager. Support includes technical and administrative support including reporting assistance, projecct tracking, analysis and evaluation. Support als | Energy, Department of | 9/01/2009 |
SKC, INC. | $147,831 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PETERS MACHINE & WELDING INC | $146,678 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $145,444 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Rcs Corporation | $145,333 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
OLH INC | $144,862 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PERKINELMER HEALTH SCIENCES, INC | $143,767 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $143,251 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
STRATTON TRANSPORT AND CONTRACTING, INC. | $142,897 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
E2 CONSULTING ENGINEERS, INC. | $142,861 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SOUTHLAND SOLUTIONS, INC. | $142,164 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
LONGENECKER & ASSOCIATES, INC. | $141,889 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEOSYNTEC CONSULTANTS, INC. | $140,000 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $139,324 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LUDLUM MEASUREMENTS, INC. | $139,198 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $138,907 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
URS ENERGY & CONSTRUCTION, INC. | $138,782 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
URS ENERGY & CONSTRUCTION, INC. | $138,602 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
COVENANT DISTRIBUTORS, INC. | $137,864 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
D & M SERVICES, LLC | $136,905 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
G, J&L, INC. | $136,884 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EXTRA PACKAGING, CORP. | $136,368 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $136,131 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
DESA, INC. | $136,023 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
INTERNATIONAL PAPER COMPANY | $135,902 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $135,810 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BARR GROUP OF NASHVILLE, INC., THE | $134,891 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DIVERSIFIED SUPPLY, INC. | $133,893 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Southern Recruiters & Consultants | $133,136 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $133,131 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
INTERA INCORPORATED | $132,130 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MOTOROLA SOLUTIONS, INC. | $130,333 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
COLUMBIA FLUID SYSTEM TECHNOLOGIES, LLC | $129,300 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GRADESOUTH, INC. | $129,176 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $128,966 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $127,579 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
TFE, INC | $127,554 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MCNEAL PROFESSIONAL SERVICES, INC. | $126,326 | OSHA Safety Engineer SRS TRU & Solid Waste Recovery ACT Project | Energy, Department of | 6/30/2010 |
Center For Occupational Medicine | $125,644 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Aiken Emergency Physicians | $125,644 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNIVERSAL MANUFACTURING CORP. | $124,528 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONSOLIDATED RIGGING AND MARINE SUPPLY COMPANY, | $124,349 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSOCIATED CONTAINER SALES & FABRICATION, INC | $124,124 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TIMBERMEN, INC., THE | $123,484 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BETA SOUTH TECHNOLOGY, INC. | $122,827 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SHEALY ELECTRICAL WHOLESALERS, INC. | $122,116 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TOTAL RELIANCE INDUSTRIAL, LLC | $121,807 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BOART LONGYEAR COMPANY | $121,792 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $121,553 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
COMTRONICS, INC. | $121,371 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GOVERNMENT SCIENTIFIC SOURCE, INC. | $121,114 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ELC & ASSOCIATES, LLC | $120,851 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AIKEN TECHNICAL COLLEGE | $120,797 |
State Energy Program During this quarter, we have made necessary adjustments to grant agreements to ensure completion within the grant period. All projects are complete, and we are processing all final payments for expenditures incurred during the period of performance. Unspe
This spending item is part of a $50,550,000 allocation.
See details
|
Energy, Department of | 4/20/2009 |
UNITED RENTALS, INC. | $120,206 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NFT INCORPORATED | $120,000 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DIVERSIFIED SUPPLY, INC. | $119,304 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DSU STAFFING, INC. | $119,142 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SHEALY ELECTRICAL WHOLESALERS, INC. | $118,859 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $118,672 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $117,868 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $117,868 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ENSAFE INC. | $117,660 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $114,449 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $114,010 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Rcs Corporation | $112,875 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $110,509 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
SOUTH CAROLINA UNIVERSITIES RESEARCH AND EDUCATION FOUNDATION | $110,322 |
In order to meet the needs of thermal management in parabolic trough solar applications, high temperature heat transfer fluids based on ionic liquid nanofluids will be investigated. During the three year period, IL nanofluids chemical properties will be c
This spending item is part of a $1,005,000 allocation.
See details
|
Energy, Department of | 5/11/2010 |
UNIVERSITY OF NOTRE DAME DU LAC | $110,322 |
In order to meet the needs of thermal management in parabolic trough solar applications, high temperature heat transfer fluids based on ionic liquid nanofluids will be investigated. During the three year period, IL nanofluids chemical properties will be c
This spending item is part of a $1,005,000 allocation.
See details
|
Energy, Department of | 5/11/2010 |
Rcs Corporation | $109,960 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
EOS REMEDIATION, INC | $109,942 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $107,395 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
AIR CENTERS OF SOUTH CAROLINA, INC. | $107,388 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
IMMIXTECHNOLOGY, INC. | $107,022 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WESCO DISTRIBUTION, INC | $105,374 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSOCIATED CONTAINER SALES & FABRICATION, INC | $104,612 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $103,769 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $103,139 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $103,139 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $102,760 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $102,760 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $102,760 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Lankelma Inc | $102,530 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CHARLESTON'S RIGGING & MARINE HARDWARE, INC. | $101,443 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
HAGEMEYER NORTH AMERICA, INC. | $100,747 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $100,538 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
RSL SAFETY CORPORATION | $100,174 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $100,000 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
SOUTH CAROLINA UNIVERSITIES RESEARCH AND EDUCATION FOUNDATION | $99,624 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BETA SOUTH TECHNOLOGY, INC. | $99,005 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PANASONIC CORPORATION OF NORTH AMERICA | $98,383 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $98,285 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $98,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
GRAYBAR ELECTRIC COMPANY, INC. | $97,852 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AIKEN OFFICE SUPPLY & BOOK SHOP INC | $97,828 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $97,277 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $97,236 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $97,100 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
URS ENERGY & CONSTRUCTION, INC. | $96,467 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
GEORGIA TECH RESEARCH CORPORATION | $96,024 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DROPBOX INC | $95,725 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DROPBOX INC | $95,725 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENGINEERING INFORMATION SYSTEMS ASSOCIATES INC | $95,630 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FORMS & SUPPLY, INC. | $95,367 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
W. W. GRAINGER, INC. | $94,822 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
RICHMOND SUPPLY COMPANY | $94,238 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
RNM, LLC | $93,920 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENGINEERING INFORMATION SYSTEMS ASSOCIATES INC | $93,464 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FORMS & SUPPLY, INC. | $93,411 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAROLINA COMPUTERS, INC | $92,534 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
KNH TECHNICAL RESOURCES, LLC | $92,420 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
Rcs Corporation | $91,988 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BETA SOUTH TECHNOLOGY, INC. | $91,966 |
In order to meet the needs of thermal management in parabolic trough solar applications, high temperature heat transfer fluids based on ionic liquid nanofluids will be investigated. During the three year period, IL nanofluids chemical properties will be c
This spending item is part of a $1,005,000 allocation.
See details
|
Energy, Department of | 5/11/2010 |
HAGEMEYER NORTH AMERICA, INC. | $91,214 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
QUALITY INDUSTRIAL DISTRIBUTION, INC. | $91,000 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TERRANEAR PMC LLC | $90,390 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PETERS MACHINE & WELDING INC | $90,301 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CONSOLIDATED SAFETY SERVICES INCORPORATED | $89,984 | SRS D&D, Soil & Groundwater Activities Site-wide Recovery Act Project | Energy, Department of | 9/30/2009 |
GEL LABORATORIES, LLC | $88,922 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DAVIS & FLOYD, INC. | $88,922 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SKC, INC. | $88,800 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $88,687 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TRI-FAST SYSTEMS, INC. | $88,620 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAREER PERSONNEL, INC. -- THE PROFESSIONAL DIFFERENCE | $88,339 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DOVER FLUID MANAGEMENT, INC. | $88,320 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $87,760 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Rcs Corporation | $87,736 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
DIONEX CORPORATION | $87,696 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
W & K CONTAINERS INC | $86,897 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PINNACLE SPECIALTY GROUP, INC. | $86,578 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
PERKINELMER HEALTH SCIENCES, INC | $86,359 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
R.W. MCCOLLUM COMPANY, INC. | $86,350 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Lankelma Inc | $86,175 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
OLH INC | $85,338 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $84,446 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
STRATTON TRANSPORT AND CONTRACTING, INC. | $84,181 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
LUDLUM MEASUREMENTS, INC. | $83,614 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEM TECHNOLOGIES, INC. | $83,594 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
LONGENECKER & ASSOCIATES, INC. | $83,586 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $83,552 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
DELTEK, INC. | $82,987 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
JANEICE PRODUCTS CO., INC. | $82,693 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Frham Safety Products, Inc | $81,736 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DESA, INC. | $81,707 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $81,375 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $81,341 |
The Recovery Act vision at the West Valley Demonstration Project (WVDP) is to create jobs and Western New York stimulus while safely reducing the site footprint and accelerating work in support of the decommissioning of the WVDP. Six major activities/goa
This spending item is part of a $62,875,000 allocation.
See details
|
Energy, Department of | 9/30/2009 |
BARR GROUP OF NASHVILLE, INC., THE | $81,027 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AUGUSTA INDUSTRIAL SERVICES, INC. | $81,012 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BAKERS WASTE EQUIPMENT, INC. | $80,928 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VETERAN SALES AND SERVICE, LLC | $80,919 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $80,779 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
E2 CONSULTING ENGINEERS, INC. | $80,146 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $79,942 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENSERV INC | $79,780 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAVANAGH SERVICES GROUP, INC. | $79,752 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $79,448 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VARIAN MEDICAL SYSTEMS, INC. | $79,269 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AIKEN, CITY OF | $78,950 |
Energy Efficiency and Conservation Block Grant Program (EECBG) Projects include energy efficiency and conservation subgrants to units of local government in collaboration with the ten regional Councils of Government; technical assistance to public, non-profit, and private sector entities to provide e energy assessments... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 9/30/2009 |
EICHROM TECHNOLOGIES LLC | $78,073 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GOVERNMENT SCIENTIFIC SOURCE, INC. | $77,396 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DIVERSE ENTERPRISE | $76,494 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $76,491 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
HOWARD LUMBER COMPANY | $76,317 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GATORLAND KUBOTA, LLC | $76,144 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GRADESOUTH, INC. | $76,097 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
REEF SYSTEMS CORP | $76,012 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GDM ELECTRONIC ASSEMBLY | $75,622 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AMERICAN HOSE & HARDWARE ,INC. | $75,566 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Center For Occupational Medicine | $75,473 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Aiken Emergency Physicians | $75,473 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ALARA ENVIRONMENTAL ANALYSIS | $75,162 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALLEY SPRING WATER CO | $75,000 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNIVERSITY OF FLORIDA | $75,000 |
Self-assembled Biomimetic Nanostructured Anti-Reflection coatings for Highly Efficient Crystalline Silicon Solar Cells will be fabricated on commerical silicon solar cell substrates and optimized for optical properties. The coatings will then be tested in
This spending item is part of a $300,000 allocation.
See details
|
Energy, Department of | 9/24/2009 |
TFE, INC | $74,630 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DAWSON ASSOCIATES, INC. | $74,288 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AUTOMATION TECHNOLOGY, INC. | $74,230 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STARRETTE TRUCKING COMPANY | $74,229 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Quality Technical Services, Inc. | $74,186 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AMERICAN MATERIAL HANDLING, INC. | $74,171 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $73,826 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
TALASCEND, LLC | $73,805 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BETA SOUTH TECHNOLOGY, INC. | $73,780 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PIERCAN USA, INC. | $73,709 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $73,618 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
VALUE ADDED SOLUTIONS, INC. | $73,618 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
INTERNATIONAL PAPER COMPANY | $73,365 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ELC & ASSOCIATES, LLC | $72,594 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MESA MACHINERY SERVICES, INC. | $72,187 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AUTOMATION TECHNOLOGY, INC. | $71,961 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ORANGECOAT SERVICES INC | $71,957 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $71,835 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
TMW GLOBAL, LLC | $71,753 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SCIENTIFIC SALES, INC. | $71,398 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCMASTER CARR SUPPLY COMPANY | $71,069 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ASSET MANAGEMENT ANALYSIS GROUP, LLC | $71,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LAFARGE BUILDING MATERIALS INC. | $70,551 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VETERAN SALES AND SERVICE, LLC | $70,396 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STARRETTE TRUCKING COMPANY | $70,299 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DIVERSIFIED SUPPLY, INC. | $70,282 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PFEIFFER VACUUM, INC. | $70,246 |
In order to meet the needs of thermal management in parabolic trough solar applications, high temperature heat transfer fluids based on ionic liquid nanofluids will be investigated. During the three year period, IL nanofluids chemical properties will be c
This spending item is part of a $1,005,000 allocation.
See details
|
Energy, Department of | 5/11/2010 |
AUGUSTA INDUSTRIAL SERVICES, INC. | $69,858 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $68,420 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CHEROKEE STEEL SUPPLY, INC. | $67,913 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
KAMO MANUFACTURING COMPANY, INC. | $67,895 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $67,408 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
QUALITY INDUSTRIAL DISTRIBUTION, INC. | $66,690 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DSU STAFFING, INC. | $66,464 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DENUKE CONTRACTING SERVICES, INC. | $65,822 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNIVERSITY OF SOUTH CAROLINA | $65,674 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GROUP MOBILE INT'L, LLC | $65,495 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ECKERT & ZIEGLER ISOTOPE PRODUCTS, INC. | $65,373 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAPERE CONSULTING INC | $65,335 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $65,282 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
C. E. BOURNE & CO., INC. | $65,090 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
A. & W. OIL & TIRE COMPANY, INC. | $64,900 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GOLDSIM TECHNOLOGY GROUP LLC | $64,580 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TETRA TECH, INC. | $64,420 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
IMMIXTECHNOLOGY, INC. | $64,287 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
U.S.COST INCORPORATED | $62,067 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Easy Street Events, LLC | $61,938 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PERFORMANCE DEVELOPMENT CORPORATION | $61,136 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PAI CORPORATION | $60,839 | Provide field engineering services to Department of Energy Savannah River Field Office (DOE-SR). These field engineers supplement the Assistant Manager for Closure Projects (AMCP) and the Office of Safety and Quality Assurance (OS&QA) in ARRA oversight, | Energy, Department of | 7/16/2010 |
URS ENERGY & CONSTRUCTION, INC. | $60,614 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
HAGEMEYER NORTH AMERICA, INC. | $60,517 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
INTERGRAPH CORPORATION | $60,000 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $60,000 |
This is a Firm Fixed Price contract for the construction and construction management services of the ARP VII Facility and Ancillary Structures over Pit 10 West at the RWMC, at the Idaho National Laboratory. The tasks being performed in the SDA at the RWM
This spending item is part of a $13,993,703 allocation.
See details
|
Energy, Department of | 7/30/2010 |
Analytic and Computational Research Inc | $59,799 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CLINE HOSE & HYDRAULICS LLC | $59,734 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TENCARVA MACHINERY COMPANY | $59,384 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $59,330 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SOUTH CAROLINA UNIVERSITIES RESEARCH AND EDUCATION FOUNDATION | $58,688 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MOBILE MINI, INC. | $58,107 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEORGIA TECH RESEARCH CORPORATION | $57,680 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
W. W. GRAINGER, INC. | $57,585 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONCORD PERSONNEL SERVICES INC | $57,571 | Property Management Specialist | Energy, Department of | 9/21/2009 |
CONCORD PERSONNEL SERVICES INC | $57,571 | Property Management Specialist | Energy, Department of | 9/21/2009 |
CONCORD PERSONNEL SERVICES INC | $57,571 | Property Management Specialist | Energy, Department of | 9/21/2009 |
ENGINEERING INFORMATION SYSTEMS ASSOCIATES INC | $57,443 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Keal | $57,286 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BROWN & MORRISON LTD | $56,553 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TMW GLOBAL, LLC | $56,424 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SHEALY ELECTRICAL WHOLESALERS, INC. | $56,089 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNIVERSITY OF KENTUCKY | $56,024 |
Conservation Research and Development 500-SREL will organize a series of short courses on technical topics for SRS environmental professionals /501-SREL is developing an automated stream monitoring system that responds to transient flow conditions in a manner designed to evaluate the impact o
This spending item is part of a $2,597,000 allocation.
See details
|
Energy, Department of | 3/04/2009 |
CAROLINA COMPUTERS, INC | $55,584 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FORMS & SUPPLY, INC. | $55,028 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TETRA TECH, INC. | $54,934 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
INTERA INCORPORATED | $54,921 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $54,668 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
TEAM SAFETY APPAREL, INC. | $54,509 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EXTRA PACKAGING, CORP. | $54,351 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
INFRARED CAMERAS, INC | $53,985 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TMW GLOBAL, LLC | $53,281 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $53,273 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCNEAL PROFESSIONAL SERVICES, INC. | $52,605 | SRS DND P&R Areas Recovery ACT Project | Energy, Department of | 6/30/2010 |
NETZSCH INSTRUMENTS NORTH AMERICA LLC | $52,465 |
In order to meet the needs of thermal management in parabolic trough solar applications, high temperature heat transfer fluids based on ionic liquid nanofluids will be investigated. During the three year period, IL nanofluids chemical properties will be c
This spending item is part of a $1,005,000 allocation.
See details
|
Energy, Department of | 5/11/2010 |
SKC, INC. | $52,312 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SCIENTIFIC SALES, INC. | $52,259 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Drillco National Group Inc | $52,146 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SYNERGISTICS, INC. | $51,514 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $51,265 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
W. W. GRAINGER, INC. | $50,881 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PERKINELMER HEALTH SCIENCES, INC | $50,874 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PAR SYSTEMS, INC. | $50,790 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
INDIAN EYES, LLC | $50,651 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Jackie B Lovett Trucking Co Inc | $50,402 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNIVERSITY OF TEXAS AT EL PASO | $50,126 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONTAINER PRODUCTS CORPORATION | $50,007 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC | $50,000 | SRNL will provide technical assistance to DOE Energy Efficiency Conservation Block Grant Recovery Act recipients including assisting with developing and planning energy efficiency conservation strategies and plans, and project activity sheets in preparati | Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $50,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
DELTEK, INC. | $49,849 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Air Liquide America Specialty Gases LLC | $49,797 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
JANEICE PRODUCTS CO., INC. | $49,673 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
LUDLUM MEASUREMENTS, INC. | $49,257 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
LABLOGIC SYSTEMS INC | $49,200 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | $49,000 |
'Argonne National Laboratory--Accelerated Cleanup of Surplus Nuclear Facilities Project (PIN 2002000) The scope of this project consists of three subprojects: 1) Decontamination (as required) and demolition of two rad-contaminated facilities and offsite
This spending item is part of a $79,000,000 allocation.
See details
|
Energy, Department of | 5/27/2009 |
AUGUSTA COMMUNICATIONS, INC. | $48,996 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TFE, INC | $48,894 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
FLUOR CORPORATION | $48,746 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CONCORD PERSONNEL SERVICES INC | $48,720 | Transparency Advocate | Energy, Department of | 9/15/2009 |
CONCORD PERSONNEL SERVICES INC | $48,720 | Transparency Advocate | Energy, Department of | 9/15/2009 |
CONCORD PERSONNEL SERVICES INC | $48,720 | Transparency Advocate | Energy, Department of | 9/15/2009 |
COOK, JAMES R | $48,511 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FUTURE UNLIMITED, INC. | $48,489 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FLUOR CORPORATION | $48,445 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DESA, INC. | $48,134 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EASTERN ILLINOIS UNIVERSITY | $48,090 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENSERV INC | $47,922 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BARR GROUP OF NASHVILLE, INC., THE | $47,733 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DILLON SUPPLY COMPANY | $47,641 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ARIZONA INSTRUMENT LLC | $47,470 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
J G MASTERS INC | $47,283 | Contracts Specialoists to provide technical and administrative support to the Office of Acquisition Management to support the ARRA | Energy, Department of | 10/06/2009 |
QUALITY INDUSTRIAL DISTRIBUTION, INC. | $47,229 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAROLINA COMPUTERS, INC | $47,126 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EICHROM TECHNOLOGIES LLC | $46,898 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MESA MACHINERY SERVICES, INC. | $46,898 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NATIONAL ENGINEERING SERVICE CORPORATION | $46,827 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $45,974 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MCNEAL PROFESSIONAL SERVICES, INC. | $45,782 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Entegee, Inc | $45,721 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
REEF SYSTEMS CORP | $45,659 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CHEROKEE STEEL SUPPLY, INC. | $44,922 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DAWSON ASSOCIATES, INC. | $44,624 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AUTOMATION TECHNOLOGY, INC. | $44,589 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MARIETTA NONDESTRUCTIVE TESTING | $44,580 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Aiken Emergency Physicians | $44,461 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Center For Occupational Medicine | $44,461 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
S & R ELECTRIC, INC. | $44,443 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
COMTRONICS, INC. | $44,047 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $44,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
TETRA TECH, INC. | $43,900 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BOART LONGYEAR COMPANY | $43,650 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NEWPORT NEWS NUCLEAR INC. | $43,547 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BETA SOUTH TECHNOLOGY, INC. | $43,464 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MESA MACHINERY SERVICES, INC. | $43,362 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ORANGECOAT SERVICES INC | $43,223 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Detection Technology | $43,050 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BLANCHARD MACHINERY COMPANY | $43,015 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ITSOLUTIONS NET, INC. | $43,006 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SCIENTIFIC SALES, INC. | $42,888 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BARRETT SUPPLY COMPANY, INC. | $42,812 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ELC & ASSOCIATES, LLC | $42,765 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PETERS MACHINE & WELDING INC | $42,719 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STRATTON TRANSPORT AND CONTRACTING, INC. | $42,715 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Metrac, Inc. | $42,597 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
STARRETTE TRUCKING COMPANY | $42,228 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $42,043 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $42,031 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
WHITE, J A & ASSOCIATES INC | $42,025 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAPP, INC. | $42,000 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
F & J SPECIALTY PRODUCTS, INC. | $41,916 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $41,464 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
TETRA TECH, INC. | $41,245 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Augusta Tool & Specialty Co., Inc. | $41,149 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CHARLESTON'S RIGGING & MARINE HARDWARE, INC. | $40,430 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ARS INTERNATIONAL, INC. | $40,396 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TOXCO, INC. | $40,396 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEL LABORATORIES, LLC | $40,396 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PACTEC, INC | $40,288 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
THE SHERWIN-WILLIAMS COMPANY | $40,232 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $40,209 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
QUALITY INDUSTRIAL DISTRIBUTION, INC. | $40,060 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
E. I. COMPUTER SYSTEMS, INC. | $39,959 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEOTRANS, INC. | $39,820 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNIVAR USA INC. | $39,648 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
UNIVERSITY OF SOUTH CAROLINA | $39,450 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $39,425 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BLADEWERX LLC | $39,375 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $39,300 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ECKERT & ZIEGLER ISOTOPE PRODUCTS, INC. | $39,268 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SAPERE CONSULTING INC | $39,246 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BETA SOUTH TECHNOLOGY, INC. | $39,211 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MAS CONSULTANTS INC | $39,000 | Provide support to the DOE-SR, Assistant Manager for Closure Project (AMCP), in performing oversight of ARRA Operations, Maintenance, Construction and/or Project Oversight. This includes performing oversight and support functions for the ARRA project inc | Energy, Department of | 9/30/2009 |
MESA MACHINERY SERVICES, INC. | $38,978 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
LAFARGE BUILDING MATERIALS INC. | $38,929 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
INTERNATIONAL PAPER COMPANY | $38,859 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WESCO DISTRIBUTION, INC | $38,707 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ALL BUSINESS MACHINES, INC. | $38,598 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
RADIATION PROTECTION SYSTEMS, INC. | $38,550 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DOVER FLUID MANAGEMENT, INC. | $38,386 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MANER BUILDERS SUPPLY COMPANY, LLC | $38,191 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
IMMIXTECHNOLOGY, INC. | $37,871 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BARR GROUP OF NASHVILLE, INC., THE | $37,827 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PAI CORPORATION | $37,750 | Provide field engineering services to Department of Energy Savannah River Field Office (DOE-SR). These field engineers supplement the Assistant Manager for Closure Projects (AMCP) and the Office of Safety and Quality Assurance (OS&QA) in ARRA oversight, | Energy, Department of | 9/30/2009 |
UNIVERSITY OF GEORGIA RESEARCH FOUNDATION, INC. | $37,693 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
REED ICE INC | $37,693 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FLUOR CORPORATION | $37,475 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
U.S.COST INCORPORATED | $37,282 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Easy Street Events, LLC | $37,205 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TECHSTAR | $37,035 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORRIS CYLINDER COMPANY | $36,677 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PALMETTO PROPANE, INC. | $36,560 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VALUE ADDED SOLUTIONS, INC. | $36,495 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
CAROLINA FRESH FARMS, LLC | $35,960 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TENCARVA MACHINERY COMPANY | $35,671 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
HAGEMEYER NORTH AMERICA, INC. | $35,651 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
RICHMOND SUPPLY COMPANY | $35,100 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TETRA TECH, INC. | $34,975 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
PALMETTO BUILDING SUPPLY INC | $34,850 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MICRO-TRAP CORPORATION | $34,831 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
NORAMTEC CONSULTANTS AMERICAS INC. | $34,829 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Keal | $34,411 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GOVERNMENT SCIENTIFIC SOURCE, INC. | $34,399 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
QUEST ENVIRONMENTAL & SAFETY PRODUCTS, INC. | $34,212 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GEORGIA TECH RESEARCH CORPORATION | $33,979 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TMW GLOBAL, LLC | $33,893 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENGINEERING INFORMATION SYSTEMS ASSOCIATES INC | $33,840 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SHEALY ELECTRICAL WHOLESALERS, INC. | $33,692 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Redox Tech, LLC | $33,600 |
Conservation Research and Development 500-SREL will organize a series of short courses on technical topics for SRS environmental professionals /501-SREL is developing an automated stream monitoring system that responds to transient flow conditions in a manner designed to evaluate the impact o
This spending item is part of a $2,597,000 allocation.
See details
|
Energy, Department of | 3/04/2009 |
HAGEMEYER NORTH AMERICA, INC. | $33,593 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
RICH INDUSTRIES, INC. | $33,572 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Corporation | $32,688 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
NUCFIL, LLC | $32,620 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
C. E. BOURNE & CO., INC. | $32,581 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EST GROUP, INC. | $32,388 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Walter Davies | $32,064 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAROLINA COMPUTERS, INC | $32,003 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MECO, INC. OF AUGUSTA | $32,000 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Ink, LLC | $31,955 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EDGEWATER TECHNICAL ASSOCIATES, LLC | $31,383 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SYNERGISTICS, INC. | $30,944 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
A. & W. OIL & TIRE COMPANY, INC. | $30,872 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
RICHMOND SUPPLY COMPANY | $30,688 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
HOWARD LUMBER COMPANY | $30,642 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
W. W. GRAINGER, INC. | $30,563 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CORPORATE STUDIO, INC. | $30,228 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
URS ENERGY & CONSTRUCTION, INC. | $30,000 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Vocational Rehabilitation Department, South Carolina | $29,857 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ADVANCED DOOR SYSTEMS, INC. | $29,842 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DIVERSE ENTERPRISE | $29,640 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
SIMCO TECHNOLOGIES INC | $29,500 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DELTEK, INC. | $29,366 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
JANEICE PRODUCTS CO., INC. | $29,262 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
FUTURE UNLIMITED, INC. | $29,126 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ARIZONA INSTRUMENT LLC | $28,515 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CAROLINA COMPUTERS, INC | $28,308 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
McJunkin Red Man Corporation | $28,289 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ENSERV INC | $28,231 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WESCO DISTRIBUTION, INC | $28,072 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EICHROM TECHNOLOGIES LLC | $27,627 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
TECHNI-TOOL INC | $27,490 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
VETERAN SALES AND SERVICE, LLC | $27,465 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
LINDE LLC | $27,358 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
GOVERNMENT SCIENTIFIC SOURCE, INC. | $27,221 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WACO INTERNATIONAL CORPORATION | $26,967 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
REEF SYSTEMS CORP | $26,898 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
INTERNATIONAL PAPER COMPANY | $26,563 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Alliance Scaffolding, Inc. | $26,494 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
COMPANY WRENCH, LTD. | $26,399 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
BLADEWERX LLC | $26,385 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
DAWSON ASSOCIATES, INC. | $26,288 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AUTOMATION TECHNOLOGY, INC. | $26,267 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
WEIRICH CONSULTING SERVICES INC | $26,204 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
EDWARDS SUPPLY COMPANY, INC. | $26,018 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PERFORMANCE DEVELOPMENT CORPORATION | $25,863 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PIEDMONT PLASTICS, INC. | $25,856 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ITSOLUTIONS NET, INC. | $25,833 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PETERS MACHINE & WELDING INC | $25,661 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MESA MACHINERY SERVICES, INC. | $25,544 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MACUCH STEEL PRODUCTS, INC. | $25,529 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ORANGECOAT SERVICES INC | $25,463 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
CANBERRA INDUSTRIES, INC. | $25,386 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
SCIENTIFIC SALES, INC. | $25,265 |
At various site areas deactivate/decommission facilities, remediate soil and ground water and remediate impacted site systems. Remove plutonium-238, characterize A-area waste units, remediate Gunsite-12 and the CMP pits, decommission the heavy water compo
This spending item is part of a $235,738,870 allocation.
See details
|
Energy, Department of | 4/10/2009 |
PROJECT SERVICES GROUP, LLC | $25,242 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ACTS OF SOUTH CAROLINA INC | $25,200 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
F & J SPECIALTY PRODUCTS, INC. | $25,178 |
Complete deactivation and in situ decommissioning of the P-Reactor and the R-Reactor, the remediation of 6 miles of underground lines and 220 acres of contaminated soil. Characterization and remediation of the C-Reactor Area Discharge Canal, C Reactor Gr
This spending item is part of a $416,711,472 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Builders Hardware & Specialty Company Inc | $25,158 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
AMERICAN AUDIO/VISUAL SERVICES INC | $25,129 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
ELECTRICAL EQUIPMENT COMPANY | $25,124 |
Handle waste disposition and impacted site systems; disposition 5,000 cubic meters of TRU legacy waste; disposition up to 200 cubic meters of additional very difficult TRU legacy waste; consolidate all RCRA waste storage and close excess facilities; dispo
This spending item is part of a $720,201,615 allocation.
See details
|
Energy, Department of | 4/10/2009 |
Rcs Industries, Inc | $25,119 |
In M Area, construction of two passive soil vapor extraction (PSVE) cells to treat volatile organic compound (VOC) contaminated soils and concrete rubble. Transportation and placement of VOC contaminated materials into 321-M and PSVE cell. In D Area, rem
This spending item is part of a $23,530,069 allocation.
See details
|
Energy, Department of | 4/10/2009 |
MCNEAL PROFESSIONAL SERVICES, INC. | $24,733 | Soil & Ground Water Activities | Energy, Department of | 6/30/2010 |
URS ENERGY & CONSTRUCTION, INC. | $21,933 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
MAS CONSULTANTS INC | $21,749 | Perform oversight and support of AMCP ARRA operations, maintenance, construction and/or project activities as assigned from the standpoint of public/personnel health and safety, nuclear and industrial safety, quality assurance, environmental protection, a | Energy, Department of | 9/13/2010 |
J G MASTERS INC | $18,427 | Contracts Specialists to provide technical and administrative support to the Office of Acquisition Management to support the ARRA | Energy, Department of | 10/06/2009 |
SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC | $16,203 | In order to meet the needs of thermal management in parabolic trough solar applications, high temperature heat transfer fluids based on ionic liquid nanofluids will be investigated. During the three year period, IL nanofluids chemical properties will be c | Energy, Department of | 4/10/2009 |
LOWER SAVANNAH COUNCIL OF GOVERNMENTS | $10,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) Projects include energy efficiency and conservation subgrants to units of local government in collaboration with the ten regional Councils of Government; technical assistance to public, non-profit, and private sector entities to provide e energy assessments... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 9/30/2009 |
J G MASTERS INC | $9,243 | Contracts Specialoists to provide technical and administrative support to the Office of Acquisition Management to support the ARRA | Energy, Department of | 10/06/2009 |
MCNEAL PROFESSIONAL SERVICES, INC. | $1,549 | SRS DND P&R Areas Recovery ACT Project | Energy, Department of | 6/30/2010 |
MAS CONSULTANTS INC | $0 | Provide support the DOE-SR, Assistant Manager for Nuclear Materials Stabilization Project Operations Division in performing oversight of TRU waste disposition work to be conducted in H and F Canyons. This includes reviewing Safety Basis documents, Techni | Energy, Department of | 9/30/2009 |
MAS CONSULTANTS INC | $0 | Provide support the DOE-SR, Assistant Manager for Nuclear Materials Stabilization Project Operations Division in performing oversight of TRU waste disposition work to be conducted in H and F Canyons. This includes reviewing Safety Basis documents, Techni | Energy, Department of | 9/30/2009 |
E2 CONSULTING ENGINEERS, INC. | $0 |
The Recovery Act vision at the West Valley Demonstration Project (WVDP) is to create jobs and Western New York stimulus while safely reducing the site footprint and accelerating work in support of the decommissioning of the WVDP. Six major activities/goa
This spending item is part of a $62,875,000 allocation.
See details
|
Energy, Department of | 9/30/2009 |