Anderson County, Tenn., funds by Energy, Department of
Listing $932,893,809.08 in stimulus funds from Energy, Department of for Anderson
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC | $79,620,230 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
MCCARTHY BUILDING COMPANIES, INC. | $58,462,928 |
SLI Construction: This award provides funding for the Modernization of Laboratory Facilities (MLF) construction project at Oak Ridge National Laboratory. The MLF Project will provide modern, 21st-century laboratories and associated space for support func
This spending item is part of a $60,568,000 allocation.
See details
|
Energy, Department of | 4/02/2009 |
CRAY INC | $47,032,589 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
LATA - SHARP REMEDIATION SERVICES, LLC | $39,012,044 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC | $29,776,370 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $27,290,133 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BECHTEL JACOBS COMPANY LLC | $26,718,235 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SEC FEDERAL SERVICES CORPORATION | $26,462,810 | Asbestos abatement of Bldgs 3038, 3517, 2026; hazardous waste removal and disposal for Bldgs. 3038, 3517,2026; Radiological waste removal and disposal of Bldgs. 3026, 3038, 2026,3517; Decontamination of radiological and hazardous contamination in prepara | Energy, Department of | 3/30/2010 |
UT-BATTELLE, LLC | $24,335,938 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC | $22,280,579 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. Sev
This spending item is part of a $23,045,990 allocation.
See details
|
Energy, Department of | 8/04/2010 |
UT-BATTELLE, LLC | $19,635,604 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC | $19,500,269 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SEC FEDERAL SERVICES CORPORATION | $18,579,923 | Asbestos abatement of Building 2026; hazardous waste removal and disposal for Bldgs. 2026; Radiological waste removal and disposal of Bldgs. 2026; Decontamination of radiological and hazardous contamination in preparation for demolition; Deactivation and | Energy, Department of | 3/30/2010 |
CRAY INC | $17,894,770 |
Leadership Computing Upgrade: To help meet the SC computational needs, this award funds a low-risk upgrade of the 1.3 petaflop (PF) Cray XT5 at the Leadership Computing Facility by replacing the 37,376 quad-core AMD Barcelona processors with six-core AMD
This spending item is part of a $19,865,345 allocation.
See details
|
Energy, Department of | 7/27/2009 |
SAFETY AND ECOLOGY CORPORATION | $16,624,810 | Asbestos abatement of Bldgs 3038, 3517, 2026; hazardous waste removal and disposal for Bldgs. 3038, 3517,2026; Radiological waste removal and disposal of Bldgs. 3026, 3038, 2026,3517; Decontamination of radiological and hazardous contamination in prepara | Energy, Department of | 3/30/2010 |
UT-BATTELLE, LLC | $16,325,249 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BECHTEL JACOBS COMPANY LLC | $15,591,246 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $14,491,050 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
UT-BATTELLE, LLC | $13,907,377 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
SEC FEDERAL SERVICES CORPORATION | $13,304,509 | Scope includes pre-abatement; hazardous, universal, asbestos, berrylium, and radiological abatement; demolition; waste transportation and disposal; and site restoration of disturbed areas. | Energy, Department of | 3/19/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $12,500,000 | The Department of Energy (DOE) Office of Science Graduate Fellowship (SCGF) program supports graduate students pursuing degrees in areas of research supportive of the SC mission. Funding from the American Recovery and Reinvestment Act of 2009 (ARRA) will | Energy, Department of | 3/24/2010 |
MCCARTHY BUILDING COMPANIES, INC. | $12,244,973 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $11,494,022 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC | $11,305,349 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $17,745,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BECHTEL JACOBS COMPANY LLC | $10,756,187 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC | $10,165,169 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $10,978,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC | $9,649,040 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $16,050,201 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $9,313,839 |
Early Career Research Program: The following funding is provided for awards made under Program Announcement to DOE National Laboratories LAB 09-26, Office of Science Early Career Research Program: $2,355,000 in operating funds and $145,000 in equipment f
This spending item is part of a $10,004,884 allocation.
See details
|
Energy, Department of | 3/25/2010 |
LATA - SHARP REMEDIATION SERVICES, LLC | $9,073,852 |
Toxic and hazardous waste cleanup at Bethel Valley Burial Grounds (SWSA 1 and SWSA 3)
This spending item is part of a $14,912,999 allocation.
See details
|
Energy, Department of | 9/18/2009 |
AVISCO, INC. | $8,454,485 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
HICKORY CONSTRUCTION, INC. | $8,234,534 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $6,919,499 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $5,652,846 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
SAFETY AND ECOLOGY CORPORATION | $5,573,977 | Asbestos abatement of Building 2026; hazardous waste removal and disposal for Bldgs. 2026; Radiological waste removal and disposal of Bldgs. 2026; Decontamination of radiological and hazardous contamination in preparation for demolition; Legacy Material | Energy, Department of | 3/30/2010 |
SEC FEDERAL SERVICES CORPORATION | $5,541,976 | Scope includes pre-abatement; hazardous, universal, asbestos, berrylium, and radiological abatement; demolition; waste transportation and disposal; and site restoration of disturbed areas. | Energy, Department of | 3/19/2010 |
OAK RIDGE CITY CENTER LLC | $5,000,000 | Renewable Energy Research and Development The purpose is to create a large-scale technology demonstration project utilizing cost-share under DE-FOA-0000116 which is in alighment with the goals of the ARRA of 2009 as well as with the DOE's stated EERE program objectives of developing and establish | Golden Field Office | 10/30/2009 |
UT-BATTELLE, LLC | $4,982,893 |
EE Conservation Block Grant Program: This award provides funding of $16,718,346 for 5 Agreements from the Office of Energy Efficiency and Renewable Energy (EERE). Agreement 19112 entitled 'Energy Services Coalition Technical Assistance for SEP and EECBG
This spending item is part of a $16,718,346 allocation.
See details
|
Energy, Department of | 8/24/2009 |
MATERIALS & ENERGY CORP | $4,947,898 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $4,653,176 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $4,821,565 allocation.
See details
|
Energy, Department of | 3/09/2009 |
DEMCO, INC. | $4,299,554 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
NAVARRO-GEM JOINT VENTURE | $3,848,653 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $3,770,839 |
Building Technologies Program: Residential Buildings (Building America, Builders Challenge, and Existing Home Retrofits). This award provides funds for the following subprojects within this program: 1) Agreement 20700 entitled 'Retrofit Marketing and B
This spending item is part of a $4,592,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
UT-BATTELLE, LLC | $3,699,909 |
EGS Technology R&D: Geothermal Technologies Program Enhanced Geo: This award provides funding to four subprojects in support of Enhanced Geothermal Systems technology: 1) Feasibility and Design Studies for a High Temperature Downhole Tool--ORNL will per
This spending item is part of a $4,110,870 allocation.
See details
|
Energy, Department of | 9/30/2009 |
RRP, LLC | $3,424,256 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
PROFESSIONAL PROJECT SERVICES, INC. | $3,390,925 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $3,485,998 allocation.
See details
|
Energy, Department of | 3/09/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $3,383,090 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
LEGACY/CRITIQUE | $3,374,567 | Provide technical, financial and administrative support to DOE Procurement and Contract Division. | Energy, Department of | 7/07/2009 |
BABCOCK & WILCOX TECHNICAL SERVICES Y-12, LLC | $3,369,705 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $4,169,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
AVISCO, INC. | $3,343,228 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $3,317,790 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
ESG CONSTRUCTION LLC | $3,276,050 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $3,135,764 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
UT-BATTELLE, LLC | $3,062,996 |
Smart Grid Investment Grant Program (EISA 1306): This award provides funds of $5,470,000 for the following activities in support of the Office of Electricity Delivery and Energy Reliability (OE). Funding in the amount of $1,370,000 is provided for ORNL
This spending item is part of a $5,470,000 allocation.
See details
|
Energy, Department of | 9/10/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $2,986,882 |
The purpose of this task is to provide the Department of Energy (DOE) with technical assistance for the implementation of the DOE Weatherization Assistance Program (WAP) and to assist the WAP grantees in the ramp up and implementation of their Weatherizat
This spending item is part of a $3,300,000 allocation.
See details
|
Energy, Department of | 8/31/2010 |
UT-BATTELLE, LLC | $2,967,048 |
R&D on Alternative Isotope Production Techniques: The following funding is provided for awards made under FOA 09-14: $750,000 in operating funds and $1,250,000 in equipment funds is provided for FWP ERST005 entitled 'Integration of Centrifuge and Electr
This spending item is part of a $4,117,000 allocation.
See details
|
Energy, Department of | 9/23/2009 |
UT-BATTELLE, LLC | $2,614,452 |
Nuclear Science Workforce: The following funding is provided for awards made under FOA 09-13, Applications of Nuclear Science and Technology: $1,181,000 in operating funds and $719,000 in equipment funds for FWP #22570 entitled 'Transfer Reactions on Un
This spending item is part of a $4,380,000 allocation.
See details
|
Energy, Department of | 9/02/2009 |
MATERIALS & ENERGY CORP | $2,608,055 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
URS | $2,500,000 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
DIVERSIFIED SCIENTIFIC SERVICES, INC. | $2,458,063 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CLAUSS CONSTRUCTION | $2,452,976 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $2,393,580 |
Enhanced Utilization of Isotope Facilities: This award provides funds as follows: $1,900,000 in equipment funding and $1,000,000 in operating funds for the Remote Target Fabrication Refurbishment and the PaR Remote Handling System Replacement. These fun
This spending item is part of a $4,847,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
BECHTEL JACOBS COMPANY LLC | $2,295,122 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $2,182,835 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $2,214,000 allocation.
See details
|
Energy, Department of | 3/09/2009 |
MCS LLC | $2,117,459 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
UT-BATTELLE, LLC | $2,105,072 |
SLI Construction: This award provides funding for the Modernization of Laboratory Facilities (MLF) construction project at Oak Ridge National Laboratory. The MLF Project will provide modern, 21st-century laboratories and associated space for support func
This spending item is part of a $60,568,000 allocation.
See details
|
Energy, Department of | 4/02/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $2,033,062 | ORNL D&D Recovery Act Project | Energy, Department of | 6/23/2009 |
UT-BATTELLE, LLC | $1,970,575 |
Leadership Computing Upgrade: To help meet the SC computational needs, this award funds a low-risk upgrade of the 1.3 petaflop (PF) Cray XT5 at the Leadership Computing Facility by replacing the 37,376 quad-core AMD Barcelona processors with six-core AMD
This spending item is part of a $19,865,345 allocation.
See details
|
Energy, Department of | 7/27/2009 |
NATIONAL RESOURCE MANAGEMENT, LLC | $1,935,094 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $1,931,878 |
Enhanced AIP funding at Nuclear Physics User Facilities: This award provided Accelerator Improvement Project (AIP) funds to refurbish the Oak Ridge Isochronous Cyclotron (ORIC) at the Holifield Radioactive Ion Beam Facility (HRIBF) to improve the facilit
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 7/10/2009 |
UT-BATTELLE, LLC | $1,788,741 |
Dover AFB -- Decentralization of Facilities from Central Heat Plant, Phase 3 East of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the H
This spending item is part of a $3,699,799 allocation.
See details
|
Energy, Department of | 6/17/2009 |
M & W DRILLING, LLC | $1,770,303 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $1,717,122 |
Dover AFB -- Decentralization of Facilities from Central Heat Plant, Phase 1 East of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the H
This spending item is part of a $4,499,993 allocation.
See details
|
Energy, Department of | 6/17/2009 |
METAL SOLUTIONS DESIGN & FABRICATION, LLC | $1,691,136 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $1,659,414 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SAFETY AND ECOLOGY CORPORATION | $1,607,538 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
MCS LLC | $1,581,382 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
MCS LLC | $1,517,934 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
UT-BATTELLE, LLC | $1,494,504 |
Investigation of intermediate ethanol blends, optimization of E-85 engines, and development of transportation infrastructure: This award provides funds for vehicle emissions testing and aging on mileage accumulation dynamometers at Southwest Research Inst
This spending item is part of a $9,769,504 allocation.
See details
|
Energy, Department of | 9/22/2009 |
SEC RADCON ALLIANCE, LLC | $1,493,266 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
PAR SYSTEMS, INC. | $1,467,839 |
Enhanced Utilization of Isotope Facilities: This award provides funds as follows: $1,900,000 in equipment funding and $1,000,000 in operating funds for the Remote Target Fabrication Refurbishment and the PaR Remote Handling System Replacement. These fun
This spending item is part of a $4,847,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
SCIENTIFIC SALES, INC. | $1,452,490 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SAFETY AND ECOLOGY CORPORATION | $1,437,505 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $1,432,271 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
RESTORATION SERVICES, INC. | $1,398,676 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $1,367,000 | ORNL Non-Defense Recovery Act Project | Energy, Department of | 6/23/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $1,366,799 |
ORIGINAL AWARD AMOUNT WAS $2,731,106. AFTER DEOLIBGATION OF $776,438.09 (DOE-EE FUNDS FOR IRA 48C-contract mod 296), NEW AWARD AMOUNT IS $1,954,667.91.
This spending item is part of a $1,954,668 allocation.
See details
|
Energy, Department of | 10/29/2009 |
MATERIALS & ENERGY CORP | $1,322,429 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PERFORMANCE CONTRACTING, INC. | $1,300,660 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $1,243,447 |
Management and Oversight (EE Program Direction): This award provides funding for five subprojects. Funding of $850,000 is provided for project #20476 entitled 'Federal Laboratory Support for Recovery Act Transactions ARRA FY 09' and provides funds for s
This spending item is part of a $1,450,205 allocation.
See details
|
Energy, Department of | 6/11/2009 |
IMPACT SERVICES, INC. | $1,229,718 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BECHTEL JACOBS COMPANY LLC | $1,226,140 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
UT-BATTELLE, LLC | $1,157,041 |
Knowledgebase R&D: This award provides funds to support the research and development of an implementation strategy for the Systems Biology Knowledgebase. The funding will allow for the Systems Biology Knowledgebase to obtain the necessary capital equipm
This spending item is part of a $3,188,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
INFORMATION INTERNATIONAL ASSOCIATES, INC. | $1,153,357 | ?OSTI Technology Infrastructure? upgrades in support of DOE and the public and scientific community, including a live alternate processing site capable of hosting all of OSTI?s scientific dissemination services. | Energy, Department of | 8/13/2009 |
UT-BATTELLE, LLC | $1,125,140 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $1,124,891 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
SAFETY AND ECOLOGY CORPORATION | $1,109,233 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $1,100,679 |
SEP/EECBG/WAP ARRA 2009-2012 Integration Projects: This award provides funding of $11,310,000 for 5 Agreements from the Office of Energy Efficiency and Renewable Energy (EERE). Agreement 20877 entitled 'Recovery Act Technical and Communications Support
This spending item is part of a $11,310,000 allocation.
See details
|
Energy, Department of | 4/20/2010 |
UT-BATTELLE, LLC | $1,096,488 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
SPECTRA TECH, INC. | $1,000,690 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
NATIONAL RESOURCE MANAGEMENT, LLC | $994,107 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $982,702 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $1,848,700 allocation.
See details
|
Energy, Department of | 3/09/2009 |
SEC RADCON ALLIANCE, LLC | $964,116 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $957,148 |
Toxic and hazardous waste cleanup at Bethel Valley Burial Grounds (SWSA 1 and SWSA 3)
This spending item is part of a $14,912,999 allocation.
See details
|
Energy, Department of | 9/18/2009 |
IMPACT SERVICES, INC. | $951,076 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
REDE | $945,000 | Mod A035 - $170,000.00 - Telecom Equipment Maintenance and Support Mod A038 - $775,000.00 - Telecom Equipment Maintenance and Suport. | Energy, Department of | 8/05/2010 |
Professional Engineers Inc | $930,470 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BROADWAY ELECTRIC SERVICE CORPORATION | $907,739 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $907,406 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $893,500 | Department of Energy Oak Ridge Office is processing the EECBG grant applications that request between $250,000 - $2,000,000. The NEPA review is only one step in the process for grant award. The remainder of the review is being conducted outside this con | Energy, Department of | 6/23/2009 |
TURNKEY TRANSPORTATION SERVICES, LLC | $878,852 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
EI REVIEW & COMPANY, INC. | $857,385 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $1,848,700 allocation.
See details
|
Energy, Department of | 3/09/2009 |
UT-BATTELLE, LLC | $851,109 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
TETRA TECH, INC. | $830,019 |
Toxic and hazardous waste cleanup at Bethel Valley Burial Grounds (SWSA 1 and SWSA 3)
This spending item is part of a $14,912,999 allocation.
See details
|
Energy, Department of | 9/18/2009 |
UT-BATTELLE, LLC | $830,000 |
Advanced Research and Projects Agency Energy Financial Assistance Program Widespread adoption of plug-in hybrid vehicles (PHEVs) is critical to reducing America's dependence on foreign oil and greenhouse gas emissions. Charging modules for PHEVs are essentially grid-tie power electronics that draw ababout as much power as a hair ... Show more
This spending item is part of a $3,914,527 allocation.
See details
|
Energy, Department of | 9/14/2010 |
MATERIALS & ENERGY CORP | $822,551 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NAVARRO-GEM JOINT VENTURE | $810,994 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $803,356 |
Bioenergy Research Center Capital Equipment: This award supports research infrastructure for the DOE BESC Bioenergy Research Center. The capital in this task will: 1) allow the current high throughput recalcitrance characterization pipeline to be double
This spending item is part of a $5,362,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
UT-BATTELLE, LLC | $797,287 |
Eastern Interconnection Demand: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. Oak Ridge National Laboratory (ORNL) will provide support needed to accurately estimate the demand-side resource technical
This spending item is part of a $1,000,000 allocation.
See details
|
Energy, Department of | 9/08/2010 |
UT-BATTELLE, LLC | $790,706 |
Nanoscale Science Research Centers: Equipment funds in the amount of $5,785,000 are provided under KC020401D to update, upgrade, or expand capabilities of the Center for Nanophase Materials to conduct leading-edge science and serve users. Specifically,
This spending item is part of a $5,785,000 allocation.
See details
|
Energy, Department of | 6/18/2009 |
LANCASTER SERVICES, INCORPORATED | $786,251 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $772,312 |
Dover AFB -- Decentralization of Facilities from Central Heat Plant, Phase 1 West of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the H
This spending item is part of a $4,529,185 allocation.
See details
|
Energy, Department of | 6/17/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $761,454 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ENVIRONMENTAL SPECIALTIES INTERNATIONAL, INC. | $755,188 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $750,000 |
Advanced Computer Architectures: This award provides funds for ORNL to acquire at least one IBM Power System 5+ and MOMBO simulation software and operate them in a test bed in collaboration with IBM for research and development in the area of application
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 9/29/2009 |
UT-BATTELLE, LLC | $737,945 |
Industrial Assessment Centers and Plant Best Practices: This award provides funding to complete new and enhanced Save Energy Now (SEN) assessments and funds to complete technical assistance activities to support SEN assessments.
This spending item is part of a $1,408,356 allocation.
See details
|
Energy, Department of | 9/30/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $733,220 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $727,212 |
Concentrating Solar Power: This award provides funding to address the need for heat transfer fluids for solar power generation that are stable to temperatures approaching 600 degrees C, have good thermal characteristics, and that do not react with the ve
This spending item is part of a $935,000 allocation.
See details
|
Energy, Department of | 1/28/2010 |
UT-BATTELLE, LLC | $726,899 |
PV Systems Development: Funding for this award was initially assigned to project number 2004420 in January 2010. Headquarters reassigned the funds for this task to project number 2004430 in July 2010. This award provides funding to address the need for
This spending item is part of a $935,000 allocation.
See details
|
Energy, Department of | 7/28/2010 |
SAFETY AND ECOLOGY CORPORATION | $716,124 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
MATERIALS & ENERGY CORP | $713,104 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
UT-BATTELLE, LLC | $696,905 |
Basic Energy Sciences--Energy Frontier Research Centers: This award funds FWP #ERKCM74 entitled 'Materials Sciences of Actinides (Lead Institute -- University of Notre Dame). UT-Battelle will perform the contractor's portion of the research proposed for
This spending item is part of a $1,100,000 allocation.
See details
|
Energy, Department of | 6/23/2010 |
UT-BATTELLE, LLC | $694,522 |
Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
UT-BATTELLE, LLC | $680,000 |
Advanced Research and Projects Agency Energy Financial Assistance Program Delphi Automotive Systems, LLC (Delphi) and International Rectifier (IR) realize a need to develop revolutionary technologies required for more efficient, compact, and cost-effective power conversion, specifically to reduce U.S.S. dependence on imported oil... Show more
This spending item is part of a $6,733,386 allocation.
See details
|
Energy, Department of | 12/22/2009 |
BECHTEL JACOBS COMPANY LLC | $677,452 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
RESTORATION SERVICES, INC. | $677,336 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $16,050,201 allocation.
See details
|
Energy, Department of | 5/07/2009 |
AREVA FEDERAL SERVICES LLC | $673,955 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BROADWAY ELECTRIC SERVICE CORPORATION | $669,573 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
RESTORATION SERVICES, INC. | $656,814 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
LYNX SUPPLY, INC. | $643,800 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $642,847 |
Modify Integrated Biorefinery Solicitation Program for Pilot and Demonstration Scale Biorefineries: This award provided initial funds of $679,046 for technical support to organize, plan, and conduct the Merit Review for Funding Opportunity Announcement N
This spending item is part of a $1,162,237 allocation.
See details
|
Energy, Department of | 9/03/2009 |
SEC RADCON ALLIANCE, LLC | $625,808 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
TC PROGRAM SOLUTIONS, LLC | $615,593 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ESG CONSTRUCTION LLC | $610,424 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
Aquaterra, LLC | $608,452 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $603,000 |
Funding to ANL for research and development and expert technical analysis and review efforts associated with supporting the Topic A and B electrical interconnection industry awards by producing products for delivery in year three.
This spending item is part of a $4,000,000 allocation.
See details
|
Energy, Department of | 7/06/2010 |
DENUKE CONTRACTING SERVICES, INC. | $590,793 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
KNH TECHNICAL RESOURCES, LLC | $580,151 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
SAFETY AND ECOLOGY CORPORATION | $572,276 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $570,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $16,050,201 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STREET LEGAL INDUSTRIES, INC | $557,998 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $550,000 | Capacitor Evaluation for Advanced Vehicle Applications: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. This project is a collaborative effort between Oak Ridge National Laboratory (ORNL) and SB Electro | Energy, Department of | 7/09/2010 |
ALLIANT CORPORATION | $547,492 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
BLAINE CONSTRUCTION CORPORATION | $545,572 |
Fundamental Neutron Physics Beamline MIE at SNS full funding (ORNL): This award provides accelerated funding for major items of equipment (MIE) and will enable prompt acquisition of the utilities and HVAC systems at Oak Ridge National Laboratory (ORNL) e
This spending item is part of a $599,807 allocation.
See details
|
Energy, Department of | 6/11/2009 |
EI REVIEW & COMPANY, INC. | $543,915 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $691,059 allocation.
See details
|
Energy, Department of | 3/09/2009 |
UT-BATTELLE, LLC | $537,743 |
Fundamental Research in Key Program Areas: This award provides funds for the following activities in the land use change modeling account. Develop a hierarchical taxonomy of underutilized lands using inventory data and high-temporal remotely sensed data
This spending item is part of a $710,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $533,611 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ADVANTAGE ELECTRONICS, INC. | $517,805 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
BROADWAY ELECTRIC SERVICE CORPORATION | $511,384 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $500,000 | Building Technologies Program: Construction Automation -- Analytics and Road-Mapping/Low Cost Wireless Sensor Networks for Efficient Building Energy Management. This award provides funding to provide a thorough review and benefit analysis of emerging co | Energy, Department of | 1/28/2010 |
BECHTEL JACOBS COMPANY LLC | $480,751 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $477,609 | Y-12 D&D Recovery Act Project - Alpha 5; Beta 2; Biology Complex; Old Salvage Yard | Energy, Department of | 6/23/2009 |
UT-BATTELLE, LLC | $475,000 | Program Direction - EM - Defense Environmental Management: This award provides the DOE Environmental Management organization with additional capability for oversight and integration functions with regards to DOE prime contractors who will be performing d | Energy, Department of | 8/10/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $473,631 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
DENUKE CONTRACTING SERVICES, INC. | $472,701 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $472,372 | K27 Demolition Ready Line Oversight - provide expertise required to plan, develop and implement/deploy tools and services for the ORO Environmental Management (EM) Safety program. These subtasks (1-6 above) will provide management and technical support t | Energy, Department of | 9/28/2009 |
FAIRFIELD SERVICE GROUP, INC. | $469,383 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
TECHNICA CORPORATION | $459,382 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
AVISCO, INC. | $457,530 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $450,000 | DOE ARRA Project Code 2005510 (TAS 89-0227) American Recovery and Reinvestment Act (ARRA) Software Development Support to DOE Oak Ridge Office Assistant Manager for Financial Management for planning and execution of ARRA projects. Assist in resolving is | Energy, Department of | 3/10/2010 |
UT-BATTELLE, LLC | $442,518 |
EE Appliance Rebate Programs: This award provides funds for technical assistance to States and Territories so that they can launch market-transforming appliance rebate programs for ENERGY STAR qualified products. Funds will be used to assist in customiz
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
NATIONAL RESOURCE MANAGEMENT, LLC | $432,886 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
Commodore Advanced Sciences, Inc. | $407,550 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
PROCESS ENGINEERING ASSOCIATES, LLC | $405,565 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
LEGACY/CRITIQUE | $401,001 | Provide technical, financial and administrative support to DOE Procurement and Contract Division. | Energy, Department of | 9/24/2009 |
UT-BATTELLE, LLC | $390,503 |
Environmental Security Technology Certification Program -- Wireless Platform for Energy-Efficient Building Control Retrofits: This award provides funding to develop a scalable, robust building control platform consisting of sensing, computation, and ac
This spending item is part of a $635,067 allocation.
See details
|
Energy, Department of | 9/29/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $383,586 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
ALLIANT CORPORATION | $380,443 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
ALLIANT CORPORATION | $378,750 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
BROADWAY ELECTRIC SERVICE CORPORATION | $371,320 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $369,000 |
Toxic and hazardous waste cleanup at Bethel Valley Burial Grounds (SWSA 1 and SWSA 3)
This spending item is part of a $14,912,999 allocation.
See details
|
Energy, Department of | 9/18/2009 |
LYNX SUPPLY, INC. | $365,639 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
NFT INCORPORATED | $364,584 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $360,000 | ORISE provided PeerNet, a proprietary web-based evaluation system, to ARPA-E and its reviewers to use to evaluate and score proposed research funded under this program. Additionally, ORISE provided travel assistance to the reviewers enabling them to atte | Energy, Department of | 9/04/2009 |
LYNX SUPPLY, INC. | $354,251 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
RESTORATION SERVICES, INC. | $351,510 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ALLIANT CORPORATION | $350,899 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $345,081 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $340,000 | DOE ARRA Project Code (2005510 and 2004040) TAS 89-0227 and TAS 890331) American Recovery and Reinvestment Act (ARRA) Software Development Support to DOE Oak Ridge Office Assistant Manager for Financial Management for planning and execution of ARRA proj | Energy, Department of | 9/30/2009 |
UT-BATTELLE, LLC | $338,277 |
Advanced Research Projects Agency-Energy (ARPA-E): ORNL has received funding for two subprojects from ARPA-E. The first award occurred in September 2009 for ARPA-E Reviews. This award provided funding of $20,000 for ORNL employees to review proposals i
This spending item is part of a $646,788 allocation.
See details
|
Energy, Department of | 9/29/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $334,080 | TRU Waste Recovery Act Project - provide expertise required to plan, develop and implement/deploy tools and services for the ORO Environmental Management (EM) Safety program. Provide management and technical support to the Oak Ridge Office (ORO) Assistan | Energy, Department of | 6/23/2009 |
ENERGYSOLUTIONS SERVICES, INC. | $330,368 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ENERGYSOLUTIONS, LLC | $328,205 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
VETCO, LLC | $323,279 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
RUBB, INC | $312,266 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $310,233 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
UT-BATTELLE, LLC | $305,000 |
Prevent blackouts and other large scale reliability issues by analyzing and assessing, and addressing emerging reliability challenges due to the integration of variable renewable resources and the changing load composition.
This spending item is part of a $1,500,000 allocation.
See details
|
Energy, Department of | 7/01/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $300,000 |
Advanced Research and Projects Agency Energy Financial Assistance Program ARPA-E Cooperative Agreement Agile Delivery of Electrical Power Technology (ADEPT)
This spending item is part of a $5,058,752 allocation.
See details
|
Energy, Department of | 9/13/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $299,551 |
Early Career Research Program: The following funding is provided for awards made under Program Announcement to DOE National Laboratories LAB 09-26, Office of Science Early Career Research Program: $2,355,000 in operating funds and $145,000 in equipment f
This spending item is part of a $10,004,884 allocation.
See details
|
Energy, Department of | 3/25/2010 |
MCS LLC | $298,112 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
BECHTEL JACOBS COMPANY LLC | $294,141 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
KNH TECHNICAL RESOURCES, LLC | $287,740 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $287,335 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $287,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
PERFORMANCE DEVELOPMENT CORPORATION | $286,196 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
ENERGYSOLUTIONS SERVICES, INC. | $280,000 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $279,567 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
LYNX SUPPLY, INC. | $278,162 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
MCS LLC | $270,532 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
BECHTEL JACOBS COMPANY LLC | $268,000 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
AECOM TECHNICAL SERVICES, INC. | $266,641 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
RESTORATION SERVICES, INC. | $262,118 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
VETCO, LLC | $261,361 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
NUCLEAR SAFETY ASSOCIATES, INC. | $260,663 |
Portsmouth Recovery Act Project
This spending item is part of a $8,000,000 allocation.
See details
|
Energy, Department of | 9/28/2010 |
STREET LEGAL INDUSTRIES, INC | $260,631 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
STRATEGIC ANALYSIS, INC. | $259,759 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
DENUKE CONTRACTING SERVICES, INC. | $258,517 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $258,400 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
PROFESSIONAL RECRUITING & STAFFING, INC | $258,295 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $257,390 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
The Performance Group Inc | $256,887 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $254,431 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $254,431 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $254,168 |
Support the Department of Energy in Idaho to prepare documentation for projects that deactivate and decomission excess facilities, remediate soils, support waste disposition, and other measures to protect the environment. Involces preparation of basic in
This spending item is part of a $275,000 allocation.
See details
|
Energy, Department of | 3/09/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $250,791 |
Nuclear Science Workforce: The following funding is provided for awards made under FOA 09-13, Applications of Nuclear Science and Technology: $1,181,000 in operating funds and $719,000 in equipment funds for FWP #22570 entitled 'Transfer Reactions on Un
This spending item is part of a $4,380,000 allocation.
See details
|
Energy, Department of | 9/02/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $250,684 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
LYNX SUPPLY, INC. | $250,461 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $250,340 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $250,240 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $249,081 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
DATADIRECT NETWORKS, INC. | $248,981 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $248,860 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
VIRTUAL ENTERPRISES, INC. | $248,560 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
American Magnetics, Inc. | $245,000 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
E2 CONSULTING ENGINEERS, INC | $244,363 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
PERFORMANCE DEVELOPMENT CORPORATION | $243,536 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $243,334 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $240,956 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
LANCASTER SERVICES, INCORPORATED | $239,085 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BECHTEL JACOBS COMPANY LLC | $238,298 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $230,965 |
Dover AFB -- Installation of Natural Gas Lines for Decentralization from Central Heat Plant (West of Atlantic Ave): This award provides funding for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of the non-i
This spending item is part of a $1,337,186 allocation.
See details
|
Energy, Department of | 6/17/2009 |
American Magnetics, Inc. | $230,650 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
LYNX SUPPLY, INC. | $229,600 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $228,767 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
ROGERS GROUP, INC. | $225,455 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
XCEL ENGINEERING, INC. | $224,297 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
STRATA G, LLC | $216,284 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $215,000 |
Renewable Energy Research and Development Create a national certification standard for all primary personnel involved in the installation of geothermal heat pump systems.
This spending item is part of a $1,077,500 allocation.
See details
|
Energy, Department of | 1/15/2010 |
TURNKEY TRANSPORTATION SERVICES, LLC | $214,247 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $210,567 |
R&D on Alternative Isotope Production Techniques: The following funding is provided for awards made under FOA 09-14: $750,000 in operating funds and $1,250,000 in equipment funds is provided for FWP ERST005 entitled 'Integration of Centrifuge and Electr
This spending item is part of a $4,117,000 allocation.
See details
|
Energy, Department of | 9/23/2009 |
SCIENTIFIC SALES, INC. | $210,495 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
LANCASTER SERVICES, INCORPORATED | $202,600 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
SHARP, WILLIAM B | $202,469 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
VETCO, LLC | $201,188 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $16,050,201 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $200,000 |
WAS Number: KA/CH14/9/ARRA-4 Long Baseline Neutrino Experiment (LBNE) - The Office of High Energy Physics prepared a Mission Need Statement, currently under internal DOE review, for a Long Baseline Neutrino Experiment, based on the strategic plan develop
This spending item is part of a $9,000,000 allocation.
See details
|
Office of Science | 8/06/2009 |
SCIENTIFIC SALES, INC. | $200,000 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
ALLIANT CORPORATION | $194,400 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
ADVANCED MEASUREMENT TECHNOLOGY, INC. | $193,553 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
INGENIUM PROFESSIONAL SERVICES, INC. | $193,013 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
GEL LABORATORIES, LLC | $190,534 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $189,974 |
Early Career Research Program: The following funding is provided for awards made under Program Announcement to DOE National Laboratories LAB 09-26, Office of Science Early Career Research Program: $2,355,000 in operating funds and $145,000 in equipment f
This spending item is part of a $10,004,884 allocation.
See details
|
Energy, Department of | 3/25/2010 |
ALLIANT CORPORATION | $189,396 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
DENUKE CONTRACTING SERVICES, INC. | $188,664 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
METAL SOLUTIONS DESIGN & FABRICATION, LLC | $187,750 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ADVANCED MEASUREMENT TECHNOLOGY, INC. | $184,054 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ADVANCED MEASUREMENT TECHNOLOGY, INC. | $183,669 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $182,964 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
M & W DRILLING, LLC | $181,948 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
MCNICHOLS COMPANY | $181,832 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $181,013 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
GEO SERVICES, LLC | $177,260 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $176,470 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
STRATA G, LLC | $175,353 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $175,304 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BECHTEL JACOBS COMPANY LLC | $175,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLIANT CORPORATION | $174,830 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
XCEL ENGINEERING, INC. | $174,738 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
STREET LEGAL INDUSTRIES, INC | $174,480 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ALLIANT CORPORATION | $173,959 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
UNIVERSITY OF TENNESSEE | $173,377 |
Advanced Research Projects Agency-Energy (ARPA-E): ORNL has received funding for two subprojects from ARPA-E. The first award occurred in September 2009 for ARPA-E Reviews. This award provided funding of $20,000 for ORNL employees to review proposals i
This spending item is part of a $646,788 allocation.
See details
|
Energy, Department of | 9/29/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $172,257 |
Fundamental Research in Key Program Areas: This award provides funds for the following activities in the land use change modeling account. Develop a hierarchical taxonomy of underutilized lands using inventory data and high-temporal remotely sensed data
This spending item is part of a $710,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
UT-BATTELLE, LLC | $172,174 | Risk of Erroneous Payments Metric Analysis: This award provides funds for ORNL support to the Department of Education to statistically assess the risk of improper payments in non-Federal Student Assistance grant programs. | Energy, Department of | 9/21/2010 |
PROFESSIONAL PROJECT SERVICES, INC. | $171,389 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $168,843 |
'Argonne National Laboratory--Accelerated Cleanup of Surplus Nuclear Facilities Project (PIN 2002000) The scope of this project consists of three subprojects: 1) Decontamination (as required) and demolition of two rad-contaminated facilities and offsite
This spending item is part of a $79,000,000 allocation.
See details
|
Energy, Department of | 5/27/2009 |
ASSOCIATED SCAFFOLDING COMPANY, INC. | $166,738 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $164,846 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
DENUKE CONTRACTING SERVICES, INC. | $163,560 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
UT-BATTELLE, LLC | $161,527 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
UT-BATTELLE, LLC | $159,887 |
Dover AFB -- Decentralization of Facilities from Central Heat Plant, Phase 2 East of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the H
This spending item is part of a $332,309 allocation.
See details
|
Energy, Department of | 6/17/2009 |
KELLY SERVICES, INC. | $156,027 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $156,015 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
W. JOE SHAW LTD | $155,999 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
NAVARRO-GEM JOINT VENTURE | $155,802 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
FAIRFIELD SERVICE GROUP, INC. | $155,367 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $154,089 |
Dover AFB -- Building 800 (VQ) Decentralization from Central Heat Plant: This award provides funding for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of the High Temperature Hot Water Energy Facility for B
This spending item is part of a $469,956 allocation.
See details
|
Energy, Department of | 6/17/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $152,561 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
URS | $152,000 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
UT-BATTELLE, LLC | $151,796 |
Building Technologies Program: Solid State Lighting. This award provides funding for solid-state lighting outreach to large retail partners for an 18-month program. The key components of the outreach include cooperative marketing support, expansion of
This spending item is part of a $1,200,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $150,415 | Brookhaven safety basis support | Energy, Department of | 9/28/2009 |
UT-BATTELLE, LLC | $150,000 | Development of Low-Cost Bio-Based Phase Change Material: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory in response to Funding Opportunity Announcement ARRA DE-FOA-0000115. Oak Ridge National Laboratory | Energy, Department of | 9/22/2010 |
DST DATA PRODUCTS LLC | $149,800 | Deliver and install a Pillar Storage Area Network ( SAN) as described in purchase order, | Energy, Department of | 2/18/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $148,023 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $147,144 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $691,059 allocation.
See details
|
Energy, Department of | 3/09/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $144,228 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
G & S CONSTRUCTION CO INC | $141,392 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLIANT CORPORATION | $138,324 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
Commodore Advanced Sciences, Inc. | $137,542 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $134,774 |
Advanced Research Projects Agency-Energy (ARPA-E): ORNL has received funding for two subprojects from ARPA-E. The first award occurred in September 2009 for ARPA-E Reviews. This award provided funding of $20,000 for ORNL employees to review proposals i
This spending item is part of a $646,788 allocation.
See details
|
Energy, Department of | 9/29/2009 |
KNH TECHNICAL RESOURCES, LLC | $133,330 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $133,120 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $132,631 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
TC PROGRAM SOLUTIONS, LLC | $130,771 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MATERIALS & ENERGY CORP | $130,000 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
STREET LEGAL INDUSTRIES, INC | $128,868 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $127,758 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
SCIENTIFIC SALES, INC. | $126,600 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $126,538 |
Knowledgebase R&D: This award provides funds to support the research and development of an implementation strategy for the Systems Biology Knowledgebase. The funding will allow for the Systems Biology Knowledgebase to obtain the necessary capital equipm
This spending item is part of a $3,188,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
ENVIRONMENTAL GEOLOGY GROUP, INC. | $125,268 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
REDE | $125,000 | Support the Office of Environmental Management at Oak Ridge National Laboratory, Building 3025M. | Energy, Department of | 9/09/2010 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $124,411 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
STREET LEGAL INDUSTRIES, INC | $121,195 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $120,359 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Commodore Advanced Sciences, Inc. | $120,054 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
ALLIANT CORPORATION | $119,600 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $118,907 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
ROGERS GROUP, INC. | $118,838 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $115,015 |
Basic Energy Sciences--Energy Frontier Research Centers: This award funds FWP #ERKCM74 entitled 'Materials Sciences of Actinides (Lead Institute -- University of Notre Dame). UT-Battelle will perform the contractor's portion of the research proposed for
This spending item is part of a $1,100,000 allocation.
See details
|
Energy, Department of | 6/23/2010 |
LYNX SUPPLY, INC. | $114,800 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $114,442 |
Nuclear Science Workforce: The following funding is provided for awards made under FOA 09-13, Applications of Nuclear Science and Technology: $1,181,000 in operating funds and $719,000 in equipment funds for FWP #22570 entitled 'Transfer Reactions on Un
This spending item is part of a $4,380,000 allocation.
See details
|
Energy, Department of | 9/02/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $113,441 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $113,400 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
BECHTEL JACOBS COMPANY LLC | $113,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLIANT CORPORATION | $112,323 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
ALLIANT CORPORATION | $111,772 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $111,544 |
Early Career Research Program: The following funding is provided for awards made under Program Announcement to DOE National Laboratories LAB 09-26, Office of Science Early Career Research Program: $2,355,000 in operating funds and $145,000 in equipment f
This spending item is part of a $10,004,884 allocation.
See details
|
Energy, Department of | 3/25/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $111,401 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
AREVA FEDERAL SERVICES LLC | $110,004 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
CLAUSS CONSTRUCTION | $109,900 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $108,948 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
CROMTECH INC | $108,389 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
ELECTROCHEMICAL SYSTEMS INC | $107,132 |
EGS Technology R&D: Geothermal Technologies Program Enhanced Geo: This award provides funding to four subprojects in support of Enhanced Geothermal Systems technology: 1) Feasibility and Design Studies for a High Temperature Downhole Tool--ORNL will per
This spending item is part of a $4,110,870 allocation.
See details
|
Energy, Department of | 9/30/2009 |
IMPACT SERVICES, INC. | $107,064 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
STREET LEGAL INDUSTRIES, INC | $105,481 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SPECTRA TECH, INC. | $104,898 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $10,978,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
LYNX SUPPLY, INC. | $104,640 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
PERMA-FIX ENVIRONMENTAL SERVICES, INC. | $104,373 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
UT-BATTELLE, LLC | $104,105 |
Dover AFB -- Decentralize Facilities from Central Heat Plant, Phase 2 West of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the High Tem
This spending item is part of a $294,666 allocation.
See details
|
Energy, Department of | 6/17/2009 |
URS | $104,000 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
MPI BUSINESS SOLUTIONS, INC | $100,900 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
UT-BATTELLE, LLC | $100,055 |
EERE Recovery Act Bridge Program Direction (Management and Oversight): This award provides funds for technical assistance to the EERE Recovery Act Energy Star Appliance Rebate Program and Energy Star Program and support for the continued development and
This spending item is part of a $1,000,000 allocation.
See details
|
Energy, Department of | 12/29/2010 |
OAK RIDGE, CITY OF (INC) | $100,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) This project is to assist states, U.S. territories, Indian tribes, counties, and cities to develop, promote, implement, and manage localized energy efficiency programs through individual program grants. The project will fund programs thatat: 1) reduce fossi... Show more
This spending item is part of a $13,818,200 allocation.
See details
|
Golden Field Office | 9/23/2009 |
NORRIS, CITY OF | $100,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) This project is to assist states, U.S. territories, Indian tribes, counties, and cities to develop, promote, implement, and manage localized energy efficiency programs through individual program grants. The project will fund programs thatat: 1) reduce fossi... Show more
This spending item is part of a $13,818,200 allocation.
See details
|
Golden Field Office | 9/23/2009 |
ANDERSON, COUNTY OF | $100,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) This project is to assist states, U.S. territories, Indian tribes, counties, and cities to develop, promote, implement, and manage localized energy efficiency programs through individual program grants. The project will fund programs thatat: 1) reduce fossi... Show more
This spending item is part of a $13,818,200 allocation.
See details
|
Golden Field Office | 9/23/2009 |
UT-BATTELLE, LLC | $99,902 | Decision Tools for Asset Management and Infrastructure Resilience: This award provides funds for ORNL support of Corps Model Review, Testing, and Production once the model is installed and executing on a Corps machine. During this phase, ORNL support wi | Energy, Department of | 3/23/2010 |
ALLIANT CORPORATION | $99,793 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
SCIENTIFIC SALES, INC. | $99,374 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $98,183 | Oak Ridge Defense D&D Recovery Act Project: This award provides the DOE Environmental Management organization with additional capability for oversight and integration functions with regards to DOE prime contractors who will be performing demolition, lega | Energy, Department of | 8/24/2010 |
ALLIANT CORPORATION | $97,953 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
RESTORATION SERVICES, INC. | $97,690 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
DENUKE CONTRACTING SERVICES, INC. | $97,153 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
STREET LEGAL INDUSTRIES, INC | $95,032 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
CLINTON INC, CITY OF | $95,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) This project is to assist states, U.S. territories, Indian tribes, counties, and cities to develop, promote, implement, and manage localized energy efficiency programs through individual program grants. The project will fund programs thatat: 1) reduce fossi... Show more
This spending item is part of a $13,818,200 allocation.
See details
|
Golden Field Office | 9/23/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $94,780 |
Portsmouth Recovery Act Project
This spending item is part of a $8,000,000 allocation.
See details
|
Energy, Department of | 9/28/2010 |
SOLUTIENT TECHNOLOGIES, LLC | $94,723 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
COMMODORE ADVANCED SCIENCES, INC. | $94,376 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ADVANCED MEASUREMENT TECHNOLOGY, INC. | $93,884 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
STREET LEGAL INDUSTRIES, INC | $93,825 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
RESTORATION SERVICES, INC. | $93,749 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $93,325 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
BABCOCK & WILCOX TECHNICAL SERVICES GROUP, INC. | $92,470 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SAFETY AND ECOLOGY CORPORATION | $92,367 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $91,827 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $91,317 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
AEROTEK, INC. | $90,000 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
UT-BATTELLE, LLC | $89,731 | Air Force Research Laboratory -- Generation of Mechanical Properties Database of NT154 Silicon Nitride: This award provides funds for ORNL to conduct the required dynamic fatigue testing in tension that is required for risk reduction prior to testing a c | Energy, Department of | 9/22/2009 |
INNOVATIVE DESIGN, INC. | $89,457 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
MANAGEMENT SOLUTIONS, L.L.C. | $88,931 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $88,829 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $87,193 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
ENERGYSOLUTIONS, LLC | $86,915 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $86,638 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $83,521 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $82,881 | Decision Tools for Asset Management and Infrastructure Resilience: This award provides funds to implement a stand-alone computing platform for Corps Machine and support of Corps Model Review. | Energy, Department of | 8/26/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $82,832 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
UNIVERSITY OF TENNESSEE | $82,534 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
UNIVERSITY OF TENNESSEE | $82,209 |
Basic Energy Sciences--Energy Frontier Research Centers: This award funds FWP #ERKCM74 entitled 'Materials Sciences of Actinides (Lead Institute -- University of Notre Dame). UT-Battelle will perform the contractor's portion of the research proposed for
This spending item is part of a $1,100,000 allocation.
See details
|
Energy, Department of | 6/23/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $82,102 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
RESTORATION SERVICES, INC. | $81,992 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BECHTEL JACOBS COMPANY LLC | $81,698 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
INGENIUM PROFESSIONAL SERVICES, INC. | $81,627 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
Commodore Advanced Sciences, Inc. | $80,772 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $80,582 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
LYNX SUPPLY, INC. | $80,300 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ADVANCED MEASUREMENT TECHNOLOGY, INC. | $78,987 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
KELLY SERVICES, INC. | $78,367 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $77,571 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
POTTS SOFTWARE LLC | $76,800 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $76,722 |
EGS Technology R&D: Geothermal Technologies Program Enhanced Geo: This award provides funding to four subprojects in support of Enhanced Geothermal Systems technology: 1) Feasibility and Design Studies for a High Temperature Downhole Tool--ORNL will per
This spending item is part of a $4,110,870 allocation.
See details
|
Energy, Department of | 9/30/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $76,008 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Pajarito Scientific Corporation, Inc | $75,620 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
American Magnetics, Inc. | $75,500 |
Nuclear Physics--Enhanced AIP funding at NP user facilities (Project code 2005220) Work Authorization Number KB/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds in support of AIP pro
This spending item is part of a $9,860,000 allocation.
See details
|
Office of Science | 6/22/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $75,194 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $74,855 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
TC PROGRAM SOLUTIONS, LLC | $74,542 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
C. J. HEALTH RECORD CONSULTANT SERVICES, INC. | $73,946 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Professional Based Consulting Services Inc | $73,845 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $72,809 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
PERFORMANCE DEVELOPMENT CORPORATION | $72,383 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
SPECTRA TECH, INC. | $72,235 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STREET LEGAL INDUSTRIES, INC | $72,000 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
MCS LLC | $71,733 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
STREET LEGAL INDUSTRIES, INC | $71,679 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ALLIANT CORPORATION | $71,467 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $71,404 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
SEC RADCON ALLIANCE, LLC | $71,267 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
M & W DRILLING, LLC | $71,035 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
PUMPING SYSTEMS, INC. | $70,619 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
METAL SOLUTIONS DESIGN & FABRICATION, LLC | $70,392 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $70,349 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
ALLIANT CORPORATION | $69,607 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $69,570 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
UT-BATTELLE, LLC | $69,000 |
Fusion Energy Sciences--Infrastructure Improvements for General Plasma Science User Facilities: This award provides equipment funds for improvements in infrastructure including hardware, upgraded diagnostics, new probes, improved data acquisition and ana
This spending item is part of a $250,000 allocation.
See details
|
Energy, Department of | 3/25/2010 |
BECHTEL JACOBS COMPANY LLC | $68,396 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STREET LEGAL INDUSTRIES, INC | $68,305 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
CDM FEDERAL PROGRAMS CORPORATION | $67,874 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Commodore Advanced Sciences, Inc. | $67,810 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $67,575 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
M & W DRILLING, LLC | $67,558 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
Commodore Advanced Sciences, Inc. | $67,380 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
C. J. HEALTH RECORD CONSULTANT SERVICES, INC. | $66,624 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ENERGX, LLC | $66,010 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
XCEL ENGINEERING, INC. | $65,874 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
LYNX SUPPLY, INC. | $65,201 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $65,070 |
'Argonne National Laboratory--Accelerated Cleanup of Surplus Nuclear Facilities Project (PIN 2002000) The scope of this project consists of three subprojects: 1) Decontamination (as required) and demolition of two rad-contaminated facilities and offsite
This spending item is part of a $79,000,000 allocation.
See details
|
Energy, Department of | 5/27/2009 |
STREET LEGAL INDUSTRIES, INC | $64,836 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
XCEL ENGINEERING, INC. | $64,206 |
EGS Technology R&D: Geothermal Technologies Program Enhanced Geo: This award provides funding to four subprojects in support of Enhanced Geothermal Systems technology: 1) Feasibility and Design Studies for a High Temperature Downhole Tool--ORNL will per
This spending item is part of a $4,110,870 allocation.
See details
|
Energy, Department of | 9/30/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $64,134 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $64,085 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Geoquill Service Inc | $63,779 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
GEORGIA TECH RESEARCH CORPORATION | $63,484 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
D & R FABRICATION INC | $63,085 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Energx Tn, LLC | $62,267 |
Project Value: 2002070: Recovery Act Project Description of Work: RA-09-001 1. Installation of two groundwater characterization/monitoring wells (one well in FY 2009 and one in FY2011) in Pahute Mesa for the Underground Test Area (UGTA) project. The 2009
This spending item is part of a $33,850,358 allocation.
See details
|
Office of Nuclear Security/National Nuclear Security Administration | 6/04/2009 |
LYNX SUPPLY, INC. | $62,018 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ROGERS GROUP, INC. | $61,927 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. Sev
This spending item is part of a $23,045,990 allocation.
See details
|
Energy, Department of | 8/04/2010 |
PROFESSIONAL PROJECT SERVICES, INC. | $60,711 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $60,584 |
Knowledgebase R&D: This award provides funds to support the research and development of an implementation strategy for the Systems Biology Knowledgebase. The funding will allow for the Systems Biology Knowledgebase to obtain the necessary capital equipm
This spending item is part of a $3,188,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
BARTLETT SERVICES INC | $60,454 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $60,000 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SCOTT LABORATORY SOLUTIONS, LLC | $59,579 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
TAYLOR MACHINE WORKS, INC. | $59,500 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $59,225 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $17,745,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SAFETY AND ECOLOGY CORPORATION | $59,135 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Industrial Products & Services Group, Inc. | $59,028 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
PACTEC, INC | $59,000 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SCIENTIFIC SALES, INC. | $58,714 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $58,458 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
APEX OFFICE DESIGN, INC. | $58,404 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $58,317 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
ENERGYSOLUTIONS SERVICES, INC. | $57,928 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
TETRATEK, INC. | $57,476 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
TC PROGRAM SOLUTIONS, LLC | $57,371 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SAIC, INC. | $57,259 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
STREET LEGAL INDUSTRIES, INC | $57,250 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ALLIANT CORPORATION | $56,285 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
LYNX SUPPLY, INC. | $56,072 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STREET LEGAL INDUSTRIES, INC | $55,535 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
TC PROGRAM SOLUTIONS, LLC | $55,313 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
PLASTIC FUSION FABRICATORS, INC. | $54,252 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $54,235 |
Fundamental Neutron Physics Beamline MIE at SNS full funding (ORNL): This award provides accelerated funding for major items of equipment (MIE) and will enable prompt acquisition of the utilities and HVAC systems at Oak Ridge National Laboratory (ORNL) e
This spending item is part of a $599,807 allocation.
See details
|
Energy, Department of | 6/11/2009 |
PERFORMANCE DEVELOPMENT CORPORATION | $53,833 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
ROGERS GROUP, INC. | $53,535 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
RUTGERS, THE STATE UNIVERSITY OF NEW JERSEY | $53,000 |
Nuclear Science Workforce: The following funding is provided for awards made under FOA 09-13, Applications of Nuclear Science and Technology: $1,181,000 in operating funds and $719,000 in equipment funds for FWP #22570 entitled 'Transfer Reactions on Un
This spending item is part of a $4,380,000 allocation.
See details
|
Energy, Department of | 9/02/2009 |
APEX OFFICE DESIGN, INC. | $52,784 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $52,555 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
LEGACY/CRITIQUE | $52,031 | Provide administrative support. | Energy, Department of | 9/30/2011 |
PERFORMANCE DEVELOPMENT CORPORATION | $51,374 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
SEC RADCON ALLIANCE, LLC | $51,141 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SAFETY AND ECOLOGY CORPORATION | $51,116 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
C. J. HEALTH RECORD CONSULTANT SERVICES, INC. | $50,905 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
TOPP CONSTRUCTION SERVICES, INC. | $50,858 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UT-BATTELLE, LLC | $50,000 | Wind Energy Technology R&D and Testing: This award provides funding for ORNL Polymer Matrix Composites staff to play an advisory role in support of GE's proposal to develop a more effective composite prepreg tape laying head for manufacturing spar caps o | Energy, Department of | 2/23/2010 |
STREET LEGAL INDUSTRIES, INC | $50,000 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
RESTORATION SERVICES, INC. | $50,000 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
METAL SOLUTIONS DESIGN & FABRICATION, LLC | $49,952 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ALLIED INDUSTRIAL EQUIPMENT, INC. | $49,940 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
GEL LABORATORIES, LLC | $49,704 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ALLIANT CORPORATION | $49,595 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
SCIENTIFIC SALES, INC. | $49,520 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $48,784 |
Geothermal Technologies Program Non-Enhanced Geo: This award provides funding for ORNL support of the Ground Source Heat Pump (GSHP) ARRA Projects. This support includes the collection, monitoring and analysis of data. ORNL will deliver for internet po
This spending item is part of a $400,000 allocation.
See details
|
Energy, Department of | 9/24/2010 |
SCIENTIFIC SALES, INC. | $48,758 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $48,715 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ADVANCED MEASUREMENT TECHNOLOGY, INC. | $48,650 |
High Energy Battery Test Facility - Agreement #20839 ($1,200,000) These funds will be used for construction of the High Energy Battery Facility at Sandia National Laboratories. Agreement #20868 ($2,000,000) These funds will be used for capital equipment p
This spending item is part of a $4,200,000 allocation.
See details
|
Energy, Department of | 2/25/2010 |
Lynx Supply, Inc. | $48,592 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $10,978,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Commodore Advanced Sciences, Inc. | $48,420 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
LYNX SUPPLY, INC. | $48,242 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SCIENTIFIC SALES, INC. | $48,232 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BECHTEL JACOBS COMPANY LLC | $48,204 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
URS | $48,000 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
VETCO, LLC | $47,972 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Commodore Advanced Sciences, Inc. | $47,951 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $47,148 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
ROGERS GROUP, INC. | $46,536 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. Sev
This spending item is part of a $23,045,990 allocation.
See details
|
Energy, Department of | 8/04/2010 |
KELLY SERVICES, INC. | $46,393 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
TFE, INC | $46,387 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $45,833 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ALLIANT CORPORATION | $45,146 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
WILDFLOWER INTERNATIONAL, LTD. | $45,126 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
ALLIANT CORPORATION | $44,986 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $44,895 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Barge, Waggoner, Sumner and Cannon, Inc. | $44,874 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ALLIED INDUSTRIAL EQUIPMENT, INC. | $44,871 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
JACOBS ENGINEERING GROUP INC. | $44,771 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
SOLUTIENT TECHNOLOGIES, LLC | $44,272 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
TFE, INC | $43,571 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SCIENTIFIC SALES, INC. | $43,523 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
VACUUM TECHNOLOGY DISTRIBUTION, INC | $43,378 |
R&D on Alternative Isotope Production Techniques: The following funding is provided for awards made under FOA 09-14: $750,000 in operating funds and $1,250,000 in equipment funds is provided for FWP ERST005 entitled 'Integration of Centrifuge and Electr
This spending item is part of a $4,117,000 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $43,372 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SEC RADCON ALLIANCE, LLC | $43,300 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ATOMIC CITY TOOL, INC. | $43,154 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
MODULAR SPACE CORPORATION | $43,050 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $42,977 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $42,772 |
Basic Energy Sciences--Energy Frontier Research Centers: This award funds FWP #ERKCM74 entitled 'Materials Sciences of Actinides (Lead Institute -- University of Notre Dame). UT-Battelle will perform the contractor's portion of the research proposed for
This spending item is part of a $1,100,000 allocation.
See details
|
Energy, Department of | 6/23/2010 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $42,512 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
STORAGE SOLUTIONS, INC | $42,450 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $42,285 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
PROFESSIONAL PROJECT SERVICES, INC. | $42,271 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
TC PROGRAM SOLUTIONS, LLC | $41,869 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INSTACOTE INC | $41,548 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BUILDING SYSTEMS TECHNOLOGY, INC. | $40,730 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ALLIANT CORPORATION | $40,530 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
Geoquill Service Inc | $40,385 |
Bioenergy Research Center Capital Equipment: This award supports research infrastructure for the DOE BESC Bioenergy Research Center. The capital in this task will: 1) allow the current high throughput recalcitrance characterization pipeline to be double
This spending item is part of a $5,362,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $40,072 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
United Rentals, Inc. | $40,055 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
BECHTEL JACOBS COMPANY LLC | $40,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
INSTACOTE INC | $39,809 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
DIRECT SCIENTIFIC | $39,752 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $39,380 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
VIKING EQUIPMENT COMPANY OF KNOXVILLE | $39,160 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
LOUDON COUNTY FENCE, LLC | $38,871 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
XCEL ENGINEERING, INC. | $38,686 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BECHTEL JACOBS COMPANY LLC | $38,524 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $38,327 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. Sev
This spending item is part of a $23,045,990 allocation.
See details
|
Energy, Department of | 8/04/2010 |
STREET LEGAL INDUSTRIES, INC | $38,318 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Energx Tn, LLC | $38,118 |
Project Value: 2002070: Recovery Act Project Description of Work: RA-09-001 1. Installation of two groundwater characterization/monitoring wells (one well in FY 2009 and one in FY2011) in Pahute Mesa for the Underground Test Area (UGTA) project. The 2009
This spending item is part of a $33,850,358 allocation.
See details
|
Office of Nuclear Security/National Nuclear Security Administration | 6/04/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $38,098 |
Basic Energy Sciences--Energy Frontier Research Centers: This award funds FWP #ERKCM74 entitled 'Materials Sciences of Actinides (Lead Institute -- University of Notre Dame). UT-Battelle will perform the contractor's portion of the research proposed for
This spending item is part of a $1,100,000 allocation.
See details
|
Energy, Department of | 6/23/2010 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $38,000 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Commodore Advanced Sciences, Inc. | $37,872 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
DOWNTOWN HARDWARE CO., INC. | $37,800 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ROGERS GROUP, INC. | $37,689 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $37,590 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $37,583 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $37,505 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
IMPACT SERVICES, INC. | $37,299 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLIANT CORPORATION | $37,199 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
Commodore Advanced Sciences, Inc. | $37,098 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
ALLIANT CORPORATION | $37,007 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $36,420 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MATERIALS & ENERGY CORP | $36,390 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
VETCO, LLC | $36,387 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
TC PROGRAM SOLUTIONS, LLC | $36,298 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ROGERS GROUP, INC. | $36,225 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $36,168 |
EE Conservation Block Grant Program: This award provides funding of $16,718,346 for 5 Agreements from the Office of Energy Efficiency and Renewable Energy (EERE). Agreement 19112 entitled 'Energy Services Coalition Technical Assistance for SEP and EECBG
This spending item is part of a $16,718,346 allocation.
See details
|
Energy, Department of | 8/24/2009 |
XCEL ENGINEERING, INC. | $35,141 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $35,126 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
NAVARRO-GEM JOINT VENTURE | $35,030 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
JACOBS ENGINEERING GROUP INC. | $34,944 |
'Argonne National Laboratory--Accelerated Cleanup of Surplus Nuclear Facilities Project (PIN 2002000) The scope of this project consists of three subprojects: 1) Decontamination (as required) and demolition of two rad-contaminated facilities and offsite
This spending item is part of a $79,000,000 allocation.
See details
|
Energy, Department of | 5/27/2009 |
STREET LEGAL INDUSTRIES, INC | $34,667 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $34,419 |
Knowledgebase R&D: This award provides funds to support the research and development of an implementation strategy for the Systems Biology Knowledgebase. The funding will allow for the Systems Biology Knowledgebase to obtain the necessary capital equipm
This spending item is part of a $3,188,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
ALLIANT CORPORATION | $34,380 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ICF INCORPORATED, L.L.C. | $34,315 |
EE Conservation Block Grant Program: This award provides funding of $16,718,346 for 5 Agreements from the Office of Energy Efficiency and Renewable Energy (EERE). Agreement 19112 entitled 'Energy Services Coalition Technical Assistance for SEP and EECBG
This spending item is part of a $16,718,346 allocation.
See details
|
Energy, Department of | 8/24/2009 |
COMMODORE ADVANCED SCIENCES, INC. | $34,282 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
XCEL ENGINEERING, INC. | $34,273 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
Neff Rental, Inc | $34,240 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $34,062 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
SCIENTIFIC SALES, INC. | $33,985 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SCIENTIFIC SALES, INC. | $33,985 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $33,888 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
ALLIANT CORPORATION | $33,552 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
ROGERS GROUP, INC. | $32,979 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SCIENTIFIC SALES, INC. | $32,951 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ADVANCED MEASUREMENT TECHNOLOGY, INC. | $32,835 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Hopper & Associates | $32,780 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
PERFORMANCE DESIGN TECHNOLOGIES, INC. | $32,303 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $32,213 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
STREET LEGAL INDUSTRIES, INC | $32,209 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $32,200 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
Allstate Trailers, Inc | $31,890 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
MEASUREMENT SYSTEMS INTERNATIONAL, INC. | $31,320 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
Commodore Advanced Sciences, Inc. | $31,145 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $31,068 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
ADAMS CRAFT HERZ WALKER, INC. | $31,035 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $4,821,565 allocation.
See details
|
Energy, Department of | 3/09/2009 |
ALLIANT CORPORATION | $30,886 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
OAK RIDGE AUTOMOTIVE AND INDUSTRIAL SUPPLY, INC. | $30,871 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SUNTECH ENGINEERED MATERIALS INC | $30,660 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
Industrial Products & Services Group, Inc. | $30,643 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $30,512 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Industrial Products & Services Group, Inc. | $30,454 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $30,168 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
CROMTECH INC | $30,074 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $30,060 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
INSTACOTE INC | $29,861 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $29,832 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $29,768 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
BECHTEL JACOBS COMPANY LLC | $29,737 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $29,669 |
Early Career Research Program: The following funding is provided for awards made under Program Announcement to DOE National Laboratories LAB 09-26, Office of Science Early Career Research Program: $2,355,000 in operating funds and $145,000 in equipment f
This spending item is part of a $10,004,884 allocation.
See details
|
Energy, Department of | 3/25/2010 |
MANAGEMENT SOLUTIONS, L.L.C. | $29,069 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
MESA ASSOCIATES, INC. | $29,000 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $28,689 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
XCEL ENGINEERING, INC. | $28,288 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $28,051 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
METAL SOLUTIONS DESIGN & FABRICATION, LLC | $27,991 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
C. J. HEALTH RECORD CONSULTANT SERVICES, INC. | $27,855 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $27,696 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
ASSOCIATED SCAFFOLDING COMPANY, INC. | $27,659 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
APOLLO CORPORATION | $27,531 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
MEASUREMENT SYSTEMS INTERNATIONAL, INC. | $27,520 |
Funds allocated by Savannah River Site Field Office to Department of Energy Carlsbad Field Office for the manufacturing of TRUPACT-III drums for Recovery Act in accordance with the approved statement of work accepted by A. Welton, Contracting Officer, Car
This spending item is part of a $12,000,000 allocation.
See details
|
Energy, Department of | 8/03/2010 |
Allstate Trailers, Inc | $27,415 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
CDM FEDERAL PROGRAMS CORPORATION | $27,322 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
UNIVERSITY OF TENNESSEE | $27,164 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
ADVANTAGE ELECTRONICS, INC. | $27,123 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $27,080 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
NORTH CAROLINA STATE UNIVERSITY | $26,805 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $26,664 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
XCEL ENGINEERING, INC. | $26,379 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
Pajarito Scientific Corporation, Inc | $26,303 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
TFE, INC | $26,281 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $26,196 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
ADAMS CRAFT HERZ WALKER, INC. | $26,057 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLIANT CORPORATION | $25,912 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
ALLIANT CORPORATION | $25,852 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
BULL RUN METAL FABRICATORS AND ENGINEERS, INC. | $25,840 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
TC PROGRAM SOLUTIONS, LLC | $25,837 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SEC RADCON ALLIANCE, LLC | $25,825 |
Building K-27 Predemoiltion The project will complete work in progress in preparation for pre-demolition and demolition activities. The work includes vault cleanout of excess material, construction power upgrades, complete lube oil and coolant draining,
This spending item is part of a $26,054,641 allocation.
See details
|
Energy, Department of | 5/05/2009 |
DIRECT SCIENTIFIC | $25,808 |
Melton Valley Monitoring Wells: This project involves the installation of groundwater monitoring wells to detect any potential off-site migration of contaminants from waste storage and disposal areas located in Melton Valley. The monitoring results from
This spending item is part of a $45,402,672 allocation.
See details
|
Energy, Department of | 5/05/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $25,765 |
Enhanced Utilization of Isotope Facilities: This award provides funds as follows: $1,900,000 in equipment funding and $1,000,000 in operating funds for the Remote Target Fabrication Refurbishment and the PaR Remote Handling System Replacement. These fun
This spending item is part of a $4,847,000 allocation.
See details
|
Energy, Department of | 7/28/2009 |
American Magnetics, Inc. | $25,500 |
Nuclear Physics--Enhanced AIP funding at NP user facilities (Project code 2005220) Work Authorization Number KB/CH12/9/ARRA-1 This modification is issued to obligate American Recovery and Reinvestment Act (Recovery Act) of 2009 funds in support of AIP pro
This spending item is part of a $9,860,000 allocation.
See details
|
Office of Science | 6/22/2009 |
OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $25,416 |
Nuclear Science Workforce: The following funding is provided for awards made under FOA 09-13, Applications of Nuclear Science and Technology: $1,181,000 in operating funds and $719,000 in equipment funds for FWP #22570 entitled 'Transfer Reactions on Un
This spending item is part of a $4,380,000 allocation.
See details
|
Energy, Department of | 9/02/2009 |
SCIENTIFIC SALES, INC. | $25,369 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ROGERS GROUP, INC. | $25,146 |
Oak Ridge Reservation Landfill Expansion This project provides for accelerated expansion and upgrades at the Oak Ridge Reservation (ORR) Landfill. The expansion is needed to safely meet increased disposal rates resulting from economic stimulus-funded proj
This spending item is part of a $26,578,390 allocation.
See details
|
Energy, Department of | 5/05/2009 |
SOLUTIENT TECHNOLOGIES, LLC | $25,020 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
LANCASTER SERVICES, INCORPORATED | $23,769 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
ALLIANT CORPORATION | $22,898 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
Geoquill Service Inc | $22,399 |
EE Conservation Block Grant Program: This award provides funding of $16,718,346 for 5 Agreements from the Office of Energy Efficiency and Renewable Energy (EERE). Agreement 19112 entitled 'Energy Services Coalition Technical Assistance for SEP and EECBG
This spending item is part of a $16,718,346 allocation.
See details
|
Energy, Department of | 8/24/2009 |
Commodore Advanced Sciences, Inc. | $22,024 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
DENUKE CONTRACTING SERVICES, INC. | $20,964 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
BECHTEL JACOBS COMPANY LLC | $20,007 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
SUN MANAGEMENT, INC. | $19,150 | PURCHASE ORDER | Energy, Department of | 1/19/2010 |
EI REVIEW & COMPANY, INC. | $18,630 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $3,485,998 allocation.
See details
|
Energy, Department of | 3/09/2009 |
LANCASTER SERVICES, INCORPORATED | $17,514 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $16,396 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
EI REVIEW & COMPANY, INC. | $15,525 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $4,821,565 allocation.
See details
|
Energy, Department of | 3/09/2009 |
ALLIANT CORPORATION | $14,186 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
UT-BATTELLE, LLC | $14,151 | Decision Tools for Asset Management and Infrastructure Resilience: This award provides funds for a stand-alone computing platform design for Ohio River Navigation Investment Model (ORNIM). | Energy, Department of | 8/06/2009 |
Thramb, LLC | $13,929 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
CDM FEDERAL SERVICES INC. | $12,997 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
CDM FEDERAL SERVICES INC. | $12,277 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
Thramb, LLC | $12,236 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ALLIANT CORPORATION | $10,403 |
ORAU will support DOE ORO and will provide independent reviews of the Y-12 team developing waste handling plans, associated sampling and analysis plans, and waste profiles. ORISE will also perform technical reviews of the site contractor's implementation
This spending item is part of a $1,643,238 allocation.
See details
|
Energy, Department of | 7/17/2009 |
Geoquill Service Inc | $10,037 |
Smart Grid Investment Grant Program (EISA 1306): This award provides funds of $5,470,000 for the following activities in support of the Office of Electricity Delivery and Energy Reliability (OE). Funding in the amount of $1,370,000 is provided for ORNL
This spending item is part of a $5,470,000 allocation.
See details
|
Energy, Department of | 9/10/2009 |
XCEL ENGINEERING, INC. | $9,721 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $8,467 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
ALLIANT CORPORATION | $7,140 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
MPI BUSINESS SOLUTIONS, INC | $7,025 |
Dover AFB -- Building 800 (VQ) Decentralization from Central Heat Plant: This award provides funding for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of the High Temperature Hot Water Energy Facility for B
This spending item is part of a $469,956 allocation.
See details
|
Energy, Department of | 6/17/2009 |
MPI BUSINESS SOLUTIONS, INC | $6,685 |
Dover AFB -- Decentralization of Facilities from Central Heat Plant, Phase 1 West of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the H
This spending item is part of a $4,529,185 allocation.
See details
|
Energy, Department of | 6/17/2009 |
MPI BUSINESS SOLUTIONS, INC | $6,295 |
Dover AFB -- Decentralization of Facilities from Central Heat Plant, Phase 2 East of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the H
This spending item is part of a $332,309 allocation.
See details
|
Energy, Department of | 6/17/2009 |
MPI BUSINESS SOLUTIONS, INC | $6,101 |
Dover AFB -- Installation of Natural Gas Lines for Decentralization from Central Heat Plant (East of Atlantic Ave): This award provides funding for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of the non-i
This spending item is part of a $280,841 allocation.
See details
|
Energy, Department of | 6/17/2009 |
MPI BUSINESS SOLUTIONS, INC | $6,101 |
Dover AFB -- Decentralization of Facilities from Central Heat Plant, Phase 1 East of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the H
This spending item is part of a $4,499,993 allocation.
See details
|
Energy, Department of | 6/17/2009 |
MPI BUSINESS SOLUTIONS, INC | $6,101 |
Dover AFB -- Decentralization of Facilities from Central Heat Plant, Phase 3 East of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the H
This spending item is part of a $3,699,799 allocation.
See details
|
Energy, Department of | 6/17/2009 |
MPI BUSINESS SOLUTIONS, INC | $6,101 |
Dover AFB -- Installation of Natural Gas Lines for Decentralization from Central Heat Plant (West of Atlantic Ave): This award provides funding for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of the non-i
This spending item is part of a $1,337,186 allocation.
See details
|
Energy, Department of | 6/17/2009 |
MPI BUSINESS SOLUTIONS, INC | $6,101 |
Dover AFB -- Decentralize Facilities from Central Heat Plant, Phase 2 West of Atlantic Avenue: This award provides funds for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of decentralization of the High Tem
This spending item is part of a $294,666 allocation.
See details
|
Energy, Department of | 6/17/2009 |
LANCASTER SERVICES, INCORPORATED | $5,983 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
GEOQUILL SERVICES, INC. | $5,033 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
RED HAT, INC. | $4,962 |
Red Hat License and Subscription
This spending item is part of a $5,504 allocation.
See details
|
Energy, Department of | 7/29/2010 |
PC MALL GOV INC | $4,566 | ADP COMPONENTS 9 SCANNERS | Energy, Department of | 5/21/2010 |
Geoquill Service Inc | $4,531 |
Building Technologies Program: Residential Buildings (Building America, Builders Challenge, and Existing Home Retrofits). This award provides funds for the following subprojects within this program: 1) Agreement 20700 entitled 'Retrofit Marketing and B
This spending item is part of a $4,592,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
Geoquill Service Inc | $4,295 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
DST DATA PRODUCTS LLC | $4,153 | Fibre Channel Switch Implementation Fee | Energy, Department of | 2/18/2010 |
PERFORMANCE DEVELOPMENT CORPORATION | $3,864 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
MPI BUSINESS SOLUTIONS, INC | $3,804 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
GEOQUILL SERVICES, INC. | $3,674 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
Geoquill Service Inc | $3,595 |
EE Conservation Block Grant Program: This award provides funding of $16,718,346 for 5 Agreements from the Office of Energy Efficiency and Renewable Energy (EERE). Agreement 19112 entitled 'Energy Services Coalition Technical Assistance for SEP and EECBG
This spending item is part of a $16,718,346 allocation.
See details
|
Energy, Department of | 8/24/2009 |
WILDFLOWER INTERNATIONAL, LTD. | $3,406 | PowerEdge 2970 Quad Core AMD Opteron? 2374HE 2.2GHz 4x512K Cache 1Ghz HyperTrnsprt 29722G [224-4888] | Energy, Department of | 6/24/2010 |
ALLIANT CORPORATION | $3,082 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
Geoquill Service Inc | $2,847 |
Bioenergy Research Center Capital Equipment: This award supports research infrastructure for the DOE BESC Bioenergy Research Center. The capital in this task will: 1) allow the current high throughput recalcitrance characterization pipeline to be double
This spending item is part of a $5,362,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
ALLIANT CORPORATION | $2,790 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
Geoquill Service Inc | $2,758 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
Geoquill Service Inc | $2,354 |
Eastern Interconnection Demand: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. Oak Ridge National Laboratory (ORNL) will provide support needed to accurately estimate the demand-side resource technical
This spending item is part of a $1,000,000 allocation.
See details
|
Energy, Department of | 9/08/2010 |
GEOQUILL SERVICES, INC. | $2,216 |
Concentrating Solar Power: This award provides funding to address the need for heat transfer fluids for solar power generation that are stable to temperatures approaching 600 degrees C, have good thermal characteristics, and that do not react with the ve
This spending item is part of a $935,000 allocation.
See details
|
Energy, Department of | 1/28/2010 |
Geoquill Service Inc | $2,216 |
PV Systems Development: Funding for this award was initially assigned to project number 2004420 in January 2010. Headquarters reassigned the funds for this task to project number 2004430 in July 2010. This award provides funding to address the need for
This spending item is part of a $935,000 allocation.
See details
|
Energy, Department of | 7/28/2010 |
ALLIANT CORPORATION | $2,160 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
KELLY SERVICES, INC. | $1,764 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
LANCASTER SERVICES, INCORPORATED | $1,692 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
KELLY SERVICES, INC. | $1,409 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
LANCASTER SERVICES, INCORPORATED | $1,345 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
MPI BUSINESS SOLUTIONS, INC | $1,216 |
Geothermal Technologies Program Non-Enhanced Geo: This award provides funding for ORNL support of the Ground Source Heat Pump (GSHP) ARRA Projects. This support includes the collection, monitoring and analysis of data. ORNL will deliver for internet po
This spending item is part of a $400,000 allocation.
See details
|
Energy, Department of | 9/24/2010 |
XCEL ENGINEERING, INC. | $1,034 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
PERFORMANCE DESIGN TECHNOLOGIES, INC. | $849 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $849 |
ASCR--Computational Partnerships (SciDAC-e): The initial award of $3,750,000 in FY 2009 provided funds for ORNL to add approximately ten new Computational Science Postdoctoral appointees to provide expert assistance to SciDAC-e, Energy Research Frontier
This spending item is part of a $3,857,898 allocation.
See details
|
Energy, Department of | 9/29/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $794 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
Thramb, LLC | $765 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
KELLY SERVICES, INC. | $733 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
DLT SOLUTIONS, LLC | $542 |
Red Hat License and Subscription
This spending item is part of a $5,504 allocation.
See details
|
Energy, Department of | 7/29/2010 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $520 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
Geoquill Service Inc | $493 |
Smart Grid Investment Grant Program (EISA 1306): This award provides funds of $5,470,000 for the following activities in support of the Office of Electricity Delivery and Energy Reliability (OE). Funding in the amount of $1,370,000 is provided for ORNL
This spending item is part of a $5,470,000 allocation.
See details
|
Energy, Department of | 9/10/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $484 |
EE Conservation Block Grant Program: This award provides funding of $16,718,346 for 5 Agreements from the Office of Energy Efficiency and Renewable Energy (EERE). Agreement 19112 entitled 'Energy Services Coalition Technical Assistance for SEP and EECBG
This spending item is part of a $16,718,346 allocation.
See details
|
Energy, Department of | 8/24/2009 |
DENUKE CONTRACTING SERVICES, INC. | $415 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
KELLY SERVICES, INC. | $362 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $360 |
Advanced Research Projects Agency-Energy (ARPA-E): ORNL has received funding for two subprojects from ARPA-E. The first award occurred in September 2009 for ARPA-E Reviews. This award provided funding of $20,000 for ORNL employees to review proposals i
This spending item is part of a $646,788 allocation.
See details
|
Energy, Department of | 9/29/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $356 |
Building Technologies Program: Residential Buildings (Building America, Builders Challenge, and Existing Home Retrofits). This award provides funds for the following subprojects within this program: 1) Agreement 20700 entitled 'Retrofit Marketing and B
This spending item is part of a $4,592,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
Geoquill Service Inc | $296 |
Eastern Interconnection Demand: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. Oak Ridge National Laboratory (ORNL) will provide support needed to accurately estimate the demand-side resource technical
This spending item is part of a $1,000,000 allocation.
See details
|
Energy, Department of | 9/08/2010 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $284 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $274 |
PV Systems Development: Funding for this award was initially assigned to project number 2004420 in January 2010. Headquarters reassigned the funds for this task to project number 2004430 in July 2010. This award provides funding to address the need for
This spending item is part of a $935,000 allocation.
See details
|
Energy, Department of | 7/28/2010 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $192 |
R&D on Alternative Isotope Production Techniques: The following funding is provided for awards made under FOA 09-14: $750,000 in operating funds and $1,250,000 in equipment funds is provided for FWP ERST005 entitled 'Integration of Centrifuge and Electr
This spending item is part of a $4,117,000 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Geoquill Service Inc | $148 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $128 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $128 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $102 |
Specialized High-Performance Computing Collaboration for Climate Modeling: This award provides funding for sophisticated research collaboration and expert technical support that contributes directly to operating high performance computer and data systems
This spending item is part of a $73,356,000 allocation.
See details
|
Energy, Department of | 8/11/2009 |
Geoquill Service Inc | $99 |
Nuclear Science Workforce: The following funding is provided for awards made under FOA 09-13, Applications of Nuclear Science and Technology: $1,181,000 in operating funds and $719,000 in equipment funds for FWP #22570 entitled 'Transfer Reactions on Un
This spending item is part of a $4,380,000 allocation.
See details
|
Energy, Department of | 9/02/2009 |
LANCASTER SERVICES, INCORPORATED | $98 |
R&D on Alternative Isotope Production Techniques: The following funding is provided for awards made under FOA 09-14: $750,000 in operating funds and $1,250,000 in equipment funds is provided for FWP ERST005 entitled 'Integration of Centrifuge and Electr
This spending item is part of a $4,117,000 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $77 |
EGS Technology R&D: Geothermal Technologies Program Enhanced Geo: This award provides funding to four subprojects in support of Enhanced Geothermal Systems technology: 1) Feasibility and Design Studies for a High Temperature Downhole Tool--ORNL will per
This spending item is part of a $4,110,870 allocation.
See details
|
Energy, Department of | 9/30/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $63 |
Eastern Interconnection Demand: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. Oak Ridge National Laboratory (ORNL) will provide support needed to accurately estimate the demand-side resource technical
This spending item is part of a $1,000,000 allocation.
See details
|
Energy, Department of | 9/08/2010 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $47 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $41 |
Management and Oversight (EE Program Direction): This award provides funding for five subprojects. Funding of $850,000 is provided for project #20476 entitled 'Federal Laboratory Support for Recovery Act Transactions ARRA FY 09' and provides funds for s
This spending item is part of a $1,450,205 allocation.
See details
|
Energy, Department of | 6/11/2009 |
LANCASTER SERVICES, INCORPORATED | $39 |
PV Systems Development: Funding for this award was initially assigned to project number 2004420 in January 2010. Headquarters reassigned the funds for this task to project number 2004430 in July 2010. This award provides funding to address the need for
This spending item is part of a $935,000 allocation.
See details
|
Energy, Department of | 7/28/2010 |
ENERGY OAKRIDGE FIELD OFFICE, UNITED STATES DEPT OF | $16 |
Building Technologies Program: Residential Buildings (Building America, Builders Challenge, and Existing Home Retrofits). This award provides funds for the following subprojects within this program: 1) Agreement 20700 entitled 'Retrofit Marketing and B
This spending item is part of a $4,592,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
UT-BATTELLE, LLC | $1 |
DIII-D Facility Upgrades: This award supports a new short term postdoctoral research position to install and implement a system that will image the edge magnetic topology on the DIII-D tokamak during the application of Resonant Magnetic Perturbations (RM
This spending item is part of a $180,842 allocation.
See details
|
Energy, Department of | 7/23/2009 |
UT-BATTELLE, LLC | $0 |
Dover AFB -- Installation of Natural Gas Lines for Decentralization from Central Heat Plant (East of Atlantic Ave): This award provides funding for specialized technical assistance to Dover AFB for the following tasks: Technology Assessment of the non-i
This spending item is part of a $280,841 allocation.
See details
|
Energy, Department of | 6/17/2009 |