Davidson County, Tenn., funds by U.S. Army Corps of Engineers
Listing $13,379,431.92 in stimulus funds from U.S. Army Corps of Engineers for Davidson
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SIMPLEXGRINNELL LP | $2,406,232 | Replace existing High Pressure CO2 systems with Low Pressure CO2 systems at 8 Dams located in TN and KY of the Nashville District U.S. Army Corps of Engineers. | U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
THOMAS INDUSTRIAL COATINGS, INC. | $2,024,000 |
Construction services for painting of the spillway gates and bulkheads at J. Percy Priest Dam and Old Hickory Dam projects of the Nashville District U.S. Army Corps of Engineers
This spending item is part of a $2,563,700 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
Deshazo Service Company, LLC | $1,538,155 |
Construction services to rehabilitate the aged overhead traveling bridge crane at the J. Percy Priest powerhouse, Nashville, TN, of the Nashville District U.S. Army Corps of Engineers to prepare for the hydropower rehabilitation program
This spending item is part of a $2,065,377 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
PRECISION DESIGN AND MACHINE, INC. | $1,480,687 | Bushing stock for TN river system | U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
MANAGEMENT CONSULTING, INC. | $672,007 | Recovery Project # 111257, Cheatham Lock and Dam, TN. Temporary laborers to provide repair and maintenance services at the Wolf Creek, Dale Hollow, Center Hill, and Cheatham power plants of the Nashville District U.S. Army Corps of Engineers. | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
ANDERSON PIPING, INC. | $657,000 | Replacement Generator Cooling Water Piping System at Center Hill Power Plant Lancaster, TN of the Nashville District U.S. Army Corps of Engineers | U.S. Army Corps of Engineers - civil program financing only | 6/30/2010 |
NATIONVIEW, LLC | $488,092 |
Construction services to rehabilitate the aged overhead traveling bridge crane at the J. Percy Priest powerhouse, Nashville, TN, of the Nashville District U.S. Army Corps of Engineers to prepare for the hydropower rehabilitation program
This spending item is part of a $2,065,377 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
JOHN J. KIRLIN SPECIAL PROJECTS, LLC | $479,135 |
Replace the Cordell Hull Natural Resource Manager's Office and Display Area Facility that was destroyed by fire in 2008.
This spending item is part of a $2,923,847 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
PRECISION DESIGN AND MACHINE, INC. | $404,730 | Tow Haulage Unit Pickwick Main Lock | U.S. Army Corps of Engineers - civil program financing only | 8/06/2009 |
BETTER BUILT CONSTRUCTION SERVICES INC | $379,340 |
Construction services for painting of the spillway gates and bulkheads at J. Percy Priest Dam and Old Hickory Dam projects of the Nashville District U.S. Army Corps of Engineers
This spending item is part of a $2,563,700 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
ELITE ROOFING CO. - GENERAL CONTRACTOR | $346,630 | Award to install shoreline power along six lock sites on the Tennessee river in three states including Tennessee, Kentucky, and Alabama. | U.S. Army Corps of Engineers - civil program financing only | 8/11/2009 |
PRECISION DESIGN AND MACHINE, INC. | $312,200 | Culvert Valve Bulkheads | U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
A & S Electric, Inc. | $281,718 |
Replace the Cordell Hull Natural Resource Manager's Office and Display Area Facility that was destroyed by fire in 2008.
This spending item is part of a $2,923,847 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
Atkins Construction Co Inc | $251,810 |
Contractor is to provide construction services for Toe Drain Expansion at Old Hickory Dam, Nashville, Tennessee in accordance with attached scope of work, plans and technical specifications.
This spending item is part of a $355,810 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
PRECISION DESIGN AND MACHINE, INC. | $248,040 | hydraulic Seals for Gates and Valves | U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
MAXWELL ROOFING & SHEET METAL, INC. | $242,150 | RECOVERY--The Corps of Engineers has a need for a contract to reroof Various Buildings, Berlin Lake, Michael J. Kirwan Dam, Shenango River Lake, and Kinzua Dam. The work is located at Berlin Lake, Berlin Center OH; Michael J. Kirwan Dam, Wayland, OH; Shen | U.S. Army Corps of Engineers - civil program financing only | 9/22/2009 |
A & K CONSTRUCTION, INC. | $160,360 |
Construction services for painting of the spillway gates and bulkheads at J. Percy Priest Dam and Old Hickory Dam projects of the Nashville District U.S. Army Corps of Engineers
This spending item is part of a $2,563,700 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
Hmt Holdings, Inc | $128,267 |
Transport, set on the pre-prepared foundation, and tremie in place two (2) precast dam elements(precast elements will be previously constructed) designated as SS-1 ( 3700 Tons )and SBS-1 (4000 Tons) during the first river season which begins 1 June 2010.
This spending item is part of a $27,941,413 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
INCA ENGINEERS INC | $106,170 | Engineering services for plans and specifications for the approach wall for the Chickamauga Lock, Chattanooga, TN of the Nashville District US Army Corps pf Engineers | U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $92,220 | Labor services (Quality Assurance Representative II) to support the Center Hill construction project, Lancaster, TN of the Nashville District U.S. Army Corps of Engineers. | U.S. Army Corps of Engineers - civil program financing only | 8/24/2010 |
INCA ENGINEERS INC | $80,273 | Specific work for heating, ventilation, air conditioning at the Old Hickory Power Plant | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
SHERRICK CONSTRUCTION, INC. | $79,391 |
Cheatham Dam Bulkheads
This spending item is part of a $190,291 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/22/2009 |
BETTER BUILT CONSTRUCTION SERVICES INC | $71,277 |
Contractor is to provide construction services for Toe Drain Expansion at Old Hickory Dam, Nashville, Tennessee in accordance with attached scope of work, plans and technical specifications.
This spending item is part of a $355,810 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
FROST ELECTRIC SUPPLY COMPANY | $65,200 | Purchase of 8 coupling capacitor voltage transformers to support the Nashville District U.S. Army Corp of Engineers, Barkley Power Plant Project | U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
IKON CONSTRUCTION, INC. | $60,790 |
Replace the Cordell Hull Natural Resource Manager's Office and Display Area Facility that was destroyed by fire in 2008.
This spending item is part of a $2,923,847 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
INCA ENGINEERS INC | $58,840 | Provide engineering services for Miter Gate Plans and Specification for Chickamauga Lock | U.S. Army Corps of Engineers - civil program financing only | 6/15/2009 |
AVPOL INTERNATIONAL LLC | $56,517 | Labor services (Quality Assurance Representative III) to support the Kentecky Lock Resident office with the Kentucky Lock construction mission of the Nashville District U.S. Army Coprs of Engineers. To date, this contract is funded with 3135 funds ($15K) | U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
JERRY B. YOUNG CONSTRUCTION, INC. | $51,176 | The J. Percy Priest Dam rip rap reinforcing project consist of placing a sanded concrete mix into the riprap on the upstream face of the dam. | U.S. Army Corps of Engineers - civil program financing only | 7/29/2009 |
MCCARTHY, JONES & WOODARD, LLC | $38,000 |
Replace the Cordell Hull Natural Resource Manager's Office and Display Area Facility that was destroyed by fire in 2008.
This spending item is part of a $2,923,847 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
LAKESHORE ENVIRONMENTAL CONTRACTORS, LLC | $33,920 |
Construction services to rehabilitate the aged overhead traveling bridge crane at the J. Percy Priest powerhouse, Nashville, TN, of the Nashville District U.S. Army Corps of Engineers to prepare for the hydropower rehabilitation program
This spending item is part of a $2,065,377 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
A & K CONSTRUCTION, INC. | $32,723 |
Contractor is to provide construction services for Toe Drain Expansion at Old Hickory Dam, Nashville, Tennessee in accordance with attached scope of work, plans and technical specifications.
This spending item is part of a $355,810 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
PRECISION DESIGN AND MACHINE, INC. | $30,124 | PINS AND BUSHINGS FOR LIFT GATE CHAIN WILSON LOCK | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $12,864 | Labor services (Primavera Scheduler) to support the Kentucky Lock construction project, Grand Rivers, KY, of the Nashville District US Army Corps of Engineers. | U.S. Army Corps of Engineers - civil program financing only | 5/05/2010 |
TRW Inc | $5,210 |
Construction services to rehabilitate the aged overhead traveling bridge crane at the J. Percy Priest powerhouse, Nashville, TN, of the Nashville District U.S. Army Corps of Engineers to prepare for the hydropower rehabilitation program
This spending item is part of a $2,065,377 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
INCA ENGINEERS INC | $4,186 | Engineering services for the gate anchorage replacement technical assistance at the Chickamauga Lock project, Chattanooga, TN of the Nashville District USACE | U.S. Army Corps of Engineers - civil program financing only | 11/09/2009 |