Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
UNIVERSITY OF TENNESSEE | $31,000,000 |
State Energy Program This project is to enhance existing funding programs for state-level energy efficiency program grants to support 25 percent energy efficiency improvements from 1990 baseline by 2012. The project will help to fund $8 billion in shovel-ready projects that t
This spending item is part of a $62,482,000 allocation.
See details
|
Energy, Department of | 4/20/2009 |
UNIVERSITY OF TENNESSEE | $29,276,682 |
State Energy Program This project is to enhance existing funding programs for state-level energy efficiency program grants to support 25 percent energy efficiency improvements from 1990 baseline by 2012. The project will help to fund $8 billion in shovel-ready projects that t
This spending item is part of a $62,482,000 allocation.
See details
|
Energy, Department of | 4/20/2009 |
Safety & Ecology Holdings Corporation | $14,974,701 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
EAST TENNESSEE HUMAN RESOURCE AGENCY, INC. | $9,818,587 |
Weatherization Assistance for Low-Income Persons Weatherization Assistance Program, Recovery Act
This spending item is part of a $99,112,101 allocation.
See details
|
Energy, Department of | 3/27/2009 |
CLAIBORNE HAULING, LLC | $8,529,674 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
KNOXVILLEKNOX COUNTY COMMUNITY ACTION COMMITTEE | $6,255,049 |
Weatherization Assistance for Low-Income Persons Weatherization Assistance Program, Recovery Act
This spending item is part of a $99,112,101 allocation.
See details
|
Energy, Department of | 3/27/2009 |
NATIONAL RESOURCE MANAGEMENT, LLC | $5,383,816 |
This project will clean-up a variety of radiological contaminated facilities and structures, all a result of non-defense nuclear studies and projects performed at Brookhaven (BNL). Completion of this project supports DOE's major priority of legacy footpr
This spending item is part of a $70,809,616 allocation.
See details
|
Energy, Department of | 4/16/2009 |
SAFETY AND ECOLOGY CORPORATION | $5,152,339 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $17,745,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
KNOXVILLE UTILITIES BOARD | $3,585,022 | Electricity Delivery and Energy Reliability, Research, Development and Analysis Project Title G?? KUB Smart Grid Community Project (KSGC) Topic Area G?? Integrated and Crosscutting Systems The Knoxville Utilities Board (KUB), a four service municipal utility system, is seeking to accelerate the deploloyment of automated metering infras... Show more | Energy, Department of | 4/30/2010 |
KNOX, COUNTY OF | $2,125,400 | Energy Efficiency and Conservation Block Grant Program (EECBG) Knox County award revised to specify projects including Solar Thermal Hot Water Project at Knox Co. Detention Facility, Traffic Signal Retrofit, and Administration of two projects. | Golden Field Office | 9/28/2009 |
SAFETY AND ECOLOGY CORPORATION | $2,103,176 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $16,050,201 allocation.
See details
|
Energy, Department of | 5/07/2009 |
NATIONAL RESOURCE MANAGEMENT, LLC | $1,776,770 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
KNOXVILLE, CITY OF | $1,542,700 |
Energy Efficiency and Conservation Block Grant Program (EECBG) Recovery Act: Energy Efficiency & Conservation Block Grant Program purpose is to assist local governments in creating and implementing strategies to increase energy efficiency, reduce fossil fuel emission, reduce energy costs, deploy renenewable energy tech... Show more
This spending item is part of a $2,012,700 allocation.
See details
|
Golden Field Office | 9/08/2009 |
ANALYSIS AND MEASUREMENT SERVICES CORPORATION | $1,148,926 | Office of Science Financial Assistance Program AMS will investigate the state-of-the-art in cable aging evaluation techniques applicable to nuclear power plant wiring systems, and investigate their effectiveness for identifying aging mechanisms in cable circuits through objective laboratory experimenent... Show more | Office of Science | 12/07/2009 |
Tindell's, Inc. | $886,547 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UT-BATTELLE, LLC | $876,993 |
Conservation Research and Development Recovery Act - System Level Demonstration of Highly Efficient and Clean, Diesel Powered Class 8 Trucks (SuperTruck)
This spending item is part of a $38,831,115 allocation.
See details
|
National Energy Technology Laboratory | 5/05/2010 |
UNIVERSITY OF TENNESSEE | $800,433 |
Office of Science Financial Assistance Program Purdue University, in partnership with the National Renewable Energy Laboratory, the University of Tennessee, and the Argonne National Laboratory, offers comprehensive expertise for a world-leading Energy Frontier Research Center (EFRC) that will make trtra... Show more
This spending item is part of a $15,074,136 allocation.
See details
|
Office of Science | 8/01/2009 |
SAFETY AND ECOLOGY CORPORATION | $774,245 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $4,169,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALSTOM POWER INC. | $750,000 |
Industrial Carbon Capture and Storage (CCS) Application The objective of this project is to demonstrate an integrated system of carbon dioxide (CO2) capture in an industrial setting and geologic sequestration in a sandstone reservoir. The CO2 used in this project is produced by Archer Daniels Midlaland Company... Show more
This spending item is part of a $141,405,945 allocation.
See details
|
National Energy Technology Laboratory | 11/16/2009 |
ENERNEX, LLC | $687,668 | Renewable Energy Research and Development The goal of this project is to accelerate the appropriate use of generic wind turbine models for transmission network analysis. Through the developments and activities proposed for this effort, transmission planning engineers will be able to confidently a | Energy, Department of | 11/30/2009 |
HAGEMEYER NORTH AMERICA, INC. | $630,439 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $421,339 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ELVADO ENVIRONMENTAL LLC | $413,111 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $17,745,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLSTATE TRAILERS, INC | $394,313 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OMEGA CONSULTANTS INC | $376,726 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Neff Rental, Inc | $316,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNITED RENTALS, INC. | $300,229 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNIVERSITY OF TENNESSEE | $300,000 |
Office of Science Financial Assistance Program Plasma-surface interactions (PSI) pose an immense scientific hurdle in magnetic confinement fusion and our present understanding of PSI in confinement environments is highly inadequate. This PSI Science Center will focus on state-of-the-art PSI experimenent... Show more
This spending item is part of a $1,476,998 allocation.
See details
|
Energy, Department of | 10/05/2009 |
ALLSTATE TRAILERS, INC | $300,000 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
E&S CONSULTING, LLC | $280,500 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
ELVADO ENVIRONMENTAL LLC | $278,053 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
A & W OFFICE SUPPLY INC | $277,392 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SENTECH, INC. | $276,595 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
NES EQUIPMENT SERVICES CORPORATION | $273,599 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
KNOXVILLEKNOX COUNTY COMMUNITY ACTION COMMITTEE | $270,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) Recovery Act: Energy Efficiency & Conservation Block Grant Program purpose is to assist local governments in creating and implementing strategies to increase energy efficiency, reduce fossil fuel emission, reduce energy costs, deploy renenewable energy tech... Show more
This spending item is part of a $2,012,700 allocation.
See details
|
Golden Field Office | 9/08/2009 |
HAGEMEYER NORTH AMERICA, INC. | $265,332 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $10,978,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $243,100 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
GEO-MARINE, INC. | $225,823 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
STOWERS RENTAL & SUPPLY, INC. | $220,755 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $216,350 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $209,263 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
GEM TECHNOLOGIES, INC. | $202,397 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
KNOXVILLEKNOX COUNTY COMMUNITY ACTION COMMITTEE | $200,000 |
Energy Efficiency and Conservation Block Grant Program (EECBG) Recovery Act: Energy Efficiency & Conservation Block Grant Program purpose is to assist local governments in creating and implementing strategies to increase energy efficiency, reduce fossil fuel emission, reduce energy costs, deploy renenewable energy tech... Show more
This spending item is part of a $2,012,700 allocation.
See details
|
Golden Field Office | 9/08/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $200,000 |
Renewable Energy Research and Development The objective of this project is to verify and demonstrate existing and new high-penetration level photovoltaics in the distribution grid while emphasizing current technological issues. The ideas and components developed will be mass manufactured to gene
This spending item is part of a $600,000 allocation.
See details
|
Energy, Department of | 1/06/2010 |
ELVADO ENVIRONMENTAL LLC | $197,189 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $176,856 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Project Objectives: Our Project will achieve three primary objectives: (1) build a secure, interoperable, and integrated smart grid infrastructure in northeast central Ohio that demonstrates the ability to maximize distriribution system efficiency and relia... Show more
This spending item is part of a $73,660,317 allocation.
See details
|
Energy, Department of | 12/31/2009 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $176,856 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Project Objectives: Our Project will achieve three primary objectives: (1) build a secure, interoperable, and integrated smart grid infrastructure in northeast central Ohio that demonstrates the ability to maximize distriribution system efficiency and relia... Show more
This spending item is part of a $73,660,317 allocation.
See details
|
Energy, Department of | 12/31/2009 |
STOWERS RENTAL & SUPPLY, INC. | $175,600 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $174,573 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
DOWNING, DARREN J | $170,000 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
STOWERS RENTAL & SUPPLY, INC. | $168,150 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNIVERSITY OF TENNESSEE | $158,078 |
DOE Power Systems Fellowship Program: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. The objective of this project is to meet the nation's workforce needs, and to help create a knowledgeable, interdisc
This spending item is part of a $1,611,050 allocation.
See details
|
Energy, Department of | 9/27/2010 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $157,986 |
Renewable Energy Research and Development The objective of this project is to determine the benefits and costs of balancing area collaboration between the Southwest Power Pool (SPP) region with very large and undeveloped wind resources and Southeastern Electric Reliability Council (SERC) with a v
This spending item is part of a $399,135 allocation.
See details
|
Energy, Department of | 11/25/2009 |
UNIVERSITY OF TENNESSEE | $150,000 | Office of Science Financial Assistance Program Computational chemistry codes such as GAMESS, NWChem and MPQC are among the most widely used and most strategic in the Department of Energys high performance computing portfolio. The current user base for these codes exceeds 100,000 users. Given the grgre... Show more | Office of Science | 8/31/2010 |
GEM TECHNOLOGIES, INC. | $148,226 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ALLIANT CORPORATION | $147,806 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RODEN ELECTRICAL SUPPLY COMPANY | $144,794 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OMEGA CONSULTANTS INC | $135,900 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
STOWERS RENTAL & SUPPLY, INC. | $128,240 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNIVERSITY OF TENNESSEE | $125,000 |
Basic Energy Sciences--Energy Frontier Research Centers: This award funds FWP #ERKCM74 entitled 'Materials Sciences of Actinides (Lead Institute -- University of Notre Dame). UT-Battelle will perform the contractor's portion of the research proposed for
This spending item is part of a $1,100,000 allocation.
See details
|
Energy, Department of | 6/23/2010 |
OAK RIDGE DESIGN PARTNERSHIP | $123,489 |
Lab Call for Facilities and Equipment: This award provides funds of $54,973,500 from the Office of Energy Efficiency and Renewable Energy (EERE). Operating funds in the amount of $6,173,500 and capital equipment funds of $28,600,000 has been allocated f
This spending item is part of a $54,973,500 allocation.
See details
|
Energy, Department of | 3/22/2010 |
STOWERS RENTAL & SUPPLY, INC. | $122,900 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
GEMTECH Y-12, LLC | $120,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNITED RENTALS, INC. | $118,071 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $116,163 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
KEL-SAN, INC. | $112,015 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $108,096 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $100,226 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNITED RENTALS, INC. | $100,000 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
ENERNEX, LLC | $99,948 |
Renewable Energy Research and Development Illinois Institute of Technology (IIT), with an ABET accredited engineering program, will lead an extensive effort in forming a world-class wind energy consortium of multiple universities (domestic and international) and multiple industry participants (al
This spending item is part of a $7,900,000 allocation.
See details
|
Energy, Department of | 1/15/2010 |
ELECTRIC POWER RESEARCH INSTITUTE, INC. | $99,720 |
Renewable Energy Research and Development Illinois Institute of Technology (IIT), with an ABET accredited engineering program, will lead an extensive effort in forming a world-class wind energy consortium of multiple universities (domestic and international) and multiple industry participants (al
This spending item is part of a $7,900,000 allocation.
See details
|
Energy, Department of | 1/15/2010 |
STOWERS RENTAL & SUPPLY, INC. | $99,165 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Professional Engineers Inc | $98,215 |
Toxic and hazardous waste cleanup at Bethel Valley Burial Grounds (SWSA 1 and SWSA 3)
This spending item is part of a $14,912,999 allocation.
See details
|
Energy, Department of | 9/18/2009 |
OMEGA CONSULTANTS INC | $97,691 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELVADO ENVIRONMENTAL LLC | $97,508 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $95,850 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $95,850 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $95,850 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BROADWAY ELECTRIC SERVICE CORPORATION | $94,129 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
Neff Rental, Inc | $93,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Neff Rental, Inc | $92,500 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SENTECH, INC. | $85,750 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
OMEGA CONSULTANTS INC | $84,421 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NATIONAL RESOURCE MANAGEMENT, LLC | $83,965 |
The National Synchrotron Light Source (NSLS) II is a major scientific user facility being constucted at Brookhaven National Laboratory to deliver x-rays with unprecendented intensity and brightness as probes for solving some of the most important energy c
This spending item is part of a $150,000,000 allocation.
See details
|
Energy, Department of | 4/02/2009 |
Tindell's, Inc. | $80,714 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $78,572 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $78,296 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
Tindell's, Inc. | $78,183 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $78,070 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Neff Rental, Inc | $77,500 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BIO-LOGIC USA, LLC | $77,378 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $76,443 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $3,485,998 allocation.
See details
|
Energy, Department of | 3/09/2009 |
STOWERS RENTAL & SUPPLY, INC. | $76,160 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
A & W OFFICE SUPPLY INC | $73,167 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
INTEGRATED SOLUTIONS & SERVICES, INC. | $70,852 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OAK RIDGE DESIGN PARTNERSHIP | $66,783 |
Tennessee Deployment of Solar and Grid-Recharge Battery Electric: This award is funded by an Inter-Entity Work Order from the National Energy Technology Laboratory. ORNL will develop and establish a solar-recharge prototype system for pilot deployment a
This spending item is part of a $6,800,000 allocation.
See details
|
Energy, Department of | 9/22/2009 |
OAK RIDGE DESIGN PARTNERSHIP | $66,626 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
ALLIANT CORPORATION | $64,845 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SENTECH, INC. | $64,238 |
Building Technologies Program: Residential Buildings (Building America, Builders Challenge, and Existing Home Retrofits). This award provides funds for the following subprojects within this program: 1) Agreement 20700 entitled 'Retrofit Marketing and B
This spending item is part of a $4,592,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
STOWERS MACHINERY CORPORATION | $61,478 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $61,474 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Neff Corp. | $60,800 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
UNIVERSITY OF TENNESSEE | $60,307 |
Early Career Research Program: The following funding is provided for awards made under Program Announcement to DOE National Laboratories LAB 09-26, Office of Science Early Career Research Program: $2,355,000 in operating funds and $145,000 in equipment f
This spending item is part of a $10,004,884 allocation.
See details
|
Energy, Department of | 3/25/2010 |
HAGEMEYER NORTH AMERICA, INC. | $59,350 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $59,350 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS MACHINERY CORPORATION | $56,493 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. Sev
This spending item is part of a $23,045,990 allocation.
See details
|
Energy, Department of | 8/04/2010 |
STOWERS RENTAL & SUPPLY, INC. | $56,070 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Neff Rental, Inc | $54,075 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $51,759 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
INTEGRATED SOLUTIONS & SERVICES, INC. | $51,345 |
ORIGINAL AWARD AMOUNT WAS $2,731,106. AFTER DEOLIBGATION OF $776,438.09 (DOE-EE FUNDS FOR IRA 48C-contract mod 296), NEW AWARD AMOUNT IS $1,954,667.91.
This spending item is part of a $1,954,668 allocation.
See details
|
Energy, Department of | 10/29/2009 |
M & W DRILLING, LLC | $50,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. Sev
This spending item is part of a $23,045,990 allocation.
See details
|
Energy, Department of | 8/04/2010 |
DOWNING, DARREN J | $49,704 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
TRENDWAY CORPORATION | $49,342 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
HAGEMEYER NORTH AMERICA, INC. | $47,925 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
CATALYST TECHNOLOGY GROUP USA, INC. | $47,774 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $47,733 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Neff Rental, Inc | $47,369 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLIANT CORPORATION | $47,323 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BUSINESS INTERIORS, INC. | $45,943 |
General Plant Project funding across all SC laboratories: This award provides funding for construction of the Melton Valley Support Facility at Oak Ridge National Laboratory which will address high-priority needs for new shop/maintenance activities space
This spending item is part of a $9,969,751 allocation.
See details
|
Energy, Department of | 4/02/2009 |
STOWERS RENTAL & SUPPLY, INC. | $44,808 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
BARGE,WAGGONER,SUMNER AND CANNON, INC. | $44,740 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
STOWERS RENTAL & SUPPLY, INC. | $44,500 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
AMARC LLC | $44,400 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
M A Jones Inc | $42,656 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Neff Rental, Inc | $42,490 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNIVERSITY OF TENNESSEE | $42,320 |
Environmental Security Technology Certification Program -- Wireless Platform for Energy-Efficient Building Control Retrofits: This award provides funding to develop a scalable, robust building control platform consisting of sensing, computation, and ac
This spending item is part of a $635,067 allocation.
See details
|
Energy, Department of | 9/29/2009 |
ALLIANT CORPORATION | $41,026 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
STOWERS RENTAL & SUPPLY, INC. | $39,225 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BIO-LOGIC USA, LLC | $38,689 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
EMERSON PROCESS MANAGEMENT LLLP | $38,500 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ALLSTATE TRAILERS, INC | $38,337 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $37,926 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $37,666 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNITED RENTALS, INC. | $36,776 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $10,978,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Neff Rental, Inc | $36,420 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $35,883 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $4,821,565 allocation.
See details
|
Energy, Department of | 3/09/2009 |
STOWERS RENTAL & SUPPLY, INC. | $35,750 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $35,350 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $34,911 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLIANT CORPORATION | $34,869 |
Portsmouth Recovery Act Project
This spending item is part of a $8,000,000 allocation.
See details
|
Energy, Department of | 9/28/2010 |
HAGEMEYER NORTH AMERICA, INC. | $34,506 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $33,956 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $33,590 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Free Service Tire Company Inc | $32,925 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
UNITED RENTALS, INC. | $32,752 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
OMEGA CONSULTANTS INC | $31,760 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $10,978,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLIANT CORPORATION | $31,456 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
STOWERS RENTAL & SUPPLY, INC. | $31,349 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ALLSTATE TRAILERS, INC | $31,162 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
SENTECH, INC. | $31,052 |
Advanced Materials RD&D in Support of EERE Needs to Advance Clean Energy Technologies and Energy-Intensive Process R&D: This award supports efforts in two primary areas: 1) Advanced Materials RD&D with focus areas in strategic materials such as titanium
This spending item is part of a $28,663,079 allocation.
See details
|
Energy, Department of | 8/24/2009 |
STOWERS RENTAL & SUPPLY, INC. | $31,050 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $30,613 |
Weatherization Assistance Program: This award provides funding for projects from the Office of Energy Efficiency and Renewable Energy. Funding of $18,336,000 is provided for projects 18777 and 20455 to conduct an evaluation of the WAP during the period
This spending item is part of a $34,836,000 allocation.
See details
|
Energy, Department of | 6/10/2009 |
ALLIANT CORPORATION | $30,000 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
Speciality Transport, Inc | $30,000 |
Portsmouth Recovery Act Project
This spending item is part of a $8,000,000 allocation.
See details
|
Energy, Department of | 9/28/2010 |
STOWERS RENTAL & SUPPLY, INC. | $29,963 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. Sev
This spending item is part of a $23,045,990 allocation.
See details
|
Energy, Department of | 8/04/2010 |
Tindell's, Inc. | $29,766 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
INTEGRATED SOLUTIONS & SERVICES, INC. | $29,736 |
ORIGINAL AWARD AMOUNT WAS $2,731,106. AFTER DEOLIBGATION OF $776,438.09 (DOE-EE FUNDS FOR IRA 48C-contract mod 296), NEW AWARD AMOUNT IS $1,954,667.91.
This spending item is part of a $1,954,668 allocation.
See details
|
Energy, Department of | 10/29/2009 |
UNITED RENTALS, INC. | $29,506 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
GEM TECHNOLOGIES, INC. | $28,989 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $28,200 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $28,200 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
TINDELL'S, INC. | $28,188 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $10,978,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BIO-LOGIC USA, LLC | $28,185 |
BES- Early Career Research Program To develop a combinatorial approach to solution-processed inorganic nanocomposite materials as a new route to the complex physical properties required for efficient energy storage and conservation devices. Specifical
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 3/24/2010 |
STOWERS RENTAL & SUPPLY, INC. | $28,078 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $28,078 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $28,078 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $28,078 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
METRO COMMUNICATIONS LLC | $28,044 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Tindell's, Inc. | $27,770 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $27,500 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $27,426 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
STOWERS RENTAL & SUPPLY, INC. | $27,380 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Neff Corp. | $27,310 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
ALLIANT CORPORATION | $27,278 |
Portsmouth Recovery Act Project
This spending item is part of a $8,000,000 allocation.
See details
|
Energy, Department of | 9/28/2010 |
All Erection & Crane Rental Corp | $27,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
CH2M HILL, INC. | $26,915 |
Oak Ridge Non-Defense Recovery Act Project: This award provides funding to demolish surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for demolition of the 2000 Compl
This spending item is part of a $38,795,601 allocation.
See details
|
Energy, Department of | 4/30/2009 |
SOUTHEASTERN LASER PRODUCTS, INC. | $26,621 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BARGE,WAGGONER,SUMNER AND CANNON, INC. | $26,603 |
Oak Ridge Defense ORNL D&D Recovery Act Project: This award provides funding to deactivate and demolish (D&D) surplus contaminated facilities and remediate contaminated soil at the Oak Ridge National Laboratory (ORNL). Subprojects include funding for de
This spending item is part of a $23,641,292 allocation.
See details
|
Energy, Department of | 4/30/2009 |
SENTECH, INC. | $26,488 |
Building Technologies Program: Residential Buildings (Building America, Builders Challenge, and Existing Home Retrofits). This award provides funds for the following subprojects within this program: 1) Agreement 20700 entitled 'Retrofit Marketing and B
This spending item is part of a $4,592,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
CATALYST TECHNOLOGY GROUP USA, INC. | $26,380 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $26,334 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
HAGEMEYER NORTH AMERICA, INC. | $26,248 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
All Erection & Crane Rental Corp | $26,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $23,447,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $26,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
UNITED RENTALS, INC. | $25,899 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $109,492,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
STOWERS RENTAL & SUPPLY, INC. | $25,021 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
STOWERS RENTAL & SUPPLY, INC. | $25,000 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
Select Engineering & Contracting, Inc. | $21,675 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $2,214,000 allocation.
See details
|
Energy, Department of | 3/09/2009 |
Select Engineering & Contracting, Inc. | $21,675 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $4,821,565 allocation.
See details
|
Energy, Department of | 3/09/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $20,832 |
Support the Department of Energy in Idaho to prepare documentation for projects that deactivate and decomission excess facilities, remediate soils, support waste disposition, and other measures to protect the environment. Involces preparation of basic in
This spending item is part of a $275,000 allocation.
See details
|
Energy, Department of | 3/09/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $15,539 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $4,821,565 allocation.
See details
|
Energy, Department of | 3/09/2009 |
ENTERPRISE HOLDINGS, INC. | $11,789 |
The Oak Ridge National Laboratory (ORNL) Small Facilities Decontamination and Decommissioning (D&D) Project (201004805) is located primarily in the northeast (NE) and southeast portions of the ORNL main campus area in Bechtel Valley. This project is compo
This spending item is part of a $10,066,264 allocation.
See details
|
Energy, Department of | 6/05/2009 |
SHIELDS ELECTRONICS SUPPLY, INC. | $9,600 | Backup power for disaster recovery project. | Energy, Department of | 8/10/2010 |
ENTERPRISE HOLDINGS, INC. | $9,595 |
Characterization of K-33 and Miscellaneous ETTP Facilities: The DOE ORO has requested ORAU provide waste characterization services for the K-33 building and Miscellaneous ETTP Facilities demolition preparation. ORAU health physics staff will prepare sam
This spending item is part of a $18,767,932 allocation.
See details
|
Energy, Department of | 6/09/2009 |
MANAGEMENT SOLUTIONS, L.L.C. | $8,986 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $2,214,000 allocation.
See details
|
Energy, Department of | 3/09/2009 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $8,613 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $1,848,700 allocation.
See details
|
Energy, Department of | 3/09/2009 |
SHIELDS ELECTRONICS SUPPLY, INC. | $8,184 | This project was designed to provide rack space for redundancy and disaster recovery capacity to meet the requirements supplied by OSTI. | Energy, Department of | 1/05/2010 |
ENTERPRISE HOLDINGS, INC. | $5,415 |
General Maintenance Facilities Decontamination and Decommissioning (D&D) Project (201004811) will demolish 17 facilities at Oak Ridge National Laboratory's (ORNL's) Central Campus totaling approximately 55,400 square ft . This project is comprised of t
This spending item is part of a $4,623,411 allocation.
See details
|
Energy, Department of | 6/09/2009 |
SHIELDS ELECTRONICS SUPPLY, INC. | $4,183 | A low profile, energy efficient 48-port enterprise class high performance network switch for all equipment housed in a single rack. | Energy, Department of | 1/26/2010 |
ENVIRONMENTAL & SAFETY SERVICES, INC. | $504 |
Support the Department of Energy in Oak Ridge to prepare documentation for projects that demolish facilities, remediate soils, and other measures to protect the environment. Involves preparation of basic information about the facilities, determining the
This spending item is part of a $2,214,000 allocation.
See details
|
Energy, Department of | 3/09/2009 |
ELECTRONICS EXPRESS, INC. | $118 | Data patchcords for IT network. | Energy, Department of | 9/03/2009 |