Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Tarrant County, Texas, funds by General Services Administration

Listing $20,354,993.96 in stimulus funds from General Services Administration for Tarrant

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC. $16,288,821 Energy Saving performance contract with implementation of energy Conservation measures in federally owned buildings throughout Texas Public Buildings Service 3/30/2010
TABCON, INC. $1,304,806 Work will consist of replacing 20 American Blower air handlers that are at the end of their useful life with 20 new air handling units. All air-cooled condensing units associated with the air handlers will be replaced. Ductwork from the new mechanical e Public Buildings Service 3/25/2010
WATSON GROUP, L.L.C., THE $871,483 Serve as the primary point(s) of contact for the design and construction review of projects, in particular energy related aspects of projects. Reviews may involve energy audit reports, scoping documents, scopes of work, design drawings, design specificati Public Buildings Service 8/27/2009
GOVERNMENT CONTRACT SOLUTIONS INC $365,900 CONTRACTOR SHALL PROVIDE PROJECT MANAGER SERVICES TO THE PROJECT MANAGEMENT FOR OPERATIONS BRANCH, IN SUPPORT OF ARRA OF 2009. PERIOD OF PERFORMANCE 11/16/2009 THROUGH 09/30/2012 Public Buildings Service 11/05/2009
HEERY INTERNATIONAL, INC. $273,592 Provide engineering and commissioning expertise to conduct recommissioning / retro-commissioning planning, identify energy conservation measures, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and report writing serv Public Buildings Service 9/02/2009
Air Balancing Company Inc $267,974 Construction contract for remodel of Post Office/Courthouse located in San Antonio, Texas.
This spending item is part of a $50,348,552 allocation. See details
Public Buildings Service 7/24/2009
FARNSWORTH GROUP, INC. $264,443 The purpose of this project is to develop energy consumption baselines, offer recommendations to reduce energy usage, and eliminate comfort and building function issues. Deliverables include recommendations of building functions that increase efficiencie Public Buildings Service 9/02/2009
WATSON GROUP, L.L.C., THE $253,377 The award is to provide engineering and commissioning expertise to conduct re-commissioning / retro-commissioning planning, identify energy conservation measures, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and re
This spending item is part of a $291,882 allocation. See details
Public Buildings Service 8/27/2009
Just-A-Services, LLC $165,459 Energy Effiecency Upgrades
This spending item is part of a $712,313 allocation. See details
Public Buildings Service 9/02/2009
HUITT - ZOLLARS, INC. $146,528 Management and inspection services for AHU Mahon U.S. Courthouse in Fort Worth, Texas. Public Buildings Service 3/08/2011
Texas Specialties & Installation, Inc $75,973 Construction contract for remodel of Post Office/Courthouse located in San Antonio, Texas.
This spending item is part of a $50,348,552 allocation. See details
Public Buildings Service 7/24/2009
University Building Specialties, Inc. $32,850 Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation. See details
Public Buildings Service 6/28/2010
INTEGRATED PRO SERVICES, LLC $26,246 ARRA PROJECT- ELDON MAHON COURTHOUSE FORT WORTH, TX Public Buildings Service 4/29/2010
Air Balancing Company Inc $17,541 Construction contract for remodel of Post Office/Courthouse located in San Antonio, Texas.
This spending item is part of a $50,348,552 allocation. See details
Public Buildings Service 7/24/2009