Travis County, Texas, funds by Department of Veterans Affairs
Listing $706,375.00 in stimulus funds from Department of Veterans Affairs for Travis
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
COX DESIGN ASSOCIATES | $221,371 | Architect / Engineer design services | Department of Veterans Affairs | 10/26/2009 |
COX DESIGN ASSOCIATES | $221,371 | Architect / Engineering Services | Department of Veterans Affairs | 10/26/2009 |
COX DESIGN ASSOCIATES | $221,371 | ARCHITECTURAL / ENGINEERING DESIGN SERVICES | Department of Veterans Affairs | 10/26/2009 |
M2 FEDERAL INC. | $19,442 | Relocate, Repair and Refinish Casket Biers at Ft. Sam Houston National Cemetery | Department of Veterans Affairs | 4/30/2010 |
SUNLAND GROUP, INC. | $11,410 |
Professional Engineering and Architectural Services required to renovate an existing 25,000 sq ft Amory building to serve as an Outpatient Clinic. Project Milestones are reviews at 35% design, 50% design, 90% and 100%.
This spending item is part of a $359,495 allocation.
See details
|
Department of Veterans Affairs | 11/23/2009 |
SUNLAND GROUP, INC. | $11,410 |
Professional Engineering and Architectural Services required to renovate an existing 25,000 sq ft Amory building to serve as an Outpatient Clinic. Project was designed to 45% and Canceled.
This spending item is part of a $203,377 allocation.
See details
|
Department of Veterans Affairs | 11/23/2009 |