Salt Lake County, Utah, funds by General Services Administration
Listing $1,498,706.92 in stimulus funds from General Services Administration for Salt Lake
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
I. H. I. | $600,000 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
AJC ARCHITECTS, P.C. | $296,621 |
Contractor shall furnish all labor, equipment, materials, supervision and transportation necessary to accomplish the IRS Service Center retro-commissioning. Contractor shall fix fan system deficiencies, furnish and install actuators, calibrate airflow &
This spending item is part of a $2,759,057 allocation.
See details
|
Public Buildings Service | 3/23/2010 |
MECHANICAL SERVICE & SYSTEMS, INC | $286,013 |
Recovery - Energy Improvements at the WF Bennett Building SLC, UT
This spending item is part of a $405,215 allocation.
See details
|
Public Buildings Service | 3/19/2010 |
RIO VISTA MANAGEMENT, L.L.C. | $119,202 |
Recovery - Energy Improvements at the WF Bennett Building SLC, UT
This spending item is part of a $405,215 allocation.
See details
|
Public Buildings Service | 3/19/2010 |
E M C ENGINEERS, INC. | $98,542 |
The Wallace F. Bennett Building in Salt Lake City, UT was selected to receive a recommissioning study under the American Recovery and Reinvestment Act. The scope of this study includes the energy analysis of the facilityG??s building envelope, lighting sy
This spending item is part of a $125,579 allocation.
See details
|
Public Buildings Service | 7/20/2009 |
UTAH CONTROLS INC | $46,842 |
Contractor shall furnish all labor, equipment, materials, supervision and transportation necessary to accomplish the IRS Service Center retro-commissioning. Contractor shall fix fan system deficiencies, furnish and install actuators, calibrate airflow &
This spending item is part of a $2,759,057 allocation.
See details
|
Public Buildings Service | 3/23/2010 |
WON-DOOR CORPORATION | $24,450 |
Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado
This spending item is part of a $14,347,332 allocation.
See details
|
Public Buildings Service | 6/28/2010 |
GSBS, P.C. | $23,372 |
The Wallace F. Bennett Building in Salt Lake City, UT was selected to receive a recommissioning study under the American Recovery and Reinvestment Act. The scope of this study includes the energy analysis of the facilityG??s building envelope, lighting sy
This spending item is part of a $125,579 allocation.
See details
|
Public Buildings Service | 7/20/2009 |
UTAH CONTROLS INC | $3,665 |
The Wallace F. Bennett Building in Salt Lake City, UT was selected to receive a recommissioning study under the American Recovery and Reinvestment Act. The scope of this study includes the energy analysis of the facilityG??s building envelope, lighting sy
This spending item is part of a $125,579 allocation.
See details
|
Public Buildings Service | 7/20/2009 |