Fairfax County, Va., funds by National Aeronautics and Space Administration
Listing $22,278,254.56 in stimulus funds from National Aeronautics and Space Administration for Fairfax
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
FIBERTEK, INC. | $3,846,122 | LSES Task 2: Laser Engineering Preliminary Design Evaluation. This task will support NASA's in-house ATLAS laser development effort and a Fibertek system level design effort for the ALTAS laser. | National Aeronautics and Space Administration | 11/13/2009 |
FIBERTEK, INC. | $3,337,200 | Task Order 4: Planar Waveguide MOPA Breadboard. TO4 will investigate and deliver a planar waveguide laser transmitter brassboard that has undergone sufficient technology development to credibly reach TRL 6 by the ATLAS Laser Preliminary Design Review. Thi | National Aeronautics and Space Administration | 12/08/2009 |
FIBERTEK, INC. | $3,337,200 | Task 8 consists of compact, high PRF, wavelength-controlled micropulse MOPA with self-imaging planar waveguide. | National Aeronautics and Space Administration | 3/16/2010 |
FIBERTEK, INC. | $3,335,287 | Task Order 5: Fiber Laser MOPA. This task involves designing, building, demonstrating and delivering a complete, compact, high-repetition rate, wavelength-controlled micropulse master oscillator power amplifier (MOPA) laser system brassboard. This task w | National Aeronautics and Space Administration | 12/08/2009 |
FIBERTEK, INC. | $2,159,110 | LSES Task 3: MOPA Laser System Brassboard. Task Order 3 involves designing, building, demonstrating and delivering a complete, compact, high-repetition rate, wavelength-controlled micropulse Master Oscillator Power Amplifier (MOPA) laser system brassboa | National Aeronautics and Space Administration | 12/07/2009 |
FIBERTEK, INC. | $1,739,000 | Task 9 InGaAsP Intensified Photodiode (IPD) Detector System for Near-Infrared (1064) Wavelength Light. Objective is to mature 1um detector technology that meets the ATLAS performance indicated in the SOW yielding high sensitivity, low noise, high speed, | National Aeronautics and Space Administration | 5/20/2010 |
FIBERTEK, INC. | $1,262,605 | Design, build and deliver three Compact, High PRF Laser Oscillator Breadboards. | National Aeronautics and Space Administration | 10/21/2009 |
FIBERTEK, INC. | $778,496 | This task involves building and delivering an autonomous data system that can be directly integrated with the airborne instrument. | National Aeronautics and Space Administration | 1/21/2010 |
FIBERTEK, INC. | $704,980 | LSES Task 6: High PRF, Micropulse Laser System for Aircraft Instrument Use Development of an aircraft demonstrator/simulator instrument for the Ice, Cloud and Land Elevation Satellite 2 (ICESat-2) photon-counting instrument. The Project requires a lase | National Aeronautics and Space Administration | 12/07/2009 |
MODERN TECHNOLOGY SOLUTIONS, INC. | $695,993 | This contract supports the Integration Team for NASAG??s Recovery Act Unmanned Aircraft System (UAS) Project. Contract activities include system engineering, project and mission management, and partnership development. MTSI leads the Integration Team an | National Aeronautics and Space Administration | 4/23/2010 |
FIBERTEK, INC. | $422,894 | Development of a Single-Frequency Global Ozone Lidar Demonstrator (GOLD) /Ozone Differential Absorption Lidar (DIAL) Pump Laser Transmitter. | National Aeronautics and Space Administration | 12/09/2009 |
LOGISTICS MANAGEMENT INSTITUTE | $383,326 |
Air traffic in the U.S. is predicted to increase significantly by 2025. The current air traffic management system will not be able to handle this growth. The objectives of this work are to evaluate the costs and benefits of NASA Concepts and Technologies
This spending item is part of a $786,228 allocation.
See details
|
National Aeronautics and Space Administration | 7/21/2010 |
MCR FEDERAL, LLC | $135,124 |
This effort supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Under this effort, NASA is funding work to conduct Concept & Technologies (C&T) research to enable capacity, efficienc
This spending item is part of a $700,405 allocation.
See details
|
National Aeronautics and Space Administration | 7/30/2010 |
VANILLA AIRCRAFT | $100,000 | Currently, wide area coverage with manned aircraft, or existing UAS, requires expensive logistical operations and many flight sorties, which are made especially difficult if operating from remote airfields in inhospitable climates. There is currently a ne | National Aeronautics and Space Administration | 1/29/2010 |
EMC CORPORATION | $32,503 |
This Task Order 1, Rev 2(A) provided for the continuation of Statement of Work activities established during Task Order 1 award. The purpose of Task Order 1, Rev 2(A) was to fund activities for the period of March 31, 2010 through April 27, 2010 with ARR
This spending item is part of a $44,741 allocation.
See details
|
National Aeronautics and Space Administration | 3/31/2010 |
EMC CORPORATION | $8,415 |
This Task Order provides for the technology refresh of the software and hardware of the Earth Orbiting Satellite Date Information System (ECS) Science Data Processing System (SDPS) and the ECS maintenance environment. It also provides for program manageme
This spending item is part of a $2,256,239 allocation.
See details
|
National Aeronautics and Space Administration | 10/28/2009 |