Hampton County, Va., funds by National Aeronautics and Space Administration
Listing $23,941,801.73 in stimulus funds from National Aeronautics and Space Administration for Hampton
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
JACOBS TECHNOLOGY INC. | $4,729,418 |
Objective is to improve the technical capability of the NTF in providing high quality Reynolds number testing by upgrade of the existing Data Acquisition System (DAS). The upgrade will improve the NTF's technical viability in the form of advanced data co
This spending item is part of a $4,965,903 allocation.
See details
|
National Aeronautics and Space Administration | 3/10/2010 |
JACOBS TECHNOLOGY INC. | $2,486,106 |
Upgrade the Tunnel Controls System for the National Transonic Facility (NTF). The objective is to improve the technical viability of the NTF in providing continued high quality high Reynolds number testing by installing a new tunnel controls sytem, repla
This spending item is part of a $3,010,427 allocation.
See details
|
National Aeronautics and Space Administration | 3/05/2010 |
JACOBS TECHNOLOGY INC. | $2,057,151 |
Acoustic Phased Array Traverse Mechanism for the 14x22 Foot Subsonic Wind Tunnel at the NASA Langley Research Center
This spending item is part of a $2,361,751 allocation.
See details
|
National Aeronautics and Space Administration | 4/23/2010 |
ATK SPACE SYSTEMS INC. | $1,699,137 | Research and Development to Mature Airborne Self-Separation Algorithms | National Aeronautics and Space Administration | 6/03/2010 |
JACOBS TECHNOLOGY INC. | $1,678,294 |
Fuel Supply and Purge Systems for the 14x22 Foot subsonic Wind Tunnel at the NASA Langley Research Center
This spending item is part of a $2,047,294 allocation.
See details
|
National Aeronautics and Space Administration | 4/02/2010 |
ATK SPACE SYSTEMS INC. | $1,349,280 | A Research & Development Plan for UAS Access to the Next Generation Air Tra | National Aeronautics and Space Administration | 1/28/2010 |
JACOBS TECHNOLOGY INC. | $845,598 | Testing of a Generic Circulation Control Semi-Span Model in the NASA Langley Research Center (LaRC) National Transonic Facility (NTF) | National Aeronautics and Space Administration | 7/27/2010 |
NATIONAL INSTITUTE OF AEROSPACE ASSOCIATES | $662,400 | Materials Research for Aircraft Aging & Durability | National Aeronautics and Space Administration | 3/30/2010 |
ATK SPACE SYSTEMS INC. | $647,356 | Research and Development for Enhancement of 4-Dimensional Flight Management | National Aeronautics and Space Administration | 2/23/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $633,690 |
Research and Development to Mature Airborne Self-Separation Algorithms and Concepts (Task 334) The NASA Langley Air Traffic Operations Laboratory (ATOL) houses a suite of complex, high-fidelity simulation systems dedicated to the research of advanced Air
This spending item is part of a $1,431,820 allocation.
See details
|
National Aeronautics and Space Administration | 11/25/2009 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $500,000 | This task order supports the Climate Absolute Radiance and Refractivity Observatory (CLARREO) Mission Concept study being conducted by NASA Langley Research Center in accordance with NASA Space Flight Program and Project Management Requirements (NPR) 7120 | National Aeronautics and Space Administration | 12/18/2009 |
ATK SPACE SYSTEMS INC. | $497,379 | Research and Development for Integrated Air and Ground-based Concepts | National Aeronautics and Space Administration | 2/04/2010 |
UNISYS CORPORATION | $449,676 | The contractor shall provide design, development, implementation, testing, operation, and maintenance support for IIFD project simulation tasks. This work supports IIFD by developing simulations and supporting equipment and technologies for human-in-the- | National Aeronautics and Space Administration | 5/27/2010 |
JACOBS TECHNOLOGY INC. | $403,380 |
National Transonic Facility (NTF) Reliability Enhancements: Task Order Part 2 - Implementation of Recommendations for Facility Reliability Improvement
This spending item is part of a $1,173,338 allocation.
See details
|
National Aeronautics and Space Administration | 8/30/2010 |
ATK SPACE SYSTEMS INC. | $389,436 | Develop and Expand Expertise in Metroplex Concept Definition and Integrated | National Aeronautics and Space Administration | 3/04/2010 |
JACOBS TECHNOLOGY INC. | $345,221 |
Combined Loads Test System (COLTS) Upgrades for the Environmentally Responsible Aviation (ERA) Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) Test at NASA Langley Research Center (LaRC) Objective of the project is to upgrade the facility al
This spending item is part of a $485,423 allocation.
See details
|
National Aeronautics and Space Administration | 6/16/2010 |
ATK SPACE SYSTEMS INC. | $333,949 | AirSTAR Testbed Development and Support | National Aeronautics and Space Administration | 2/25/2010 |
ADAPTIVE AEROSPACE GROUP INC. | $330,650 |
The NASA Next Generation Air Transportation System (NextGen) - Airspace Project, under the Airspace Systems Program (ASP), directly addresses the fundamental air traffic management (ATM) research needs for NextGen (www.jpdo.gov/nextgen.asp) by developing
This spending item is part of a $939,697 allocation.
See details
|
National Aeronautics and Space Administration | 3/08/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $313,170 |
The objectives of this task are provided in the following subtasks: Subtask 1: Airspace and Traffic Operations Simulation (ATOS) 4-Dimensional Flight Management System (4D-FMS) Integration with the Autonomous Operations Planner (AOP) Background: The NAS
This spending item is part of a $701,269 allocation.
See details
|
National Aeronautics and Space Administration | 3/31/2010 |
UNISYS CORPORATION | $265,213 | The contractor shall perform the review, implementation, and operation of software in the AirSTAR flight control system and Generic Transport Model (GTM) simulation during the year 2010. During this year, three flight test campaigns are planned in order t | National Aeronautics and Space Administration | 2/26/2010 |
JACOBS TECHNOLOGY INC. | $262,348 |
Enhancements to the Rotorcraft Test Cell at the 14 x 22 Foot Subsonic Wind Tunnel ay the NASA Langley Research Center. The objective of this work is to enhance the 14x22 Foot Subsonic Wind Tunnel complex Rotorcraft Test Cell control room, test equipment
This spending item is part of a $583,806 allocation.
See details
|
National Aeronautics and Space Administration | 3/09/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $250,000 | This task quantifies the impacts of contrails on climate. In this study, satellite data are used to derive the contrail climatology based on 2 years of data. The contrail climatology describes the temporal and spatial coverage. A radiative forcing calc | National Aeronautics and Space Administration | 6/15/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $225,000 | SSAI will provide the technical staff and work processes to accomplish the requirements specified in the Task Order. Responsiveness will be an important metric for task performance. SSAI will keep the government informed of all activities, such as work su | National Aeronautics and Space Administration | 7/12/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $224,965 |
Research and Development to Conduct Air-ground Functional Allocation Studies (Task 341) The NASA Next Generation Air Transportation System (NextGen) - Airspace Project, under the Airspace Systems Program (ASP), directly addresses the fundamental air traff
This spending item is part of a $853,881 allocation.
See details
|
National Aeronautics and Space Administration | 12/10/2009 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $218,283 |
The NASA Next Generation Air Transportation System (NextGen) - Airspace Project, under the Airspace Systems Program (ASP), directly addresses the fundamental air traffic management (ATM) research needs for NextGen (www.jpdo.gov/nextgen.asp) by developing
This spending item is part of a $939,697 allocation.
See details
|
National Aeronautics and Space Administration | 3/08/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $187,690 |
The objectives of this task are provided in the following subtasks: Subtask 1: Airspace and Traffic Operations Simulation (ATOS) 4-Dimensional Flight Management System (4D-FMS) Integration with the Autonomous Operations Planner (AOP) Background: The NAS
This spending item is part of a $701,269 allocation.
See details
|
National Aeronautics and Space Administration | 3/31/2010 |
ATK SPACE SYSTEMS INC. | $184,137 | Research and Development to Conduct Air-ground Functional Allocation Studie | National Aeronautics and Space Administration | 12/03/2009 |
ATK SPACE SYSTEMS INC. | $182,499 | Research and Development to Mature Airborne Self-Separation Algorithms | National Aeronautics and Space Administration | 12/01/2009 |
JACOBS TECHNOLOGY INC. | $177,471 | Operational Reliability Assessment for the National Transonic Facility (NTF). The objective of this task order is to improve the operational reliability of the NTF. To achieve this objective the Government is seeking a detailed operational reliability | National Aeronautics and Space Administration | 3/12/2010 |
PRESSURE SYSTEMS, INC. | $140,603 |
Evaluation of Sonic Boom measurement test techniques under contract NNA09DB39C.
This spending item is part of a $1,650,000 allocation.
See details
|
National Aeronautics and Space Administration | 4/09/2010 |
ATK SPACE SYSTEMS INC. | $138,175 | Develop and Expand Expertise in Metroplex Concept Definition and Integrated | National Aeronautics and Space Administration | 2/23/2010 |
ATK SPACE SYSTEMS INC. | $127,936 | Monitor and Assess the Effectiveness of Airframe Structural Damage | National Aeronautics and Space Administration | 3/04/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $123,009 | This task provides support to design, assemble, operate, and maintain the GOLD lidar system. This shall include optimizing opto-mechanical designs, performing optical alignments, and developing software and procedures for the laser and data acquisition sy | National Aeronautics and Space Administration | 1/15/2010 |
GENEX SYSTEMS LLC | $94,702 |
Subtask 1: Development of a Graphical User Interface for the Flight Deck Research System with Integrated Setup/Configuration Functions Background: In order to make preflight setup more efficient and less prone to configuration errors, an integrated, compr
This spending item is part of a $131,779 allocation.
See details
|
National Aeronautics and Space Administration | 3/24/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $90,330 |
The objective of this task is to evaluate the current Airborne Precision Spacing (APS) concept with realistic winds and wind forecast errors, and ADS-B range limitations. Several previous studies have identified winds, wind forecast errors, and ADS-B rang
This spending item is part of a $242,808 allocation.
See details
|
National Aeronautics and Space Administration | 3/31/2010 |
ATK SPACE SYSTEMS INC. | $88,027 | Open Circuit Resonate Sensor for Composite Diagnosis | National Aeronautics and Space Administration | 2/22/2010 |
EAGLE AERONAUTICS INC | $84,461 |
Develop a total of 3 Sonic Boom Focus Research Software Codes (capable of traditional and conceptual low-boom aircraft analysis), and design and assist in the execution of a flight experiment under a range of realistic atmosphereic conditions to validate
This spending item is part of a $407,138 allocation.
See details
|
National Aeronautics and Space Administration | 6/21/2010 |
ATK SPACE SYSTEMS INC. | $80,328 | Research and Development to Increase maturity of concept, operations | National Aeronautics and Space Administration | 4/27/2010 |
GENEX SYSTEMS LLC | $51,084 |
SAIC will provide technical expertise and adminstrative support to the NASA Science Support Office in the preparation for and during the evaluation of the Earth Venture-1 (EV-1) proposals (a maximum of 35 proposals). SAIC's technical support will include
This spending item is part of a $561,900 allocation.
See details
|
National Aeronautics and Space Administration | 11/19/2009 |
ANALYTICAL SERVICES & MATERIALS, INC. | $46,395 |
Research and Development to Mature Airborne Self-Separation Algorithms and Concepts (Task 334) The NASA Langley Air Traffic Operations Laboratory (ATOL) houses a suite of complex, high-fidelity simulation systems dedicated to the research of advanced Air
This spending item is part of a $1,431,820 allocation.
See details
|
National Aeronautics and Space Administration | 11/25/2009 |
ANALYTICAL SERVICES & MATERIALS, INC. | $43,750 |
Upgrade the Tunnel Controls System for the National Transonic Facility (NTF). The objective is to improve the technical viability of the NTF in providing continued high quality high Reynolds number testing by installing a new tunnel controls sytem, repla
This spending item is part of a $3,010,427 allocation.
See details
|
National Aeronautics and Space Administration | 3/05/2010 |
NCI INFORMATION SYSTEMS, INC. | $40,808 |
The objectives of this task are provided in the following subtasks: Subtask 1: Airspace and Traffic Operations Simulation (ATOS) 4-Dimensional Flight Management System (4D-FMS) Integration with the Autonomous Operations Planner (AOP) Background: The NAS
This spending item is part of a $701,269 allocation.
See details
|
National Aeronautics and Space Administration | 3/31/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $36,096 |
This task supports NASA LaRCG??s unmanned aerial vehicle (UAV) airborne Global Ozone Lidar Demonstrator (GOLD) remote sensing program. Support includes the design and development of hardware; including mechanical systems, opto-mechanical systems, thermal
This spending item is part of a $216,097 allocation.
See details
|
National Aeronautics and Space Administration | 1/15/2010 |
ANALYTICAL SERVICES & MATERIALS, INC. | $35,999 |
The NASA Next Generation Air Transportation System (NextGen) - Airspace Project, under the Airspace Systems Program (ASP), directly addresses the fundamental air traffic management (ATM) research needs for NextGen (www.jpdo.gov/nextgen.asp) by developing
This spending item is part of a $939,697 allocation.
See details
|
National Aeronautics and Space Administration | 3/08/2010 |
ANALYTICAL SERVICES & MATERIALS, INC. | $33,000 |
Objective is to improve the technical capability of the NTF in providing high quality Reynolds number testing by upgrade of the existing Data Acquisition System (DAS). The upgrade will improve the NTF's technical viability in the form of advanced data co
This spending item is part of a $4,965,903 allocation.
See details
|
National Aeronautics and Space Administration | 3/10/2010 |
ANALYTICAL SERVICES & MATERIALS, INC. | $32,759 |
National Transonic Facility (NTF) Reliability Enhancements: Task Order Part 2 - Implementation of Recommendations for Facility Reliability Improvement
This spending item is part of a $1,173,338 allocation.
See details
|
National Aeronautics and Space Administration | 8/30/2010 |
ANALYTICAL SERVICES & MATERIALS, INC. | $32,560 |
Research and Development to Conduct Air-ground Functional Allocation Studies (Task 341) The NASA Next Generation Air Transportation System (NextGen) - Airspace Project, under the Airspace Systems Program (ASP), directly addresses the fundamental air traff
This spending item is part of a $853,881 allocation.
See details
|
National Aeronautics and Space Administration | 12/10/2009 |
ANALYTICAL SERVICES & MATERIALS, INC. | $30,106 |
The objectives of this task are provided in the following subtasks: Subtask 1: Airspace and Traffic Operations Simulation (ATOS) 4-Dimensional Flight Management System (4D-FMS) Integration with the Autonomous Operations Planner (AOP) Background: The NAS
This spending item is part of a $701,269 allocation.
See details
|
National Aeronautics and Space Administration | 3/31/2010 |
PRESSURE SYSTEMS, INC. | $25,700 |
Evaluation of Sonic Boom measurement test techniques under contract NNA09DB39C.
This spending item is part of a $1,650,000 allocation.
See details
|
National Aeronautics and Space Administration | 4/09/2010 |
NCI INFORMATION SYSTEMS, INC. | $20,076 |
Subtask 1: Development of a Graphical User Interface for the Flight Deck Research System with Integrated Setup/Configuration Functions Background: In order to make preflight setup more efficient and less prone to configuration errors, an integrated, compr
This spending item is part of a $131,779 allocation.
See details
|
National Aeronautics and Space Administration | 3/24/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $17,001 |
Subtask 1: Development of a Graphical User Interface for the Flight Deck Research System with Integrated Setup/Configuration Functions Background: In order to make preflight setup more efficient and less prone to configuration errors, an integrated, compr
This spending item is part of a $131,779 allocation.
See details
|
National Aeronautics and Space Administration | 3/24/2010 |