Benton County, Wash., funds by General Services Administration
Listing $3,290,558.70 in stimulus funds from General Services Administration for Benton
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
APOLLO SHEET METAL, INC. | $1,018,876 |
This project is located just north of Norhtport Washington on the Canadian border. The project consists of the design and construction of a new two story land port of entry facility. The new facility will be approximately 9,000 square feet total. The proj
This spending item is part of a $15,098,680 allocation.
See details
|
Public Buildings Service | 8/14/2009 |
MEIER ENTERPRISES, INC. | $782,355 |
This project is located just north of Norhtport Washington on the Canadian border. The project consists of the design and construction of a new two story land port of entry facility. The new facility will be approximately 9,000 square feet total. The proj
This spending item is part of a $15,098,680 allocation.
See details
|
Public Buildings Service | 8/14/2009 |
APOLLO SHEET METAL, INC. | $731,484 |
The project is located at the Richland Federal Building in Richland, Washington. The Scope is to implement energy savings measures to the existing mechanical systems and replace energy inefficient mechanical equipment with energy efficient equipment, whic
This spending item is part of a $954,855 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
MEIER ENTERPRISES, INC. | $445,000 |
The Project in located West of Oroville Washington on the Canadian border North of the old town of Nighthawk. This project consists of the design and construction of a single story land port of entry facility. The project will include the devolvement of t
This spending item is part of a $8,201,436 allocation.
See details
|
Public Buildings Service | 9/20/2010 |
RANDOLPH CONSTRUCTION SERVICES, INC. | $186,268 |
The project is located at the Richland Federal Building in Richland, Washington. The Scope is to implement energy savings measures to the existing mechanical systems and replace energy inefficient mechanical equipment with energy efficient equipment, whic
This spending item is part of a $954,855 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
COOPER ZIETZ ENGINEERS, INC | $85,462 | Construction Mangement and Commissioning Services for the Richland Federal Builiding, Richland WA | Public Buildings Service | 9/21/2010 |
GARRETT ELECTRIC COMPANY, INC. | $28,303 |
The project is located at the Richland Federal Building in Richland, Washington. The Scope is to implement energy savings measures to the existing mechanical systems and replace energy inefficient mechanical equipment with energy efficient equipment, whic
This spending item is part of a $954,855 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
ALL SAFE ABATEMENT | $8,800 |
The project is located at the Richland Federal Building in Richland, Washington. The Scope is to implement energy savings measures to the existing mechanical systems and replace energy inefficient mechanical equipment with energy efficient equipment, whic
This spending item is part of a $954,855 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
ENVIRONMENTAL COMPLIANCE ASSOCIATES LLC | $4,011 |
The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation.
See details
|
Public Buildings Service | 5/20/2009 |