Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Benton County, Wash., funds by Energy, Department of

Listing $1,596,531,954.67 in stimulus funds from Energy, Department of for Benton

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
CH2M HILL PLATEAU REMEDIATION COMPANY $324,707,475 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
WASHINGTON RIVER PROTECTION SOLUTIONS LLC $185,373,028 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
CH2M HILL PLATEAU REMEDIATION COMPANY $173,311,372 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
WASHINGTON CLOSURE HANFORD LLC $64,037,395 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
CH2M HILL PLATEAU REMEDIATION COMPANY $60,922,052 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
CH2M HILL PLATEAU REMEDIATION COMPANY $40,859,863 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
WASHINGTON CLOSURE HANFORD LLC $38,351,174 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
TRADEWIND SERVICES LLC $35,157,733 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
Mission Support Alliance, LLC $34,790,515 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
FLUOR FEDERAL SERVICES, INC. $25,536,779 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
PERMA-FIX NORTHWEST RICHLAND, INC. $24,987,053 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $18,981,675 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
Mission Support Alliance, LLC $15,589,051 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FLUOR FEDERAL SERVICES, INC. $15,173,955 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $15,130,070 Electricity Delivery and Energy Reliability, Research, Development and Analysis Title: Pacific Northwest Smart Grid Demonstration Purpose: This demonstration will validate new smart grid technologies and inform business cases; provide two-way communication between distributed generation, storage,... Show more
This spending item is part of a $88,821,251 allocation. See details
Energy, Department of 2/01/2010
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $14,744,308 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $14,229,690 57402 - Title: Land-Use Change Modeling Studies Purpose: The purpose of the project is to improve land-use change modeling capabilities to help ensure biofuels can be produced sustainably Description: The project will Increase the scope of sustainabi
This spending item is part of a $18,129,243 allocation. See details
Energy, Department of 8/10/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $12,790,115 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BABCOCK SERVICES, INC. $12,154,830 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $11,673,162 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
Mission Support Alliance, LLC $11,468,600 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
FLUOR FEDERAL SERVICES, INC. $9,744,124 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
ELRFOWLER JV $9,557,467 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $9,215,830 Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
APPLIED GEOTECHNICAL ENGINEERING AND CONSTRUCTION INC $8,144,499 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $7,290,017 58055 - Combine advanced enzyme design methodology with superior molecular catalyst design to advance the state-of-the-art in homogeneous catalysts by incorporating a rationally designed extended proton relay system. Description: This emphasis of this pr
This spending item is part of a $7,500,000 allocation. See details
Office of Science 3/18/2010
BATTELLE MEMORIAL INSTITUTE $6,837,207 ARRA Task Description Overall EEPs Technical Assistance to States - Identify regional needs and develop a strategy to respond to them. Provide assistance to the states with Section 410 compliance. State Technical Assistance ? provide specialized ass
This spending item is part of a $16,244,133 allocation. See details
Energy, Department of 12/09/2009
AREVA FEDERAL SERVICES LLC $6,722,043 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $6,341,876 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $6,139,629 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ELECTRIC, INC $6,087,996 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TOTAL SITE SERVICES LLC $5,743,848 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
MCS LLC $5,734,857 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
BABCOCK SERVICES, INC. $5,329,114 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
WATTS CONSTRUCTION, INC. $5,312,448 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, $5,303,065 To perform analytical services at the 222-S Laboratory complex, the primary laboratory for highly radioactive samples at Hanford. The analyses are needed to determine what is in the waste, maintain control of the chemistry of the wastes in the tanks, and Energy, Department of 2/26/2010
OJEDA BUSINESS VENTURES, LLC $5,273,625 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
OJEDA BUSINESS VENTURES, LLC $4,732,533 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
FLUOR FEDERAL SERVICES, INC. $4,726,824 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $4,689,800 57509 ? ARRA Smart Grid Investment Grant & Interoperability Coordination - Morgan - $4,675,000: Task 1 - ARRA - Smart Grid Investment Grant & Interoperability Coordination - $480K: Purpose: OE requires smart grid technical expertise in support of their
This spending item is part of a $4,875,000 allocation. See details
Energy, Department of 8/26/2009
TOTAL SITE SERVICES LLC $4,342,317 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $4,161,228 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $4,099,098 SA 58017 Title: ARRA SW Regional Partnership Kansas Carbon Sequestration Purpose: Provide new insight on the chemical, electronic & photo properties of the interface layer formed at the junction between Cadmium sulfide (CdS) & Cadmium telluride (CdTe) Energy, Department of 1/26/2010
FOWLER GENERAL CONSTRUCTION, INC. $4,016,218 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $3,973,393 SA 58489 Award Title: Commercial Building Partnerships (CBP) in support of the Commercial Buildings Initiative. Award Purpose: The goal of this project is to substantially reduce energy consumption in the commercial real estate sector by creating, testin
This spending item is part of a $6,944,706 allocation. See details
Energy, Department of 12/09/2009
AREVA FEDERAL SERVICES LLC $3,922,572 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BABCOCK SERVICES, INC. $3,867,918 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
MID COLUMBIA ENGINEERING, INC. $3,693,000 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BABCOCK SERVICES, INC. $3,475,100 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER GENERAL CONSTRUCTION, INC. $3,404,847 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $3,201,298 ARRA - Solid-State Lighting (SSL) Commercialization Support (Project #57162) - 1) SSL Manufacturer, Large Buyer, Lighting Designer Workshop ? in an effort to organize and accelerate the transmission of important lighting design information back to SSL man
This spending item is part of a $4,205,000 allocation. See details
Energy, Department of 12/09/2009
GEORGE A. GRANT, INC. $3,189,363 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $3,155,030 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER GENERAL CONSTRUCTION, INC. $3,057,290 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BLUE STAR ENTERPRISES NORTHWEST INCORPORATED $3,050,790 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
PERMA-FIX NORTHWEST RICHLAND, INC. $3,023,844 $37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation. See details
Energy, Department of 7/24/2009
PHOENIX-ABC A JOINT VENTURE $3,014,830 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
INFINIA CORPORATION $3,000,617 Advanced Research and Projects Agency Energy Financial Assistance Program Infinia Corporation will develop and demonstrate a prototype Stirling Air Conditioner (StAC) that combines recent technology advances in a unique manner to produce a transformational improvement in compact cooling. Two generati... Show more Energy, Department of 9/01/2010
PHOENIX-ABC A JOINT VENTURE $2,780,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $2,773,142 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $2,650,606 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FLUOR FEDERAL SERVICES, INC. $2,623,607 D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation. See details
Energy, Department of 4/06/2010
OJEDA BUSINESS VENTURES, LLC $2,608,934 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $2,494,377 SA 57148, 59041, 59042, 59043, 60663 Award Title: ARRA PNNL Building America. PNNL Research and Documentation in Support of Residential Integration. There are three non-ARRA tasks (Tasks 1, 2, and 3) and three ARRA tasks (Task 4, 5, and 6) . The ARRA
This spending item is part of a $3,650,000 allocation. See details
Energy, Department of 2/11/2010
PHOENIX ENTERPRISES NW, LLC $2,392,717 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $2,388,272 Advanced Research and Projects Agency Energy Financial Assistance Program This project aims to develop a dehumidification membrane that can selectively sieve out water molecules from the humid air stream that flows over it while leaving behind the oxygen and nitrogen molecules.
This spending item is part of a $3,408,237 allocation. See details
Energy, Department of 8/27/2010
ARES CORPORATION $2,283,032 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
LOCKHEED MARTIN SERVICES, INC. $2,253,868 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $2,206,230 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
TRADEWIND SERVICES LLC $2,125,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $2,085,539 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $2,037,322 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
CARPENTER DRILLING $2,017,086 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $2,000,000 Award Title: Enhance and Accelerate FEMP Service Functions t the Federal Government Purpose: PNNL will provide technical assistance to enhance and accelerate Federal Energy Management Program (FEMP) service functions to the Federal government so agenci Energy, Department of 9/08/2009
KADLEC MEDICAL CENTER $2,000,000 State Energy Program Funding supports energy efficiency, renewable energy and clean technology programs statewide. The funding addresses a specific goal to reduce energy consumption by at least 25 percent of the stateG??s 1990 per capita energy use by 2012.
This spending item is part of a $60,944,000 allocation. See details
National Energy Technology Laboratory 5/01/2009
APOLLO, INC. $1,986,700 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $1,959,111 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $1,831,149 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PERMA-FIX NORTHWEST RICHLAND, INC. $1,800,000 This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation. See details
Energy, Department of 4/13/2009
WATTS CONSTRUCTION, INC. $1,748,119 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
BNL TECHNICAL SERVICES, L.L.C. $1,686,398 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $1,639,253 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
PROJECT ASSISTANCE CORPORATION $1,637,728 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 7/07/2009
INDUSTRIAL CONSTRUCTORS, INC. $1,611,465 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TOTAL SITE SERVICES LLC $1,605,956 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $1,600,141 Provide quality assurance support to DOE/RL. Individual tasks are assigned by the DOE/RL Assistant Manager for Safety and Environment, and deliverables are entered into the DOE/RL OA Database. Energy, Department of 5/28/2009
J. and D. Sales, Inc. $1,583,928 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
WATTS CONSTRUCTION, INC. $1,540,516 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
LOCKHEED MARTIN SERVICES, INC. $1,525,725 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FREESTONE ENVIRONMENTAL SERVICES, INC. $1,521,916 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $1,509,288 SA 57984 Award Title: Pacific Northwest National Laboratory: Reviewers for ARPA-E Award Purpose ARPA-E review Award Description To fund the expenses of PNNL employees to review proposals in support of the ARPA-E Program ( DE-FOA-0000206, DE-FOA-0000207 Energy, Department of 8/26/2009
OJEDA BUSINESS VENTURES, LLC $1,503,144 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $1,478,231 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER GENERAL CONSTRUCTION, INC. $1,459,041 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
IMPACT SERVICES, INC. $1,448,026 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $1,440,929 Pacific Northwest National Laboratory (PNNL) will provide analytic support and expertise to Battelle Columbus Operations (BCO) and American Electric Power (AEP) for project activities related to AEP?s gridSMARTSM demonstration project. In this role, PNNL
This spending item is part of a $1,500,929 allocation. See details
Energy, Department of 8/11/2010
BATTELLE MEMORIAL INSTITUTE $1,413,251 Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation. See details
Office of Science 9/23/2009
UNITECH SERVICES GROUP INC $1,379,900 This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation. See details
Energy, Department of 4/13/2009
AMERICAN ELECTRIC, INC $1,377,002 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $1,376,952 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
BATTELLE MEMORIAL INSTITUTE $1,358,169 Sub Account 57718 Title: PV Systems Development Purpose: Provide new insight on the chemical, electronic and photo properties of the interface layer formed at the junction between Cadmium Description: Milestones: Sub Account 57720 Title: Therm
This spending item is part of a $1,497,974 allocation. See details
Energy, Department of 1/25/2010
PERMA-FIX NORTHWEST RICHLAND, INC. $1,351,648 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
J.A.D. ENVIRONMENTAL $1,345,688 Provide Office of the Assistant Secretary and the office of the Deputy Assistant Secretary for Technology Development the means to support the R&D mission and vision of the Energy Efficiency and Renewable Energy with technical, engineering, analytical, an
This spending item is part of a $13,901,856 allocation. See details
Energy, Department of 7/08/2009
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. $1,336,528 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ABB INC. $1,316,065 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $1,311,240 56595 - Develop a new type of biphasic working fluid for subcritical geothermal systems that utilizes microporous nanostructured metal-organic solids as the primary heat carrier and heat transfer medium to support an organic Rankine cycle. The goal is to Energy, Department of 9/08/2009
MCS LLC $1,309,860 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
PHOENIX-ABC A JOINT VENTURE $1,300,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $1,298,708 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $1,297,045 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MID COLUMBIA ENGINEERING, INC. $1,271,523 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $1,260,653 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $1,225,000 Title: 58100 Merit Review Purpose: Provide Merit Reviewers for DOE Biomass Solicitation Description: To provide technical experts to assist in reviewing biomass proposals submitted to DOE Milestones: Complete reviews, November 30, 2009. 57636 -
This spending item is part of a $1,330,000 allocation. See details
Energy, Department of 8/26/2009
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. $1,215,332 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $1,199,547 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
PACIFIC SUPPLY & SAFETY, LLC $1,196,348 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $1,195,000 Prevent blackouts and other large scale reliability issues by analyzing and assessing, and addressing emerging reliability challenges due to the integration of variable renewable resources and the changing load composition.
This spending item is part of a $1,500,000 allocation. See details
Energy, Department of 7/01/2010
BATTELLE MEMORIAL INSTITUTE $1,194,526 Award Title: Integrated Assessment Research. Award Purpose: Contribute to significant advances for the Integrated Assessment Research Program (IARP) whose goals are to improve understanding of and to develop leading national decision support tools regardi
This spending item is part of a $4,860,000 allocation. See details
Office of Science 8/12/2009
FLUOR HANFORD, INC. $1,190,127 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $1,175,169 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TOTAL SITE SERVICES LLC $1,172,012 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
HILINE ENGINEERING & FABRICATION, INC. $1,145,197 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
STONEWAY ELECTRIC SUPPLY CO. $1,136,931 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
Mission Support Alliance, LLC $1,136,150 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $1,129,455 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $1,087,778 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
GEORGE A. GRANT, INC. $1,081,594 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
APOLLO, INC. $1,053,385 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $1,042,875 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PERMA-FIX NORTHWEST RICHLAND, INC. $1,011,374 $37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation. See details
Energy, Department of 7/24/2009
FOWLER GENERAL CONSTRUCTION, INC. $979,707 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $975,425 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FLUOR FEDERAL SERVICES, INC. $954,579 Toxic and hazardous waste cleanup at Bethel Valley Burial Grounds (SWSA 1 and SWSA 3)
This spending item is part of a $14,912,999 allocation. See details
Energy, Department of 9/18/2009
FOWLER GENERAL CONSTRUCTION, INC. $950,388 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PROJECT ASSISTANCE CORPORATION $949,217 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 8/18/2009
PROJECT ASSISTANCE CORPORATION $913,040 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 9/18/2009
ARES CORPORATION $912,964 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
GREEN ENERGY TODAY, LLC $898,175 State Energy Program Funding supports energy efficiency, renewable energy and clean technology programs statewide. The funding addresses a specific goal to reduce energy consumption by at least 25 percent of the stateG??s 1990 per capita energy use by 2012.
This spending item is part of a $60,944,000 allocation. See details
National Energy Technology Laboratory 5/01/2009
Aecom Services, Inc. $880,085 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
WATTS CONSTRUCTION, INC. $877,471 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $872,710 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NFT INCORPORATED $870,236 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
GEORGE A. GRANT, INC. $864,773 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $860,000 The project goal is to develop advanced Kalman filtering techniques and formulate dynamic state estimations that will fundamentally change the paradigm of real-time operations and control for complex engineering systems. Power grids, gas-pipelines, and Office of Science 8/25/2009
LOCKHEED MARTIN SERVICES, INC. $858,200 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
PHOENIX ENTERPRISES NW, LLC $795,500 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
SEALASKA ENVIRONMENTAL SERVICES, LLC $784,545 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $777,091 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
BNL TECHNICAL SERVICES, L.L.C. $771,791 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER GENERAL CONSTRUCTION, INC. $759,794 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
RICHLAND INDUSTRIAL, INC $758,496 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $756,211 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PROJECT ASSISTANCE CORPORATION $750,309 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 5/06/2009
BATTELLE MEMORIAL INSTITUTE $747,974 G?? Title: Thermochemical Energy Storage for Stirling Concentrating Solar Power Systems G?? Purpose: The programmatic objective of this project is to support DOEG??s goal of increasing the use of concentrating solar power (CSP) in the United States, mak Energy, Department of 1/14/2010
INTERNATIONAL ENGINEERING SERVICES, INC. $745,741 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $732,711 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
DADE MOELLER & ASSOCIATES, INC. $731,542 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
APOLLO, INC. $731,133 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
LOCKHEED MARTIN SERVICES, INC. $730,036 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $718,286 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DGR GRANT CONSTRUCTION, INC. $717,718 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $709,952 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $700,000 Provide support to the ARRA Program and the Recovery Act Program Manager (RAPM) by: 1) Performing assessments of policies and procedures to ensure DOE-RL compliance with ARRA requirements; 2) Preparation of assessment reports of DOE RL and Hanford Site co Energy, Department of 9/28/2009
TRI CITY SIGN & BARRICADE $698,897 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $695,926 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AMERICAN ELECTRIC, INC $671,767 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PAI CORPORATION $668,878 Fire Protection BP0000733 Fire Protection Engineering Support PAI Corporation provides fire protection safety support to DOE-RL for ARRA work scope. The work scope includes: ? Reviews of Fire Hazards Analyses and associated Documented Safety Analyses for Energy, Department of 8/27/2009
ARES CORPORATION $664,427 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
G FORCE ENGINEERING & TECHNOLOGY, INC. $639,884 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $639,729 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
GEORGE A. GRANT, INC. $625,884 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AREVA FEDERAL SERVICES LLC $619,825 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
CARRELL TECHNICAL SERVICES, INC. $616,429 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $609,188 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGX, LLC $605,000 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $599,585 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
REMOTE SYSTEMS ENGINEERING, INC $595,358 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
KENNEWICK, CITY OF $589,700 Energy Efficiency and Conservation Block Grant Program (EECBG) Project Description: The City of Kennewick is utilizing the EECBG allocation to fund the replacement of 884 high pressure sodium street lights with induction lights. To date the contractor has replaced: Number ... Show more National Energy Technology Laboratory 9/28/2009
WASHINGTON CLOSURE HANFORD LLC $587,787 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
PROJECT ASSISTANCE CORPORATION $583,283 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 9/17/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $580,189 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $579,949 1. Reviews of Health and Safety Plans for specific work scope areas related to ARRA accelerated work scope; 2. Assists in the evaluation of contractor work activities to verify that work is being conducted safely and in accordance with contractual require Energy, Department of 9/25/2009
WORLEYPARSONS POLESTAR, INC. $574,893 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $569,668 The contractor shall provide support to the Department of Energy Richland Operations Office (DOE-RL) Financial Management Division (FMD), Contractor Industrial Relations (CIR), and Finance Team Lead in the following areas: 1. Preparation of independent fi Energy, Department of 1/15/2010
JONES AND COMPANY PROFESSIONAL CORPORATION $566,173 Financial Auditors Support Energy, Department of 6/17/2009
RC CONSTRUCTION SERVICES INC $562,662 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $560,195 Title: ARRA-Advanced HX development for fuel cell systems Purpose: Develop, test and characterize advanced materials and design for high temperature heat exchangers for application in fuel cell power generation systems. Gas -to gas heat exchangers will b
This spending item is part of a $650,000 allocation. See details
Energy, Department of 3/16/2010
WEIRICH CONSULTING SERVICES INC $552,821 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $548,379 Provide support to the ARRA Program and the Recovery Act Program Manager by: 1) Providing relational database development, support and maintenance for the DOE RL ARRA Program; 2) Providing tracking, monitoring, and notification to DOE RL and contractors; Energy, Department of 5/06/2009
PROJECT ASSISTANCE CORPORATION $548,250 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 9/18/2009
PROJECT ASSISTANCE CORPORATION $546,433 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 5/19/2009
PAI CORPORATION $546,114 ? Safety basis reviews for work related to ARRA work scope. ? Preparation of drafts or recommendations on safety basis related procedures, processes, and policies. ? Evaluations of implementation of safety basis requirements. ? Reviews of safety basis doc Energy, Department of 6/17/2009
BNL TECHNICAL SERVICES, L.L.C. $543,957 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ELECTRIC, INC $540,294 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $530,349 1. Reviews of Health and Safety Plans for specific work scope areas related to ARRA accelerated work scope; 2. Assists in the evaluation of contractor work activities to verify that work is being conducted safely and in accordance with contractual require Energy, Department of 9/25/2009
ELR CONSULTING, INC. $524,377 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $521,359 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER GENERAL CONSTRUCTION, INC. $506,942 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $505,137 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $503,949 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PAI CORPORATION $501,119 ? Special Packaging Authorization reviews ? One Time Requests for Shipment reviews ? Evaluation of implementation of Transportation and /or Shipping Requirements ? Evaluation and review of the contractor?s Safety Basis documentation for transportation ? T Energy, Department of 8/04/2009
RICHLAND INDUSTRIAL, INC $500,448 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $500,000 Award Title: Recovery Act ? Greenhouse Gas Tools and Resources Support Award Purpose: To have FEMP develop and provide comprehensive GHG management and abatement services to Federal agencies as they begin to focus attention on mitigating climate change. Energy, Department of 9/08/2009
A E M CONSULTING LLC $499,178 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MCS LLC $498,682 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
AMERICAN ELECTRIC, INC $498,667 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $496,000 The scope of the enhanced utilization of Isotope facilities project is to set up the processing capability to produce high specific activity of Gadolinium-153 to meet current and future needs for this radioisotope for research applications in nuclear medi Office of Science 9/23/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $493,330 Provide PBS-40 Project Management oversight Energy, Department of 9/25/2009
TRADEWIND SERVICES LLC $492,704 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $490,878 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
YAHSGS LLC $485,865 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
YAHSGS LLC $484,800 Environmental Management Program Support - Provide environmental regulatory compliance support including review of regulatory documents, support for Environmental Management Division oversight activities, assessment of environmental compliance processes, Energy, Department of 9/03/2009
BATTELLE MEMORIAL INSTITUTE $484,600 Provide risk identification, characterization and monitoring of DOE, Richland Operations (RL) American Recovery and Reinvestment (ARRA) This work is was awarded via an Inter Entity Work Authorization Energy, Department of 5/15/2009
BATTELLE MEMORIAL INSTITUTE $482,064 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
M.H. CHEW AND ASSOCIATES, INC. $473,016 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $468,093 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ELECTRIC, INC $461,519 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $460,226 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AMERICAN ELECTRIC, INC $449,842 Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation. See details
Office of Science 9/23/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $442,492 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. $441,283 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $437,958 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $430,414 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BARTLETT SERVICES INC $427,444 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
M.H. CHEW AND ASSOCIATES, INC. $425,160 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $423,552 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
PROJECT ASSISTANCE CORPORATION $422,901 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 6/17/2009
FOWLER, LLC $420,602 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $419,683 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
INTERNATIONAL ENGINEERING SERVICES, INC. $416,821 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $416,093 Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation. See details
Energy, Department of 9/15/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $411,297 1. Provide Project Management support added to the 100K Area to assist in ensuring compliance with ARRA 100K Area requirements to include: a) Monitor and Analyze project performance related to the ARRA 100K Area scope using Earned Value Management pri Energy, Department of 6/16/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $402,905 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PUBLIC UTILITY DISTRICT 1 OF BENTON COUNTY $402,500 Electricity Delivery and Energy Reliability, Research, Development and Analysis Title: Pacific Northwest Smart Grid Demonstration Purpose: This demonstration will validate new smart grid technologies and inform business cases; provide two-way communication between distributed generation, storage,... Show more
This spending item is part of a $88,821,251 allocation. See details
Energy, Department of 2/01/2010
PACIFIC SUPPLY & SAFETY, LLC $393,360 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
HOYDAR BUCK INC $389,360 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $385,802 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $385,655 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $385,074 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $382,283 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NUCFIL, LLC $379,983 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $374,084 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $373,644 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NFT INCORPORATED $372,067 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $371,740 ARRA Project Management Support for DOE-RL PBS-41 River Corridor Closure Project 1. Provide Project Management support to RCCP to assist in ensuring compl Energy, Department of 6/17/2009
FOWLER, LLC $370,229 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PHOENIX-ABC A JOINT VENTURE $370,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
DANIELS CONSULTING $364,616 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $364,202 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $363,296 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AREVA FEDERAL SERVICES LLC $362,720 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DADE MOELLER & ASSOCIATES, INC. $360,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $350,000 SA 58807B, 59376 Purpose: Provide project technical assistance to GSA to help execute best practice relighting solutions and assist GSA with the mandated 5 year review of the Green Building Rating System for both existing buildings, major renovations and Energy, Department of 9/27/2010
TRI-CITY INDUSTRIAL, LLC $349,195 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
JONES AND COMPANY PROFESSIONAL CORPORATION $349,158 Financial analyst support Energy, Department of 6/17/2009
FOWLER, LLC $346,057 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $338,867 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $338,744 1. Provide support to AMCP in execution of ARRA project activities in functional areas related to Plateau Remediation Contract modification and execution 2. Provide Project Management support to assist in ensuring compliance with ARRA requirements 3. Pr Energy, Department of 7/01/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $336,400 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DADE MOELLER & ASSOCIATES, INC. $335,886 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
APOLLO, INC. $335,683 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $334,705 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $334,581 Industrial Carbon Capture and Storage (CCS) Application Develop a proposal for commercial-scale CO2 capture and geologic sequestration project at the Boise Wallula paper mill.
This spending item is part of a $409,581 allocation. See details
Energy, Department of 11/16/2009
J. and D. Sales, Inc. $334,337 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
G FORCE ENGINEERING & TECHNOLOGY, INC. $334,011 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $333,521 Provide project management oversight for ARRA funded activities associated with decommissioning and dimantlement of the Plutonium Finishing Plant (PFP) at the Hanford Site. Energy, Department of 9/14/2009
YAHSGS LLC $332,969 Cultural Resources Program Support - Provide support to the DOE-RL Cultural Resources Program in administration and implementation of the program including assessment of processes and assisting in the development of documents. Updated database and assiste Energy, Department of 8/12/2009
FOWLER, LLC $332,832 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $332,024 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
FOWLER, LLC $330,744 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $330,688 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $326,408 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $325,441 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $325,000 SA 58335 Inter Transmission Planning and Analysis Provide technical support by projecting future market penetration scenarios of electric vehicles and establishing a set of charging profiles as a new load impacting the Western grid. The analysis will es Energy, Department of 9/16/2010
FOWLER, LLC $324,437 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
GEORGE A. GRANT, INC. $322,344 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $322,281 Provide project management oversight for ARRA funded activities associated with the Waste Management Project at the Hanford Site Energy, Department of 9/02/2009
FOWLER GENERAL CONSTRUCTION, INC. $320,664 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $319,291 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $319,232 SA 58807A Scope Summary The major tasks are expected to include: Green Building Research: EPA Wynkoop Office Building performance analysis, including Return on Investment analysis of miscellaneous electric load for representative office spaces, Data c
This spending item is part of a $400,000 allocation. See details
Energy, Department of 7/30/2010
ELR CONSULTING, INC. $316,781 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $315,871 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $314,663 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
VISIONARY INTEGRATION PROFESSIONALS LLC $314,553 Provide assistance processing all types of contract modifications. Ensure the timely and accurate compliance with ARRA reporting requirements. Coordinating with DOE-RL Integrated Project Teams (IPT) to ensure timely and compliant resolution of ARRA contra Energy, Department of 8/19/2009
EDUCATIONAL AND BUSINESS SERVICES, LLC $314,500 Provide ARRA contract administration support to the RL procurment Division for the period of July 2009 through September 2012. This Task Order is to purchase: 1.) 512 labor hours at a unit price of a $66.99 and 3 months of other direct costs at a unit pr Energy, Department of 7/14/2009
FOWLER, LLC $312,443 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Commodore Advanced Sciences, Inc. $312,317 The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation. See details
Energy, Department of 5/07/2009
FOWLER, LLC $307,223 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISIONARY INTEGRATION PROFESSIONALS LLC $306,979 Provide assistance processing all types of contract modifications. Ensure the timely and accurate compliance with ARRA reporting requirements. Coordinating with DOE-RL Integrated Project Teams (IPT) to ensure timely and compliant resolution of ARRA contra Energy, Department of 7/09/2009
Inland Asphalt $303,304 Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation. See details
Office of Science 9/23/2009
FOWLER, LLC $301,920 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $300,422 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PHOENIX-ABC A JOINT VENTURE $300,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $298,844 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $298,370 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NATIONAL SECURITY TECHNOLOGIES, LLC $298,337 Aerial Radiological Survey of DOE-Richland; BC Controlled area of Hanford Site. Energy, Department of 8/14/2009
MID-COLUMBIA INSULATION, LLC $297,945 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ELECTRIC, INC $297,461 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $296,242 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
AREVA FEDERAL SERVICES LLC $295,104 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $294,376 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DADE MOELLER & ASSOCIATES, INC. $294,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $293,479 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $293,357 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $293,168 Provide project management oversight for ARRA funded activities associated with AMSE Energy, Department of 9/25/2009
BARTLETT SERVICES INC $290,813 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
PROJECT ASSISTANCE CORPORATION $288,392 ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES Energy, Department of 5/19/2009
FOWLER, LLC $287,676 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $285,705 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $283,493 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BARTLETT SERVICES INC $282,379 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
BATTELLE MEMORIAL INSTITUTE $281,945 Knowledgebase R&D: This award provides funds to support the research and development of an implementation strategy for the Systems Biology Knowledgebase. The funding will allow for the Systems Biology Knowledgebase to obtain the necessary capital equipm
This spending item is part of a $3,188,000 allocation. See details
Energy, Department of 8/12/2009
BATTELLE MEMORIAL INSTITUTE $280,719 Knowledgebase R&D: This award provides funds to support the research and development of an implementation strategy for the Systems Biology Knowledgebase. The funding will allow for the Systems Biology Knowledgebase to obtain the necessary capital equipm
This spending item is part of a $3,188,000 allocation. See details
Energy, Department of 8/12/2009
CALYPTUS CONSULTING GROUP, INC. $280,463 Calyptus was awarded the contract to provide support to the DOE-RL Procurement Division for ARRA contract administration through November, 2011. Energy, Department of 8/20/2009
G FORCE ENGINEERING & TECHNOLOGY, INC. $279,755 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. $279,193 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
VISIONARY INTEGRATION PROFESSIONALS LLC $277,238 Provide assistance processing all types of contract modifications. Ensure the timely and accurate compliance with ARRA reporting requirements. Coordinating with DOE-RL Integrated Project Teams (IPT) to ensure timely and compliant resolution of ARRA contra Energy, Department of 9/09/2009
PEERLESS TECHNOLOGIES CORPORATION $276,722 This is a Firm Fixed Price Task Order in accordance with the terms and conditions set forth in the Basic Contract DE-EM0000156. The contract is for one full-time equivalent (FTE) at the Progam Manager III level to serve as support at the Richland Operatio
This spending item is part of a $540,924 allocation. See details
Energy, Department of 9/22/2009
INTERNATIONAL ENGINEERING SERVICES, INC. $276,048 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
FOWLER, LLC $274,642 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $273,338 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BARTLETT SERVICES INC $271,315 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
ELR CONSULTING, INC. $267,121 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
SAA SOLUTIONS, INC. $264,203 This is a Firm Fixed Price Task Order in accordance with the terms and conditions set forth in the Basic Contract DE-EM0000156. The contract is for one full-time equivalent (FTE) at the Progam Manager III level to serve as support at the Richland Operatio
This spending item is part of a $540,924 allocation. See details
Energy, Department of 9/22/2009
PRIORITY ONE $263,903 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
LOS ALAMOS TECHNICAL ASSOCIATES, INC. $262,984 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $260,352 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PAI CORPORATION $260,115 ? Radiation protection plan reviews for specific work scope as assigned ? Oversight of contractor work activities to verify that work is being conducted safely and in accordance with contractual requirements ? Evaluation of implementation of radiation saf Energy, Department of 8/25/2009
FOWLER, LLC $255,024 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $254,743 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $250,000 SA 58139 ARRA-Context-Aware Adaptive Home Energy Manager Manage, monitor and recommend better modes of operations for on-demand home appliances. Support and analyze the performance of the home energy manager pilot deployment. Energy, Department of 9/22/2010
J A D ENVIRONMENTAL $249,242 National Environmental Policy Act Support Services. Energy, Department of 10/22/2009
PUGET SOUND PIPE AND SUPPLY COMPANY $248,821 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $248,750 SA 57961 Title: ARRA: Carbon Capture and Storage Regional Training Purpose: Develop with EOS Alliance and key partners regional sequestration technology training to facilitate transfer of knowledge and technologies required for site development, operatio Energy, Department of 1/26/2010
SYNERGISTICS, INC. $247,836 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PARADISE BOTTLED WATER LLC $246,789 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $245,800 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
INTERNATIONAL ENGINEERING SERVICES, INC. $245,348 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
FOWLER, LLC $243,199 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
WEIRICH CONSULTING SERVICES INC $241,626 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
INTERNATIONAL ENGINEERING SERVICES, INC. $238,329 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
ENERGX, LLC $237,857 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PHOENIX-ABC A JOINT VENTURE $237,244 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $237,212 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DADE MOELLER & ASSOCIATES, INC. $236,578 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $236,398 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $235,118 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
M.H. CHEW AND ASSOCIATES, INC. $234,341 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PHOENIX-ABC A JOINT VENTURE $233,490 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $232,117 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $231,003 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $225,532 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
TRADEWIND SERVICES LLC $225,077 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
M.H. CHEW AND ASSOCIATES, INC. $223,338 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AREVA FEDERAL SERVICES LLC $222,045 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
MOORE CONSULTANTS $222,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $219,535 Provide the United States Department of Energy (DOE), Richland Operations Office (RL) with a Program/Project Manager with TRU waste management experience to support the ARRA accelerated scope for RL-013. Specifically, the contractor shall provide ARRA su Energy, Department of 8/04/2009
M.H. CHEW AND ASSOCIATES, INC. $219,491 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AMERICAN ROCK PRODUCTS INC. $219,188 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $217,589 SA 58795 Purpose: Provide design Review services for 16 Radiation Portal Monitors (RPM) and Quality Control/Assurance verification/validation for RPM's at 33 Land Port of Entry's (LPOE), all of which are associated with CBP's American Recovery and Reinv Energy, Department of 9/27/2010
ANR GROUP INC $217,368 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $217,351 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $217,254 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $215,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
SAVAGE LOGISTICS, LLC $213,660 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
YAHSGS LLC $213,157 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $211,643 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MOORE CONSULTANTS $209,750 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
NORTH WIND, INC. $206,907 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $205,458 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $205,323 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $204,983 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
RICHLAND, CITY OF $204,300 Energy Efficiency and Conservation Block Grant Program (EECBG) ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT - FUNDS TO BE USED FOR LIGHTING RETROFIT AT CITY FACILITIES AND FOR PURCHASE AND INSTALLATION OF TRAFFIC SIGNALING CENTRAL CONTROL SYSTEM Energy, Department of 9/14/2009
G FORCE ENGINEERING & TECHNOLOGY, INC. $204,162 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
DADE MOELLER & ASSOCIATES, INC. $203,543 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $202,610 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $202,138 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NORTHWEST SOFTWARE INC $202,070 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Infotech West Inc $201,838 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
Infotech West Inc $201,838 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
TRADEWIND SERVICES LLC $201,611 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
AREVA FEDERAL SERVICES LLC $201,505 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
BNL TECHNICAL SERVICES, L.L.C. $200,836 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $199,565 Electricity Delivery and Energy Reliability, Research, Development and Analysis There are two main objectives: 1. To create a set of engineering courses in the area of electric power that covers the subject matter knowledge needed by the 21st century power engineer. This includes the traditional subj... Show more
This spending item is part of a $2,500,000 allocation. See details
Energy, Department of 7/30/2010
PASCO RANCH & HOME INC $196,984 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $195,871 This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation. See details
Energy, Department of 4/13/2009
FOWLER, LLC $195,643 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
SAFETY AND RISK ANALYSIS CONSULTING, INC. $195,346 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $193,739 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
STONEWAY ELECTRIC SUPPLY CO. $193,728 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
PACIFIC MOBILE STRUCTURES, INC. $193,645 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, $193,415 To perform analytical services at the 222-S Laboratory complex, the primary laboratory for highly radioactive samples at Hanford. The analyses are needed to determine what is in the waste, maintain control of the chemistry of the wastes in the tanks, and Energy, Department of 9/10/2009
J A D ENVIRONMENTAL $192,686 Assist DOE/NETL in Environmental Assessments of DOE Project entitled Combined Heat & Power-Areas of INterest 1 & 3 Energy, Department of 2/09/2010
BATTELLE MEMORIAL INSTITUTE $192,654 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
OJEDA BUSINESS VENTURES, LLC $192,305 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
PACIFIC SUPPLY & SAFETY, LLC $191,646 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
PASCO RANCH & HOME INC $189,189 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $189,087 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $188,716 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $187,242 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MID COLUMBIA ENGINEERING, INC. $185,113 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $185,080 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
HOT SOX LLC $184,800 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
Aecom Services, Inc. $183,250 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, $183,079 To perform analytical services at the 222-S Laboratory complex, the primary laboratory for highly radioactive samples at Hanford. The analyses are needed to determine what is in the waste, maintain control of the chemistry of the wastes in the tanks, and Energy, Department of 2/26/2010
PHOENIX-ABC A JOINT VENTURE $182,753 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
AREVA FEDERAL SERVICES LLC $182,731 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $181,744 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TOTAL SITE SERVICES LLC $181,434 SA 57148, 59041, 59042, 59043, 60663 Award Title: ARRA PNNL Building America. PNNL Research and Documentation in Support of Residential Integration. There are three non-ARRA tasks (Tasks 1, 2, and 3) and three ARRA tasks (Task 4, 5, and 6) . The ARRA
This spending item is part of a $3,650,000 allocation. See details
Energy, Department of 2/11/2010
MEIER ENTERPRISES, INC. $181,102 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
D and R Auto Parts Inc $180,481 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $180,145 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $177,291 Provide financial support Energy, Department of 12/29/2009
G FORCE ENGINEERING & TECHNOLOGY, INC. $176,997 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
WEIRICH CONSULTING SERVICES INC $175,387 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
BARTLETT SERVICES INC $175,215 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
APOLLO, INC. $173,337 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $172,997 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
INTERNATIONAL ENGINEERING SERVICES, INC. $172,905 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
FOWLER, LLC $171,257 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $170,836 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $169,020 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $168,818 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $167,513 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $166,727 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $166,459 $37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation. See details
Energy, Department of 7/24/2009
ENERGX, LLC $165,288 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. $164,256 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
MCS LLC $163,411 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $162,489 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $160,825 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $160,682 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
NORTHWEST SOFTWARE INC $160,331 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DANIELS CONSULTING $159,963 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
Larsonallen LLP $159,885 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $159,198 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
XRON ASSOCIATES INC $158,688 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $158,548 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $158,002 The purpose of this award was to provide expert technical review from PNNL of applications submitted to DOE as part of the ARRA Advanced Energy Manufacturing Tax Credit ( 48C Program). PNNL submitted over 20 resumes of expert technical staff members with Energy, Department of 6/05/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $157,492 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
ELR CONSULTING, INC. $157,046 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MID-COLUMBIA INSULATION, LLC $156,703 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
YAHSGS LLC $155,560 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
GLOBAL GOVERNMENT SERVICES, LLC $154,800 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
CRC TECHNOLOGIES, INC. $154,552 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $154,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $152,364 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Ultronics $152,050 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $152,000 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
WEIRICH CONSULTING SERVICES INC $151,877 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
SAGE TEC LLC $151,576 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
NORTH WIND, INC. $150,717 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Commodore Advanced Sciences, Inc. $150,546 The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation. See details
Energy, Department of 5/07/2009
BATTELLE MEMORIAL INSTITUTE $150,000 SA 59639 Pacific Northwest National Lab is tasked to assist in developing an integrated Energy-Water Decision Support System (DSS) that in enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for Energy, Department of 9/17/2010
GEORGE A. GRANT, INC. $148,319 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
TRADEWIND SERVICES LLC $148,124 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
PARSONS HANFORD FABRICATORS INC $148,086 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
M.H. CHEW AND ASSOCIATES, INC. $147,355 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
A E M CONSULTING LLC $147,315 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
TRADEWIND SERVICES LLC $146,976 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
FREESTONE ENVIRONMENTAL SERVICES, INC. $146,588 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $145,960 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $144,876 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $142,751 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $142,139 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $140,361 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AMERICAN ELECTRIC, INC $139,415 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $139,312 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $137,465 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Numerical Applications, Inc. $137,422 SA 58489 Award Title: Commercial Building Partnerships (CBP) in support of the Commercial Buildings Initiative. Award Purpose: The goal of this project is to substantially reduce energy consumption in the commercial real estate sector by creating, testin
This spending item is part of a $6,944,706 allocation. See details
Energy, Department of 12/09/2009
TOTAL SITE SERVICES LLC $136,245 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $135,550 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MID COLUMBIA ENGINEERING, INC. $135,094 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
YAHSGS LLC $134,861 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $134,218 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $133,963 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $132,506 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
TRADEWIND SERVICES LLC $131,415 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
XRON ASSOCIATES INC $130,888 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $130,365 Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation. See details
Energy, Department of 9/15/2009
GEORGE A. GRANT, INC. $129,923 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $128,759 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
WASHINGTON CLOSURE HANFORD LLC $128,180 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
WILDLANDS INC $128,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $127,584 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TOTAL SITE SERVICES LLC $127,349 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $127,200 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $126,912 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BENEGAS ENGINEERING, P.S. $126,148 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
STONEWAY ELECTRIC SUPPLY CO. $125,789 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $125,425 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $124,965 Electricity Delivery and Energy Reliability, Research, Development and Analysis Recovery Act - Workforce Training for the Electric Power Sector
This spending item is part of a $4,998,859 allocation. See details
Energy, Department of 7/30/2010
Technogeneral Services Company $124,136 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
OPERATIONS & MAINTENANCE EXCELLENCE, INC. $123,072 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $122,302 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $120,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
INFINIA CORPORATION $119,967 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
TRADEWIND SERVICES LLC $119,802 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $119,660 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PHOENIX ENTERPRISES NW, LLC $119,630 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
ARES CORPORATION $119,175 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $118,790 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $117,650 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $117,500 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PACIFIC SUPPLY & SAFETY, LLC $117,270 Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation. See details
Energy, Department of 4/01/2009
MID COLUMBIA ENGINEERING, INC. $117,119 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
DANIELS CONSULTING $116,740 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
PRIORITY ONE $115,779 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
LOS ALAMOS TECHNICAL ASSOCIATES, INC. $114,658 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
J. and D. Sales, Inc. $114,582 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $113,240 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $110,744 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
GLOBAL GOVERNMENT SERVICES, LLC $110,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $109,606 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
RC CONSTRUCTION SERVICES INC $109,316 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BABCOCK SERVICES, INC. $107,645 $37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation. See details
Energy, Department of 7/24/2009
ELR CONSULTING, INC. $106,639 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
HILINE ENGINEERING & FABRICATION, INC. $106,312 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
Excelsior Design, Inc. $104,900 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
PARAMOUNT SUPPLY CO. $104,153 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
TOTAL SITE SERVICES LLC $103,859 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
ELR CONSULTING, INC. $103,811 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
REMOTE SYSTEMS ENGINEERING, INC $103,802 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
ANR GROUP INC $103,776 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $103,745 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $103,305 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $102,407 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $102,245 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $102,108 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
SAVAGE LOGISTICS, LLC $102,094 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
M.H. CHEW AND ASSOCIATES, INC. $102,062 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DANIELS CONSULTING $101,207 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $101,063 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $100,701 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
SAVAGE LOGISTICS, LLC $100,690 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $100,474 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $100,206 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $100,000 This task is part of an Energy Frontier Research Center (EFRC) on Materials Sciences of Actinides that is led by the University of Notre Dame. Under this EFRC task, ion-beam irradiation techniques and computational approaches will be used to study defects Office of Science 7/23/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $98,945 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $98,900 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
FOWLER, LLC $98,215 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $98,096 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGY NORTHWEST EMPLOYEES' ASSOCIATION $97,951 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FLUOR FEDERAL SERVICES, INC. $97,948 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $97,167 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $97,109 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PARSONS HANFORD FABRICATORS INC $97,047 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ABB INC. $95,557 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $95,497 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $94,500 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
PERMA-FIX NORTHWEST RICHLAND, INC. $94,392 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $93,303 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
ELR CONSULTING, INC. $92,140 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Butler Health & Safety, LLC $91,920 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $91,387 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
LONGENECKER & ASSOCIATES, INC. $90,488 Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation. See details
Energy, Department of 9/15/2009
ANR GROUP INC $90,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $89,198 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MASTER-LEE ENERGY SERVICES CORPORATION $89,080 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $89,018 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
WORLEYPARSONS POLESTAR, INC. $88,852 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Brutzman's, Inc. $88,340 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
WORLEYPARSONS POLESTAR, INC. $88,327 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. $88,315 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $88,238 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FREESTONE ENVIRONMENTAL SERVICES, INC. $88,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $87,396 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MANUFACTURING SERVICES, INC. $87,335 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
ELR CONSULTING, INC. $87,081 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $87,069 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $86,702 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $86,405 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MCS LLC $86,131 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
ANR GROUP INC $86,113 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $85,344 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $85,025 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
YAHSGS LLC $84,572 Administrative Support Services Energy, Department of 9/28/2010
PRIORITY ONE $84,494 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. $84,317 Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation. See details
Energy, Department of 9/15/2009
LOS ALAMOS TECHNICAL ASSOCIATES, INC. $83,676 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
JOHN MARVIN INC $83,161 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $82,422 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $82,415 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $82,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
TRADEWIND SERVICES LLC $81,879 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PERMA-FIX NORTHWEST RICHLAND, INC. $80,789 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
VISTA ENGINEERING TECHNOLOGIES, LLC $80,680 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
TOTAL SITE SERVICES LLC $80,280 Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation. See details
Office of Science 9/23/2009
M.H. CHEW AND ASSOCIATES, INC. $80,248 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $80,000 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BABCOCK SERVICES, INC. $80,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $80,000 Office of Science Financial Assistance Program Recovery Act--Solar Photovoltaic Holographic Cogeneration System
This spending item is part of a $1,149,999 allocation. See details
Office of Science 12/07/2009
ARES CORPORATION $79,955 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $79,925 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGX, LLC $79,795 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ROCK PRODUCTS INC. $79,625 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $79,334 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $78,525 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $78,462 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $78,258 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $77,545 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $77,318 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Provident Consulting Group $76,941 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
WHITE SHIELD, INC. $76,918 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PACIFIC SUPPLY & SAFETY, LLC $76,700 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
BASIN DEPARTMENT STORE, INC $76,678 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
PARADISE BOTTLED WATER LLC $76,187 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $75,925 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $74,400 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $74,305 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PARSONS HANFORD FABRICATORS INC $73,972 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PRIORITY ONE $73,251 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
Intellegration, LLC $73,207 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
Wesco Distribution, Inc $72,606 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
MCS LLC $72,574 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
LOS ALAMOS TECHNICAL ASSOCIATES, INC. $72,542 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $72,209 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $72,185 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Los Alamos Technical Associates, Inc. $71,311 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $71,076 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $70,935 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $70,812 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
XRON ASSOCIATES INC $70,040 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. $70,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $69,900 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
TRADEWIND SERVICES LLC $69,702 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
PERMA-FIX NORTHWEST RICHLAND, INC. $69,637 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $69,497 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Kennewick Industrial & Electrical Supply Inc $69,251 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $69,094 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $68,984 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $68,143 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Columbia Nuclear International LLC $67,479 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ANR GROUP INC $67,145 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $67,013 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ANR GROUP INC $66,883 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $66,532 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $66,333 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
SYNERGISTICS, INC. $66,175 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Aecom Services, Inc. $65,246 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $65,203 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
ARES CORPORATION $64,701 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
A E M CONSULTING LLC $64,629 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
WORLEYPARSONS POLESTAR, INC. $64,460 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
S.M. STOLLER CORPORATION, THE $64,223 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
FOWLER, LLC $63,786 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
HILINE ENGINEERING & FABRICATION, INC. $63,165 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $63,066 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PERMA-FIX NORTHWEST RICHLAND, INC. $62,764 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $62,694 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $62,601 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $62,475 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $61,791 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $60,992 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
PUGET SOUND PIPE AND SUPPLY COMPANY $60,631 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $60,189 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $59,813 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FREESTONE ENVIRONMENTAL SERVICES, INC. $59,439 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $59,326 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
AGILENT TECHNOLOGIES, INC. $59,264 The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation. See details
Energy, Department of 4/15/2009
AMERICAN ELECTRIC, INC $58,840 Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation. See details
Office of Science 9/23/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $57,960 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Aecom Services, Inc. $57,720 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
KBL, INC. $57,503 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $56,955 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $56,646 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AMERICAN ROCK PRODUCTS INC. $56,526 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $56,350 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
WORLEYPARSONS POLESTAR, INC. $55,883 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
INNOVATIONS GROUP INC. $55,852 ADMINISTRATIVE SUPPORT SERVICES Energy, Department of 1/11/2010
MEIER ENTERPRISES, INC. $55,661 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGX, LLC $55,527 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $55,191 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $55,028 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
OPERATIONS & MAINTENANCE EXCELLENCE, INC. $53,994 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $53,944 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
Columbia Paint & Drywall, Inc. $53,874 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
SHERWIN-WILLIAMS COMPANY, THE $53,560 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
GEOPHYSICAL SURVEY LLC $53,430 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ROCK PRODUCTS INC. $53,340 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
FOWLER, LLC $53,067 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MEIER ENTERPRISES, INC. $52,364 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $52,256 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $51,690 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $51,593 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $51,453 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AREVA FEDERAL SERVICES LLC $51,051 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Technogeneral Services Company $50,609 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $50,413 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $50,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
Technogeneral Services Company $49,999 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. $49,907 $37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation. See details
Energy, Department of 7/24/2009
MORRISON CONSTRUCTION SERVICES, INC. $49,688 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
YOUNG, S & ASSOCIATES GENERAL CONTRACTOR $49,596 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ANR GROUP INC $49,575 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $48,983 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Technogeneral Services Company $48,479 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $48,428 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
RICHLAND INDUSTRIAL, INC $48,426 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
A E M CONSULTING LLC $48,060 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $48,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
CANBERRA INDUSTRIES, INC. $47,890 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Tri Cities Cycle Supply, Incorporated $47,673 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ANR GROUP INC $47,571 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
A E M CONSULTING LLC $47,166 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
J. and D. Sales, Inc. $46,710 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Excelsior Design, Inc. $46,021 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $45,682 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $45,484 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
MKM, INC. $45,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $44,976 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ANR GROUP INC $44,824 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $44,765 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $44,624 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $44,440 Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation. See details
Energy, Department of 9/03/2009
Rybarczyk-Gomez & Associates, P.S., Inc. $44,120 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
XRON ASSOCIATES INC $44,064 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
ARES CORPORATION $43,861 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENGINEERS AND CONSTRUCTORS, LLC $43,101 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
STONEWAY ELECTRIC SUPPLY CO. $42,963 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ELECTRIC, INC $42,779 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DADE MOELLER & ASSOCIATES, INC. $42,598 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FOWLER, LLC $42,102 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
E2 CONSULTING ENGINEERS, INC. OF COLORADO $41,985 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AMERICAN ROCK PRODUCTS INC. $41,864 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
Girvin, Nancy K $41,739 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
CPR GROUP INC $41,688 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
A E M CONSULTING LLC $40,890 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
ANR GROUP INC $40,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
RE MERRIMAN P.E. LLC $39,864 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $39,777 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COMM/TECH, INC. $39,605 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
RIVER BEND TRANSFER SYSTEMS LLC $39,565 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
Kennewick Industrial & Electrical Supply Inc $39,446 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENGINEERS AND CONSTRUCTORS, LLC $39,418 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
OPERATIONS & MAINTENANCE EXCELLENCE, INC. $39,404 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
Rybarczyk-Gomez & Associates, P.S., Inc. $39,284 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
FREESTONE ENVIRONMENTAL SERVICES, INC. $38,929 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $38,794 On a weekly and monthly basis, identify and compile as necessary the performance data, forecasts and other ARRA metrics to be reviewed and evaluated. Data will include RL and contractor generated information. Examples of performance data to be analyzed in Energy, Department of 5/11/2009
FOWLER, LLC $38,710 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TOTAL SITE SERVICES LLC $38,538 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $38,176 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DINESH ENTERPRISE $37,947 Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
EMP2 INCORPORATED $37,901 Modification to Project Facilitation Task Order DE-AT36-08GO28128 Statement of Work. Replaced the Statement of Work with a revised Statement of Work applicable to the ESPC Indefinite Delivery Indefinite Quantity (IDIQ) Contracts awarded December 17, 2008 Energy, Department of 9/29/2009
WASHINGTON CLOSURE HANFORD LLC $37,728 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
WASHINGTON CLOSURE HANFORD LLC $37,488 $37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation. See details
Energy, Department of 7/24/2009
Redwing Shoe Store Inc $37,067 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
TRADEWIND SERVICES LLC $35,741 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BNL TECHNICAL SERVICES, L.L.C. $35,432 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ENERGX, LLC $35,008 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
TRADEWIND SERVICES LLC $35,000 ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation. See details
Energy, Department of 4/09/2009
BATTELLE MEMORIAL INSTITUTE $34,892 Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation. See details
Energy, Department of 9/03/2009
WASHINGTON CLOSURE HANFORD LLC $34,888 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $34,867 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. $34,600 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
OPERATIONS & MAINTENANCE EXCELLENCE, INC. $34,161 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. $34,130 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
Excelsior Design, Inc. $33,586 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
PACIFIC SUPPLY & SAFETY, LLC $33,521 1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation. See details
Office of Science 5/22/2009
COLUMBIA ENGINEERS AND CONSTRUCTORS, LLC $33,391 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
ANR GROUP INC $32,905 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AMERICAN ROCK PRODUCTS INC. $32,680 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
BNL TECHNICAL SERVICES, L.L.C. $32,398 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DADE MOELLER & ASSOCIATES, INC. $32,026 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TRADEWIND SERVICES LLC $31,901 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $31,610 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
FLUOR FEDERAL SERVICES, INC. $30,675 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BNL TECHNICAL SERVICES, L.L.C. $30,637 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ELR CONSULTING, INC. $30,615 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
HILINE ENGINEERING & FABRICATION, INC. $30,520 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BRUKER AXS HANDHELD INC. $30,190 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
BATTELLE MEMORIAL INSTITUTE $30,000 Honeywell is developing and demonstrating an advanced wind turbine condition based maintenance system. The system will include a vibration-based mechanical failure detection and diagnosis system, as well as a supervisory control and data acquisition data Energy, Department of 1/25/2010
REMOTE SYSTEMS ENGINEERING, INC $30,000 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
RIVER BEND TRANSFER SYSTEMS LLC $29,962 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TOTAL SITE SERVICES LLC $29,817 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AREVA FEDERAL SERVICES LLC $29,799 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
TOTAL SITE SERVICES LLC $29,292 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
Excelsior Design, Inc. $29,117 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
FLUOR FEDERAL SERVICES, INC. $29,000 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ARES CORPORATION $28,987 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
NAVARRO RESEARCH AND ENGINEERING, INC. $28,910 Provide QA Training in the areas of Commercial Grade Dedication and general executive levels QA training for Federal personnel involved in ARRA activities. Energy, Department of 9/23/2009
ENERGX, LLC $27,888 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
EFFICIENCY SOLUTIONS LLC $27,617 SA 58489 Award Title: Commercial Building Partnerships (CBP) in support of the Commercial Buildings Initiative. Award Purpose: The goal of this project is to substantially reduce energy consumption in the commercial real estate sector by creating, testin
This spending item is part of a $6,944,706 allocation. See details
Energy, Department of 12/09/2009
EFFICIENCY SOLUTIONS LLC $27,617 SA 58489 Award Title: Commercial Building Partnerships (CBP) in support of the Commercial Buildings Initiative. Award Purpose: The goal of this project is to substantially reduce energy consumption in the commercial real estate sector by creating, testin
This spending item is part of a $6,944,706 allocation. See details
Energy, Department of 12/09/2009
ENERGYSOLUTIONS FEDERAL EPC, INC. $27,511 The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation. See details
Energy, Department of 9/23/2009
ENERGX, LLC $27,498 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ELECTRIC, INC $27,492 Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation. See details
Office of Science 9/23/2009
ARES CORPORATION $27,439 EGS Technology R&D: Geothermal Technologies Program Enhanced Geo: This award provides funding to four subprojects in support of Enhanced Geothermal Systems technology: 1) Feasibility and Design Studies for a High Temperature Downhole Tool--ORNL will per
This spending item is part of a $4,110,870 allocation. See details
Energy, Department of 9/30/2009
RIVER BEND TRANSFER SYSTEMS LLC $27,419 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
ANR GROUP INC $27,119 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
COMM/TECH, INC. $26,802 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
ELR CONSULTING, INC. $26,343 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
DGR GRANT CONSTRUCTION, INC. $26,205 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation. See details
Energy, Department of 4/09/2009
WASHINGTON RIVER PROTECTION SOLUTIONS LLC $25,676 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation. See details
Energy, Department of 4/09/2009
BRUTZMAN'S, INC. $25,628 The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation. See details
Energy, Department of 4/09/2009
GEORGE A. GRANT, INC. $25,626 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
RIVER BEND TRANSFER SYSTEMS LLC $25,372 The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation. See details
Energy, Department of 4/14/2009
AMERICAN ROCK PRODUCTS INC. $25,200 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
AMERICAN ROCK PRODUCTS INC. $25,200 The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation. See details
Energy, Department of 4/09/2009
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, $20,921 To perform analytical services at the 222-S Laboratory complex, the primary laboratory for highly radioactive samples at Hanford. The analyses are needed to determine what is in the waste, maintain control of the chemistry of the wastes in the tanks, and Energy, Department of 9/24/2009
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. $8,355 Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation. See details
Energy, Department of 9/15/2009
EMP2 INCORPORATED $8,231 PF Site Review Orientation, GSA Federal Center. Energy, Department of 5/12/2010
EMP2 INCORPORATED $6,871 Project Facilitator attended the FEMP Portland Workshop and participated in the 3 day training session. Energy, Department of 5/13/2010