Benton County, Wash., funds by Energy, Department of
Listing $1,596,531,954.67 in stimulus funds from Energy, Department of for Benton
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CH2M HILL PLATEAU REMEDIATION COMPANY | $324,707,475 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WASHINGTON RIVER PROTECTION SOLUTIONS LLC | $185,373,028 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
CH2M HILL PLATEAU REMEDIATION COMPANY | $173,311,372 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WASHINGTON CLOSURE HANFORD LLC | $64,037,395 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CH2M HILL PLATEAU REMEDIATION COMPANY | $60,922,052 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CH2M HILL PLATEAU REMEDIATION COMPANY | $40,859,863 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WASHINGTON CLOSURE HANFORD LLC | $38,351,174 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TRADEWIND SERVICES LLC | $35,157,733 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Mission Support Alliance, LLC | $34,790,515 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FLUOR FEDERAL SERVICES, INC. | $25,536,779 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $24,987,053 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $18,981,675 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
Mission Support Alliance, LLC | $15,589,051 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FLUOR FEDERAL SERVICES, INC. | $15,173,955 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $15,130,070 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Title: Pacific Northwest Smart Grid Demonstration Purpose: This demonstration will validate new smart grid technologies and inform business cases; provide two-way communication between distributed generation, storage,e, and demand assets and the existin... Show more
This spending item is part of a $88,821,251 allocation.
See details
|
Energy, Department of | 2/01/2010 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $14,744,308 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $14,229,690 |
57402 - Title: Land-Use Change Modeling Studies Purpose: The purpose of the project is to improve land-use change modeling capabilities to help ensure biofuels can be produced sustainably Description: The project will Increase the scope of sustainabi
This spending item is part of a $18,129,243 allocation.
See details
|
Energy, Department of | 8/10/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $12,790,115 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BABCOCK SERVICES, INC. | $12,154,830 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $11,673,162 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Mission Support Alliance, LLC | $11,468,600 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FLUOR FEDERAL SERVICES, INC. | $9,744,124 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELRFOWLER JV | $9,557,467 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $9,215,830 |
Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
APPLIED GEOTECHNICAL ENGINEERING AND CONSTRUCTION INC | $8,144,499 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $7,290,017 |
58055 - Combine advanced enzyme design methodology with superior molecular catalyst design to advance the state-of-the-art in homogeneous catalysts by incorporating a rationally designed extended proton relay system. Description: This emphasis of this pr
This spending item is part of a $7,500,000 allocation.
See details
|
Office of Science | 3/18/2010 |
BATTELLE MEMORIAL INSTITUTE | $6,837,207 |
ARRA Task Description Overall EEPs Technical Assistance to States - Identify regional needs and develop a strategy to respond to them. Provide assistance to the states with Section 410 compliance. State Technical Assistance ? provide specialized ass
This spending item is part of a $16,244,133 allocation.
See details
|
Energy, Department of | 12/09/2009 |
AREVA FEDERAL SERVICES LLC | $6,722,043 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $6,341,876 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $6,139,629 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ELECTRIC, INC | $6,087,996 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TOTAL SITE SERVICES LLC | $5,743,848 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MCS LLC | $5,734,857 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
BABCOCK SERVICES, INC. | $5,329,114 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WATTS CONSTRUCTION, INC. | $5,312,448 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, | $5,303,065 | To perform analytical services at the 222-S Laboratory complex, the primary laboratory for highly radioactive samples at Hanford. The analyses are needed to determine what is in the waste, maintain control of the chemistry of the wastes in the tanks, and | Energy, Department of | 2/26/2010 |
OJEDA BUSINESS VENTURES, LLC | $5,273,625 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
OJEDA BUSINESS VENTURES, LLC | $4,732,533 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FLUOR FEDERAL SERVICES, INC. | $4,726,824 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $4,689,800 |
57509 ? ARRA Smart Grid Investment Grant & Interoperability Coordination - Morgan - $4,675,000: Task 1 - ARRA - Smart Grid Investment Grant & Interoperability Coordination - $480K: Purpose: OE requires smart grid technical expertise in support of their
This spending item is part of a $4,875,000 allocation.
See details
|
Energy, Department of | 8/26/2009 |
TOTAL SITE SERVICES LLC | $4,342,317 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $4,161,228 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $4,099,098 | SA 58017 Title: ARRA SW Regional Partnership Kansas Carbon Sequestration Purpose: Provide new insight on the chemical, electronic & photo properties of the interface layer formed at the junction between Cadmium sulfide (CdS) & Cadmium telluride (CdTe) | Energy, Department of | 1/26/2010 |
FOWLER GENERAL CONSTRUCTION, INC. | $4,016,218 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $3,973,393 |
SA 58489 Award Title: Commercial Building Partnerships (CBP) in support of the Commercial Buildings Initiative. Award Purpose: The goal of this project is to substantially reduce energy consumption in the commercial real estate sector by creating, testin
This spending item is part of a $6,944,706 allocation.
See details
|
Energy, Department of | 12/09/2009 |
AREVA FEDERAL SERVICES LLC | $3,922,572 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BABCOCK SERVICES, INC. | $3,867,918 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MID COLUMBIA ENGINEERING, INC. | $3,693,000 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BABCOCK SERVICES, INC. | $3,475,100 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $3,404,847 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $3,201,298 |
ARRA - Solid-State Lighting (SSL) Commercialization Support (Project #57162) - 1) SSL Manufacturer, Large Buyer, Lighting Designer Workshop ? in an effort to organize and accelerate the transmission of important lighting design information back to SSL man
This spending item is part of a $4,205,000 allocation.
See details
|
Energy, Department of | 12/09/2009 |
GEORGE A. GRANT, INC. | $3,189,363 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $3,155,030 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $3,057,290 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BLUE STAR ENTERPRISES NORTHWEST INCORPORATED | $3,050,790 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $3,023,844 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
PHOENIX-ABC A JOINT VENTURE | $3,014,830 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INFINIA CORPORATION | $3,000,617 | Advanced Research and Projects Agency Energy Financial Assistance Program Infinia Corporation will develop and demonstrate a prototype Stirling Air Conditioner (StAC) that combines recent technology advances in a unique manner to produce a transformational improvement in compact cooling. Two generatitions of the device will be de... Show more | Energy, Department of | 9/01/2010 |
PHOENIX-ABC A JOINT VENTURE | $2,780,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $2,773,142 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $2,650,606 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FLUOR FEDERAL SERVICES, INC. | $2,623,607 |
D&D of Building K-33 at the East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee
This spending item is part of a $71,037,996 allocation.
See details
|
Energy, Department of | 4/06/2010 |
OJEDA BUSINESS VENTURES, LLC | $2,608,934 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $2,494,377 |
SA 57148, 59041, 59042, 59043, 60663 Award Title: ARRA PNNL Building America. PNNL Research and Documentation in Support of Residential Integration. There are three non-ARRA tasks (Tasks 1, 2, and 3) and three ARRA tasks (Task 4, 5, and 6) . The ARRA
This spending item is part of a $3,650,000 allocation.
See details
|
Energy, Department of | 2/11/2010 |
PHOENIX ENTERPRISES NW, LLC | $2,392,717 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $2,388,272 |
Advanced Research and Projects Agency Energy Financial Assistance Program This project aims to develop a dehumidification membrane that can selectively sieve out water molecules from the humid air stream that flows over it while leaving behind the oxygen and nitrogen molecules.
This spending item is part of a $3,408,237 allocation.
See details
|
Energy, Department of | 8/27/2010 |
ARES CORPORATION | $2,283,032 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
LOCKHEED MARTIN SERVICES, INC. | $2,253,868 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $2,206,230 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TRADEWIND SERVICES LLC | $2,125,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $2,085,539 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $2,037,322 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
CARPENTER DRILLING | $2,017,086 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $2,000,000 | Award Title: Enhance and Accelerate FEMP Service Functions t the Federal Government Purpose: PNNL will provide technical assistance to enhance and accelerate Federal Energy Management Program (FEMP) service functions to the Federal government so agenci | Energy, Department of | 9/08/2009 |
KADLEC MEDICAL CENTER | $2,000,000 |
State Energy Program Funding supports energy efficiency, renewable energy and clean technology programs statewide. The funding addresses a specific goal to reduce energy consumption by at least 25 percent of the stateG??s 1990 per capita energy use by 2012.
This spending item is part of a $60,944,000 allocation.
See details
|
National Energy Technology Laboratory | 5/01/2009 |
APOLLO, INC. | $1,986,700 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $1,959,111 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $1,831,149 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $1,800,000 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WATTS CONSTRUCTION, INC. | $1,748,119 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $1,686,398 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $1,639,253 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
PROJECT ASSISTANCE CORPORATION | $1,637,728 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 7/07/2009 |
INDUSTRIAL CONSTRUCTORS, INC. | $1,611,465 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TOTAL SITE SERVICES LLC | $1,605,956 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $1,600,141 | Provide quality assurance support to DOE/RL. Individual tasks are assigned by the DOE/RL Assistant Manager for Safety and Environment, and deliverables are entered into the DOE/RL OA Database. | Energy, Department of | 5/28/2009 |
J. and D. Sales, Inc. | $1,583,928 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WATTS CONSTRUCTION, INC. | $1,540,516 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
LOCKHEED MARTIN SERVICES, INC. | $1,525,725 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FREESTONE ENVIRONMENTAL SERVICES, INC. | $1,521,916 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $1,509,288 | SA 57984 Award Title: Pacific Northwest National Laboratory: Reviewers for ARPA-E Award Purpose ARPA-E review Award Description To fund the expenses of PNNL employees to review proposals in support of the ARPA-E Program ( DE-FOA-0000206, DE-FOA-0000207 | Energy, Department of | 8/26/2009 |
OJEDA BUSINESS VENTURES, LLC | $1,503,144 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $1,478,231 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $1,459,041 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
IMPACT SERVICES, INC. | $1,448,026 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $1,440,929 |
Pacific Northwest National Laboratory (PNNL) will provide analytic support and expertise to Battelle Columbus Operations (BCO) and American Electric Power (AEP) for project activities related to AEP?s gridSMARTSM demonstration project. In this role, PNNL
This spending item is part of a $1,500,929 allocation.
See details
|
Energy, Department of | 8/11/2010 |
BATTELLE MEMORIAL INSTITUTE | $1,413,251 |
Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation.
See details
|
Office of Science | 9/23/2009 |
UNITECH SERVICES GROUP INC | $1,379,900 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
AMERICAN ELECTRIC, INC | $1,377,002 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $1,376,952 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
BATTELLE MEMORIAL INSTITUTE | $1,358,169 |
Sub Account 57718 Title: PV Systems Development Purpose: Provide new insight on the chemical, electronic and photo properties of the interface layer formed at the junction between Cadmium Description: Milestones: Sub Account 57720 Title: Therm
This spending item is part of a $1,497,974 allocation.
See details
|
Energy, Department of | 1/25/2010 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $1,351,648 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
J.A.D. ENVIRONMENTAL | $1,345,688 |
Provide Office of the Assistant Secretary and the office of the Deputy Assistant Secretary for Technology Development the means to support the R&D mission and vision of the Energy Efficiency and Renewable Energy with technical, engineering, analytical, an
This spending item is part of a $13,901,856 allocation.
See details
|
Energy, Department of | 7/08/2009 |
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. | $1,336,528 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ABB INC. | $1,316,065 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $1,311,240 | 56595 - Develop a new type of biphasic working fluid for subcritical geothermal systems that utilizes microporous nanostructured metal-organic solids as the primary heat carrier and heat transfer medium to support an organic Rankine cycle. The goal is to | Energy, Department of | 9/08/2009 |
MCS LLC | $1,309,860 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
PHOENIX-ABC A JOINT VENTURE | $1,300,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $1,298,708 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $1,297,045 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MID COLUMBIA ENGINEERING, INC. | $1,271,523 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $1,260,653 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $1,225,000 |
Title: 58100 Merit Review Purpose: Provide Merit Reviewers for DOE Biomass Solicitation Description: To provide technical experts to assist in reviewing biomass proposals submitted to DOE Milestones: Complete reviews, November 30, 2009. 57636 -
This spending item is part of a $1,330,000 allocation.
See details
|
Energy, Department of | 8/26/2009 |
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. | $1,215,332 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $1,199,547 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
PACIFIC SUPPLY & SAFETY, LLC | $1,196,348 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $1,195,000 |
Prevent blackouts and other large scale reliability issues by analyzing and assessing, and addressing emerging reliability challenges due to the integration of variable renewable resources and the changing load composition.
This spending item is part of a $1,500,000 allocation.
See details
|
Energy, Department of | 7/01/2010 |
BATTELLE MEMORIAL INSTITUTE | $1,194,526 |
Award Title: Integrated Assessment Research. Award Purpose: Contribute to significant advances for the Integrated Assessment Research Program (IARP) whose goals are to improve understanding of and to develop leading national decision support tools regardi
This spending item is part of a $4,860,000 allocation.
See details
|
Office of Science | 8/12/2009 |
FLUOR HANFORD, INC. | $1,190,127 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $1,175,169 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TOTAL SITE SERVICES LLC | $1,172,012 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
HILINE ENGINEERING & FABRICATION, INC. | $1,145,197 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
STONEWAY ELECTRIC SUPPLY CO. | $1,136,931 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Mission Support Alliance, LLC | $1,136,150 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $1,129,455 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $1,087,778 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
GEORGE A. GRANT, INC. | $1,081,594 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
APOLLO, INC. | $1,053,385 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $1,042,875 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $1,011,374 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $979,707 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $975,425 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FLUOR FEDERAL SERVICES, INC. | $954,579 |
Toxic and hazardous waste cleanup at Bethel Valley Burial Grounds (SWSA 1 and SWSA 3)
This spending item is part of a $14,912,999 allocation.
See details
|
Energy, Department of | 9/18/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $950,388 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PROJECT ASSISTANCE CORPORATION | $949,217 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 8/18/2009 |
PROJECT ASSISTANCE CORPORATION | $913,040 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 9/18/2009 |
ARES CORPORATION | $912,964 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
GREEN ENERGY TODAY, LLC | $898,175 |
State Energy Program Funding supports energy efficiency, renewable energy and clean technology programs statewide. The funding addresses a specific goal to reduce energy consumption by at least 25 percent of the stateG??s 1990 per capita energy use by 2012.
This spending item is part of a $60,944,000 allocation.
See details
|
National Energy Technology Laboratory | 5/01/2009 |
Aecom Services, Inc. | $880,085 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WATTS CONSTRUCTION, INC. | $877,471 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $872,710 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NFT INCORPORATED | $870,236 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
GEORGE A. GRANT, INC. | $864,773 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $860,000 | The project goal is to develop advanced Kalman filtering techniques and formulate dynamic state estimations that will fundamentally change the paradigm of real-time operations and control for complex engineering systems. Power grids, gas-pipelines, and | Office of Science | 8/25/2009 |
LOCKHEED MARTIN SERVICES, INC. | $858,200 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PHOENIX ENTERPRISES NW, LLC | $795,500 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SEALASKA ENVIRONMENTAL SERVICES, LLC | $784,545 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $777,091 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $771,791 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $759,794 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RICHLAND INDUSTRIAL, INC | $758,496 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $756,211 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PROJECT ASSISTANCE CORPORATION | $750,309 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 5/06/2009 |
BATTELLE MEMORIAL INSTITUTE | $747,974 | G?? Title: Thermochemical Energy Storage for Stirling Concentrating Solar Power Systems G?? Purpose: The programmatic objective of this project is to support DOEG??s goal of increasing the use of concentrating solar power (CSP) in the United States, mak | Energy, Department of | 1/14/2010 |
INTERNATIONAL ENGINEERING SERVICES, INC. | $745,741 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $732,711 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
DADE MOELLER & ASSOCIATES, INC. | $731,542 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
APOLLO, INC. | $731,133 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
LOCKHEED MARTIN SERVICES, INC. | $730,036 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $718,286 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DGR GRANT CONSTRUCTION, INC. | $717,718 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $709,952 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $700,000 | Provide support to the ARRA Program and the Recovery Act Program Manager (RAPM) by: 1) Performing assessments of policies and procedures to ensure DOE-RL compliance with ARRA requirements; 2) Preparation of assessment reports of DOE RL and Hanford Site co | Energy, Department of | 9/28/2009 |
TRI CITY SIGN & BARRICADE | $698,897 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $695,926 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AMERICAN ELECTRIC, INC | $671,767 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PAI CORPORATION | $668,878 | Fire Protection BP0000733 Fire Protection Engineering Support PAI Corporation provides fire protection safety support to DOE-RL for ARRA work scope. The work scope includes: ? Reviews of Fire Hazards Analyses and associated Documented Safety Analyses for | Energy, Department of | 8/27/2009 |
ARES CORPORATION | $664,427 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
G FORCE ENGINEERING & TECHNOLOGY, INC. | $639,884 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $639,729 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
GEORGE A. GRANT, INC. | $625,884 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AREVA FEDERAL SERVICES LLC | $619,825 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CARRELL TECHNICAL SERVICES, INC. | $616,429 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $609,188 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGX, LLC | $605,000 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $599,585 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
REMOTE SYSTEMS ENGINEERING, INC | $595,358 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
KENNEWICK, CITY OF | $589,700 | Energy Efficiency and Conservation Block Grant Program (EECBG) Project Description: The City of Kennewick is utilizing the EECBG allocation to fund the replacement of 884 high pressure sodium street lights with induction lights. To date the contractor has replaced: Number Lamp Type ... Show more | National Energy Technology Laboratory | 9/28/2009 |
WASHINGTON CLOSURE HANFORD LLC | $587,787 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PROJECT ASSISTANCE CORPORATION | $583,283 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 9/17/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $580,189 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $579,949 | 1. Reviews of Health and Safety Plans for specific work scope areas related to ARRA accelerated work scope; 2. Assists in the evaluation of contractor work activities to verify that work is being conducted safely and in accordance with contractual require | Energy, Department of | 9/25/2009 |
WORLEYPARSONS POLESTAR, INC. | $574,893 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $569,668 | The contractor shall provide support to the Department of Energy Richland Operations Office (DOE-RL) Financial Management Division (FMD), Contractor Industrial Relations (CIR), and Finance Team Lead in the following areas: 1. Preparation of independent fi | Energy, Department of | 1/15/2010 |
JONES AND COMPANY PROFESSIONAL CORPORATION | $566,173 | Financial Auditors Support | Energy, Department of | 6/17/2009 |
RC CONSTRUCTION SERVICES INC | $562,662 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $560,195 |
Title: ARRA-Advanced HX development for fuel cell systems Purpose: Develop, test and characterize advanced materials and design for high temperature heat exchangers for application in fuel cell power generation systems. Gas -to gas heat exchangers will b
This spending item is part of a $650,000 allocation.
See details
|
Energy, Department of | 3/16/2010 |
WEIRICH CONSULTING SERVICES INC | $552,821 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $548,379 | Provide support to the ARRA Program and the Recovery Act Program Manager by: 1) Providing relational database development, support and maintenance for the DOE RL ARRA Program; 2) Providing tracking, monitoring, and notification to DOE RL and contractors; | Energy, Department of | 5/06/2009 |
PROJECT ASSISTANCE CORPORATION | $548,250 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 9/18/2009 |
PROJECT ASSISTANCE CORPORATION | $546,433 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 5/19/2009 |
PAI CORPORATION | $546,114 | ? Safety basis reviews for work related to ARRA work scope. ? Preparation of drafts or recommendations on safety basis related procedures, processes, and policies. ? Evaluations of implementation of safety basis requirements. ? Reviews of safety basis doc | Energy, Department of | 6/17/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $543,957 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ELECTRIC, INC | $540,294 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $530,349 | 1. Reviews of Health and Safety Plans for specific work scope areas related to ARRA accelerated work scope; 2. Assists in the evaluation of contractor work activities to verify that work is being conducted safely and in accordance with contractual require | Energy, Department of | 9/25/2009 |
ELR CONSULTING, INC. | $524,377 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $521,359 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $506,942 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $505,137 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $503,949 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PAI CORPORATION | $501,119 | ? Special Packaging Authorization reviews ? One Time Requests for Shipment reviews ? Evaluation of implementation of Transportation and /or Shipping Requirements ? Evaluation and review of the contractor?s Safety Basis documentation for transportation ? T | Energy, Department of | 8/04/2009 |
RICHLAND INDUSTRIAL, INC | $500,448 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $500,000 | Award Title: Recovery Act ? Greenhouse Gas Tools and Resources Support Award Purpose: To have FEMP develop and provide comprehensive GHG management and abatement services to Federal agencies as they begin to focus attention on mitigating climate change. | Energy, Department of | 9/08/2009 |
A E M CONSULTING LLC | $499,178 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MCS LLC | $498,682 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
AMERICAN ELECTRIC, INC | $498,667 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $496,000 | The scope of the enhanced utilization of Isotope facilities project is to set up the processing capability to produce high specific activity of Gadolinium-153 to meet current and future needs for this radioisotope for research applications in nuclear medi | Office of Science | 9/23/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $493,330 | Provide PBS-40 Project Management oversight | Energy, Department of | 9/25/2009 |
TRADEWIND SERVICES LLC | $492,704 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $490,878 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
YAHSGS LLC | $485,865 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
YAHSGS LLC | $484,800 | Environmental Management Program Support - Provide environmental regulatory compliance support including review of regulatory documents, support for Environmental Management Division oversight activities, assessment of environmental compliance processes, | Energy, Department of | 9/03/2009 |
BATTELLE MEMORIAL INSTITUTE | $484,600 | Provide risk identification, characterization and monitoring of DOE, Richland Operations (RL) American Recovery and Reinvestment (ARRA) This work is was awarded via an Inter Entity Work Authorization | Energy, Department of | 5/15/2009 |
BATTELLE MEMORIAL INSTITUTE | $482,064 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
M.H. CHEW AND ASSOCIATES, INC. | $473,016 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $468,093 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ELECTRIC, INC | $461,519 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $460,226 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AMERICAN ELECTRIC, INC | $449,842 |
Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation.
See details
|
Office of Science | 9/23/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $442,492 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. | $441,283 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $437,958 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $430,414 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BARTLETT SERVICES INC | $427,444 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
M.H. CHEW AND ASSOCIATES, INC. | $425,160 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $423,552 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
PROJECT ASSISTANCE CORPORATION | $422,901 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 6/17/2009 |
FOWLER, LLC | $420,602 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $419,683 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
INTERNATIONAL ENGINEERING SERVICES, INC. | $416,821 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $416,093 |
Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation.
See details
|
Energy, Department of | 9/15/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $411,297 | 1. Provide Project Management support added to the 100K Area to assist in ensuring compliance with ARRA 100K Area requirements to include: a) Monitor and Analyze project performance related to the ARRA 100K Area scope using Earned Value Management pri | Energy, Department of | 6/16/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $402,905 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PUBLIC UTILITY DISTRICT 1 OF BENTON COUNTY | $402,500 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Title: Pacific Northwest Smart Grid Demonstration Purpose: This demonstration will validate new smart grid technologies and inform business cases; provide two-way communication between distributed generation, storage,e, and demand assets and the existin... Show more
This spending item is part of a $88,821,251 allocation.
See details
|
Energy, Department of | 2/01/2010 |
PACIFIC SUPPLY & SAFETY, LLC | $393,360 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
HOYDAR BUCK INC | $389,360 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $385,802 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $385,655 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $385,074 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $382,283 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NUCFIL, LLC | $379,983 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $374,084 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $373,644 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NFT INCORPORATED | $372,067 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $371,740 | ARRA Project Management Support for DOE-RL PBS-41 River Corridor Closure Project 1. Provide Project Management support to RCCP to assist in ensuring compl | Energy, Department of | 6/17/2009 |
FOWLER, LLC | $370,229 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PHOENIX-ABC A JOINT VENTURE | $370,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
DANIELS CONSULTING | $364,616 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $364,202 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $363,296 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AREVA FEDERAL SERVICES LLC | $362,720 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DADE MOELLER & ASSOCIATES, INC. | $360,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $350,000 | SA 58807B, 59376 Purpose: Provide project technical assistance to GSA to help execute best practice relighting solutions and assist GSA with the mandated 5 year review of the Green Building Rating System for both existing buildings, major renovations and | Energy, Department of | 9/27/2010 |
TRI-CITY INDUSTRIAL, LLC | $349,195 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
JONES AND COMPANY PROFESSIONAL CORPORATION | $349,158 | Financial analyst support | Energy, Department of | 6/17/2009 |
FOWLER, LLC | $346,057 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $338,867 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $338,744 | 1. Provide support to AMCP in execution of ARRA project activities in functional areas related to Plateau Remediation Contract modification and execution 2. Provide Project Management support to assist in ensuring compliance with ARRA requirements 3. Pr | Energy, Department of | 7/01/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $336,400 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DADE MOELLER & ASSOCIATES, INC. | $335,886 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
APOLLO, INC. | $335,683 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $334,705 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $334,581 |
Industrial Carbon Capture and Storage (CCS) Application Develop a proposal for commercial-scale CO2 capture and geologic sequestration project at the Boise Wallula paper mill.
This spending item is part of a $409,581 allocation.
See details
|
Energy, Department of | 11/16/2009 |
J. and D. Sales, Inc. | $334,337 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
G FORCE ENGINEERING & TECHNOLOGY, INC. | $334,011 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $333,521 | Provide project management oversight for ARRA funded activities associated with decommissioning and dimantlement of the Plutonium Finishing Plant (PFP) at the Hanford Site. | Energy, Department of | 9/14/2009 |
YAHSGS LLC | $332,969 | Cultural Resources Program Support - Provide support to the DOE-RL Cultural Resources Program in administration and implementation of the program including assessment of processes and assisting in the development of documents. Updated database and assiste | Energy, Department of | 8/12/2009 |
FOWLER, LLC | $332,832 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $332,024 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
FOWLER, LLC | $330,744 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $330,688 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $326,408 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $325,441 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $325,000 | SA 58335 Inter Transmission Planning and Analysis Provide technical support by projecting future market penetration scenarios of electric vehicles and establishing a set of charging profiles as a new load impacting the Western grid. The analysis will es | Energy, Department of | 9/16/2010 |
FOWLER, LLC | $324,437 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
GEORGE A. GRANT, INC. | $322,344 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $322,281 | Provide project management oversight for ARRA funded activities associated with the Waste Management Project at the Hanford Site | Energy, Department of | 9/02/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $320,664 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $319,291 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $319,232 |
SA 58807A Scope Summary The major tasks are expected to include: Green Building Research: EPA Wynkoop Office Building performance analysis, including Return on Investment analysis of miscellaneous electric load for representative office spaces, Data c
This spending item is part of a $400,000 allocation.
See details
|
Energy, Department of | 7/30/2010 |
ELR CONSULTING, INC. | $316,781 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $315,871 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $314,663 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
VISIONARY INTEGRATION PROFESSIONALS LLC | $314,553 | Provide assistance processing all types of contract modifications. Ensure the timely and accurate compliance with ARRA reporting requirements. Coordinating with DOE-RL Integrated Project Teams (IPT) to ensure timely and compliant resolution of ARRA contra | Energy, Department of | 8/19/2009 |
EDUCATIONAL AND BUSINESS SERVICES, LLC | $314,500 | Provide ARRA contract administration support to the RL procurment Division for the period of July 2009 through September 2012. This Task Order is to purchase: 1.) 512 labor hours at a unit price of a $66.99 and 3 months of other direct costs at a unit pr | Energy, Department of | 7/14/2009 |
FOWLER, LLC | $312,443 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Commodore Advanced Sciences, Inc. | $312,317 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
FOWLER, LLC | $307,223 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISIONARY INTEGRATION PROFESSIONALS LLC | $306,979 | Provide assistance processing all types of contract modifications. Ensure the timely and accurate compliance with ARRA reporting requirements. Coordinating with DOE-RL Integrated Project Teams (IPT) to ensure timely and compliant resolution of ARRA contra | Energy, Department of | 7/09/2009 |
Inland Asphalt | $303,304 |
Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation.
See details
|
Office of Science | 9/23/2009 |
FOWLER, LLC | $301,920 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $300,422 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PHOENIX-ABC A JOINT VENTURE | $300,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $298,844 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $298,370 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NATIONAL SECURITY TECHNOLOGIES, LLC | $298,337 | Aerial Radiological Survey of DOE-Richland; BC Controlled area of Hanford Site. | Energy, Department of | 8/14/2009 |
MID-COLUMBIA INSULATION, LLC | $297,945 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ELECTRIC, INC | $297,461 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $296,242 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AREVA FEDERAL SERVICES LLC | $295,104 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $294,376 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DADE MOELLER & ASSOCIATES, INC. | $294,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $293,479 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $293,357 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $293,168 | Provide project management oversight for ARRA funded activities associated with AMSE | Energy, Department of | 9/25/2009 |
BARTLETT SERVICES INC | $290,813 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
PROJECT ASSISTANCE CORPORATION | $288,392 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | Energy, Department of | 5/19/2009 |
FOWLER, LLC | $287,676 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $285,705 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $283,493 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BARTLETT SERVICES INC | $282,379 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
BATTELLE MEMORIAL INSTITUTE | $281,945 |
Knowledgebase R&D: This award provides funds to support the research and development of an implementation strategy for the Systems Biology Knowledgebase. The funding will allow for the Systems Biology Knowledgebase to obtain the necessary capital equipm
This spending item is part of a $3,188,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
BATTELLE MEMORIAL INSTITUTE | $280,719 |
Knowledgebase R&D: This award provides funds to support the research and development of an implementation strategy for the Systems Biology Knowledgebase. The funding will allow for the Systems Biology Knowledgebase to obtain the necessary capital equipm
This spending item is part of a $3,188,000 allocation.
See details
|
Energy, Department of | 8/12/2009 |
CALYPTUS CONSULTING GROUP, INC. | $280,463 | Calyptus was awarded the contract to provide support to the DOE-RL Procurement Division for ARRA contract administration through November, 2011. | Energy, Department of | 8/20/2009 |
G FORCE ENGINEERING & TECHNOLOGY, INC. | $279,755 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. | $279,193 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
VISIONARY INTEGRATION PROFESSIONALS LLC | $277,238 | Provide assistance processing all types of contract modifications. Ensure the timely and accurate compliance with ARRA reporting requirements. Coordinating with DOE-RL Integrated Project Teams (IPT) to ensure timely and compliant resolution of ARRA contra | Energy, Department of | 9/09/2009 |
PEERLESS TECHNOLOGIES CORPORATION | $276,722 |
This is a Firm Fixed Price Task Order in accordance with the terms and conditions set forth in the Basic Contract DE-EM0000156. The contract is for one full-time equivalent (FTE) at the Progam Manager III level to serve as support at the Richland Operatio
This spending item is part of a $540,924 allocation.
See details
|
Energy, Department of | 9/22/2009 |
INTERNATIONAL ENGINEERING SERVICES, INC. | $276,048 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
FOWLER, LLC | $274,642 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $273,338 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BARTLETT SERVICES INC | $271,315 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
ELR CONSULTING, INC. | $267,121 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
SAA SOLUTIONS, INC. | $264,203 |
This is a Firm Fixed Price Task Order in accordance with the terms and conditions set forth in the Basic Contract DE-EM0000156. The contract is for one full-time equivalent (FTE) at the Progam Manager III level to serve as support at the Richland Operatio
This spending item is part of a $540,924 allocation.
See details
|
Energy, Department of | 9/22/2009 |
PRIORITY ONE | $263,903 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $262,984 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $260,352 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PAI CORPORATION | $260,115 | ? Radiation protection plan reviews for specific work scope as assigned ? Oversight of contractor work activities to verify that work is being conducted safely and in accordance with contractual requirements ? Evaluation of implementation of radiation saf | Energy, Department of | 8/25/2009 |
FOWLER, LLC | $255,024 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $254,743 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $250,000 | SA 58139 ARRA-Context-Aware Adaptive Home Energy Manager Manage, monitor and recommend better modes of operations for on-demand home appliances. Support and analyze the performance of the home energy manager pilot deployment. | Energy, Department of | 9/22/2010 |
J A D ENVIRONMENTAL | $249,242 | National Environmental Policy Act Support Services. | Energy, Department of | 10/22/2009 |
PUGET SOUND PIPE AND SUPPLY COMPANY | $248,821 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $248,750 | SA 57961 Title: ARRA: Carbon Capture and Storage Regional Training Purpose: Develop with EOS Alliance and key partners regional sequestration technology training to facilitate transfer of knowledge and technologies required for site development, operatio | Energy, Department of | 1/26/2010 |
SYNERGISTICS, INC. | $247,836 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARADISE BOTTLED WATER LLC | $246,789 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $245,800 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INTERNATIONAL ENGINEERING SERVICES, INC. | $245,348 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
FOWLER, LLC | $243,199 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
WEIRICH CONSULTING SERVICES INC | $241,626 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INTERNATIONAL ENGINEERING SERVICES, INC. | $238,329 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
ENERGX, LLC | $237,857 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PHOENIX-ABC A JOINT VENTURE | $237,244 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $237,212 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DADE MOELLER & ASSOCIATES, INC. | $236,578 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $236,398 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $235,118 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
M.H. CHEW AND ASSOCIATES, INC. | $234,341 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PHOENIX-ABC A JOINT VENTURE | $233,490 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $232,117 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $231,003 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $225,532 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TRADEWIND SERVICES LLC | $225,077 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
M.H. CHEW AND ASSOCIATES, INC. | $223,338 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AREVA FEDERAL SERVICES LLC | $222,045 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MOORE CONSULTANTS | $222,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $219,535 | Provide the United States Department of Energy (DOE), Richland Operations Office (RL) with a Program/Project Manager with TRU waste management experience to support the ARRA accelerated scope for RL-013. Specifically, the contractor shall provide ARRA su | Energy, Department of | 8/04/2009 |
M.H. CHEW AND ASSOCIATES, INC. | $219,491 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AMERICAN ROCK PRODUCTS INC. | $219,188 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $217,589 | SA 58795 Purpose: Provide design Review services for 16 Radiation Portal Monitors (RPM) and Quality Control/Assurance verification/validation for RPM's at 33 Land Port of Entry's (LPOE), all of which are associated with CBP's American Recovery and Reinv | Energy, Department of | 9/27/2010 |
ANR GROUP INC | $217,368 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $217,351 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $217,254 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $215,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SAVAGE LOGISTICS, LLC | $213,660 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
YAHSGS LLC | $213,157 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $211,643 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MOORE CONSULTANTS | $209,750 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NORTH WIND, INC. | $206,907 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $205,458 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $205,323 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $204,983 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
RICHLAND, CITY OF | $204,300 | Energy Efficiency and Conservation Block Grant Program (EECBG) ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT - FUNDS TO BE USED FOR LIGHTING RETROFIT AT CITY FACILITIES AND FOR PURCHASE AND INSTALLATION OF TRAFFIC SIGNALING CENTRAL CONTROL SYSTEM | Energy, Department of | 9/14/2009 |
G FORCE ENGINEERING & TECHNOLOGY, INC. | $204,162 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
DADE MOELLER & ASSOCIATES, INC. | $203,543 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $202,610 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $202,138 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NORTHWEST SOFTWARE INC | $202,070 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Infotech West Inc | $201,838 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Infotech West Inc | $201,838 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TRADEWIND SERVICES LLC | $201,611 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AREVA FEDERAL SERVICES LLC | $201,505 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $200,836 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $199,565 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis There are two main objectives: 1. To create a set of engineering courses in the area of electric power that covers the subject matter knowledge needed by the 21st century power engineer. This includes the traditional subjbjects in power engineering and inco... Show more
This spending item is part of a $2,500,000 allocation.
See details
|
Energy, Department of | 7/30/2010 |
PASCO RANCH & HOME INC | $196,984 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $195,871 |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
FOWLER, LLC | $195,643 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
SAFETY AND RISK ANALYSIS CONSULTING, INC. | $195,346 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $193,739 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
STONEWAY ELECTRIC SUPPLY CO. | $193,728 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PACIFIC MOBILE STRUCTURES, INC. | $193,645 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, | $193,415 | To perform analytical services at the 222-S Laboratory complex, the primary laboratory for highly radioactive samples at Hanford. The analyses are needed to determine what is in the waste, maintain control of the chemistry of the wastes in the tanks, and | Energy, Department of | 9/10/2009 |
J A D ENVIRONMENTAL | $192,686 | Assist DOE/NETL in Environmental Assessments of DOE Project entitled Combined Heat & Power-Areas of INterest 1 & 3 | Energy, Department of | 2/09/2010 |
BATTELLE MEMORIAL INSTITUTE | $192,654 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
OJEDA BUSINESS VENTURES, LLC | $192,305 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PACIFIC SUPPLY & SAFETY, LLC | $191,646 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PASCO RANCH & HOME INC | $189,189 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $189,087 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $188,716 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $187,242 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MID COLUMBIA ENGINEERING, INC. | $185,113 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $185,080 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
HOT SOX LLC | $184,800 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Aecom Services, Inc. | $183,250 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, | $183,079 | To perform analytical services at the 222-S Laboratory complex, the primary laboratory for highly radioactive samples at Hanford. The analyses are needed to determine what is in the waste, maintain control of the chemistry of the wastes in the tanks, and | Energy, Department of | 2/26/2010 |
PHOENIX-ABC A JOINT VENTURE | $182,753 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AREVA FEDERAL SERVICES LLC | $182,731 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $181,744 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TOTAL SITE SERVICES LLC | $181,434 |
SA 57148, 59041, 59042, 59043, 60663 Award Title: ARRA PNNL Building America. PNNL Research and Documentation in Support of Residential Integration. There are three non-ARRA tasks (Tasks 1, 2, and 3) and three ARRA tasks (Task 4, 5, and 6) . The ARRA
This spending item is part of a $3,650,000 allocation.
See details
|
Energy, Department of | 2/11/2010 |
MEIER ENTERPRISES, INC. | $181,102 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
D and R Auto Parts Inc | $180,481 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $180,145 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $177,291 | Provide financial support | Energy, Department of | 12/29/2009 |
G FORCE ENGINEERING & TECHNOLOGY, INC. | $176,997 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WEIRICH CONSULTING SERVICES INC | $175,387 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BARTLETT SERVICES INC | $175,215 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
APOLLO, INC. | $173,337 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $172,997 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
INTERNATIONAL ENGINEERING SERVICES, INC. | $172,905 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
FOWLER, LLC | $171,257 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $170,836 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $169,020 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $168,818 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $167,513 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $166,727 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $166,459 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
ENERGX, LLC | $165,288 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. | $164,256 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
MCS LLC | $163,411 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $162,489 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $160,825 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $160,682 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NORTHWEST SOFTWARE INC | $160,331 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DANIELS CONSULTING | $159,963 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Larsonallen LLP | $159,885 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $159,198 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
XRON ASSOCIATES INC | $158,688 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $158,548 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $158,002 | The purpose of this award was to provide expert technical review from PNNL of applications submitted to DOE as part of the ARRA Advanced Energy Manufacturing Tax Credit ( 48C Program). PNNL submitted over 20 resumes of expert technical staff members with | Energy, Department of | 6/05/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $157,492 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ELR CONSULTING, INC. | $157,046 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MID-COLUMBIA INSULATION, LLC | $156,703 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
YAHSGS LLC | $155,560 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GLOBAL GOVERNMENT SERVICES, LLC | $154,800 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CRC TECHNOLOGIES, INC. | $154,552 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $154,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $152,364 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Ultronics | $152,050 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $152,000 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
WEIRICH CONSULTING SERVICES INC | $151,877 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SAGE TEC LLC | $151,576 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NORTH WIND, INC. | $150,717 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Commodore Advanced Sciences, Inc. | $150,546 |
The B&W Y-12 American Recovery and Reinvestment Act of 2009 (ARRA) program will accomplish environmental and infrastructure work scope over the next two years by reducing the risks from Cold War legacies and furthering Y-12's physical transformation. The
This spending item is part of a $42,105,000 allocation.
See details
|
Energy, Department of | 5/07/2009 |
BATTELLE MEMORIAL INSTITUTE | $150,000 | SA 59639 Pacific Northwest National Lab is tasked to assist in developing an integrated Energy-Water Decision Support System (DSS) that in enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for | Energy, Department of | 9/17/2010 |
GEORGE A. GRANT, INC. | $148,319 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
TRADEWIND SERVICES LLC | $148,124 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $148,086 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
M.H. CHEW AND ASSOCIATES, INC. | $147,355 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
A E M CONSULTING LLC | $147,315 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TRADEWIND SERVICES LLC | $146,976 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FREESTONE ENVIRONMENTAL SERVICES, INC. | $146,588 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $145,960 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $144,876 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $142,751 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $142,139 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $140,361 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AMERICAN ELECTRIC, INC | $139,415 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $139,312 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $137,465 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Numerical Applications, Inc. | $137,422 |
SA 58489 Award Title: Commercial Building Partnerships (CBP) in support of the Commercial Buildings Initiative. Award Purpose: The goal of this project is to substantially reduce energy consumption in the commercial real estate sector by creating, testin
This spending item is part of a $6,944,706 allocation.
See details
|
Energy, Department of | 12/09/2009 |
TOTAL SITE SERVICES LLC | $136,245 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $135,550 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MID COLUMBIA ENGINEERING, INC. | $135,094 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
YAHSGS LLC | $134,861 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $134,218 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $133,963 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $132,506 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
TRADEWIND SERVICES LLC | $131,415 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
XRON ASSOCIATES INC | $130,888 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $130,365 |
Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation.
See details
|
Energy, Department of | 9/15/2009 |
GEORGE A. GRANT, INC. | $129,923 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $128,759 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
WASHINGTON CLOSURE HANFORD LLC | $128,180 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WILDLANDS INC | $128,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $127,584 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TOTAL SITE SERVICES LLC | $127,349 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $127,200 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $126,912 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BENEGAS ENGINEERING, P.S. | $126,148 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
STONEWAY ELECTRIC SUPPLY CO. | $125,789 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $125,425 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $124,965 |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Recovery Act - Workforce Training for the Electric Power Sector
This spending item is part of a $4,998,859 allocation.
See details
|
Energy, Department of | 7/30/2010 |
Technogeneral Services Company | $124,136 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
OPERATIONS & MAINTENANCE EXCELLENCE, INC. | $123,072 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $122,302 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $120,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INFINIA CORPORATION | $119,967 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
TRADEWIND SERVICES LLC | $119,802 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $119,660 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PHOENIX ENTERPRISES NW, LLC | $119,630 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
ARES CORPORATION | $119,175 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $118,790 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $117,650 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $117,500 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PACIFIC SUPPLY & SAFETY, LLC | $117,270 |
Title: LCLS Ultrafast Science Instruments MIE (LUSI Acceleration) Purpose: Specifically, this funding is to accelerate progress on the LUSI project as compared to its already approved project baseline plan. For more detailed information, see Contract Wo
This spending item is part of a $33,600,000 allocation.
See details
|
Energy, Department of | 4/01/2009 |
MID COLUMBIA ENGINEERING, INC. | $117,119 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
DANIELS CONSULTING | $116,740 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PRIORITY ONE | $115,779 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $114,658 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
J. and D. Sales, Inc. | $114,582 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $113,240 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $110,744 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
GLOBAL GOVERNMENT SERVICES, LLC | $110,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $109,606 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
RC CONSTRUCTION SERVICES INC | $109,316 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BABCOCK SERVICES, INC. | $107,645 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
ELR CONSULTING, INC. | $106,639 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
HILINE ENGINEERING & FABRICATION, INC. | $106,312 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Excelsior Design, Inc. | $104,900 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARAMOUNT SUPPLY CO. | $104,153 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TOTAL SITE SERVICES LLC | $103,859 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
ELR CONSULTING, INC. | $103,811 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
REMOTE SYSTEMS ENGINEERING, INC | $103,802 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ANR GROUP INC | $103,776 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $103,745 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $103,305 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $102,407 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $102,245 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $102,108 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
SAVAGE LOGISTICS, LLC | $102,094 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
M.H. CHEW AND ASSOCIATES, INC. | $102,062 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DANIELS CONSULTING | $101,207 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $101,063 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $100,701 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
SAVAGE LOGISTICS, LLC | $100,690 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $100,474 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $100,206 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $100,000 | This task is part of an Energy Frontier Research Center (EFRC) on Materials Sciences of Actinides that is led by the University of Notre Dame. Under this EFRC task, ion-beam irradiation techniques and computational approaches will be used to study defects | Office of Science | 7/23/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $98,945 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $98,900 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
FOWLER, LLC | $98,215 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $98,096 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGY NORTHWEST EMPLOYEES' ASSOCIATION | $97,951 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FLUOR FEDERAL SERVICES, INC. | $97,948 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $97,167 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $97,109 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $97,047 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ABB INC. | $95,557 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $95,497 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $94,500 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $94,392 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $93,303 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ELR CONSULTING, INC. | $92,140 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Butler Health & Safety, LLC | $91,920 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $91,387 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
LONGENECKER & ASSOCIATES, INC. | $90,488 |
Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation.
See details
|
Energy, Department of | 9/15/2009 |
ANR GROUP INC | $90,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $89,198 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MASTER-LEE ENERGY SERVICES CORPORATION | $89,080 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $89,018 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
WORLEYPARSONS POLESTAR, INC. | $88,852 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Brutzman's, Inc. | $88,340 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
WORLEYPARSONS POLESTAR, INC. | $88,327 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. | $88,315 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $88,238 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FREESTONE ENVIRONMENTAL SERVICES, INC. | $88,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $87,396 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MANUFACTURING SERVICES, INC. | $87,335 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
ELR CONSULTING, INC. | $87,081 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $87,069 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $86,702 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $86,405 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MCS LLC | $86,131 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
ANR GROUP INC | $86,113 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $85,344 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $85,025 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
YAHSGS LLC | $84,572 | Administrative Support Services | Energy, Department of | 9/28/2010 |
PRIORITY ONE | $84,494 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. | $84,317 |
Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation.
See details
|
Energy, Department of | 9/15/2009 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $83,676 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
JOHN MARVIN INC | $83,161 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $82,422 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $82,415 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $82,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TRADEWIND SERVICES LLC | $81,879 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $80,789 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
VISTA ENGINEERING TECHNOLOGIES, LLC | $80,680 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TOTAL SITE SERVICES LLC | $80,280 |
Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation.
See details
|
Office of Science | 9/23/2009 |
M.H. CHEW AND ASSOCIATES, INC. | $80,248 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $80,000 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BABCOCK SERVICES, INC. | $80,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $80,000 |
Office of Science Financial Assistance Program Recovery Act--Solar Photovoltaic Holographic Cogeneration System
This spending item is part of a $1,149,999 allocation.
See details
|
Office of Science | 12/07/2009 |
ARES CORPORATION | $79,955 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $79,925 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGX, LLC | $79,795 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ROCK PRODUCTS INC. | $79,625 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $79,334 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $78,525 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $78,462 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $78,258 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $77,545 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $77,318 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Provident Consulting Group | $76,941 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
WHITE SHIELD, INC. | $76,918 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PACIFIC SUPPLY & SAFETY, LLC | $76,700 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BASIN DEPARTMENT STORE, INC | $76,678 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARADISE BOTTLED WATER LLC | $76,187 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $75,925 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $74,400 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $74,305 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $73,972 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PRIORITY ONE | $73,251 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Intellegration, LLC | $73,207 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Wesco Distribution, Inc | $72,606 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MCS LLC | $72,574 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
LOS ALAMOS TECHNICAL ASSOCIATES, INC. | $72,542 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $72,209 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $72,185 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Los Alamos Technical Associates, Inc. | $71,311 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $71,076 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $70,935 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $70,812 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
XRON ASSOCIATES INC | $70,040 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ENERGYSOLUTIONS GOVERNMENT GROUP, INC. | $70,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $69,900 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
TRADEWIND SERVICES LLC | $69,702 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $69,637 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $69,497 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Kennewick Industrial & Electrical Supply Inc | $69,251 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $69,094 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $68,984 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $68,143 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Columbia Nuclear International LLC | $67,479 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ANR GROUP INC | $67,145 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $67,013 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ANR GROUP INC | $66,883 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $66,532 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $66,333 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
SYNERGISTICS, INC. | $66,175 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Aecom Services, Inc. | $65,246 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $65,203 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ARES CORPORATION | $64,701 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
A E M CONSULTING LLC | $64,629 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WORLEYPARSONS POLESTAR, INC. | $64,460 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
S.M. STOLLER CORPORATION, THE | $64,223 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
FOWLER, LLC | $63,786 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
HILINE ENGINEERING & FABRICATION, INC. | $63,165 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $63,066 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PERMA-FIX NORTHWEST RICHLAND, INC. | $62,764 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $62,694 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $62,601 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $62,475 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $61,791 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $60,992 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PUGET SOUND PIPE AND SUPPLY COMPANY | $60,631 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $60,189 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $59,813 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FREESTONE ENVIRONMENTAL SERVICES, INC. | $59,439 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $59,326 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
AGILENT TECHNOLOGIES, INC. | $59,264 |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
AMERICAN ELECTRIC, INC | $58,840 |
Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation.
See details
|
Office of Science | 9/23/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $57,960 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Aecom Services, Inc. | $57,720 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
KBL, INC. | $57,503 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $56,955 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $56,646 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AMERICAN ROCK PRODUCTS INC. | $56,526 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $56,350 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
WORLEYPARSONS POLESTAR, INC. | $55,883 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INNOVATIONS GROUP INC. | $55,852 | ADMINISTRATIVE SUPPORT SERVICES | Energy, Department of | 1/11/2010 |
MEIER ENTERPRISES, INC. | $55,661 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGX, LLC | $55,527 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $55,191 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $55,028 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
OPERATIONS & MAINTENANCE EXCELLENCE, INC. | $53,994 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $53,944 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Columbia Paint & Drywall, Inc. | $53,874 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SHERWIN-WILLIAMS COMPANY, THE | $53,560 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEOPHYSICAL SURVEY LLC | $53,430 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ROCK PRODUCTS INC. | $53,340 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FOWLER, LLC | $53,067 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MEIER ENTERPRISES, INC. | $52,364 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $52,256 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $51,690 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $51,593 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $51,453 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AREVA FEDERAL SERVICES LLC | $51,051 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Technogeneral Services Company | $50,609 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $50,413 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $50,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Technogeneral Services Company | $49,999 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. | $49,907 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
MORRISON CONSTRUCTION SERVICES, INC. | $49,688 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
YOUNG, S & ASSOCIATES GENERAL CONTRACTOR | $49,596 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ANR GROUP INC | $49,575 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $48,983 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Technogeneral Services Company | $48,479 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $48,428 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
RICHLAND INDUSTRIAL, INC | $48,426 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
A E M CONSULTING LLC | $48,060 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $48,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CANBERRA INDUSTRIES, INC. | $47,890 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Tri Cities Cycle Supply, Incorporated | $47,673 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ANR GROUP INC | $47,571 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
A E M CONSULTING LLC | $47,166 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
J. and D. Sales, Inc. | $46,710 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Excelsior Design, Inc. | $46,021 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $45,682 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $45,484 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MKM, INC. | $45,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $44,976 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ANR GROUP INC | $44,824 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $44,765 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $44,624 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $44,440 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
Rybarczyk-Gomez & Associates, P.S., Inc. | $44,120 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
XRON ASSOCIATES INC | $44,064 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ARES CORPORATION | $43,861 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENGINEERS AND CONSTRUCTORS, LLC | $43,101 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
STONEWAY ELECTRIC SUPPLY CO. | $42,963 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ELECTRIC, INC | $42,779 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DADE MOELLER & ASSOCIATES, INC. | $42,598 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FOWLER, LLC | $42,102 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
E2 CONSULTING ENGINEERS, INC. OF COLORADO | $41,985 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AMERICAN ROCK PRODUCTS INC. | $41,864 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Girvin, Nancy K | $41,739 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
CPR GROUP INC | $41,688 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
A E M CONSULTING LLC | $40,890 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ANR GROUP INC | $40,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RE MERRIMAN P.E. LLC | $39,864 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $39,777 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COMM/TECH, INC. | $39,605 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RIVER BEND TRANSFER SYSTEMS LLC | $39,565 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
Kennewick Industrial & Electrical Supply Inc | $39,446 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENGINEERS AND CONSTRUCTORS, LLC | $39,418 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
OPERATIONS & MAINTENANCE EXCELLENCE, INC. | $39,404 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Rybarczyk-Gomez & Associates, P.S., Inc. | $39,284 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FREESTONE ENVIRONMENTAL SERVICES, INC. | $38,929 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $38,794 | On a weekly and monthly basis, identify and compile as necessary the performance data, forecasts and other ARRA metrics to be reviewed and evaluated. Data will include RL and contractor generated information. Examples of performance data to be analyzed in | Energy, Department of | 5/11/2009 |
FOWLER, LLC | $38,710 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TOTAL SITE SERVICES LLC | $38,538 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $38,176 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DINESH ENTERPRISE | $37,947 |
Award Title: ARM Climate Research Facility (ACRF) Initiative Award Purpose: The Recovery Act funds will support the development of the next generation Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF), which has been an identified
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
EMP2 INCORPORATED | $37,901 | Modification to Project Facilitation Task Order DE-AT36-08GO28128 Statement of Work. Replaced the Statement of Work with a revised Statement of Work applicable to the ESPC Indefinite Delivery Indefinite Quantity (IDIQ) Contracts awarded December 17, 2008 | Energy, Department of | 9/29/2009 |
WASHINGTON CLOSURE HANFORD LLC | $37,728 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WASHINGTON CLOSURE HANFORD LLC | $37,488 |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
Redwing Shoe Store Inc | $37,067 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TRADEWIND SERVICES LLC | $35,741 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $35,432 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ENERGX, LLC | $35,008 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
TRADEWIND SERVICES LLC | $35,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE MEMORIAL INSTITUTE | $34,892 |
Enhance and Accelerate FEMP Service Functions to the Federal Government: This award provides funds for technical assistance to the Federal Energy Management Program (FEMP) to assist agencies with the increase in activity and investments in energy efficie
This spending item is part of a $2,340,000 allocation.
See details
|
Energy, Department of | 9/03/2009 |
WASHINGTON CLOSURE HANFORD LLC | $34,888 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $34,867 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COLUMBIA ENERGY & ENVIRONMENTAL SERVICES, INC. | $34,600 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
OPERATIONS & MAINTENANCE EXCELLENCE, INC. | $34,161 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FEDERAL ENGINEERS AND CONSTRUCTORS, INC. | $34,130 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Excelsior Design, Inc. | $33,586 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PACIFIC SUPPLY & SAFETY, LLC | $33,521 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
COLUMBIA ENGINEERS AND CONSTRUCTORS, LLC | $33,391 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ANR GROUP INC | $32,905 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AMERICAN ROCK PRODUCTS INC. | $32,680 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $32,398 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DADE MOELLER & ASSOCIATES, INC. | $32,026 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TRADEWIND SERVICES LLC | $31,901 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $31,610 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FLUOR FEDERAL SERVICES, INC. | $30,675 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BNL TECHNICAL SERVICES, L.L.C. | $30,637 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ELR CONSULTING, INC. | $30,615 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
HILINE ENGINEERING & FABRICATION, INC. | $30,520 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BRUKER AXS HANDHELD INC. | $30,190 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BATTELLE MEMORIAL INSTITUTE | $30,000 | Honeywell is developing and demonstrating an advanced wind turbine condition based maintenance system. The system will include a vibration-based mechanical failure detection and diagnosis system, as well as a supervisory control and data acquisition data | Energy, Department of | 1/25/2010 |
REMOTE SYSTEMS ENGINEERING, INC | $30,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RIVER BEND TRANSFER SYSTEMS LLC | $29,962 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TOTAL SITE SERVICES LLC | $29,817 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AREVA FEDERAL SERVICES LLC | $29,799 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
TOTAL SITE SERVICES LLC | $29,292 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Excelsior Design, Inc. | $29,117 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FLUOR FEDERAL SERVICES, INC. | $29,000 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ARES CORPORATION | $28,987 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NAVARRO RESEARCH AND ENGINEERING, INC. | $28,910 | Provide QA Training in the areas of Commercial Grade Dedication and general executive levels QA training for Federal personnel involved in ARRA activities. | Energy, Department of | 9/23/2009 |
ENERGX, LLC | $27,888 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
EFFICIENCY SOLUTIONS LLC | $27,617 |
SA 58489 Award Title: Commercial Building Partnerships (CBP) in support of the Commercial Buildings Initiative. Award Purpose: The goal of this project is to substantially reduce energy consumption in the commercial real estate sector by creating, testin
This spending item is part of a $6,944,706 allocation.
See details
|
Energy, Department of | 12/09/2009 |
EFFICIENCY SOLUTIONS LLC | $27,617 |
SA 58489 Award Title: Commercial Building Partnerships (CBP) in support of the Commercial Buildings Initiative. Award Purpose: The goal of this project is to substantially reduce energy consumption in the commercial real estate sector by creating, testin
This spending item is part of a $6,944,706 allocation.
See details
|
Energy, Department of | 12/09/2009 |
ENERGYSOLUTIONS FEDERAL EPC, INC. | $27,511 |
The American Recovery and Reinvestment Act provided funding to the Savannah River Site (SRS) Liquid Waste Program operated by Savannah River Remediation LLC (SRR) to support facility infrastructure, waste tank closure, and radioactive sludge and salt disp
This spending item is part of a $199,851,822 allocation.
See details
|
Energy, Department of | 9/23/2009 |
ENERGX, LLC | $27,498 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ELECTRIC, INC | $27,492 |
Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation.
See details
|
Office of Science | 9/23/2009 |
ARES CORPORATION | $27,439 |
EGS Technology R&D: Geothermal Technologies Program Enhanced Geo: This award provides funding to four subprojects in support of Enhanced Geothermal Systems technology: 1) Feasibility and Design Studies for a High Temperature Downhole Tool--ORNL will per
This spending item is part of a $4,110,870 allocation.
See details
|
Energy, Department of | 9/30/2009 |
RIVER BEND TRANSFER SYSTEMS LLC | $27,419 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ANR GROUP INC | $27,119 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
COMM/TECH, INC. | $26,802 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ELR CONSULTING, INC. | $26,343 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
DGR GRANT CONSTRUCTION, INC. | $26,205 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WASHINGTON RIVER PROTECTION SOLUTIONS LLC | $25,676 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BRUTZMAN'S, INC. | $25,628 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GEORGE A. GRANT, INC. | $25,626 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
RIVER BEND TRANSFER SYSTEMS LLC | $25,372 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
AMERICAN ROCK PRODUCTS INC. | $25,200 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICAN ROCK PRODUCTS INC. | $25,200 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) INTERNATIONAL, | $20,921 | To perform analytical services at the 222-S Laboratory complex, the primary laboratory for highly radioactive samples at Hanford. The analyses are needed to determine what is in the waste, maintain control of the chemistry of the wastes in the tanks, and | Energy, Department of | 9/24/2009 |
LUCAS ENGINEERING & MANAGEMENT SERVICES, INC. | $8,355 |
Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation.
See details
|
Energy, Department of | 9/15/2009 |
EMP2 INCORPORATED | $8,231 | PF Site Review Orientation, GSA Federal Center. | Energy, Department of | 5/12/2010 |
EMP2 INCORPORATED | $6,871 | Project Facilitator attended the FEMP Portland Workshop and participated in the 3 day training session. | Energy, Department of | 5/13/2010 |