Franklin County, Wash., funds by Energy, Department of
Listing $52,287,971.28 in stimulus funds from Energy, Department of for Franklin
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
INDIAN EYES, LLC | $8,325,144 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INDIAN EYES, LLC | $5,864,053 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WHITE SHIELD/APOLLO JV, A JOINT VENTURE | $4,498,857 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ROWAND MACHINERY COMPANY | $4,246,010 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
GWP HOLDINGS, LLC | $2,438,716 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INDIAN EYES, LLC | $1,642,162 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RANDOLPH CONSTRUCTION SERVICES, INC. | $1,631,892 |
Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation.
See details
|
Office of Science | 9/23/2009 |
INDIAN EYES, LLC | $1,510,579 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $1,444,344 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BENTON FRANKLIN COMMUNITY ACTION COMMITTEE | $1,417,636 |
Weatherization Assistance for Low-Income Persons ARRA Supplemental Funding for Weatherization Assistance to Low-Income Persons: To reduce energy costs for low-income families, particularly for the elderly, people with disabilities, and children, by improving the energy efficiency of their homes whilele en... Show more
This spending item is part of a $66,507,122 allocation.
See details
|
Energy, Department of | 4/01/2009 |
STILLWATER, LLC | $829,173 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SAFWAY SERVICES, LLC | $783,672 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $780,905 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
GEN-X ENERGY GROUP, INC. | $720,000 |
State Energy Program Funding supports energy efficiency, renewable energy and clean technology programs statewide. The funding addresses a specific goal to reduce energy consumption by at least 25 percent of the stateG??s 1990 per capita energy use by 2012.
This spending item is part of a $60,944,000 allocation.
See details
|
National Energy Technology Laboratory | 5/01/2009 |
GREAT AMERICAN INDUSTRIAL SUPPLY INC. | $698,528 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
POWERS EQUIPMENT COMPANY, INC. | $682,466 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA RIGGING CORPORATION | $660,634 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RC CONSTRUCTION SERVICES INC | $622,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA RIGGING CORPORATION | $588,411 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INDIAN EYES, LLC | $578,631 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INDIAN EYES, LLC | $545,510 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
The Terteling Company Inc | $540,363 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PASCO, CITY OF | $495,500 | Energy Efficiency and Conservation Block Grant Program (EECBG) Energy Efficiency and Conservation Block Grant Program | Energy, Department of | 9/14/2009 |
POWERS EQUIPMENT COMPANY, INC. | $477,940 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
H & N Electric, Inc., Pasco | $427,246 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Diamond M Supply LLC | $423,858 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
SAFWAY SERVICES, LLC | $423,246 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $373,076 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
STELLAR INDUSTRIAL SUPPLY, INC. | $372,767 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $356,424 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $334,343 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MONARCH MACHINE & TOOL CO INC | $323,898 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
STELLAR INDUSTRIAL SUPPLY, INC. | $280,136 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PROGRESSIVE MACHINE INC | $275,400 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $271,598 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $246,686 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $242,039 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $228,981 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ACE SALES & SERVICE CO, INC | $227,691 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RC CONSTRUCTION SERVICES INC | $226,413 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
INDIAN EYES, LLC | $204,001 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA BASIN COMMUNITY COLLEGE | $201,991 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Diamond M Supply LLC | $191,775 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
WALTEK II, INCORPORATED | $176,297 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
POWERS EQUIPMENT COMPANY, INC. | $171,078 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
COLUMBIA BASIN, LLC | $168,216 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $166,506 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
MONARCH MACHINE & TOOL CO INC | $154,794 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ACE SALES & SERVICE CO, INC | $152,896 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
The Terteling Company Inc | $150,480 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
AMERICA WEST ENVIRONMENTAL SUPPLIES, INC | $150,000 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $144,056 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
POWERS EQUIPMENT COMPANY, INC. | $131,299 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MONARCH MACHINE & TOOL CO INC | $122,254 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
POWERS EQUIPMENT COMPANY, INC. | $119,652 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Diamond M Supply LLC | $118,044 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BENTON FRANKLIN COMMUNITY ACTION COMMITTEE | $117,972 |
Weatherization Assistance for Low-Income Persons ARRA Supplemental Funding for Weatherization Assistance to Low-Income Persons: To reduce energy costs for low-income families, particularly for the elderly, people with disabilities, and children, by improving the energy efficiency of their homes whilele en... Show more
This spending item is part of a $66,507,122 allocation.
See details
|
Energy, Department of | 4/01/2009 |
STILLWATER, LLC | $115,052 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $107,916 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
RC CONSTRUCTION SERVICES INC | $102,133 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $101,482 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NORTH COAST ELECTRIC COMPANY | $100,750 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Sky Guy Supply LLC | $100,198 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
H & N Electric, Inc., Pasco | $99,533 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WALTEK II, INCORPORATED | $98,707 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Diamond M Supply LLC | $91,724 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Diamond M Supply LLC | $86,564 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $81,423 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Central Machinery Sales, Inc. | $76,186 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RC CONSTRUCTION SERVICES INC | $72,953 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Empire Rubber & Supply Co. | $70,566 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $68,770 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
ACE SALES & SERVICE CO, INC | $68,615 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RC CONSTRUCTION SERVICES INC | $62,958 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
POWELL - CHRISTENSEN, INC. | $60,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $57,137 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Columbia Grain & Feed, Co. | $54,707 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
STELLAR INDUSTRIAL SUPPLY, INC. | $51,164 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $50,274 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
FRONTIER FENCE, INC. | $49,361 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MONARCH MACHINE & TOOL CO INC | $48,797 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $46,826 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $46,271 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
STELLAR INDUSTRIAL SUPPLY, INC. | $44,534 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
ROWAND MACHINERY COMPANY | $43,054 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $43,001 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
FRONTIER FENCE, INC. | $42,226 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $41,814 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $41,080 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
PARSONS HANFORD FABRICATORS INC | $39,853 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
Diamond M Supply LLC | $39,050 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
NORTH COAST ELECTRIC COMPANY | $35,100 |
Award Title 56991; CONTRACT NO. DE-AC05-76RLOI830 - MODIFICATION A508 FUNDING UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Award Purpose 56991; Modification A508 Award Purpose: The purpose of the attached bilateral contract modification is to ob
This spending item is part of a $4,000,000 allocation.
See details
|
Office of Science | 9/23/2009 |
Columbia Specialty Products, LLC | $32,040 |
1. Award Description field should include the following elements; a. Award Title Environmental Molecular Sciences Laboratory b. Award Purpose The Recovery Act funding will accelerate the planned capital equipment improvements to the Environmental Mol
This spending item is part of a $60,000,000 allocation.
See details
|
Office of Science | 5/22/2009 |
INDIAN EYES, LLC | $31,400 |
Project Value: 2002070: Recovery Act Project Description of Work: RA-09-001 1. Installation of two groundwater characterization/monitoring wells (one well in FY 2009 and one in FY2011) in Pahute Mesa for the Underground Test Area (UGTA) project. The 2009
This spending item is part of a $33,850,358 allocation.
See details
|
Office of Nuclear Security/National Nuclear Security Administration | 6/04/2009 |
Image Works Digital Media Inc | $29,996 |
ARRA Task Description Overall EEPs Technical Assistance to States - Identify regional needs and develop a strategy to respond to them. Provide assistance to the states with Section 410 compliance. State Technical Assistance ? provide specialized ass
This spending item is part of a $16,244,133 allocation.
See details
|
Energy, Department of | 12/09/2009 |
Rowand Machinery Company | $28,035 |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $26,843 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
PARSONS HANFORD FABRICATORS INC | $26,000 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
BLEYHL FARM SERVICE, INC. | $25,564 |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Image Works Digital Media Inc | $25,079 |
The American Recovery and Reinvestment Act (ARRA) provided funding to accelerate Tank Operations Contract (TOC) out year work scope into Fiscal Years 2009 thru 2011. The benefits of acceleration were increased reliability and availability of infrastructur
This spending item is part of a $323,855,000 allocation.
See details
|
Energy, Department of | 4/14/2009 |
WHITE SHIELD, INC. | $25,000 |
ERDF is the hub of the WCH scope of work and supports a major portion of other Hanford contractor (OHC) waste disposal. Wastes collected from sites around the Hanford complex are brought to ERDF for treatment and disposal. WCH operates the ERDF and is
This spending item is part of a $156,847,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |