Grant County, Wash., funds by Interior, Department of
Listing $33,055,228.77 in stimulus funds from Interior, Department of for Grant
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MOWAT CONSTRUCTION COMPANY | $28,759,589 | INSTALLATION OF THE SECOND BARRELS OF THE WEBER BRANCH SIPHON AND THE WEBER COULEE SIPHON EAST LOW CANAL. | Bureau of Reclamation | 9/30/2009 |
M.J. HUGHES CONSTRUCTION, INC. | $1,601,347 | The principal components of the work to be performed under these specifications include control of water for foundation,backfill and compaction about structures,channel reshaping,constructing embankment,furnishing and placing riprap and gravel bedding,fur | Bureau of Reclamation | 10/19/2009 |
CENTRAL WASHINGTON ASPHALT, INC | $510,640 |
Amount of Award was modified to reflect Modifications 1 and 2. Construction of roadway including grade, drain, removal and disposal of existing bituminous pavement and drainage structures; construct placement of new storm drain system, placement of aggre
This spending item is part of a $1,757,435 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/14/2010 |
COLUMBIA BASIN RAILROAD COMPANY INC | $380,104 | Railroad track removal and installation. Land Contract. | Bureau of Reclamation | 8/14/2009 |
SELLAND CONSTRUCTION, INC. | $347,611 |
Construction perform on Road 16-NE of the Crab Creek Crossing
This spending item is part of a $422,982 allocation.
See details
|
Bureau of Reclamation | 7/31/2009 |
HIGH PLAINS COMPUTING, INC. | $295,966 |
To provide construction inspection services for the contstruction of second barrels for the Weber coulee siphon and Weber branch siphon. The requirement is for the inspector to monitor compliance with the specifications, monitor contractor safety complian
This spending item is part of a $513,782 allocation.
See details
|
Bureau of Reclamation | 9/27/2010 |
KNIGHT CONST. & SUPPLY, INC. | $290,055 |
The overall purpose of this award is to perform High-Pressure Gate Modifications at Pinto Dam, located on the Columbia Basin Project in the State of Washington. AUS (Associated Underwater Services, Inc.) expects to successfully complete this project usin
This spending item is part of a $1,093,850 allocation.
See details
|
Bureau of Reclamation | 4/19/2010 |
ENVIROTEMPS, INC. | $217,817 |
To provide construction inspection services for the contstruction of second barrels for the Weber coulee siphon and Weber branch siphon. The requirement is for the inspector to monitor compliance with the specifications, monitor contractor safety complian
This spending item is part of a $513,782 allocation.
See details
|
Bureau of Reclamation | 9/27/2010 |
MACNAK CONSTRUCTION LLC | $208,326 | ASPHALT OVERLAY AT MOUNT RAINIER NATIONAL PARK | National Park Service | 5/14/2010 |
MACNAK CONSTRUCTION LLC | $115,786 | REPLACE HVAC SYSTEM LAKE MEAD | National Park Service | 4/29/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $82,180 | LCGR Grasslands Restoration Project, Mechanical Mesquite Reduction, Spring Treatment Unit | Bureau of Land Management | 6/09/2010 |
GRANT, COUNTY OF | $75,370 |
Construction perform on Road 16-NE of the Crab Creek Crossing
This spending item is part of a $422,982 allocation.
See details
|
Bureau of Reclamation | 7/31/2009 |
ENVIROTEMPS, INC. | $56,284 |
Construction inspection services for a construction project at Pinto Dam, 2.5 miles northwest of Stratford, Washington.TAS::14 0681::TAS. BOR Project No. 6.0000 Provide a Construction Inspector to represent Bureau of Reclamation interest and enforce cons
This spending item is part of a $66,713 allocation.
See details
|
Bureau of Reclamation | 8/30/2010 |
MACNAK CONSTRUCTION LLC | $43,400 | Hot Asphalt overlay on the Longmire Back road | National Park Service | 8/28/2009 |
BARLOWORLD HANDLING LLC | $32,026 | Purchase Hyster Forklift model J40ZT for the Dept of Interior | Bureau of Reclamation | 12/03/2009 |
BENSON FARMS, INC. | $28,299 | Seed Purchase | Bureau of Land Management | 9/21/2009 |
HIGH PLAINS COMPUTING, INC. | $10,429 |
Construction inspection services for a construction project at Pinto Dam, 2.5 miles northwest of Stratford, Washington.TAS::14 0681::TAS. BOR Project No. 6.0000 Provide a Construction Inspector to represent Bureau of Reclamation interest and enforce cons
This spending item is part of a $66,713 allocation.
See details
|
Bureau of Reclamation | 8/30/2010 |
ASSOCIATED UNDERWATER SERVICES, INC. | $0 |
The overall purpose of this award is to perform High-Pressure Gate Modifications at Pinto Dam, located on the Columbia Basin Project in the State of Washington. AUS (Associated Underwater Services, Inc.) expects to successfully complete this project usin
This spending item is part of a $1,093,850 allocation.
See details
|
Bureau of Reclamation | 4/19/2010 |