King County, Wash., funds by General Services Administration
Listing $167,970,138.56 in stimulus funds from General Services Administration for King
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SELLEN CONSTRUCTION CO., INC. | $73,201,826 | The project is a redevelopment/modernization of a portion of the existing 1202 Building Warehouse located at the Federal Center South - Seattle. The primary tenant will be the U.S. Army Corps of Engineers (USACE) Seattle District. The redeveloped/modern | Public Buildings Service | 3/26/2010 |
MCKINSTRY CO., LLC | $19,245,957 |
Thomas S. Foley US Federal Courthouse Design-Build Modernization Project, Spokane, WA construction remodel
This spending item is part of a $40,573,396 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
MCKINSTRY CO., LLC | $17,950,817 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
HOWARD S WRIGHT COMPANIES, WASHINGTON JOINT VENTURE | $9,701,835 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
Nuprecon, L.P. | $9,190,649 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
Prime Electric, Inc. | $8,493,283 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
Nuprecon, L.P. | $6,752,633 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
NBBJ LP | $4,223,950 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
Walters & Wolf Curtain Wall, LLC | $2,113,297 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
HEERY INTERNATIONAL, INC. | $1,736,569 |
Initial scope was for pre-design services for the design and construction of new office space for the Army Corp of Engineers on the Federal Center South campus in Seattle, WA. Design and construction will be procured under a design-build procurement meth
This spending item is part of a $1,773,477 allocation.
See details
|
Public Buildings Service | 9/02/2009 |
URS GROUP, INC. | $1,703,964 |
Construction Management Assist, Energy Modeling and Commissioning Services for the Jackson Federal Building Modernization Project
This spending item is part of a $2,407,474 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
MCKINSTRY ESSENTION, INC. | $1,534,318 | ARRA 2009 funded Contract Award under Building Services to install Advanced Metering for Water, Steam, Gas, Fuel/Oil and/or Electrical based on the site specific utilities for GSA owned properties within GSA Region 10 for compliance with the Energy Indep | Public Buildings Service | 3/31/2010 |
SOUTHWEST CONSTRUCTION & PROPERTY MANAGEMENT | $777,641 |
The purpose of this project is to provide a roof system(s) that balances and meets the ARRA requirements, initial capital, sustainability, life costs, good stewardship, and historical preservation and performance for the Federal Center South Building 1201
This spending item is part of a $3,328,647 allocation.
See details
|
Public Buildings Service | 3/19/2010 |
CB ENGINEERS | $703,510 |
Construction Management Assist, Energy Modeling and Commissioning Services for the Jackson Federal Building Modernization Project
This spending item is part of a $2,407,474 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
LORACHE CAD/IT SERVICES LLC | $664,919 | DESIGN AND BUILD FROMT ENTRY DOOR REPLACEMENT, U.S. COURTHOUSE, SEATTLE WA. USING THE AMERICIAN AND REINVESTMENT ACT FUND | Public Buildings Service | 9/15/2010 |
K.O.O. CONSTRUCTION, INC. | $589,264 | Base award is for Design-build construction services to perform Energy Conservation Measure Number One for the replacement of existing lighting in the courthouse main lobby/atrium with induction lighting. Options awarded this quarter on March 26 in the a | Public Buildings Service | 3/12/2010 |
Amazon.com, Inc. | $558,772 |
Team Smartronix provided continued operations & maintenance and enhancements support during the quarter (Jan G?? Mar 2012). Significant activities performed during this period included providing technical support services and advanced data analytics for F
This spending item is part of a $17,948,517 allocation.
See details
|
Office of the Federal Acquisition Service | 7/08/2009 |
C-2 CONSTRUCTION INC | $509,297 | Replace Chiller and do an elevator upgrade for the federal building in Yakima.The Replacement of Chiller has been accomplished and the initial upgrade of the elevator gears and circuitry has begun for the #2 elevator. | Public Buildings Service | 7/09/2010 |
AIR SYSTEMS ENGINEERING, INC. | $497,223 |
Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation.
See details
|
Public Buildings Service | 3/25/2010 |
Nuprecon, L.P. | $494,830 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
JACOBS TECHNOLOGY INC. | $475,918 | Requirements and Estimating Sevices for facilities in GSA Region 10 Prepare performance based requirements packages for solicitation of Design/Build contracts for various projects. This is to include high performance Green buildings. The intent is to gath | Public Buildings Service | 9/15/2009 |
Laurel Vanek Project Planning, LLC | $416,000 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
EHS-INTERNATIONAL, INC. | $364,610 | Conduct and Environmental Site Assessment and Minor Remediation at Building 1203, Federal Center South, Seattle, Washington, as outlined in the Scope of Work and contractor quote. | Public Buildings Service | 5/27/2010 |
B&M CONSTRUCTION, INC. | $305,013 | Furniture design and move services in Spokane, WA for the new military entrance processing facility. | Public Buildings Service | 9/24/2010 |
SIMPSON, BUSTER | $305,000 | We are creating a public artwork for the GSA Recovery project site in Seattle, Washington. | Public Buildings Service | 11/15/2010 |
MAGNUSSON KLEMENCIC ASSOCIATES, INC. | $289,758 |
Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
E M C ENGINEERS, INC. | $275,307 | This work is in support of the energy conservation and sustainability measures to be implemented as part of the American Recovery and Reinvestment Act of 2009. This stage is for a study to determine both low-cost control system modifications and equipment | Public Buildings Service | 7/23/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $259,030 | Additional Operational and maintenance support services, awarded as a not-to-exceed (NTE) amount for additional services, man-power, and equipment costs necessary to perform additional operational and maintenance support services in support of the RECOVER | Public Buildings Service | 7/01/2010 |
Wsp Flack + Kurtz, Inc. | $247,680 |
Mechanical engineering support services to the Architectural and Engineering Services branch at Auburn, WA
This spending item is part of a $272,020 allocation.
See details
|
Public Buildings Service | 2/28/2011 |
Whb Plaster Company Inc | $201,938 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
UPTIME INSTITUTE PROFESSIONAL SERVICES, LLC | $197,400 | Uptime Institute design certification and construction certification for SSA NSC Project. | Public Buildings Service | 1/31/2012 |
ALLEN BRADBURY CONSTRUCTION LLC | $181,113 |
Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation.
See details
|
Public Buildings Service | 3/25/2010 |
URS GROUP, INC. | $169,224 | Provide project management services of Retro-Commissioning studies for seven (7) Federal Buildings throughout Region 10. | Public Buildings Service | 7/20/2009 |
LUMENOMICS LLC | $168,177 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
HEERY INTERNATIONAL, INC. | $167,267 | Two federally owned buildings originally constructed in 1952 and 1982 in Portland, Oregon, are currently being surveyed to evaluate the HVAC, mechanical, electrical and plumbing services and equipment, to establish their age, condition and current perform | Public Buildings Service | 7/21/2009 |
TRADE-MARX SIGN & DISPLAY CORPORATION | $167,140 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
Gerber & Vail, Inc. | $161,000 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
SEQUOYAH ELECTRIC, LLC | $156,785 |
ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
GARNER CONSTRUCTION WBE INC | $152,565 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
MORRISON HERSHFIELD CORPORATION | $125,200 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
KPFF, INC. | $124,766 |
Engineering analysis and investigation of existing building
This spending item is part of a $154,263 allocation.
See details
|
Public Buildings Service | 5/06/2009 |
CHEROKEE GENERAL CORPORATION | $113,978 |
ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
WORKING BUILDINGS, LLC | $111,700 | Retro-commissioning study of Federal buildings in Auburn Washington and Anchorage Alaska | Public Buildings Service | 7/23/2009 |
MAGNUSSON KLEMENCIC ASSOCIATES, INC. | $105,000 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
SEATTLE CITY LIGHT | $101,000 | Seattle City Light provides services necessary to connect electrical power to Federal Center South Building 12021, located at 4735 E. Marginal Way, Seattle, WA. | Public Buildings Service | 6/16/2011 |
URS GROUP, INC. | $99,805 | Construction Management Services for the Seattle Federal Oddice Building HVAC Upgrades and the Auburn Energy Conservation Upgrade Projects. | Public Buildings Service | 3/29/2010 |
Anchor Plumbing, Inc. | $98,100 |
ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
PETROCHEM INSULATION, INC. | $95,615 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
DLR GROUP INC. | $95,000 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
EDAW, INC. | $89,799 |
Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
Richard Hagg Associates Inc | $89,000 |
Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation.
See details
|
Public Buildings Service | 12/23/2009 |
BLYTHE PLUMBING & HEATING, INC. | $88,719 |
ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation.
See details
|
Public Buildings Service | 3/22/2010 |
DOYON PROJECT SERVICES LLC | $86,295 |
Hatfield Federal Courthouse Portland, Oregon. Upgrade or replace the existing Lighting Controls System and the Building Automation System (BAS), including system presentation and installation of the new components/equipmentmaterials, including labor and s
This spending item is part of a $336,088 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
Amazon.com, Inc. | $85,644 |
Team Smartronix provided continued operations & maintenance and enhancements support during the quarter (Jan G?? Mar 2012). Significant activities performed during this period included providing technical support services and advanced data analytics for F
This spending item is part of a $17,948,517 allocation.
See details
|
Office of the Federal Acquisition Service | 7/08/2009 |
AMEC EARTH & ENVIRONMENTAL, INC. | $80,480 | Prepare an Environmental Assessment (EA) to address potential environmental consequences anticipated to result from 1) redeveloping/modernizing a portion of Federal Center South (FCS) B12021 warehouse on federally-owned lands located at 4735 East Marginal | Public Buildings Service | 6/23/2009 |
EHS-INTERNATIONAL, INC. | $70,412 | Perform testing to measure ambient airborne chemicals of concern in the vicinity of Warehouse Building 1202 located at 4735 East Marginal Way, Seattle, Washington. The chemicals of concern include: diesel particulate matter, polyaromatic hydrocarbons, ai | Public Buildings Service | 9/16/2010 |
ART ANDERSON ASSOCIATES, INC. | $69,960 | Construction Management Assistance Services for Federal Center South, 1201 Building Roof Project, Seattle, WA | Public Buildings Service | 6/04/2010 |
PALADINO & COMPANY, INC | $63,000 |
The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation.
See details
|
Public Buildings Service | 3/08/2010 |
ESC AUTOMATION INC. | $60,633 |
Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation.
See details
|
Public Buildings Service | 3/25/2010 |
Com Group Inc | $59,500 |
Construction Manager as Agent Services for the Design and construction of the U.S. Federal Courthouse Billings, Montana
This spending item is part of a $4,703,183 allocation.
See details
|
Public Buildings Service | 12/17/2009 |
LMN ARCHITECTS | $57,802 |
Federal Center South Master Plan Update Study. Update 2001 site planning component of the Federal Center South Redevelopment Feasibility Study to provide site development concepts for a secured Federal campus supporting agencies with extraordinary securit
This spending item is part of a $73,622 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
HEERY INTERNATIONAL, INC. | $52,009 | Commissioning services for building boiler and chiller upgrades at General Services Administration (GSA) Region - 10 Admin Building, Auburn WA. This work included the major revisions to the means and method of controlling the chillers and the addition of | Public Buildings Service | 9/27/2010 |
CORNERSTONE ARCHITECTURAL GROUP, PS | $45,301 |
PROVIDE LIGHTING REQUIREMENTS AS PART OF A FUTURE RELIGHTING PROJECT AT TWO FEDERAL FACILITIES.
This spending item is part of a $87,771 allocation.
See details
|
Public Buildings Service | 12/30/2009 |
SPARLING, INC. | $44,681 |
Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation.
See details
|
Public Buildings Service | 8/12/2010 |
AFFILIATED ENGINEERS INC | $42,470 |
PROVIDE LIGHTING REQUIREMENTS AS PART OF A FUTURE RELIGHTING PROJECT AT TWO FEDERAL FACILITIES.
This spending item is part of a $87,771 allocation.
See details
|
Public Buildings Service | 12/30/2009 |
ENGINEERED PRODUCTS, A PAPE COMPANY | $41,217 |
Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation.
See details
|
Public Buildings Service | 12/11/2009 |
Krazan & Associates Inc | $37,440 |
Provide Construction Management as Agent (CMa) services for the Lighting Upgrades Project in US Courthouse, Seattle, WA
This spending item is part of a $74,560 allocation.
See details
|
Public Buildings Service | 5/04/2010 |
APSI CONSTRUCTION MANAGEMENT | $37,120 |
Provide Construction Management as Agent (CMa) services for the Lighting Upgrades Project in US Courthouse, Seattle, WA
This spending item is part of a $74,560 allocation.
See details
|
Public Buildings Service | 5/04/2010 |
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. | $33,973 | The purpose of this award is to provide archaeological monitoring during remediation activities and all ground disturbing activities associated with the demolition of the Federal Building 1202 in Seattle, Washington. Prior to commencing monitoring, an Arc | Public Buildings Service | 4/15/2010 |
EHS-INTERNATIONAL, INC. | $33,440 | Provide the preparation of Opinion Repsonse Plan, Planning meeting with DOE, Site Characterization Documentation, Vinyl Chloride Remediation Study, Devleop Site Cleanup standards, Develop Final Reponse Doucment and Sample existing groundwater monitoring w | Public Buildings Service | 9/13/2011 |
Akb Engineers Inc PS | $30,000 |
TAS::47 4543::TAS CONSTRUCTION MANAGEMENT SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING.
This spending item is part of a $8,367,060 allocation.
See details
|
Public Buildings Service | 12/28/2009 |
SHANNON & WILSON, INC. | $29,497 |
Engineering analysis and investigation of existing building
This spending item is part of a $154,263 allocation.
See details
|
Public Buildings Service | 5/06/2009 |
MASTER CRAFT ELECTRIC, INC. | $29,186 |
Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation.
See details
|
Public Buildings Service | 3/25/2010 |
MCKINSTRY ESSENTION, INC. | $27,750 |
RECOVERY: CONSTRUCTION MANAGEMENT ASSIST AND COMMISSIONING AUTHORITY SERVICES IN SUPPORT OF REPLACE BOILER, CHILLER, FAN-COILS AND WINDOWS DESIGN/BUILD CONSTRUCTION PROJECT AT THE US BORDER STATION LOCATED IN PORTHILL IDAHO.
This spending item is part of a $61,803 allocation.
See details
|
Public Buildings Service | 12/09/2010 |
MOVE MANAGEMENT CENTER, THE | $25,185 | moving services to relocate multiple agencies | Public Buildings Service | 8/07/2009 |
APSI CONSTRUCTION MANAGEMENT | $24,340 |
Mechanical engineering support services to the Architectural and Engineering Services branch at Auburn, WA
This spending item is part of a $272,020 allocation.
See details
|
Public Buildings Service | 2/28/2011 |
CORNERSTONE ARCHITECTURAL GROUP, PS | $21,907 |
Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation.
See details
|
Public Buildings Service | 10/07/2009 |
PERFORMANCE ABATEMENT SERVICES, INC. | $18,045 |
The purpose of this project is to provide a roof system(s) that balances and meets the ARRA requirements, initial capital, sustainability, life costs, good stewardship, and historical preservation and performance for the Federal Center South Building 1201
This spending item is part of a $3,328,647 allocation.
See details
|
Public Buildings Service | 3/19/2010 |
EHS-INTERNATIONAL, INC. | $16,985 | Soil Sampling at Federal Center South, Seattle | Public Buildings Service | 9/08/2009 |
SIGNET PARTNERS, A CORPORATION | $15,820 |
Federal Center South Master Plan Update Study. Update 2001 site planning component of the Federal Center South Redevelopment Feasibility Study to provide site development concepts for a secured Federal campus supporting agencies with extraordinary securit
This spending item is part of a $73,622 allocation.
See details
|
Public Buildings Service | 5/20/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $14,796 | Northern Management Services, Inc. (NMSI) shall provide all personnel and any equipment as necessary to perform Hydronic Water System Analysis and Balancing services at the Seattle Federal Office Building (FOB) located in Seattle, WA in accordance with th | Public Buildings Service | 3/09/2011 |
American Air Measurement | $9,420 |
Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation.
See details
|
Public Buildings Service | 3/25/2010 |
PETERSON, STREHLE & MARTINSON INC | $9,300 |
Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation.
See details
|
Public Buildings Service | 10/07/2009 |
VETERAN SALES, LLC | $7,204 |
Manufacture, deliver, and install office furniture for GSA Swing Space.
This spending item is part of a $7,694,601 allocation.
See details
|
General Services Administration | 6/17/2010 |
ACEPEX MANAGEMENT CORPORATION | $5,784 | This contract is used to track labor hours in support of the Seattle Courthouse ARRA program. There are a total of 70 hours available overall; an estimated 45 hours regular time and 25 hours overtime. There are no subcontractors planned for this work. | Public Buildings Service | 12/02/2010 |
BROOKS RANGE CONTRACT SERVICES, INC. | $5,782 | Provide access and escort assistance to construction contractors. Provide eqiupment and system information to construction contractor. Assist instalation teams with operation of equipment in Auburn Washington. | Public Buildings Service | 12/02/2010 |
CASCADE DESIGN COLLABORATIVE | $5,500 |
Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation.
See details
|
Public Buildings Service | 10/07/2009 |
Mayes Testing Engineers | $5,336 |
Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation.
See details
|
Public Buildings Service | 10/07/2009 |
LORACHE CAD/IT SERVICES LLC | $5,038 |
Contractor shall provided all management, supervision, labor, materials, supplies equipment and shall plan, schedule, coordinate and assure effective performance for the successful completion of the Warehouse 7 Dock Electrical for VA project.
This spending item is part of a $11,451 allocation.
See details
|
Public Buildings Service | 6/24/2010 |
GLUMAC | $5,000 |
DLR Group (Architect) - $20,000 Glumac (Mechanical/Electrical/Plumbing Consultant) - $5,000 Dick Anderson Construction (Local Strategic Affiliate) - $5,000. Note: DLR Group is the company's actual name and is not an acronym.
This spending item is part of a $40,000 allocation.
See details
|
Public Buildings Service | 6/30/2010 |
D'AMATO, CONVERSANO, INC. | $4,564 |
Construction Administration services for new U.S. Courthouse in Austin, TX. Construction Administration services last 36 months.
This spending item is part of a $1,959,793 allocation.
See details
|
Public Buildings Service | 7/25/2009 |
Travis, Fitzmaurice & Associates Inc | $3,000 |
Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation.
See details
|
Public Buildings Service | 10/07/2009 |
P.B.S. ENVIRONMENTAL BUILDING CONSULTANTS INC. | $2,745 | Laboratory anlaysis for asbestos content. | Public Buildings Service | 7/02/2009 |
ACCESS SERVICES, INC. | $2,385 | FSC Storage Design Build | Public Buildings Service | 8/07/2009 |
Queen City Sheet Metal and Roofing, Inc. | $1,029 |
Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation.
See details
|
Public Buildings Service | 10/07/2009 |