Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Snohomish County, Wash., funds by Commerce, Department of

Listing $8,921,791.21 in stimulus funds from Commerce, Department of for Snohomish

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
KONGSBERG UNDERWATER TECHNOLOGY, INC. $2,598,566 MMC shall provide engineering, design, technical and support efforts necessary for development of a complete and accurate technical description of the FSV 6 ship. This effort will produce a design with descriptive documentation, which meets the requirem
This spending item is part of a $74,975,588 allocation. See details
National Oceanic and Atmospheric Administration 4/19/2010
THE TULALIP TRIBES OF WASHINGTON $2,000,000 Habitat Conservation The Qwuloolt Estuary Restoration Project represents a broad-based interagency and community effort to restore historic tidal processes and a functioning estuary intertidal marsh system to 350 acres of isolated floodplain within the lower Snohomish River e National Oceanic and Atmospheric Administration 6/27/2009
EDLAB GROUP FOUNDATION $1,785,006 Broadband Technology Opportunities Program (BTOP) The Communities Connect Network Project will expand the capacity of Washington State public computing centers to improve broadband adoption rates, workforce preparation, digital literacy, access to education, justice resources, and training. The proje... Show more
This spending item is part of a $4,169,734 allocation. See details
National Institute of Standards and Technology 9/16/2010
Techlink Northwest, Inc. $401,040 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Techlink Northwest, Inc. $349,172 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Scout Consulting $249,000 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Scout Consulting $246,160 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Scout Consulting $219,182 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Kenneth A Bircher $214,866 Purpose of the award is to provide construction administration services for the construction of a world-class laboratory and office complex for the National Oceanic and Atmospheric Administrations Southwest Fisheries Science Center in La Jolla, California
This spending item is part of a $3,830,686 allocation. See details
National Oceanic and Atmospheric Administration 6/29/2010
Scout Consulting $190,090 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Techlink Northwest, Inc. $101,640 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Techlink Northwest, Inc. $101,640 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Scout Consulting $97,020 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
GNS CONSULTING $70,000 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Kenm Consulting $70,000 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
AD PRO DESIGN ENGINEERING $69,086 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Scout Consulting $52,200 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Scout Consulting $45,000 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Scout Consulting $42,000 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
PRECISION DATA TECHNOLOGY, INC. $12,000 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
PRECISION DATA TECHNOLOGY, INC. $4,000 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
Techlink Northwest, Inc. $1,964 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
POLARIS MANUFACTURING, INC. $1,920 3EA Equipment Mounting Stands - Aluminum stand to be used to mount an enclosure with sensitive electronic oceanographic and meteorological instrumentation in remote locations. National Oceanic and Atmospheric Administration 6/22/2009
PRECISION DATA TECHNOLOGY, INC. $240 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010
FLUKE ELECTRONICS CORPORATION $0 Measurement and Engineering Research and Standards Fluke will provide technology towards the deployment of the Smart Grid in the US electric power system by developing a state-of-the-art instrument that calibrates Phasor Measurement Units (PMUs). This program has four key deliverables, with the final... Show more
This spending item is part of a $1,404,400 allocation. See details
National Institute of Standards and Technology 1/08/2010