Spokane County, Wash., funds by Department of Veterans Affairs
Listing $7,154,529.32 in stimulus funds from Department of Veterans Affairs for Spokane
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ARC ELECTRIC AND LIGHTING CORPORATION | $3,617,026 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
METAL BENDERS, INC. | $566,530 |
Install New Heating, Ventilation and Air Conditioning
This spending item is part of a $1,079,200 allocation.
See details
|
Department of Veterans Affairs | 4/21/2010 |
MTM CONTRACTORS, INC. | $478,428 |
Install New Heating, Ventilation and Air Conditioning
This spending item is part of a $1,079,200 allocation.
See details
|
Department of Veterans Affairs | 4/21/2010 |
CMEC, INCORPORATED | $472,091 |
Replacement and construction of a new structure for new switchgear high voltage substation at the Spokane VA Hospital. Excavation, concrete and electrical work.
This spending item is part of a $717,835 allocation.
See details
|
Department of Veterans Affairs | 1/01/2010 |
PRECISION ELECTRICAL SYSTEMS, INC. | $247,330 |
Nurse Call Alarm Upgrades at VA Medical Center, Roseburg, OR
This spending item is part of a $381,178 allocation.
See details
|
Department of Veterans Affairs | 8/28/2009 |
NAC, INC. | $218,379 | Design Services to replace Facility Generators | Department of Veterans Affairs | 7/09/2009 |
NAC, INC. | $218,379 | Design services for replacement of emergency generators at VAMC Spokane | Department of Veterans Affairs | 7/09/2009 |
DWG & ASSOCIATES, INC. | $205,891 | Design-Build Building 32 HVAC Replacement | Department of Veterans Affairs | 12/17/2009 |
PICK ELECTRIC, INC. | $170,826 |
Replacement and construction of a new structure for new switchgear high voltage substation at the Spokane VA Hospital. Excavation, concrete and electrical work.
This spending item is part of a $717,835 allocation.
See details
|
Department of Veterans Affairs | 1/01/2010 |
PRECISION ELECTRICAL SYSTEMS, INC. | $141,720 |
Renovate Bldg 249 at VA HealthCare Center, White City, OR
This spending item is part of a $1,410,391 allocation.
See details
|
Department of Veterans Affairs | 3/24/2010 |
MTM CONTRACTORS, INC. | $88,757 | Repair/Replace Heating, Ventilation and Air Conditioning Systems in Building 3. | Department of Veterans Affairs | 11/13/2009 |
PRECISION ELECTRICAL SYSTEMS, INC. | $79,450 |
Telecomm Closet Climate Control Upgrades at VA HealthCare Center, White City, OR
This spending item is part of a $296,003 allocation.
See details
|
Department of Veterans Affairs | 3/12/2010 |
DIVCO, INCORPORATED | $77,035 |
Contractor to furnish labor, materials and perform work for the renovation in Bldg 86 3rd Floor. Renovation includes general construction, demolition, alterations, mechanical and electrical work, necessary removal of existing structures, construction and
This spending item is part of a $1,080,416 allocation.
See details
|
Department of Veterans Affairs | 5/11/2009 |
NAC, INC. | $76,277 | Design services for replace 6th floor HVAC, VAMC Spokane | Department of Veterans Affairs | 9/04/2009 |
S.R. SICILIA INC | $69,020 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
PACIFIC ENVIRONMENTAL SERVICES COMPANY | $65,415 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
Rubensteins Contract Carpet LLC | $50,778 |
Renovate Bldg 249 at VA HealthCare Center, White City, OR
This spending item is part of a $1,410,391 allocation.
See details
|
Department of Veterans Affairs | 3/24/2010 |
STERLING CONCRETE, INC. | $43,238 |
Replacement and construction of a new structure for new switchgear high voltage substation at the Spokane VA Hospital. Excavation, concrete and electrical work.
This spending item is part of a $717,835 allocation.
See details
|
Department of Veterans Affairs | 1/01/2010 |
CANTER ELECTRIC INC | $23,347 |
Install New Heating, Ventilation and Air Conditioning
This spending item is part of a $1,079,200 allocation.
See details
|
Department of Veterans Affairs | 4/21/2010 |
KEVCON, INC. | $21,950 |
Canteen Dinning Area Renovation
This spending item is part of a $76,168 allocation.
See details
|
Department of Veterans Affairs | 1/22/2010 |
ZECK BUTLER ARCHITECTS PS | $21,320 |
Provide all labor and materials to conduct a renovation feasibility study in the CLC (Community Living Center - previously known as the Nursing Home Care Unit.)
This spending item is part of a $28,670 allocation.
See details
|
Department of Veterans Affairs | 5/27/2009 |
Professional Piping LLC | $21,253 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
C & K ROOFING, INC | $19,104 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
Paras General Contractors Inc. | $17,570 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
PRECISION ELECTRICAL SYSTEMS, INC. | $17,340 |
Renovate Alzheimer Unit at VA Medical Center, Roseburg, OR
This spending item is part of a $254,115 allocation.
See details
|
Department of Veterans Affairs | 3/02/2010 |
TANZ MECHANICAL INSULATION LLC | $14,289 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
Paras General Contractors Inc. | $13,200 |
Replacement and construction of a new structure for new switchgear high voltage substation at the Spokane VA Hospital. Excavation, concrete and electrical work.
This spending item is part of a $717,835 allocation.
See details
|
Department of Veterans Affairs | 1/01/2010 |
INSULATION SPECIALISTS INC | $10,895 |
Install New Heating, Ventilation and Air Conditioning
This spending item is part of a $1,079,200 allocation.
See details
|
Department of Veterans Affairs | 4/21/2010 |
Krueger Sheet Metal Co. | $10,574 |
Canteen Dinning Area Renovation
This spending item is part of a $76,168 allocation.
See details
|
Department of Veterans Affairs | 1/22/2010 |
RC Mechanical LLC | $9,672 |
Canteen Dinning Area Renovation
This spending item is part of a $76,168 allocation.
See details
|
Department of Veterans Affairs | 1/22/2010 |
C & K ROOFING, INC | $9,057 |
Replacement and construction of a new structure for new switchgear high voltage substation at the Spokane VA Hospital. Excavation, concrete and electrical work.
This spending item is part of a $717,835 allocation.
See details
|
Department of Veterans Affairs | 1/01/2010 |
S.R. SICILIA INC | $8,843 |
Replacement and construction of a new structure for new switchgear high voltage substation at the Spokane VA Hospital. Excavation, concrete and electrical work.
This spending item is part of a $717,835 allocation.
See details
|
Department of Veterans Affairs | 1/01/2010 |
PRECISION ELECTRICAL SYSTEMS, INC. | $8,800 |
Canteen Dinning Area Renovation
This spending item is part of a $76,168 allocation.
See details
|
Department of Veterans Affairs | 1/22/2010 |
Thomas J Gerard & Associates Inc | $7,350 |
Provide all labor and materials to conduct a renovation feasibility study in the CLC (Community Living Center - previously known as the Nursing Home Care Unit.)
This spending item is part of a $28,670 allocation.
See details
|
Department of Veterans Affairs | 5/27/2009 |
SUMMIT ENVIROMENT INC | $7,121 |
Canteen Dinning Area Renovation
This spending item is part of a $76,168 allocation.
See details
|
Department of Veterans Affairs | 1/22/2010 |
Thomas J Gerard & Associates Inc | $5,860 |
Completion of Site Investigation and 30% Working Drawings & Specifications (Design/Build documents) for the installation of a new HVAC system for Bldg. 32 at the VA Medical Center, Spokane, WA
This spending item is part of a $7,619 allocation.
See details
|
Department of Veterans Affairs | 5/27/2009 |
Northwest Caulking | $5,661 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
ROCK PLACING CO, LLC | $5,500 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |
Rubensteins Contract Carpet LLC | $5,266 |
Canteen Dinning Area Renovation
This spending item is part of a $76,168 allocation.
See details
|
Department of Veterans Affairs | 1/22/2010 |
ZECK BUTLER ARCHITECTS PS | $1,759 |
Completion of Site Investigation and 30% Working Drawings & Specifications (Design/Build documents) for the installation of a new HVAC system for Bldg. 32 at the VA Medical Center, Spokane, WA
This spending item is part of a $7,619 allocation.
See details
|
Department of Veterans Affairs | 5/27/2009 |
Final Clean | $1,650 |
Canteen Dinning Area Renovation
This spending item is part of a $76,168 allocation.
See details
|
Department of Veterans Affairs | 1/22/2010 |
Northwest Caulking | $580 |
Replacement and construction of a new structure for new switchgear high voltage substation at the Spokane VA Hospital. Excavation, concrete and electrical work.
This spending item is part of a $717,835 allocation.
See details
|
Department of Veterans Affairs | 1/01/2010 |
CMEC, INCORPORATED | $0 |
Replace/Upgrade Generators, FCA Correction for the Spokane Veterans Medical Center.
This spending item is part of a $5,268,215 allocation.
See details
|
Department of Veterans Affairs | 5/04/2010 |