Cabell County, W.Va., funds by General Services Administration
Listing $26,238,911.80 in stimulus funds from General Services Administration for Cabell
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MASCARO CONSTRUCTION COMPANY, L.P. | $21,668,328 | The Project includes energy efficient renovation of the existing Huntington Federal Building. The scope of the work includes photovoltaics, new energy efficient windows,facade upgrades and a new energy efficient HVAC system. | Public Buildings Service | 11/19/2009 |
HDM ASSOCIATES, INC | $1,749,437 |
Huntington Federal Building, Huntington, WV. The project objectives are: Modernize the existing heating,ventilation, air conditioning system to a Variable Air Volume system; Incorporate photo voltaic technology on the existing roof; Replace existing windo
This spending item is part of a $4,625,053 allocation.
See details
|
Public Buildings Service | 10/09/2009 |
JACOBS PROJECT MANAGEMENT CO. | $1,413,916 | The purpose of this scope of work is to assist GSA by providing the Construction Mangement as Agent (CMa) Services necessary for pre-award, procurement, design, construction and commissioning phase services for the Huntington, WV Federal Building Energy R | Public Buildings Service | 7/31/2009 |
PERRY GREGORY | $633,152 |
Huntington Federal Building, Huntington, WV. The project objectives are: Modernize the existing heating,ventilation, air conditioning system to a Variable Air Volume system; Incorporate photo voltaic technology on the existing roof; Replace existing windo
This spending item is part of a $4,625,053 allocation.
See details
|
Public Buildings Service | 10/09/2009 |
BREAKELL, INC. | $400,033 | Furnish and install new light fixtures in the Federal Building in Huntington, WV | Public Buildings Service | 3/24/2010 |
SCHNEIDER ELECTRIC USA, INC. | $209,532 |
Provide advanced metering to the Huntington Federal Office Building in Huntington WV. Project includes the installation of advanced electric meters to the incoming electrical service at the Huntington Federal Office Building, connection of the meters to t
This spending item is part of a $250,132 allocation.
See details
|
Public Buildings Service | 4/14/2010 |
HDM ASSOCIATES, INC | $123,914 |
To provide a survey and concept drawings for the following issues: 1) Replace existing perimeter air induction unit with a new variable air volume system. 2) Convert the existing steam heating system to a hot water system. 3) Replace existing window sys
This spending item is part of a $271,950 allocation.
See details
|
Public Buildings Service | 4/29/2009 |
DIXON ELECTRICAL SYSTEMS & CONTRACTING INC. | $40,600 |
Provide advanced metering to the Huntington Federal Office Building in Huntington WV. Project includes the installation of advanced electric meters to the incoming electrical service at the Huntington Federal Office Building, connection of the meters to t
This spending item is part of a $250,132 allocation.
See details
|
Public Buildings Service | 4/14/2010 |