Monroe County, Wis., funds by Army, Department of
Listing $31,920,959.76 in stimulus funds from Army, Department of for Monroe
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CARLSON CONSTRUCTORS CORPORATION | $3,112,683 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
ALLIANCE STEEL CONSTRUCTION, INC. | $2,819,918 |
Remodel barracks 1702, 1703, 1704, 1707, 1708, 1709, 1710, 1712, 1713, 1714
This spending item is part of a $3,191,688 allocation.
See details
|
Army, Department of | 6/15/2009 |
ARTEAGA CONSTRUCTION, INC | $2,679,966 | renovate dining facility, pas::21 2081::tas | Army, Department of | 6/15/2009 |
ALLIANCE STEEL CONSTRUCTION, INC. | $2,635,817 |
Remodel Barracks 1715, 1718, 1719, 1720, 1723, 1724, 1725, 1728, 1729, 1730.
This spending item is part of a $3,164,201 allocation.
See details
|
Army, Department of | 6/13/2009 |
TCI ARCHITECTS/ENGINEERS/CONTRACTOR, INC. | $2,426,402 |
renovate dining facility, pas::21 2081::tas
This spending item is part of a $2,668,941 allocation.
See details
|
Army, Department of | 6/15/2009 |
W. GOHMAN CONSTRUCTION CO. | $2,393,484 |
The contract is to construct (8) new family houses during FY10 at Ft. McCoy WI. Recovery Project 76748. TAS 21 0721
This spending item is part of a $4,272,319 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/17/2010 |
ALLIANCE STEEL CONSTRUCTION, INC. | $2,110,320 |
Remodel Barracks 1731, 1732, 1736, 1737, 1740, 1741, 1742.
This spending item is part of a $2,566,536 allocation.
See details
|
Army, Department of | 6/15/2009 |
FEYEN CONCRETE CONSTRUCTION INC | $941,254 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
SAGINAW CONTRACTING, INC. | $933,516 | Construct Medical Buildings | Army, Department of | 9/25/2009 |
Cedar Creek Carpentry, Inc. | $736,000 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
ALLIANCE STEEL CONSTRUCTION, INC. | $591,778 |
Remodel Barracks 1602, 1603.
This spending item is part of a $623,298 allocation.
See details
|
Army, Department of | 6/07/2009 |
CARGILL HEATING AND AIR CONDITIONING COMPANY, INC. | $504,884 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
ALLIANCE STEEL CONSTRUCTION, INC. | $503,228 |
Hydrants & Valves
This spending item is part of a $860,991 allocation.
See details
|
Army, Department of | 9/14/2009 |
ALACRAN CONTRACTING, LLC | $474,373 | Renovation of BOQ | Army, Department of | 6/23/2009 |
Justin Birdd Construction | $466,750 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
FOWLER & HAMMER, INCORPORATED | $404,205 | Construct Laundry Bldg | Army, Department of | 6/17/2009 |
GERKE EXCAVATING, INC | $404,008 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Eric A Stickney | $357,762 |
Hydrants & Valves
This spending item is part of a $860,991 allocation.
See details
|
Army, Department of | 9/14/2009 |
TCI ARCHITECTS/ENGINEERS/CONTRACTOR, INC. | $341,386 |
Renovation of an existing metal building including demolition and new work including sanitary sewer lines, sitework, concrete, roofing, drywall, doors, floor finishes, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $657,160 allocation.
See details
|
Army, Department of | 5/05/2010 |
TCI ARCHITECTS/ENGINEERS/CONTRACTOR, INC. | $337,535 |
Renovation of an existing wood framed building including demolition and new work consisting of concrete, wood framing, roofing, thermal insulation, doors and windows, drywall, floor coverings, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $561,393 allocation.
See details
|
Army, Department of | 4/30/2010 |
McKinney's Home Decorating Inc | $331,784 |
Remodel Barracks 1715, 1718, 1719, 1720, 1723, 1724, 1725, 1728, 1729, 1730.
This spending item is part of a $3,164,201 allocation.
See details
|
Army, Department of | 6/13/2009 |
KA ENTERPRISES LLC | $317,816 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
ALLIANCE STEEL CONSTRUCTION, INC. | $315,746 | Municipal Water Distribution | Army, Department of | 11/30/2009 |
HARRY VINER, INC. | $315,000 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Ray's Electric Service | $292,370 |
Remodel barracks 1702, 1703, 1704, 1707, 1708, 1709, 1710, 1712, 1713, 1714
This spending item is part of a $3,191,688 allocation.
See details
|
Army, Department of | 6/15/2009 |
IMPERIAL ROOF SYSTEMS CO. | $291,565 | Repair the roofs on various buildings in the 1700 block of Fort McCoy, WI | Army, Department of | 3/26/2010 |
UNIQUE INTERIOR FLOOR FINISHING | $249,220 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
ARTEAGA CONSTRUCTION, INC | $242,539 |
renovate dining facility, pas::21 2081::tas
This spending item is part of a $2,668,941 allocation.
See details
|
Army, Department of | 6/15/2009 |
MATHY CONSTRUCTION COMPANY | $239,800 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Yellow Thunder Corporation | $239,000 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Ray's Electric Service | $233,896 |
Remodel Barracks 1731, 1732, 1736, 1737, 1740, 1741, 1742.
This spending item is part of a $2,566,536 allocation.
See details
|
Army, Department of | 6/15/2009 |
C3T, INC. | $223,388 |
Renovate Recreation Center Building 2874
This spending item is part of a $445,018 allocation.
See details
|
Army, Department of | 9/23/2009 |
TOMAH ENVIRONMENTAL CONTRACTORS INCORPORATED | $213,340 |
The contract is to construct (8) new family houses during FY10 at Ft. McCoy WI. Recovery Project 76748. TAS 21 0721
This spending item is part of a $4,272,319 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/17/2010 |
GERKE EXCAVATING, INC | $203,987 |
The contract is to construct (8) new family houses during FY10 at Ft. McCoy WI. Recovery Project 76748. TAS 21 0721
This spending item is part of a $4,272,319 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/17/2010 |
Carl S Landscape Service Inc | $189,236 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Hofflin Construction | $166,240 |
Remodel Barracks 1731, 1732, 1736, 1737, 1740, 1741, 1742.
This spending item is part of a $2,566,536 allocation.
See details
|
Army, Department of | 6/15/2009 |
FAR EAST CONSTRUCTION CORPORATION | $163,415 |
RENOVATE ADMIN OR CLASSROOM BUILDING - OPTION YEAR 1 TAS::21 2081::TAS
This spending item is part of a $3,321,448 allocation.
See details
|
Army, Department of | 6/25/2009 |
JRC INC | $160,168 | Labor, Tools, Equipment, Materials, Transporation, and Supervision necessary to repair Building 2505 at Fort McCoy, Wisconsin in accordance with the specifications, contract documents, and agreed upon bid schedule | Army, Department of | 9/29/2009 |
FARNSWORTH GROUP, INC. | $151,800 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Champion Builders | $136,850 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Lenard Szarek Inc | $135,180 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Jeffrey W Vieth | $131,000 |
Remodel Barracks 1715, 1718, 1719, 1720, 1723, 1724, 1725, 1728, 1729, 1730.
This spending item is part of a $3,164,201 allocation.
See details
|
Army, Department of | 6/13/2009 |
DON'S PLUMBING SERVICE, INC. | $119,042 |
Renovate Recreation Center Building 2874
This spending item is part of a $445,018 allocation.
See details
|
Army, Department of | 9/23/2009 |
Gerber Leisure Products, Inc. | $112,147 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
BAHR ELECTRIC | $107,855 |
Renovation of an existing metal building including demolition and new work including sanitary sewer lines, sitework, concrete, roofing, drywall, doors, floor finishes, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $657,160 allocation.
See details
|
Army, Department of | 5/05/2010 |
AMERICAN DIRECT PROCUREMENT, INC. | $97,481 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
FGM ARCHITECTS INC. | $95,000 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
E & B INSULATION CO | $91,770 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
SCOTT CONSTRUCTION INC. | $84,981 | Asphalt Road Repair | Army, Department of | 10/01/2010 |
A & A Electric & Underground Const. Inc. | $77,084 |
Renovation of an existing wood framed building including demolition and new work consisting of concrete, wood framing, roofing, thermal insulation, doors and windows, drywall, floor coverings, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $561,393 allocation.
See details
|
Army, Department of | 4/30/2010 |
Stelter Construction | $70,100 |
Remodel barracks 1702, 1703, 1704, 1707, 1708, 1709, 1710, 1712, 1713, 1714
This spending item is part of a $3,191,688 allocation.
See details
|
Army, Department of | 6/15/2009 |
Alexander Lumber Co | $65,995 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Jeffer's Acoustical Inc | $65,600 |
Remodel Barracks 1715, 1718, 1719, 1720, 1723, 1724, 1725, 1728, 1729, 1730.
This spending item is part of a $3,164,201 allocation.
See details
|
Army, Department of | 6/13/2009 |
ANDREW'S DRYWALL & CONSTRUCTION, INC. | $63,105 |
Renovation of an existing metal building including demolition and new work including sanitary sewer lines, sitework, concrete, roofing, drywall, doors, floor finishes, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $657,160 allocation.
See details
|
Army, Department of | 5/05/2010 |
Stelter Construction | $56,080 |
Remodel Barracks 1731, 1732, 1736, 1737, 1740, 1741, 1742.
This spending item is part of a $2,566,536 allocation.
See details
|
Army, Department of | 6/15/2009 |
Olson Floor Covering, Inc. | $52,547 |
Renovation of an existing wood framed building including demolition and new work consisting of concrete, wood framing, roofing, thermal insulation, doors and windows, drywall, floor coverings, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $561,393 allocation.
See details
|
Army, Department of | 4/30/2010 |
FAR EAST CONSTRUCTION CORPORATION | $52,124 |
RENOVATE ADMIN OR CLASSROOM BUILDING - OPTION YEAR 1 TAS::21 2081::TAS
This spending item is part of a $1,059,437 allocation.
See details
|
Army, Department of | 6/25/2009 |
H J Martin & Son Inc | $48,088 |
Renovate Recreation Center Building 2874
This spending item is part of a $445,018 allocation.
See details
|
Army, Department of | 9/23/2009 |
BETCHER & WALKER HEATING & PLUMBING LLC | $47,950 |
Renovation of an existing metal building including demolition and new work including sanitary sewer lines, sitework, concrete, roofing, drywall, doors, floor finishes, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $657,160 allocation.
See details
|
Army, Department of | 5/05/2010 |
WINONA HEATING & VENTILATING COMPANY | $39,940 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
DON'S PLUMBING SERVICE, INC. | $37,526 |
Renovation of an existing metal building including demolition and new work including sanitary sewer lines, sitework, concrete, roofing, drywall, doors, floor finishes, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $657,160 allocation.
See details
|
Army, Department of | 5/05/2010 |
Endres Manufacturing Company | $37,500 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
DON'S PLUMBING SERVICE, INC. | $36,792 |
Renovation of an existing wood framed building including demolition and new work consisting of concrete, wood framing, roofing, thermal insulation, doors and windows, drywall, floor coverings, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $561,393 allocation.
See details
|
Army, Department of | 4/30/2010 |
FIRELINE SPRINKLER CORPORATION | $33,040 |
Renovation of an existing metal building including demolition and new work including sanitary sewer lines, sitework, concrete, roofing, drywall, doors, floor finishes, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $657,160 allocation.
See details
|
Army, Department of | 5/05/2010 |
SCOTT CONSTRUCTION INC. | $31,950 | Asphalt Road Repair | Army, Department of | 10/01/2010 |
Masco Corporation | $29,500 |
Renovation of an existing wood framed building including demolition and new work consisting of concrete, wood framing, roofing, thermal insulation, doors and windows, drywall, floor coverings, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $561,393 allocation.
See details
|
Army, Department of | 4/30/2010 |
Energys, Inc. | $29,240 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
BETCHER & WALKER HEATING & PLUMBING LLC | $27,935 |
Renovation of an existing wood framed building including demolition and new work consisting of concrete, wood framing, roofing, thermal insulation, doors and windows, drywall, floor coverings, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $561,393 allocation.
See details
|
Army, Department of | 4/30/2010 |
Masco Corporation | $27,500 |
Renovate Recreation Center Building 2874
This spending item is part of a $445,018 allocation.
See details
|
Army, Department of | 9/23/2009 |
Blueox Construction | $27,000 |
Renovate Recreation Center Building 2874
This spending item is part of a $445,018 allocation.
See details
|
Army, Department of | 9/23/2009 |
CLOPAY BUILDING PRODUCTS COMPANY, INC. | $26,420 |
Carlson Constructors Corporation has been contracted by the United States Army Corps of Engineers, Omaha District, for the design-build project of New Family Housing at the South Post Housing Area, at Fort McCoy, Wisconsin. This project is for the design
This spending item is part of a $8,734,974 allocation.
See details
|
U.S. Army Corps of Engineers, except civil program financing | 9/16/2009 |
Olson Floor Covering, Inc. | $26,298 |
Renovation of an existing metal building including demolition and new work including sanitary sewer lines, sitework, concrete, roofing, drywall, doors, floor finishes, painting, plumbing, electrical, fire protection and HVAC work.
This spending item is part of a $657,160 allocation.
See details
|
Army, Department of | 5/05/2010 |
IMPERIAL ROOF SYSTEMS CO. | $23,129 | Bldgs 1121 & 1133 | Army, Department of | 1/08/2010 |
IMPERIAL ROOF SYSTEMS CO. | $20,812 | Bldgs 1602 & 1603 | Army, Department of | 2/04/2010 |
Carnahan City-Wide Insulation, Inc | $18,400 |
Remodel Barracks 1602, 1603.
This spending item is part of a $623,298 allocation.
See details
|
Army, Department of | 6/07/2009 |
Jeffer's Acoustical Inc | $13,120 |
Remodel Barracks 1602, 1603.
This spending item is part of a $623,298 allocation.
See details
|
Army, Department of | 6/07/2009 |
E & B INSULATION CO | $9,300 |
Remodel barracks 1702, 1703, 1704, 1707, 1708, 1709, 1710, 1712, 1713, 1714
This spending item is part of a $3,191,688 allocation.
See details
|
Army, Department of | 6/15/2009 |