Sheridan County, Wyo., funds by Department of Veterans Affairs
Listing $3,717,999.38 in stimulus funds from Department of Veterans Affairs for Sheridan
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CONTRACTORS SERVICES LLC | $709,098 | Veterans Affairs Medical Center (90C) Sheridan, Wyoming - provide all labor, material and equipment to excavate, remove and replace sections of steam and condensate line and insulation. Known as Phase 3 of Steam Main Corrections. | Department of Veterans Affairs | 7/01/2010 |
CONTRACTORS SERVICES LLC | $666,092 | Expand Parking Lot to meet patient and visitor demand | Department of Veterans Affairs | 12/31/2009 |
A PLUS PLUMBERS INC | $473,998 | Energy Reduction Phase I Install energy-saving devices. Remove/replace high energy using equipment. | Department of Veterans Affairs | 12/31/2009 |
A PLUS PLUMBERS INC | $473,998 | Sheridan VA Energy Reduction Phase I. Install energy-saving devices & replace high energy-using equipment. | Department of Veterans Affairs | 12/31/2009 |
CONTRACTORS SERVICES LLC | $470,073 | Repair and replace sanitary sewer | Department of Veterans Affairs | 12/31/2009 |
MIKE'S ELECTRIC INC | $258,500 |
Work includes removal of cloth wires from electrical panels to lights/outlets. Replace wiring with new electrical wire. Remove/install new meters to specific buildings. Remove outdated electrical panels and replace with new panels. Re-feed panels from
This spending item is part of a $392,522 allocation.
See details
|
Department of Veterans Affairs | 12/31/2009 |
SBH, LLC | $163,973 |
Remodel of the Building 7 Dining Room
This spending item is part of a $277,517 allocation.
See details
|
Department of Veterans Affairs | 6/08/2010 |
UTILITY SERVICE CO, INC | $160,730 |
Perform sandblasting and recoating of 600,000 gallon elevated water tank. Remove and reinstall cathodic protection.
This spending item is part of a $254,701 allocation.
See details
|
Department of Veterans Affairs | 12/14/2009 |
SBH, LLC | $134,022 |
Work includes removal of cloth wires from electrical panels to lights/outlets. Replace wiring with new electrical wire. Remove/install new meters to specific buildings. Remove outdated electrical panels and replace with new panels. Re-feed panels from
This spending item is part of a $392,522 allocation.
See details
|
Department of Veterans Affairs | 12/31/2009 |
SBH, LLC | $88,171 |
Perform sandblasting and recoating of 600,000 gallon elevated water tank. Remove and reinstall cathodic protection.
This spending item is part of a $254,701 allocation.
See details
|
Department of Veterans Affairs | 12/14/2009 |
Maxim Inc | $51,767 |
Remodel of the Building 7 Dining Room
This spending item is part of a $277,517 allocation.
See details
|
Department of Veterans Affairs | 6/08/2010 |
WOODS INTERIORS, INC. | $35,142 |
Remodel of the Building 7 Dining Room
This spending item is part of a $277,517 allocation.
See details
|
Department of Veterans Affairs | 6/08/2010 |
MIKE'S ELECTRIC INC | $10,490 |
Remodel of the Building 7 Dining Room
This spending item is part of a $277,517 allocation.
See details
|
Department of Veterans Affairs | 6/08/2010 |
NEIL DRYWALL, INC | $9,955 |
Remodel of the Building 7 Dining Room
This spending item is part of a $277,517 allocation.
See details
|
Department of Veterans Affairs | 6/08/2010 |
Yellowstone Acoustics | $6,190 |
Remodel of the Building 7 Dining Room
This spending item is part of a $277,517 allocation.
See details
|
Department of Veterans Affairs | 6/08/2010 |
CORRPRO COMPANIES, INC. | $5,800 |
Perform sandblasting and recoating of 600,000 gallon elevated water tank. Remove and reinstall cathodic protection.
This spending item is part of a $254,701 allocation.
See details
|
Department of Veterans Affairs | 12/14/2009 |