Browse All Approved Stimulus Highway Projects
Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|---|
CALIFORNIA | LOS ANGELES | 5164016 | MANCHESTER BOULEVARD CORRIDOR ROADWAY IMPROVEMENT PROJECT. TO PRESERVE AND REHABILITATE THE EXISTING ROADWAY (GRIND AND OVERLAY) BETWEEN ASH ST AND CRENSHAW BL. | Pavement Improvement | $3,200,000 |
CALIFORNIA | MARIN | 5166022 | Rehabilitate local street | Pavement Improvement | $236,000 |
CALIFORNIA | SAN MATEO | 5171016 | Rehabilitate local street | Pavement Improvement | $551,000 |
CALIFORNIA | SAN MATEO | 5177022 | Rehabilitate local street | Pavement Improvement | $1,001,000 |
CALIFORNIA | ORANGE | 5181164 | Landscaping and Irrigation, fine grading and adjustment of utilities to grade | Transportation Enhancements | $156,000 |
CALIFORNIA | PLACER | 5182046 | Place hot mix asphalt on Junction Boulevard, Woodcreek Oaks Boulevard & Eureka Road. | Pavement Improvement | $1,006,173 |
CALIFORNIA | PLACER | 5182048 | At Douglas & Sierra College Boulevard install E/B & W/B dual left turn lanes, control, ITS cabinet & CCTV camera, relocate medians, micro-pave intersection & restripe/B & W/B Douglas Boulevard. | Other | $521,320 |
CALIFORNIA | PLACER | 5182049 | Place hot mix asphalt bonded wearing course to North Sunrise, Eureka Road & to Junction Blvd. | Pavement Improvement | $1,125,000 |
CALIFORNIA | PLACER | 5182051 | Install CMS on N/B Sunrise Avenue south of Cirby Way per ITS Master Plan. | Safety/Traffic Management | $130,630 |
CALIFORNIA | PLACER | 5182052 | At Sierra College Boulevard & East Roseville Parkway install N/B dual left turn lanes, including median modification & S/B approach restripe. | Safety/Traffic Management | $220,000 |
CALIFORNIA | SAN MATEO | 5191004 | Rehabilitate local street | Pavement Improvement | $392,000 |
CALIFORNIA | SAN JOAQUIN | 5192028 | BESSIE AVE:- 11TH ST TO CARLTON WAY , ROADWAY RECONSTRUCTION | Pavement Improvement | $1,614,306 |
CALIFORNIA | MONTEREY | 5194005 | Reconstruct between San Lorenzo and Canal Streets | Pavement Improvement | $232,000 |
CALIFORNIA | SAN MATEO | 5196032 | Rehabilitate local street | Pavement Improvement | $1,363,000 |
CALIFORNIA | LOS ANGELES | 5200028 | AT-GRADE CROSSING IMPROVEMENTS INCLUDING OUTBOUND PRE-SIGNALS, CHANGEABLE MESSAGE SIGNS, LANE RECONFIGURATION AND ROADWAY IMPROVEMENTS INCLUDING NORTHBOUND MODIFICATION OF BUENA VISTA STREET STRIPING | Safety/Traffic Management | $1,250,000 |
CALIFORNIA | LOS ANGELES | 5200029 | MODERNIZE FOUR TRAFFIC SIGNALS ON BUENA VISTA STREET AND ON HOLLYWOOD WAY AND INSTALL FIBER OPTIC COMMUNICATIONS ON MAGNOLIA BOULEVARD | Safety/Traffic Management | $618,000 |
CALIFORNIA | LOS ANGELES | 5200033 | VARIOUS LOCATIONS CITYWIDE . , SIDEWALK REMOVAL & REPLMT, PED RAMP | Transportation Enhancements | $693,000 |
CALIFORNIA | LOS ANGELES | 5202014 | ECONOMIC STIMULUS PROJECT- NORTH BRAND BOULEVARD STREET IMPROVEMENT BETWEEN TRUMAN STREET AND SOUTH CITY LIMIT | Pavement Improvement | $745,000 |
CALIFORNIA | LOS ANGELES | 5204011 | GRAND AVENUE PAVING PROJECT FROM ARROW HIGHWAY TO FOOTHILL BOULEVARD. GRIND AND PAVE ASPHALT PAVEMENT, CONSTRUCT LOCAL REPAIRS, RECONSTRUCT DAMAGED CURB/GUTTER, SIDEWALK, CROSSGUTTER AND CURB RAMPS. | Pavement Improvement | $1,537,000 |
CALIFORNIA | FRESNO | 5208093 | ON NEES AVE. FROM PEACH TO MINNEWAWA AVENUES , AC OVERLAY/ REHAB. | Pavement Improvement | $350,000 |
CALIFORNIA | LOS ANGELES | 5210016 | CITYWIDE AND TRANSIT VILLAGE PEDESTRIAN IMPROVEMENTS INCLUDING PEDESTRIAN RAMPS | Transportation Enhancements | $1,219,000 |
CALIFORNIA | LOS ANGELES | 5210018 | CITYWIDE AND TRANSIT VILLAGE IMPROVEMENTS THAT CALL FOR THE OVERLAY, REMOVAL AND REPLACEMENT OF STREETS, DAMAGED CURB AND GUTTER, DRIVEWAY, APPROACHES, PARKWAY TREE, CROSS GUTTERS. | Pavement Improvement | $3,217,000 |
CALIFORNIA | LOS ANGELES | 5212003 | AVIATION BL: MARINE AV TO MANHATTAN BEACH BL. , REHABILITATION/RECONSTRUCTION | Pavement Improvement | $464,000 |
CALIFORNIA | LOS ANGELES | 5212004 | VALLEY DRIVE FROM 15TH ST TO SEPULVEDA BL. , REHABILITATION/RECONSTRUCTION | Pavement Improvement | $610,000 |
CALIFORNIA | SANTA CLARA | 5213032 | Rehabilitate local street | Bridge Improvement | $2,745,000 |
CALIFORNIA | LOS ANGELES | 5217011 | LAS TUNAS DR. STREET LIGHTING RETROFIT - GREEN/ENERGY SAVING IMPROVEMENT - PEDESTRIAN/SAFETY LIGHTING INSTALLATION | Pavement Improvement | $1,257,000 |
CALIFORNIA | LOS ANGELES | 5218007 | HUNTINGTON DR. FRM SAN MARINO TO SAN GABRIEL. , ST REHAB, LANDSCPE & IRRIGATION | Pavement Improvement | $500,000 |
CALIFORNIA | LOS ANGELES | 5221009 | ROBERTSON BLVD: BURTON WY TO WITHWORTH DR. , ASPHALT OVERLAY | Pavement Improvement | $1,059,000 |
CALIFORNIA | VENTURA | 5222018 | Edge Grinding & Rubberized Asphalt | Pavement Improvement | $400,000 |
CALIFORNIA | FRESNO | 5224014 | Reconstruction of sidewalks and curb cut ramps on 'O' Street from 9th Street to 11th Street. Reconstruction of curb returns with bulb outs and installation of landscape irrigation. | Other | $12,000 |
CALIFORNIA | CONTRA COSTA | 5225022 | Rehabilitate local street | Pavement Improvement | $1,446,000 |
CALIFORNIA | MARIN | 5232009 | Rehabilitate local street | Pavement Improvement | $174,000 |
CALIFORNIA | LOS ANGELES | 5235010 | PAVEMENT REHABILITATION OF MARIPOSA AVENUE - SEPULVEDA BOULEVARD TO NASH STREET | Pavement Improvement | $358,000 |
CALIFORNIA | LOS ANGELES | 5235011 | Main Street Rehabilitation - Mariposa Avenue to Imperial Highway | Pavement Improvement | $147,000 |
CALIFORNIA | YOLO | 5238048 | In Yolo County, rehabilitate various roadways. | Pavement Improvement | $730,932 |
CALIFORNIA | CONTRA COSTA | 5239014 | Rehabilitate local street | Pavement Improvement | $678,000 |
CALIFORNIA | LOS ANGELES | 5240021 | NEW LANDSCAPE IMPROVEMENTS ADJACENT TO BALLONA CREEK BIKEWAY BETWEEN OVERLAND AVENUE AND PEDESTRIAN BRIDGE/OCEAN DRIVE. | Transportation Enhancements | $476,174 |
CALIFORNIA | LOS ANGELES | 5240023 | WASHINGTON BOULEVARD RESURFACING PROJECT BETWEEN HELMS AVENUE AND LA CIENEGA BOULEVARD. | Pavement Improvement | $670,000 |
CALIFORNIA | LOS ANGELES | 5240024 | GRIND AND OVERLAY 3 INCHES OF ASPHALT ON CULVER BOULEVARD FROM COMMONWEALTH AVENUE TO ELENDA STREET INCLUDING RECONSTRUCTING FAILED ASPHALT AREAS. | Pavement Improvement | $400,000 |
CALIFORNIA | SAN JOAQUIN | 5242021 | Rehabilitation of 9 streets in the City of Manteca | Pavement Improvement | $1,356,058 |
CALIFORNIA | LOS ANGELES | 5247015 | NEIGHBORHOOD CITYWIDE SIDEWALK REHABILITATION: REMOVAL AND REPLACEMENT OF CONCRETE SIDEWALKS, DRIVEWAY APPROACHES, AND CURB AND GUTTER. PROJECT AREA IS ALL RESIDENTIAL NEIGHBORHOODS. | Transportation Enhancements | $1,925,000 |
CALIFORNIA | LOS ANGELES | 5247016 | WHITTIER BLVD REVITALIZATION: PHASE II; RECONSTRUCTION OF CONCRETE SIDEWALKS AND OTHER PEDESTRIAN SAFETY IMPROVEMENTS; LANDSCAPING ENHANCEMENT. | Transportation Enhancements | $749,000 |
CALIFORNIA | MONTEREY | 5248006 | Install new traffic signal at Oak & Front Streets | Safety/Traffic Management | $544,891 |
CALIFORNIA | LOS ANGELES | 5249019 | CRENSHAW BLVD REHABILITATION, MARICOPA ST TO SEPULVEDA BLVD, CITY OF TORRANCE | Pavement Improvement | $2,000,000 |
CALIFORNIA | LOS ANGELES | 5250013 | ATLANTIC AVE: FERNWOOD AVE TO MCMILAN AVE . , PAVEMENT REHABILITATION . | Pavement Improvement | $564,871 |
CALIFORNIA | LOS ANGELES | 5250014 | MLK BL: FROM ATLANTIC AVE. TO EAST CITY LIMIT , RECONSTRUCTION SIDEWALK, CURB/GUTTE | Pavement Improvement | $684,580 |
CALIFORNIA | LOS ANGELES | 5250015 | Atlantic Ave work to include pavement improvements, sidewalk, curb ramps, curb and gutter raised median islands. | Pavement Improvement | $399,030 |
CALIFORNIA | LOS ANGELES | 5250016 | Martin Luther King Blvd work to include pavement improvements, sidewalk, curb ramps and drainage improvements. | Pavement Improvement | $492,519 |
CALIFORNIA | VENTURA | 5251020 | Road Rehabilitation, various locations | Pavement Improvement | $400,000 |
CALIFORNIA | LOS ANGELES | 5253014 | THE PURPOSE OF THE ALTERATIONS IS TO ENHANCE PUBLIC SAFETY ON A RAILROAD CROSSING ON BIRCH AVENUE IN THE CITY OF HAWTHORNE. THE PROPOSED ALTERATIONS CONSIST OF THE REMOVING AND REPLACING OF THE PEDES | Pavement Improvement | $35,000 |