Browse All Approved Stimulus Highway Projects
Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|---|
COLORADO | WELD | 257A007 | SH 257 & GARDEN DR. (WINDSOR) INTERSECTION SIGNALIZATION, SIGNALIZE INTERSECTION | Safety/Traffic Management | $344,070 |
COLORADO | SAGUACHE | 2852016 | US 285 SAGUACHE COUNTY, RESURFACING | Pavement Improvement | $4,779,826 |
COLORADO | JEFFERSON | 2854117 | US 285: FOXTON RD TO PARK/JEFFERSON COUNTY LINE, CONSTRUCT A GRADE SEPARATED INTERCHANGE US285 AND ELK CR. RD | Pavement Widening | $8,400,000 |
COLORADO | MESA | 340A015 | SH340 FRUITA SIGNALIZATION & IMPROV, RECONSTRUCTION | Pavement Widening | $2,065,880 |
COLORADO | DOUGLAS | 4701118 | C-470: SANTA FE TO I-25 RESURFACING + C-470 BIKETRAIL, CPR/SMA OVERLAY FOR C-470 AND REHAB C-470 BIKE TRAIL | Pavement Improvement | $31,465,789 |
COLORADO | OURAY | 5502064 | US 550 VEHICLE WILDLIFE COLLISION REDUCTION, INCL.FENCE,RAMPS,ETC. | Other | $5,000 |
COLORADO | WELD | C030035 | WCR 74 BETWEEN WCR 13 AND SH 257 IN WELD COUNTY, 3" MILL AND OVERLAY ON WELD COUNTY ROAD 74 | Pavement Improvement | $625,000 |
COLORADO | LARIMER | C060049 | ON SH 392, WEST OF THE CACHE LA POUDRE RIVER IN WINDSOR, CONCRETE BOX CULVERT FOR BIKE/PED TRAIL | Transportation Enhancements | $600,000 |
COLORADO | LARIMER | C060050 | LCR 17 BETWEEN FORT COLLINS AND BERTHOUD, PATCHING AND RESURFACING ON LCR 17 | Pavement Improvement | $3,485,000 |
COLORADO | ARAPAHOE | C100028 | INVERNESS DRIVE WEST, SOUTH OF DRY CREEK ROAD, CONSTRUCT NEW BIKE/PED BRIDGE OVER INVERNESS DRIVE | Transportation Enhancements | $1,400,000 |
COLORADO | LA PLATA | C200006 | LA PLATA COUNTY, BAYFIELD, CO, COUNTY ROAD 501, SHARED USE PATH | Transportation Enhancements | $216,666 |
COLORADO | JEFFERSON | M040017 | W. 86TH PKWY FROM QUEEN ST. TO W. 88TH AVE., COMPLETE MISSING LENGTH OF ATTACHED BIKE LANE ON SOUTH SIDE. | Transportation Enhancements | $300,000 |
COLORADO | LA PLATA | M065003 | BAYFIELD US 160 BUSINESS ROUTE PHASE II, CONSTRUCTION OF SIDEWALKS | Transportation Enhancements | $250,000 |
COLORADO | LARIMER | M070002 | BERTHOUD MAINSTREET, -BIKE PED IMPROVEMENT TO ROUNDABOUTS | Other | $20,500 |
COLORADO | BOULDER | M110065 | BOULDER ADA PEDESTRIAN ACCESS IMPROVEMENTS, ADA CURB RAMP INSTALLATIONS | Transportation Enhancements | $505,000 |
COLORADO | BOULDER | M110066 | BIKE/PED INTERSECTION IMPROVEMENTS: SPRUCE TO FOLSOM ST, INTERSECTION IMPROVEMENTS | Transportation Enhancements | $320,000 |
COLORADO | EL PASO | M240121 | WOODMEN RD: I-25 TO POWERS BLVD, WIDEN WOODMEN ROAD WITH NEW INTERCHANGE AT ACADEMY BOULEVARD | Pavement Widening | $35,031,818 |
COLORADO | LOGAN | M256012 | CITY OF STERLING, 7TH AVENUE - MAIN ST. TO BROADWAY ST., SIDEWALK & ADA RAMP IMPROVEMENTS | Other | $40,000 |
COLORADO | DENVER | M320064 | DENVER: MULTIPLE LOCATIONS CITYWIDE, NEW SIGNAGE & LANE MARKINGS FOR BIKE LANES & SHARROWS | Transportation Enhancements | $250,000 |
COLORADO | ADAMS | M356024 | US36 TRAIL: BRADBURN BLVD. FROM 73RD AVE-TURNPIKE DRIVE, REPLACE 4' DETACHED SIDEWALK W/8' DETACHED SIDEWALK | Transportation Enhancements | $300,000 |
COLORADO | WELD | M400004 | LEON A WURL BIKE LANES, FROM BONANZA DR. EAST TO I-25 INTERCHANGE (ERIE) | Other | $90,000 |
COLORADO | WELD | M415012 | 37TH STREET IN EVANS FROM 35TH AVE TO THE CITY LIMIT, RESURFACING 1.5 MILES OF 37TH STREET IN EVANS | Pavement Improvement | $354,000 |
COLORADO | WELD | M465007 | N. OF SH 52 AT THE S PLATTE RIVER IN FT. LUPTON, BIKE TRAIL ENHANCEMENTS | Other | $20,000 |
COLORADO | MORGAN | M470009 | SOUTH SIDE OF THE RAINBOW ARCH BRIDGE IN FT.MORGAN, KIOSK AND PED ENHANCEMENTS | Transportation Enhancements | $140,000 |
COLORADO | GARFIELD | M535004 | I-70 PED BRIDGE-DEVEREUX RD. GLENWOOD, CONSTRUCT A PED BRIDGE OVER I-70 | Transportation Enhancements | $50,000 |
COLORADO | JEFFERSON | R600346 | SH 40 (COLFAX): KIPLING TO SHERIDAN, RESURFACING | Pavement Improvement | $3,337,195 |
COLORADO | LARIMER | M830047 | ON WILSON AVE NORTH AND SOUTH OF US 34, MEDIAN REPLACEMENT AND PAVING | Safety/Traffic Management | $250,000 |
COLORADO | BOULDER | M935001 | SH 119 IN NEDERLAND FROM ELDORA RD TO 2ND, SIDEWALKS, CURB AND GUTTER, DRAINAGE | Transportation Enhancements | $325,000 |
COLORADO | LINCOLN | R100157 | US40/287:PORTS TO PLAINS CORRIDOR, CONCRETE RECONSTRUCTION, EMBANKMENT, DRAINAGE. | Pavement Improvement | $12,248,750 |
COLORADO | ADAMS | R600340 | I-25, US 36 AND C-470 RAMP METERING (MULTIPLE LOCATIONS), INSTALL RAMP METERING | Safety/Traffic Management | $333,489 |
COLORADO | BOULDER | R600343 | US6/ SH93/ SH58/ SH128 AT SIMMS -SIGNAL INSTALL/REPLACE, SIGNAL INSTALLATION AND UPGRADE | Safety/Traffic Management | $886,979 |
COLORADO | LARIMER | M830046 | LOVELAND TRAFFIC OPERATIONS CENTER 105 W, 5TH ST. LOVELAND, PURCHASE EQUIPMENT AND IMPROVEMENTS TO TRAFFIC OPERATION CTR | Other | $130,000 |
CONNECTICUT | NEW HAVEN | 1315 | Branford; Reconstruction of Br # 00340 (Amtrak RR bridge over US 1) | Bridge Replacement | $70,755,491 |
CONNECTICUT | HARTFORD | 5105 | ENFIELD; US ROUTE 5 OVER I-91; REHABILITATION OF BRIDGE 00445 (NO ADDED CAPACITY) (CN). | Bridge Improvement | $6,657,600 |
CONNECTICUT | STATEWIDE | 000R418 | STATEWIDE; REPLACEMENT OF OVERHEAD SIGN SUPPORTS ON VARIOUS ROUTES. (CN) | Safety/Traffic Management | $5,575,600 |
CONNECTICUT | HARTFORD | 000R430 | DISTRICT 1; INSTALLATION OF TRAFFIC SIGNALS AS APPROVED BY THE STATE TRAFFIC COMMISSION. (CN) | Safety/Traffic Management | $1,362,070 |
CONNECTICUT | STATEWIDE | 000R442 | Traffic Control Signal installations & revisions at SLOSSS Locations (CN), District 2 - 000R(442) | Safety/Traffic Management | $328,970 |
CONNECTICUT | STATEWIDE | 000R444 | Traffic Control Signal installations & revisions at STC Locations, District 2 - 000R(444) | Safety/Traffic Management | $1,872,080 |
CONNECTICUT | FAIRFIELD | 000R447 | DISTRICT 3; INSTALLATION AND REVISION OF TRAFFIC CONTROL SIGNALS AT SLOSSS LOCATIONS. (NO ADDED CAPACITY) (CN) | Safety/Traffic Management | $186,176 |
CONNECTICUT | FAIRFIELD | 000R449 | DISTRICT 3; INSTALLATION AND REVISION OF STC TRAFFIC CONTROL SIGNALS. (NO ADDED CAPACITY) (CN) | Safety/Traffic Management | $339,748 |
CONNECTICUT | STATEWIDE | 000R453 | DISTRICT 4; INSTALLATION OF TRAFFIC SIGNALS AS APPROVED BY THE STATE TRAFFIC COMMISSION (CN). | Safety/Traffic Management | $980,540 |
CONNECTICUT | STATEWIDE | 000R514 | DISTRICT 3; INSTALLATION AND REVISION OF STC TRAFFIC CONTROL SIGNALS. (NO ADDED CAPACITY) (CN) | Safety/Traffic Management | $1,073,963 |
CONNECTICUT | STATEWIDE | 000R538 | DISTRICT 4; REPLACEMENT OF FAILING EXPANSION JOINTS OF VARIOUS BRIDGES ON STATE HIGHWAYS (CN). | Bridge Improvement | $5,734,200 |
CONNECTICUT | FAIRFIELD | 15103 | TRUMBULL; RT 15; MEDIAN DECK REPAIRS; BRIDGE NO. 00750 OVER RESERVOIR AVE. (NO ADDED CAPACITY) (CN) | Bridge Improvement | $1,344,200 |
CONNECTICUT | WINDHAM | 89118 | ASHFORD; RTE 89; REHABILITATION OF BR# 01256 OVER MT HOPE RIVER (CN). | Bridge Improvement | $1,272,600 |
CONNECTICUT | FAIRFIELD | 150192 | FAIRFIELD; RT 15; FROM CONGRESS ST. TO MOREHOUSE HWY.; RESURFACING, BRIDGE, AND SAFETY IMPROVEMENTS. (NO ADDED CAPACITY) (CN) | Pavement Improvement | $25,328,500 |
CONNECTICUT | FAIRFIELD | 150193 | FAIRFIELD; RT 15; REPLACEMENT OF BRIDGE# 00743 OVER MILL RIVER. (NO ADDED CAPACITY) (CN) | Bridge Replacement | $11,202,400 |
CONNECTICUT | FAIRFIELD | 150194 | TRUMBULL; RT 15; FROM MOREHOUSE HWY TO RT 8; RESURFACING, BRIDGE, AND SAFETY IMPROVEMENTS. (NO ADDED CAPACITY) (CN) | Pavement Improvement | $32,914,900 |
CONNECTICUT | MIDDLESEX | 952111 | OLD SAYBROOK; I-95, REPLACEMENT OF EXPANSION JOINTS ON THE BALDWIN BRIDGE # 06200A & B OVER THE CONNECTICUT RIVER (CN). | Bridge Improvement | $2,751,300 |
CONNECTICUT | HARTFORD | 1076120 | MANCHESTER; INSTALLATION OF A TRAFFIC CONTROL SIGNAL @ INTERSECTION OF SLATER STREET AT CIRCUIT CITY/BEST BUY DRIVEWAYS. (CN) | Safety/Traffic Management | $270,000 |