Browse All Approved Stimulus Highway Projects

Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.

Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.

For more on the stimulus, check out our blog and resource page.

State County Project Number Project Description Improvement Type ARRA Funds Obligated
FLORIDA WALTON ARRA510 LIVE OAK AVE FROM 20TH ST TO 25TH ST & 19TH ST FROM NORTH HEDGER TO LIVE OAK SIDEWALKS;CITY OF DEFUNIAK SPRINGS; DB;ARRA Transportation Enhancements $251,379
FLORIDA WALTON ARRA511 CR 30A W OF TOPSAIL HILL ST PARK TO E OF SUNRISE CIRCLE;RESURFACING;LAP; AMERICAN RECOVERY & REINVESMENT ACT (ARRA) Pavement Improvement $925,630
FLORIDA JACKSON ARRA512 COLLEGE STREET FROM KELSON TO NORTH OF WORKFORCE WAY;RESURFACING;LAP; AMERICAN RECOVER & REINVESTMENT ACT (ARRA) Pavement Improvement $314,931
FLORIDA WALTON ARRA513 SR 20 FROM KYLEA LAIRD ROAD TO E OF WASHINGTON STREET;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $110,000
FLORIDA WAKULLA ARRA514 SR 369 (US 319) AT RUSSELL DRIVE INTERSECTION;ADD LEFT TURN LANE; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Pavement Widening $374,871
FLORIDA JACKSON ARRA515 SR 166 FROM BALES AVENUE TO MARIANNA HIGH SCHOOL;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $938,489
FLORIDA JACKSON ARRA516 CITY OF MARIANNA CROSSWALK SAFETY IMPROVEMENTS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Safety/Traffic Management $162,617
FLORIDA LEON ARRA518 LUCY ST FROM MAGNOLIA DR HILLCREST ST SIDEWALKS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $157,202
FLORIDA LEON ARRA519 SR 371 LAKE BRADFORD FROM PINEVIEW ELEMENTARY TO STADIUM DR;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $174,865
FLORIDA LEON ARRA520 JOE LOUIS ST FROM ALABAMA ST TO PRESTON ST & INGLESIDE AVE FROM END OF SIDEWALK E MARTIN TO TERRACE ST SIDEWALKS;(ARRA) Transportation Enhancements $742,205
FLORIDA OKALOOSA ARRA521 COUNTRY CLUB AVE NE FROM MOONEY ROAD NE TO MOONEY ROAD NE;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Pavement Improvement $448,334
FLORIDA GADSDEN ARRA523 CR 269 SOUTH MAIN ST FROM SR 10 (US 90) TO 1/4 MI SOUTH OF US 90;LAP Pavement Improvement $272,023
FLORIDA LEON ARRA524 DEMPSEY MAYO RD FROM MAHAN DR TO MICCOUSUKEE RD;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $342,893
FLORIDA LEON ARRA525 PERKINS ROAD FROM N MONROE ST TO OLD BAINBRIDGE RD;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $97,738
FLORIDA LEON ARRA526 VELDA DAIRY RD FROM BRADFORDVILLE RD TO KERRY FOREST PKWY;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESMENT ACT (ARRA) Transportation Enhancements $484,376
FLORIDA OKALOOSA ARRA527 BROOKMEADE DRIVE SIDEWALKS;CONSTRUCTION;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $110,000
FLORIDA FRANKLIN ARRA528 ST. GEORGE ISLAND SIDEWALKS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $214,102
FLORIDA ESCAMBIA ARRA529 CR 297 DOG TRACK RD FROM 5,940' NORTH TO GULF BEACH HIGHWAY;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Pavement Improvement $363,178
FLORIDA ESCAMBIA ARRA530 CR 95A OLD PALAFOX FROM E ROBERTS BLVD TO 9 MILE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Pavement Improvement $858,684
FLORIDA ESCAMBIA ARRA532 CR 498 COPTER RD FROM ELLYSON PK ENTRANCE TO 9 MILE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Pavement Improvement $499,053
FLORIDA ESCAMBIA ARRA533 CR 453 W STREET FROM NORTH SR 95 (US 29) TO FAIRFIELD DRIVE;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Pavement Improvement $2,527,424
FLORIDA ESCAMBIA ARRA534 CR 297 DOG TRACK RD FROM SR 173 BLUE ANGEL TO SR 30 (US 98);LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Pavement Improvement $871,927
FLORIDA ESCAMBIA ARRA535 EAST JOHNSON AVE FROM GATEWOOD ROAD TO SR 290 OLIVE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Pavement Improvement $409,790
FLORIDA ESCAMBIA ARRA537 BROAD STREET FROM UNTREINER AVE TO ALEXIA AVE;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) Transportation Enhancements $143,690
FLORIDA CITRUS ARRA539 WITHLACOOCHEE TRAIL CONNECTION FROM N TRAIL ND TO NE OF US 41 & RIVER;BIKE PATH/TRAIL;CONSTRUCTION;LAP Transportation Enhancements $320,000
FLORIDA MARION ARRA540 GREENWAY X-ING GRADE 475A,475B,95TH & 25TH ST UN-PASSES @ CR 475 & 484;BIKE PATH/TRAIL;CONSTRUCTION;LAP Transportation Enhancements $2,000,000
GEORGIA MUSCOGEE 99 Project 0000099 consists of the construction of a 10 to 12 foot multi use trail beginning at Columbus State University and extending northeasterly to Cooper Creek Park. The proposed project would be c Transportation Enhancements $1,250,000
GEORGIA LANIER 310 This project proposes to realign on new location SR 11/US 129 and SR 31, 122/ US 221 to create two, (2), 90 degree "T" intersections with SR 37 to improve safety and turning movements. These intersec Pavement Widening $3,129,018
GEORGIA DOUGLAS 424 This project consists of reconstructing the existing intersection of SR 5 and Rose Avenue, located just north of I-20 in Douglas County. The existing intersection has an undesirable "scissor-type" con Safety/Traffic Management $2,843,820
GEORGIA GORDON 683 This project consists of a bridge replacement on CR 134/County Line Road over Polecat Creek on the Gordon and Murray county line. Also, there will be three overflow box culverts to prevent flooding. Bridge Replacement $1,687,138
GEORGIA MILLER 1361 The construction proposes to construct a new 160' x 44' concrete bridge over Dry Creek at the existing bridge site. The approaches will consist of two, 12' lanes with 10' rural shoulders (2 paved). Tr Bridge Replacement $3,122,043
GEORGIA TATTNALL 1364 This project is a bridge replacement on S.R. 56/Nail Bridge @ the Ohoopee River 2 miles west of Reidsville. Bridge Replacement $4,177,171
GEORGIA CLAY 1369 This project will replace the structurally deficient bridge on CR 76 over Drag Nasty Creek with a new 180' x 28' reinforced concrete bridge. The existing approaches consist of two 9 ft travel lanes, Bridge Replacement $1,674,423
GEORGIA BARTOW 1574 The proposed project is located on SR 3/US 41 beginning approximately at the Cobb/Bartow County line and extending north to the SR 293 Connector in Bartow County. The proposed improvement will add tu Safety/Traffic Management $18,081,428
GEORGIA DE KALB 2406 This project includes construction of sidewalks on both sides of Covington Hwy from Memorial Dr. to W. Austin Dr for a total of 1.58 miles. Project will be 5' ADA compliant sidewalks with a 2' stamped Transportation Enhancements $2,483,200
GEORGIA HENRY 2638 This project is located on Eagle's Landing Parkway, 0.4 miles east of the I-75 interchange in Henry County. This project proposes to continue the widening of Eagle's Landing Parkway from Eagle's Poin Pavement Widening $33,591,874
GEORGIA CANDLER 2734 This project is a bridge replacement on C.R. 203 / Glisson Road @ Wolfe Creek. The existing bridge, constructed in 1955, is load limited with a sufficiency rating of 27. Bridge Replacement $1,710,677
GEORGIA CANDLER 2841 This project is a bridge replacement on C.R. 223/Portal Highway @ Little Stocking Head Creek in Candler County, 5 miles north of Metter. The existing bridge, constructed in 1967, is load limited with Bridge Replacement $1,792,577
GEORGIA CANDLER 2842 This project is a bridge replacement on C.R. 223/Portal Highway @ Big Branch and @ Lotts Creek in Bulloch/Candler Counties. The existing bridges, constructed in 1953, are 27.5' wide with sufficiency Bridge Replacement $2,911,530
GEORGIA FULTON 3769 Intersection improvements on Kimball Bridge Rd at Waters Rd in Fulton County will provide Kimball Bridge Rd. one left turn lane, a through lane and one right turn lane. Westbound Kimball Bridge Rd. a Pavement Improvement $1,422,750
GEORGIA FULTON 4393 This project proposes to improve accessibility, mobility and safety by connecting to a bike and pedestrian system that is planned for the entire midtown area. Upon its completion, the project would r Transportation Enhancements $4,766,040
GEORGIA GWINNETT 4456 This proposed project will connect to the existing intersection of McGinnis Ferry Road and Satellite Boulevard, with only minor improvements to Satellite Boulevard and McGinnis Boulevard. The roadway New Construction $28,745,941
GEORGIA CLAYTON 4633 This project includes enhancements to pedestrian safety and improved near term traffic flow. The project will also address aesthetic concerns typically involved with streetscape improvements. Improv Transportation Enhancements $3,329,993
GEORGIA CLINCH 6534 The Homerville Depot, also known as Station 11 will be restored to its original architectural style to the extent possible. Vinyl siding that has been installed on the west end of the Depot will be re Transportation Enhancements $500,000
GEORGIA MUSCOGEE 6597 Streetscape on Veterans Pkwy SR 1/US 27 beginning at 8th Street and extending northerly to 13th Street. The total length of the project is .65 mile. Improvements consists of streetscape elements. P Transportation Enhancements $1,250,000
GEORGIA PIKE 6600 The aesthetic revitalization of a portion of Georgia Highway 109 east of Georgia Highway 18 intersection. As a part of the proposal, some of the existing sidewalk and stand-up curb and gutter will ne Transportation Enhancements $156,000
GEORGIA POLK 6627 Streetscape improvements within the downtown of Rockmart along: State Route 6 (Elm Street) from CSX Railroad right-of-way to Slate Street; Marble Street from State Route 6 (Elm Street) to 325 feet nor Transportation Enhancements $281,000
GEORGIA DE KALB 6810 The proposed project is entirely contained within Dekalb County. The project consists of the South and North Hairston Road corridors from Kenilworth Drive to Mainstreet Park Drive. The total project Safety/Traffic Management $873,026
GEORGIA GWINNETT 6825 The proposed project along Buford Hwy. in Gwinnett County will upgrade signal equipment and install fiber optic interconnect. Installation of ITS on Buford Highway from Global Forum Boulevard to Sugar Safety/Traffic Management $2,402,881
GEORGIA GWINNETT 6829 This project includes the design of fiber optic communications cable and closed-circuit television (CCTV) cameras along Sugarloaf Parkway from Peachtree Industrial Boulevard in Duluth to SR 20/Grayson Safety/Traffic Management $2,335,467