Browse All Approved Stimulus Highway Projects
Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|---|
FLORIDA | WALTON | ARRA510 | LIVE OAK AVE FROM 20TH ST TO 25TH ST & 19TH ST FROM NORTH HEDGER TO LIVE OAK SIDEWALKS;CITY OF DEFUNIAK SPRINGS; DB;ARRA | Transportation Enhancements | $251,379 |
FLORIDA | WALTON | ARRA511 | CR 30A W OF TOPSAIL HILL ST PARK TO E OF SUNRISE CIRCLE;RESURFACING;LAP; AMERICAN RECOVERY & REINVESMENT ACT (ARRA) | Pavement Improvement | $925,630 |
FLORIDA | JACKSON | ARRA512 | COLLEGE STREET FROM KELSON TO NORTH OF WORKFORCE WAY;RESURFACING;LAP; AMERICAN RECOVER & REINVESTMENT ACT (ARRA) | Pavement Improvement | $314,931 |
FLORIDA | WALTON | ARRA513 | SR 20 FROM KYLEA LAIRD ROAD TO E OF WASHINGTON STREET;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $110,000 |
FLORIDA | WAKULLA | ARRA514 | SR 369 (US 319) AT RUSSELL DRIVE INTERSECTION;ADD LEFT TURN LANE; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Widening | $374,871 |
FLORIDA | JACKSON | ARRA515 | SR 166 FROM BALES AVENUE TO MARIANNA HIGH SCHOOL;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $938,489 |
FLORIDA | JACKSON | ARRA516 | CITY OF MARIANNA CROSSWALK SAFETY IMPROVEMENTS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $162,617 |
FLORIDA | LEON | ARRA518 | LUCY ST FROM MAGNOLIA DR HILLCREST ST SIDEWALKS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $157,202 |
FLORIDA | LEON | ARRA519 | SR 371 LAKE BRADFORD FROM PINEVIEW ELEMENTARY TO STADIUM DR;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $174,865 |
FLORIDA | LEON | ARRA520 | JOE LOUIS ST FROM ALABAMA ST TO PRESTON ST & INGLESIDE AVE FROM END OF SIDEWALK E MARTIN TO TERRACE ST SIDEWALKS;(ARRA) | Transportation Enhancements | $742,205 |
FLORIDA | OKALOOSA | ARRA521 | COUNTRY CLUB AVE NE FROM MOONEY ROAD NE TO MOONEY ROAD NE;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $448,334 |
FLORIDA | GADSDEN | ARRA523 | CR 269 SOUTH MAIN ST FROM SR 10 (US 90) TO 1/4 MI SOUTH OF US 90;LAP | Pavement Improvement | $272,023 |
FLORIDA | LEON | ARRA524 | DEMPSEY MAYO RD FROM MAHAN DR TO MICCOUSUKEE RD;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $342,893 |
FLORIDA | LEON | ARRA525 | PERKINS ROAD FROM N MONROE ST TO OLD BAINBRIDGE RD;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $97,738 |
FLORIDA | LEON | ARRA526 | VELDA DAIRY RD FROM BRADFORDVILLE RD TO KERRY FOREST PKWY;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESMENT ACT (ARRA) | Transportation Enhancements | $484,376 |
FLORIDA | OKALOOSA | ARRA527 | BROOKMEADE DRIVE SIDEWALKS;CONSTRUCTION;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $110,000 |
FLORIDA | FRANKLIN | ARRA528 | ST. GEORGE ISLAND SIDEWALKS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $214,102 |
FLORIDA | ESCAMBIA | ARRA529 | CR 297 DOG TRACK RD FROM 5,940' NORTH TO GULF BEACH HIGHWAY;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $363,178 |
FLORIDA | ESCAMBIA | ARRA530 | CR 95A OLD PALAFOX FROM E ROBERTS BLVD TO 9 MILE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $858,684 |
FLORIDA | ESCAMBIA | ARRA532 | CR 498 COPTER RD FROM ELLYSON PK ENTRANCE TO 9 MILE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $499,053 |
FLORIDA | ESCAMBIA | ARRA533 | CR 453 W STREET FROM NORTH SR 95 (US 29) TO FAIRFIELD DRIVE;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $2,527,424 |
FLORIDA | ESCAMBIA | ARRA534 | CR 297 DOG TRACK RD FROM SR 173 BLUE ANGEL TO SR 30 (US 98);LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $871,927 |
FLORIDA | ESCAMBIA | ARRA535 | EAST JOHNSON AVE FROM GATEWOOD ROAD TO SR 290 OLIVE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $409,790 |
FLORIDA | ESCAMBIA | ARRA537 | BROAD STREET FROM UNTREINER AVE TO ALEXIA AVE;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $143,690 |
FLORIDA | CITRUS | ARRA539 | WITHLACOOCHEE TRAIL CONNECTION FROM N TRAIL ND TO NE OF US 41 & RIVER;BIKE PATH/TRAIL;CONSTRUCTION;LAP | Transportation Enhancements | $320,000 |
FLORIDA | MARION | ARRA540 | GREENWAY X-ING GRADE 475A,475B,95TH & 25TH ST UN-PASSES @ CR 475 & 484;BIKE PATH/TRAIL;CONSTRUCTION;LAP | Transportation Enhancements | $2,000,000 |
GEORGIA | MUSCOGEE | 99 | Project 0000099 consists of the construction of a 10 to 12 foot multi use trail beginning at Columbus State University and extending northeasterly to Cooper Creek Park. The proposed project would be c | Transportation Enhancements | $1,250,000 |
GEORGIA | LANIER | 310 | This project proposes to realign on new location SR 11/US 129 and SR 31, 122/ US 221 to create two, (2), 90 degree "T" intersections with SR 37 to improve safety and turning movements. These intersec | Pavement Widening | $3,129,018 |
GEORGIA | DOUGLAS | 424 | This project consists of reconstructing the existing intersection of SR 5 and Rose Avenue, located just north of I-20 in Douglas County. The existing intersection has an undesirable "scissor-type" con | Safety/Traffic Management | $2,843,820 |
GEORGIA | GORDON | 683 | This project consists of a bridge replacement on CR 134/County Line Road over Polecat Creek on the Gordon and Murray county line. Also, there will be three overflow box culverts to prevent flooding. | Bridge Replacement | $1,687,138 |
GEORGIA | MILLER | 1361 | The construction proposes to construct a new 160' x 44' concrete bridge over Dry Creek at the existing bridge site. The approaches will consist of two, 12' lanes with 10' rural shoulders (2 paved). Tr | Bridge Replacement | $3,122,043 |
GEORGIA | TATTNALL | 1364 | This project is a bridge replacement on S.R. 56/Nail Bridge @ the Ohoopee River 2 miles west of Reidsville. | Bridge Replacement | $4,177,171 |
GEORGIA | CLAY | 1369 | This project will replace the structurally deficient bridge on CR 76 over Drag Nasty Creek with a new 180' x 28' reinforced concrete bridge. The existing approaches consist of two 9 ft travel lanes, | Bridge Replacement | $1,674,423 |
GEORGIA | BARTOW | 1574 | The proposed project is located on SR 3/US 41 beginning approximately at the Cobb/Bartow County line and extending north to the SR 293 Connector in Bartow County. The proposed improvement will add tu | Safety/Traffic Management | $18,081,428 |
GEORGIA | DE KALB | 2406 | This project includes construction of sidewalks on both sides of Covington Hwy from Memorial Dr. to W. Austin Dr for a total of 1.58 miles. Project will be 5' ADA compliant sidewalks with a 2' stamped | Transportation Enhancements | $2,483,200 |
GEORGIA | HENRY | 2638 | This project is located on Eagle's Landing Parkway, 0.4 miles east of the I-75 interchange in Henry County. This project proposes to continue the widening of Eagle's Landing Parkway from Eagle's Poin | Pavement Widening | $33,591,874 |
GEORGIA | CANDLER | 2734 | This project is a bridge replacement on C.R. 203 / Glisson Road @ Wolfe Creek. The existing bridge, constructed in 1955, is load limited with a sufficiency rating of 27. | Bridge Replacement | $1,710,677 |
GEORGIA | CANDLER | 2841 | This project is a bridge replacement on C.R. 223/Portal Highway @ Little Stocking Head Creek in Candler County, 5 miles north of Metter. The existing bridge, constructed in 1967, is load limited with | Bridge Replacement | $1,792,577 |
GEORGIA | CANDLER | 2842 | This project is a bridge replacement on C.R. 223/Portal Highway @ Big Branch and @ Lotts Creek in Bulloch/Candler Counties. The existing bridges, constructed in 1953, are 27.5' wide with sufficiency | Bridge Replacement | $2,911,530 |
GEORGIA | FULTON | 3769 | Intersection improvements on Kimball Bridge Rd at Waters Rd in Fulton County will provide Kimball Bridge Rd. one left turn lane, a through lane and one right turn lane. Westbound Kimball Bridge Rd. a | Pavement Improvement | $1,422,750 |
GEORGIA | FULTON | 4393 | This project proposes to improve accessibility, mobility and safety by connecting to a bike and pedestrian system that is planned for the entire midtown area. Upon its completion, the project would r | Transportation Enhancements | $4,766,040 |
GEORGIA | GWINNETT | 4456 | This proposed project will connect to the existing intersection of McGinnis Ferry Road and Satellite Boulevard, with only minor improvements to Satellite Boulevard and McGinnis Boulevard. The roadway | New Construction | $28,745,941 |
GEORGIA | CLAYTON | 4633 | This project includes enhancements to pedestrian safety and improved near term traffic flow. The project will also address aesthetic concerns typically involved with streetscape improvements. Improv | Transportation Enhancements | $3,329,993 |
GEORGIA | CLINCH | 6534 | The Homerville Depot, also known as Station 11 will be restored to its original architectural style to the extent possible. Vinyl siding that has been installed on the west end of the Depot will be re | Transportation Enhancements | $500,000 |
GEORGIA | MUSCOGEE | 6597 | Streetscape on Veterans Pkwy SR 1/US 27 beginning at 8th Street and extending northerly to 13th Street. The total length of the project is .65 mile. Improvements consists of streetscape elements. P | Transportation Enhancements | $1,250,000 |
GEORGIA | PIKE | 6600 | The aesthetic revitalization of a portion of Georgia Highway 109 east of Georgia Highway 18 intersection. As a part of the proposal, some of the existing sidewalk and stand-up curb and gutter will ne | Transportation Enhancements | $156,000 |
GEORGIA | POLK | 6627 | Streetscape improvements within the downtown of Rockmart along: State Route 6 (Elm Street) from CSX Railroad right-of-way to Slate Street; Marble Street from State Route 6 (Elm Street) to 325 feet nor | Transportation Enhancements | $281,000 |
GEORGIA | DE KALB | 6810 | The proposed project is entirely contained within Dekalb County. The project consists of the South and North Hairston Road corridors from Kenilworth Drive to Mainstreet Park Drive. The total project | Safety/Traffic Management | $873,026 |
GEORGIA | GWINNETT | 6825 | The proposed project along Buford Hwy. in Gwinnett County will upgrade signal equipment and install fiber optic interconnect. Installation of ITS on Buford Highway from Global Forum Boulevard to Sugar | Safety/Traffic Management | $2,402,881 |
GEORGIA | GWINNETT | 6829 | This project includes the design of fiber optic communications cable and closed-circuit television (CCTV) cameras along Sugarloaf Parkway from Peachtree Industrial Boulevard in Duluth to SR 20/Grayson | Safety/Traffic Management | $2,335,467 |