Browse All Approved Stimulus Highway Projects
Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|---|
GEORGIA | WHEELER | M004001 | This project is the resurfacing of SR 30. This section of SR 30 needs resurfacing because the existing pavement is deteriorating. SR 30 was last resurfaced in 1997. | Pavement Improvement | $3,236,978 |
GEORGIA | WHEELER | M004003 | This project is the resurfacing of SR 126. This section of SR 126 needs resurfacing because the existing pavement is deteriorating. SR 126 was last resurfaced in 1998. | Pavement Improvement | $2,003,639 |
GEORGIA | WILKES | M004006 | This project is the resurfacing of SR 47. This section of SR 47 needs resurfacing because the existing pavement is deteriorating. SR 47 was last resurfaced in 1995. | Pavement Improvement | $3,282,708 |
GEORGIA | HALL | M004015 | This project is the removal of selected concrete slabs on SR 365. The reason for removal and replacement of the selected concrete slabs is due deterioration. The last time any work was done on SR 365 | Pavement Improvement | $4,558,437 |
GEORGIA | HOUSTON | M004021 | This project is the resurfacing of SR 11 Business. This section of SR 11 Business needs resurfacing because the existing pavement is deteriorating. SR 11 Business was last resurfaced in 1994. | Pavement Improvement | $992,900 |
GEORGIA | BRANTLEY | M004040 | This project is the resurfacing of SR 520. This section of SR 520 needs resurfacing because the existing pavement is deteriorating. SR 520 was last resurfaced in 1998. | Pavement Improvement | $1,451,691 |
GUAM | STATEWIDE | 2104 | Rte 2, Reconstruction or Repair of Three Culverts and One Slide | Other | $1,582,000 |
GUAM | STATEWIDE | 4012 | Rte 4 Widening and Resurfacing Ylig Bridge to Pago Bay | Other | $4,400,000 |
GUAM | STATEWIDE | 6011 | MassoRiver Bridge, Abutment Repair | Other | $220,000 |
GUAM | STATEWIDE | 17102 | Rte 17 Rehabilitation and Widening in several areas, Phase 1 | Other | $5,298,000 |
GUAM | STATEWIDE | 25101 | Rte 25 (Alageta Road) Reconstruction and Widening (Bello Road to Route 26) | Other | $6,500,000 |
HAWAII | HONOLULU | 1036 | TRAFFIC SIGNALS AT VARIOUS LOCATIONS, PHASE 10 (P, C) | Safety/Traffic Management | $3,407,221 |
HAWAII | HONOLULU | 11250 | INTERSTATE ROUTE H-1 AT FARRINGTON HIGHWAY, MAKAKILO SEPARATION & MILITARY ROAD OVERPASSES; PE, ROW & CON FOR SEISMIC RETROFIT | Bridge Improvement | $1,485,691 |
HAWAII | HAWAII | 192059 | HAWAII BELT ROAD, CLEAN AND PAINT STEEL MEMBERS, NINOLE, MAULUA, KUWAIKAHI, AND KUKAIAU BRIDGES (CON) | Bridge Improvement | $8,274,152 |
HAWAII | MAUI | 311011 | Limited to extending the life of the pavement by cold planing and resurfacing (1 1/2" maximum) areas that are starting to show pavement distress. Use of slurry seal, crack seals, white topping and/or | Pavement Improvement | $5,605,823 |
HAWAII | MAUI | 360010 | HANA HIGHWAY PAVEMENT PREVENTIVE MAINTENANCE, KAUPAKALUA ROAD TO HUELO (CON) | Pavement Improvement | $1,363,530 |
HAWAII | MAUI | 460014 | Resurface and reconstruct damaged areas of the pavement. Safety (including guardrail and shoulder improvements) and ADA improvements could be included. | Pavement Improvement | $3,893,243 |
HAWAII | MAUI | 470006 | Limited to extending the life of the pavement by cold planing and resurfacing (1 1/2" maximum) areas that are starting to show pavement distress. Use of slurry seal, crack seals, white topping and/or | Pavement Improvement | $1,904,805 |
HAWAII | KAUAI | 561052 | KUHIO HIGHWAY RESURFACING, KAWAIHAU ROAD TO KAPAA BRIDGE (CON) | Pavement Improvement | $1,021,416 |
HAWAII | KAUAI | 583001 | MAALO ROAD RESURFACING, MILE POST 0.0 TO MILE POST 1.0 | Pavement Improvement | $729,083 |
HAWAII | HONOLULU | 831042 | RT 83 KAMEHAMEHA HIGHWAY AT PUNALUU STREAM, PE/ROW/CON FOR BRIDGE REPLACEMENT | Bridge Replacement | $20,343,107 |
HAWAII | MAUI | 3405002 | Reconstruction and beautification of Market Street from Kahawai Street to Makuhau Road. Install drainage system, street lights, landscaping and irrigation. | Pavement Improvement | $5,287,166 |
IDAHO | JEFFERSON | A009387 | Widen 1.71 miles of road | Pavement Widening | $5,403,562 |
IDAHO | BONNER | A001222 | Replace one deficient, restricted-access bridge | New Bridge Construction | $36,976,832 |
IDAHO | FREMONT | A008624 | Widen 6.37 miles of congested rural road | Pavement Widening | $2,780,627 |
IDAHO | IDAHO | 4110137 | Widen 2.619 miles of road | Pavement Widening | $5,589,767 |
IDAHO | ADA | A010489 | Add sidewalks and lighting along 0.454 miles of road | Other | $188,212 |
IDAHO | BANNOCK | A010584 | Widen 1.2 miles of congested urban Interstate | Pavement Improvement | $11,569,574 |
IDAHO | TWIN FALLS | A010917 | Construct 20.28 new lane-miles and one new bridge | New Construction | $42,354,235 |
IDAHO | LATAH | A011031 | Widen 1.338 miles of road | Pavement Widening | $4,210,319 |
IDAHO | BONNEVILLE | A011920 | Sealcoat local streets throughout Idaho Falls city | Pavement Improvement | $866,027 |
IDAHO | ADA | A011932 | One mile of landscaping along the newly constructed Ten Mile interchange on I 84 | Other | $108,880 |
IDAHO | BOUNDARY | A011935 | Cement Recycled Asphalt Base Stabilization on 3.5 miles of road | Other | $81,000 |
IDAHO | SHOSHONE | A011936 | Resurface 1.49 miles of road | Other | $66,000 |
IDAHO | BENEWAH | A011937 | Resurface one intersection | Other | $81,000 |
IDAHO | SHOSHONE | A011938 | Resurface 0.45 mile of road | Other | $56,000 |
IDAHO | CLEARWATER | A011939 | Resurface 14.345 miles of road | Other | $65,000 |
IDAHO | CLEARWATER | A011940 | Resurface 1 mile of road | Other | $66,000 |
IDAHO | CLEARWATER | A011941 | Resurface 3.2 miles of road | Other | $56,000 |
IDAHO | IDAHO | A011942 | Resurface 0.722 mile of road | Other | $81,000 |
IDAHO | PAYETTE | A011943 | Resurface 0.489 mile of road | Other | $78,500 |
IDAHO | CANYON | A011944 | Cement Recycled Asphalt Base Stabilization on 1.48 miles of road | Other | $81,000 |
IDAHO | GEM | A011945 | Resurface 3 miles of road | Other | $80,000 |
IDAHO | ADAMS | A011946 | Resurface 4.2 miles of road | Other | $81,000 |
IDAHO | LINCOLN | A011947 | Resurface 4.6 miles of road | Other | $66,000 |
IDAHO | CASSIA | A011948 | Cement Recycled Asphalt Base Stabilization on 1.5 miles of road | Other | $81,000 |
IDAHO | TWIN FALLS | A011949 | Resurface 0.19 mile of road | Other | $66,000 |
IDAHO | CAMAS | A011950 | Resurface 0.61 mile of road | Other | $63,000 |
IDAHO | BANNOCK | A011951 | Resurface 1.232 mile of road | Other | $65,000 |
IDAHO | CARIBOU | A011952 | Resurface 0.426 mile of road | Other | $66,000 |