Browse All Approved Stimulus Highway Projects
Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
| State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
|---|---|---|---|---|---|
| KANSAS | JOHNSON | K825107 | US-69 CORRIDOR: FROM I-435 N TO .5 KM N OF 95TH ST IN OVERLAND PARK | Pavement Widening | $31,966,459 |
| KANSAS | JOHNSON | K825111 | US-69 CORRIDOR: FROM .5 KM N OF 95TH ST N TO I-35 & I-35 N TO 75TH ST IN OVERLAND PARK/ LENEXA | Pavement Widening | $51,977,796 |
| KANSAS | MCPHERSON | K825301 | CORR: K-61 FROM RN-MP CO LN NE TO APPX .2 MI NE OF CHISOLM RD | Pavement Widening | $36,046,133 |
| KANSAS | MCPHERSON | K825302 | CORR: K-61 FROM APPX .2 MI NE OF CHISOLM RD NE TO 4-LN | Pavement Widening | $36,839,656 |
| KANSAS | STATEWIDE | K921806 | KANSAS CITY METROPOLITAN AREA - JOHNSON & WYANDOTTE COUNTIES | Other | $1,000,000 |
| KANSAS | JOHNSON | N037301 | COLLEGE BLVD FROM PFLUMM RD TO US-69 IN OVERLAND PARK | Pavement Widening | $1,000,000 |
| KANSAS | BUTLER | N039001 | ANDOVER RD FROM HARRY ST TO 1100' S OF US-54 IN ANDOVER | Pavement Widening | $1,234,800 |
| KANSAS | SEDGWICK | N048701 | BROADWAY BR OVER CHISHOLM CR IN PARK CITY | Other | $63,000 |
| KANSAS | SEDGWICK | N048801 | W GRAND AVE FROM MERIDIAN AVE TO N MAIN ST IN HAYSVILLE | Other | $18,000 |
| KANSAS | DOUGLAS | U204101 | INTERSECTION @ N 2ND ST & LOCUST ST IN LAWRENCE | Safety/Traffic Management | $2,000,000 |
| KANSAS | LEAVENWORTH | U223501 | TONGANOXIE: US-24 @ NORTHSTAR DR | Pavement Improvement | $23,800 |
| KANSAS | MONTGOMERY | U225301 | 4TH AVE (RS-809) FROM US-75 TO WOOD ST IN CANEY | Pavement Improvement | $177,500 |
| KANSAS | BOURBON | U225401 | NATIONAL ST FROM LINKER ST TO WALL ST IN FORT SCOTT | Pavement Improvement | $228,180 |
| KANSAS | MIAMI | U225501 | 8TH ST FROM N CITY LIMITS TO MAIN ST IN OSAWATOMIE | Pavement Improvement | $118,380 |
| KANSAS | CRAWFORD | U225601 | BROADWAY ST FROM CENTENNIAL TO WILLIAMS IN PITTSBURG | Pavement Improvement | $265,500 |
| KENTUCKY | LINCOLN, ROCKCASTLE | 1501099 | RECONSTRUCT US-150/STANFORD-MT. VERNON ROAD FROM CRAB ORCHARD TO BRODHEAD. (06CCN)(FUNDING SWAP WITH 8-163.10 AS SHOWN IN 2006SYP) | Pavement Improvement | $32,182,400 |
| KENTUCKY | LETCHER | 151067 | PROVIDE LEFT TURN LANE ON KY-15 @ WEST END OF WHITESBURG BYPASS. | Safety/Traffic Management | $1,589,000 |
| KENTUCKY | MONROE | 159006 | TOMPKINSVILLE - KY-90 (PRIORITY SECTION 1): FROM 0.34MI SOUTH OF BUSHONG ROAD EXTENDING NORTHERLY TO 0.68MI SOUTH OF CYCLONE ROAD (GRADE DRAIN & INC. SURFACE). (02CCR)(2002BOP)(SEE 3-276.11 FOR 2005HP | Pavement Improvement | $9,590,000 |
| KENTUCKY | CALDWELL, LYON | 242066 | REPAIR AND GRIND PAVEMENT ON I-24 EB & WB FROM 0.5 MILE E KY-293 (MP 45.133) IN LYON COUNTY TO KY-139 (MP 65.300) IN CALDWELL COUNTY. | Pavement Improvement | $12,226,812 |
| KENTUCKY | CAMPBELL | 272109 | PARIS-COVINGTON RD; RECONSTRUCT FROM SOUTH OF KY-154 TO CAMPBELL COUNTY PARK. | Pavement Widening | $29,120,000 |
| KENTUCKY | KENTON | 273013 | RECONSTRUCT 12TH ST. FR I-75 TO SCOTT STREET (OKI T.I.P.) | Pavement Improvement | $8,761,860 |
| KENTUCKY | KENTON | 273014 | 12th St (KY 1120) in Covington from Russell St to Scott Street. Grade, Drain, and Surface for Roadway Reconstruction. | Pavement Improvement | $1,000,000 |
| KENTUCKY | JEFFERSON | 655098 | REHABILITATE I-65, REPAIR AND GRIND PAVEMENT FROM MP 128.13 (FERN VALLEY ROAD) TO MP 131.89. | Pavement Improvement | $18,000,000 |
| KENTUCKY | TRIGG | 801075 | US 68/KY 80; LAND BETWEEN THE LAKES. CONVERT DESIGN/BUILD COSTS TO FEDERAL FUNDS | Pavement Widening | $30,000,000 |
| KENTUCKY | WASHINGTON | 1501096 | BARDSTOWN-SPRINGFIELD; CONSTRUCT SPRINGFIELD NORTHWEST BYPASS. (02CCR)(06CCR) | New Construction | $15,938,900 |
| KENTUCKY | BREATHITT | 151066 | JACKSON-CAMPTON: FROM 0.43 M N OF KY 15 AT JACKSON TO 0.31 M S OF STILL HOUSE HOLLOW. (G&D) | Pavement Improvement | $21,960,000 |
| KENTUCKY | JEFFERSON | 2641166 | MILL 1" THIN OVERLAY ON I-264 EB & WB FROM MP 22.61 TO I-71 (MP 22.97). | Pavement Improvement | $306,623 |
| KENTUCKY | TODD | 3000764 | SOUTH STREETS AVENUE SIDEWALK PROJECT- REPLACEMENT OF OLD, DETERIORATING SIDEWALKS AND EXPANSION OF THE CURRENT SIDEWALK SYSTEM. CURB AND GUTTER WILL BE ADDED. BEAUTIFICATION PROJECTS WILL ALSO BE | Pavement Improvement | $196,000 |
| KENTUCKY | CARROLL | 3000766 | POLK STREET EXTENSION PROJECT - PROJECT WILL ENABLE STUDENTS TO WALK OR BICYCLE TO 4 AREA SCHOOLS VIA SIDEWALK CONSTRUCTION,TRAFFIC CALMING MEASURES AND PEDESTRIAN AND BICYCLE CROSSING IMPROVEMENTS. | Transportation Enhancements | $247,000 |
| KENTUCKY | UNION | 3000767 | MORGANFIELD WALKING AND BICYCLE TRAIL - ADD BICYCLE RACKS AND SIGNAGE, DESIGNATION OF BICYCLE LANES CONSTRUCTION OF BICYCLE AND WALKING TRAIL SYSTEM AND AESTHETIC IMPROVEMENTS. | Transportation Enhancements | $55,500 |
| KENTUCKY | STATEWIDE | 3000769 | KY HISTORICAL SOCIETY HISTORIC MARKERS PHASE III - REPAIR OR REPLACEMENT OF DAMAGED HISTORICAL MARKERS. | Transportation Enhancements | $64,000 |
| KENTUCKY | HENRY | 3000770 | EMINENCE PEDESTRIAN WALKWAY - REPLACEMENT OF DETERIORATED SIDEWALKS THROUGH DOWNTOWN EMINENCE. | Transportation Enhancements | $82,500 |
| KENTUCKY | BARREN | 3000771 | US 31 W SIDEWALK PROJECT - INSTALLATION OF SIDEWALKS ALONG US 31 W. | Transportation Enhancements | $68,000 |
| KENTUCKY | OHIO | 3000773 | PEDESTRIAN FACILITY PROJECT -REPLACEMENT OF AGING, CRACKED AND BUCKLED SIDEWALKS IN DOWNTOWN HARTFORD. | Transportation Enhancements | $120,000 |
| KENTUCKY | CHRISTIAN | 3000778 | OLD CROFTON HOTEL BUILDING RESTORATION - RESTORE THE OLD CROFTON HOTEL, WHICH WILL SERVE AS A WELCOME CENTER. THIS HISTORIC STRUCTURE WAS BUILT IN 1904. | Other | $300,000 |
| KENTUCKY | HICKMAN | 3000779 | CLINTON SIDEWALK REHAB & BEAUTIFICATION- REPLACE SIDEWALKS & IMPROVE LANDSCAPING ALONG NORTH WASHINGTON ST (US51) FROM CLAY ST TO NORTH ST, JEFFERSON ST FROM JACKSON ST TO CLAY ST, AND CLAY ST (KY123/ | Transportation Enhancements | $38,000 |
| KENTUCKY | ADAIR | 3000780 | PUBLIC SQUARE UNDERGROUND ELECTRICAL SERVICE - INSTALLATION OF UNDERGROUND ELECTRICAL SERVICE TO PROVIDE ENHANCED LIGHTING AND INSTALLATION OF BRICK PAVERS. | Transportation Enhancements | $12,500 |
| KENTUCKY | BALLARD | 3000781 | BARLOW SIDEWALK PROJECT - REPLACEMENT OF DETERIORATED SIDEWALKS. | Transportation Enhancements | $54,000 |
| KENTUCKY | FLOYD | 3000782 | PRESTONSBURG CONNECTIVITY PROJECT- DESIGN AND CONSTRUCTION OF A SIDEWALK TO CONNECT KY 1428 TO KY 321 NEAR THE ENTRANCE OF BIG SANDY COMMUNITY AND TECHNICAL COLLEGE. | Transportation Enhancements | $11,500 |
| KENTUCKY | MARION | 3000786 | CONSTRUCT NEW CONNECTOR FROM US-68/NORTHERN BYPASS TO INDUSTRIAL DRIVE IN LEBANON. (04CCR) | New Construction | $4,000,000 |
| KENTUCKY | JEFFERSON | 3001339 | EASTERN PARKWAY AT 3RD STREET - TRAFFIC AND PEDESTRIAN SAFETY IMPROVEMENTS ON EASTERN PARKWAY NEAR THIRD STREET. | Safety/Traffic Management | $1,600,000 |
| KENTUCKY | FAYETTE | 3003239 | BIG BARN TRANSPORTATION MUSEUM RESTORATION - STABILIZATION OF THE HISTORIC ÒBIG BARNÓ FOR THE CREATION OF A VISITOR CENTER AND CARRIAGE MUSEUM WITHIN THE STRUCTURE. | Transportation Enhancements | $964,000 |
| KENTUCKY | FRANKLIN | 3005014 | WILKINSON BLVD. BIKE/PED FACILITIES - CREATION OF BICYCLE AND PEDESTRIAN FACILITIES ALONG THE KY RIVER AND WILKINSON BLVD FROM RIVERVIEW PARK TO FAIR OAKS LANE. | Pavement Improvement | $314,500 |
| KENTUCKY | BARREN | 3013012 | GLASGOW OUTER LOOP FR US-68 TO THE LOUIE B. NUNN PARKWAY EAST OF GLASGOW. | New Construction | $17,200,000 |
| KENTUCKY | BOYLE | 3019005 | STREETSCAPE IMPROVEMENT PROJECT PHASE III - REPLACEMENT OF DETERIORATING SIDEWALKS AND INSTALLATION OF PEDESTRIAN CROSSWALKS, CURB RAMPS, DECORATIVE LIGHT FIXTURES AND BENCHES TO BEAUTIFY THE AREA. | Transportation Enhancements | $273,000 |
| KENTUCKY | DAVIESS | 3023014 | RELOCATE US-60 BYPASS EAST OF OWENSBORO (EAST COUNTY CORRIDOR) PRIORITY SECTION: FROM REID ROAD EAST TO EXISTING US 60 EAST OF OWENSBORO. (98KYD)(2005HPP-KY158)(SEE 2-287.51 FOR FS"COMPONENT)" | Pavement Improvement | $27,200,000 |
| KENTUCKY | MADISON | 3034003 | TATES CREEK TRAIL PROJECT- CONSTRUCT A SIDEWALK ALONG THE OLD ABANDONED RINEY B RAIL THAT RUNS ALONG KY 169. | Transportation Enhancements | $157,500 |
| KENTUCKY | SHELBY | 3035008 | HOSPITAL DRIVE SIDEWALK PROJECT - CONSTRUCTION OF 1700 LINEAR FEET OF SIDEWALK WITH CURB AND GUTTERING ALONG HOSPITAL DRIVE. THE NEW SIDEWALKS WILL CONNECT WITH US 60 SIDEWALKS. | Transportation Enhancements | $103,500 |
| KENTUCKY | MCLEAN | 4312045 | US 431 BEAUTIFICATION PROJECT THIS PROJECT WILL MAKE AESTHETIC IMPROVEMENTS TO A ONE-MILE STRETCH OF US 431. ENHANCEMENTS WILL INCLUDE WELCOME SIGNS AND LANDSCAPING. | Transportation Enhancements | $24,000 |
| KENTUCKY | BULLITT | 5116024 | KY-61 BEGINS SOUTH OF JOHN HARPER HIGHWAY (BROOKS ROAD) AND ENDS AT THE EXISTING 4-LANE SECTION SOUTH OF CARDINAL AVENUE. (2006BOPC) | Pavement Widening | $7,410,000 |