Browse All Approved Stimulus Highway Projects
Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
| State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
|---|---|---|---|---|---|
| MINNESOTA | MORRISON | 09ES072 | MSAS 125: TH 27 TO N CITY LIMITS - STREET RECONST, GR, PAVE, CURB & GUTTER | Pavement Improvement | $1,007,039 |
| MINNESOTA | ISANTI | 09ES073 | CSAH 6: REPL BR #L2529 OVER STANCHFIELD CREEK WITH BR #30515 | Bridge Replacement | $475,463 |
| MINNESOTA | MORRISON | 09ES074 | CR 203: (330TH ST) FR TH 10 TO CSAH 2 - GR, AGG BASE, BIT SURF & AGG SHOULDERS | Pavement Improvement | $786,114 |
| MINNESOTA | BECKER | 09ES075 | CSAH 7: OVER BUFFALO RIVER, REPL BR #7251 W #03J37 CULV, BIT SURF | Bridge Replacement | $410,688 |
| MINNESOTA | DOUGLAS | 09ES076 | CSAH 7: N LIMITS OF BRANDON TO S LIMITS OF MILLERVILLE - BIT OVLY, BIT AGG SHLDS | Pavement Improvement | $1,004,623 |
| MINNESOTA | SWIFT | 09ES077 | CSAH 33: OVER JUDICIAL DITCH #19, REPL BR #89468 WITH BOX CULV #79J19 | Bridge Replacement | $282,769 |
| MINNESOTA | TRAVERSE | 09ES078 | CSAH 16: FR BR #78507 TO TH 75 N OF WHEATON - HOT MIX BIT, SHOULDERING & BIT SEAL COAT | Pavement Improvement | $2,428,830 |
| MINNESOTA | STEELE | 09ES079 | MSAS 135: REPL BR #5789 W/ BR #74537 CEDAR AVE OVER MAPLE CREEK, PRECAST CONC BEAM STRUCTURE & APPROACH GRADING... | Pavement Improvement | $1,363,231 |
| MINNESOTA | GOODHUE | 09ES080 | CSAH 1: FR 285TH ST TO FEATHERSTONE RD - GR, AGG BASE, BIT SURF, AGG SHLD, LTG SS & REPL BR #L0357 W BR #25J59 OVER A STREAM | Pavement Improvement | $1,784,727 |
| MINNESOTA | JACKSON | 09ES081 | CSAH 20: REPL BR #89249 WITH BR #32564 OVER CO DITCH 3, APPROACH GR | Bridge Replacement | $326,354 |
| MINNESOTA | WASECA | 09ES082 | CSAH 3: REPL BR #7191, 1963 STEEL BEAM CONCRETE DECK STRUCTURE WITH THREE 12' x8' BOX CULVERTS #81J09 | Bridge Replacement | $766,010 |
| MINNESOTA | WASECA | 09ES083 | CSAH 3: REPL BR #7139, 1954 STEEL BEAM CONCRETE DICK STRUCTURE WITH THREE 12'X8' BOX CULVER #81J09 | Bridge Replacement | $408,832 |
| MINNESOTA | NOBLES | 09ES084 | CSAH 1: FR N CITY LIM OF BREWSTER TO CSAH 18 - EDGE DRAIN TILE, PLANT MIX, BIT NON-WEAR & WEAR SURF, AGG SHLDS | Pavement Improvement | $1,685,712 |
| MINNESOTA | BLUE EARTH | 09ES085 | CSAH 12: OVER DM&E RR, CONST NEW BR #07589 | New Bridge Construction | $4,065,812 |
| MINNESOTA | CHIPPEWA | 09ES086 | CSAH 32: 1 MI S OF TH 7 / 55 - REPL BR #7137 WITH BR #12551 OVER THE CHIPPEWA RIVER | Bridge Replacement | $657,305 |
| MINNESOTA | LYON | 09ES087 | CSAH 3: 0.9 MI N OF JCT CSAH 8 - REPL BR #4251 W BR #42565 OVER S BRANCH OF THE YELLOW MEDICINE RIVER | Bridge Replacement | $407,423 |
| MINNESOTA | MCLEOD | 09ES088 | CSAH 7: REPL BR #92467 OVER HIGH ISLAND CREEK WITH BR #43551, 4.3 MI S OF STEWART, INCL APPR GR | Bridge Replacement | $456,825 |
| MINNESOTA | LINCOLN | 09ES089 | ON CSAH 6: FR SO CO LINE TO TH 14, CSAH 9 FR CSAH 1 TO CSAH 2, CSAH 11 FR CSAH 8 TO E CO LINE - BIT OVLY | Pavement Improvement | $1,130,303 |
| MINNESOTA | RENVILLE | 09ES090 | CSAH 9: REPL BR #65527 W BR #65562 OVER CHETAMBA CR, INCLUDES APPROACH GR & SURF | Bridge Replacement | $459,776 |
| MINNESOTA | YELLOW MEDICINE | 09ES091 | CSAH 3: REPL BR #7103 W BR #97658 OVER THE LAC QUI PARLE RIVER, INCL APPROACH GR & SURF | Bridge Replacement | $299,056 |
| MINNESOTA | ITASCA | 09ES092 | MSAS 19:7TH AVE SE FR 17TH ST SE TO 33RD ST SE - REMOVALS, GR, BIT SURF, CONC C&G, STORM & SAN SWR, WATERMAIN, LIGHT & TRAFF STRIP | Pavement Improvement | $2,324,519 |
| MINNESOTA | BELTRAMI | 09ES093 | CSAH 23: FR JCT CSAH 29 TO JCT CSAH 32 - BIT RESURF & BIT SHLDS | Pavement Improvement | $1,063,128 |
| MINNESOTA | CLEARWATER | 09ES094 | CSAH 5: FR CSAH 4 TO THE RED LAKE RESERVATION LINE - SUB GR BASE REPAIR, BIT SURF & AGG SHLDRS | Pavement Improvement | $1,680,669 |
| MINNESOTA | TODD | 09ES095 | CSAH 2: FR TH 28 W TO TODD CO CSAH 11 - BIT OVLY & MISC SAFETY IMPROVEMENTS, AGG SHOULDERS | Pavement Improvement | $898,365 |
| MINNESOTA | SHERBURNE | 09ES096 | CSAH 5: REPL BR #7130 W BR #71525 OVER THE ST. FRANCIS RIVER, INCLUDES APPROACH GR & PAVE | Bridge Replacement | $578,176 |
| MINNESOTA | WRIGHT | 09ES097 | MSAS 104: (JAMISON AVE) FR CR 119 TO CSAH 18 -GR, AGG BASE, CURB & GUTTER, BIT SURF,STORM SEWER,BIT BIKE PATH & TRAFF CTRL SYSTEM | Pavement Improvement | $2,996,407 |
| MINNESOTA | OTTER TAIL | 09ES098 | CSAH 1: SOPHUS ANDERSON RD TO 0.25 MI E OF OTTER TAIL CSAH 10 - BIT OVLY & AGG SHLDR | Pavement Improvement | $1,910,477 |
| MINNESOTA | OTTER TAIL | 09ES099 | MSAS 121 (CONCORD ST): OVER OTTER TAIL RIVER, REPL BR #56507 WITH #56540 | Bridge Replacement | $1,026,000 |
| MINNESOTA | YELLOW MEDICINE | 09ES100 | CSAH 8: FR TH 67 TO CSAH 5 E & N OF CLARKSFIELD - GR, SHLD WIDENING, INSLOPE INPR, BIT MILL & OVLY, AGG SHLD, PVT MKG | Pavement Improvement | $1,373,993 |
| MINNESOTA | KANDIYOHI, RENVILLE | 09ES101 | CSAH 2/16: 1.38 MI S OF CR 77 TO TH 7, GR, SURF, REPL BR #94098 W #34J25 CULV | Pavement Improvement | $2,759,071 |
| MINNESOTA | ST LOUIS | 09ES103 | CSAH 4: JCT CSAH 32 (ARROWHEAD) TO JCT CSAH 9 (MARTIN) - BIT PAVE RECLAMATION | Pavement Improvement | $2,562,578 |
| MINNESOTA | STEARNS | 09ES104 | MSAS 165 (PINE CONE RD): CR 120 TO CR 134, GR, BASE, BIT, C&G, DRAINAGE, SIGNING, STRIPING, & APPURTENANT WORK | Pavement Improvement | $1,729,503 |
| MINNESOTA | OLMSTED | 09ES106 | MSAS 119: REPL BR #6839, 4TH ST OVER BEAR CREEK WITH BR #55588 | Bridge Replacement | $2,787,019 |
| MINNESOTA | STATEWIDE | 09ES107 | DISTRICT 1 (3 LOCATIONS): TH 61 @ GRAND PORTAGE, TH 2 @ BONG BRIDGE, I-535 @ BLATNIK BR, STATE ENTRY SIGN LANDSCAPE REHABILITATION | Transportation Enhancements | $132,579 |
| MINNESOTA | FREEBORN | 09ES122 | I-35: STATE ENTRY SIGN LOCATION LANDSCAPE REHAB AT ALVERT LEA, NO OF IA/MN BORDER - ENTRY AND EXIT SIGNS | Transportation Enhancements | $60,642 |
| MINNESOTA | CHISAGO | 09ES124 | County Road 17 Interchange Living Snow Fence Landscaping south of North Branch | Transportation Enhancements | $79,895 |
| MINNESOTA | CHISAGO | 09ES125 | Pavement Preservation - TH95 in North Branch to Chisago County Road 9 unbonded concrete overlay, | Pavement Improvement | $13,738,800 |
| MINNESOTA | WASHINGTON | 09ES126 | Lake Elmo intersection improvement | Pavement Improvement | $3,210,000 |
| MINNESOTA | DAKOTA, HENNEPIN | 09ES127 | Rebuild lighting system - TH 100 south of 394 | Safety/Traffic Management | $2,296,429 |
| MINNESOTA | DAKOTA, STATEWIDE | 09ES128 | Districtwide loop detectors plus 2 TH13 signals | Safety/Traffic Management | $963,000 |
| MINNESOTA | HENNEPIN | 09ES130 | Rebuild Cable Median Barrier, Assign Resources | Safety/Traffic Management | $1,239,274 |
| MINNESOTA | STATEWIDE | 09ES131 | Pavement Preservation - North junction of 35E/35W to North of TH 8 - bituminous mill and overlay, includes CMPS aux. lane. | Pavement Improvement | $8,239,000 |
| MINNESOTA | HENNEPIN | 09ES132 | Landscaping between TH5 and I394 | Other | $535,000 |
| MINNESOTA | CLAY | 09ES135 | I-94: LANDSCAPING OF THE MOOREHEAD STATE ENTRY SIGN & LANDSCAPING | Transportation Enhancements | $90,950 |
| MINNESOTA | HENNEPIN | 09ES136 | TH 169 to Fernbrook - Construct new 4-lane freeway and interchanges | Pavement Widening | $56,215,303 |
| MINNESOTA | STATEWIDE | 09ES137 | Districtwide Signal & Lighting Cabinet Replacement | Safety/Traffic Management | $1,926,000 |
| MINNESOTA | HENNEPIN | 09ES138 | Interchange modification to allow WB 494 to enter WB 212 as an add lane, Layout work needs to begin soon | Pavement Improvement | $1,070,000 |
| MINNESOTA | DAKOTA | 09ES139 | Interchange modification to EB and WB I-494 ramps to SB I-35E, Layout work needs to begin soon | Safety/Traffic Management | $1,284,000 |
| MINNESOTA | STATEWIDE | 09ES140 | Districtwide Fiber installation | Safety/Traffic Management | $1,177,000 |
| MINNESOTA | STATEWIDE | 09ES141 | Districtwide Permanent Pavement Markings | Pavement Improvement | $1,070,000 |