Georgia • DeKalb County

Get Adobe Flash player

Total # Projects: 13
Total # Contracts: 8
Total $ Projects: $28,445,634
Total $ Contracts: $17,181,221

Other Counties

Project $
Appling $0
Atkinson $1,528,744
Bacon $1,152,581
Baker $0
Baldwin $750,000
Banks $797,418
Barrow $0
Bartow $13,572,232
Ben Hill $0
Berrien $0
Bibb $11,223,280
Bleckley $0
Brantley $979,733
Brooks $0
Bryan $3,663,025
Bulloch $0
Burke $725,000
Butts $0
Calhoun $0
Camden $0
Candler $4,425,072
Carroll $0
Catoosa $1,531,013
Charlton $8,015,506
Chatham $5,725,010
Chattahoochee $0
Chattooga $0
Cherokee $23,092,707
Clarke $0
Clay $1,201,513
Clayton $6,149,976
Clinch $500,000
Cobb $11,926,752
Coffee $1,997,847
Colquitt $1,279,473
Columbia $2,397,388
Cook $2,215,295
Coweta $3,384,368
Crawford $2,363,595
Crisp $0
Dade $0
Dawson $1,242,103
Decatur $625,000
Dodge $2,275,144
Dooly $2,357,849
Dougherty $8,573,373
Douglas $5,151,435
Early $0
Echols $0
Effingham $741,328
Elbert $0
Emanuel $0
Evans $0
Fannin $0
Fayette $31,163,426
Floyd $14,219,489
Forsyth $1,999,234
Franklin $7,164,119
Fulton $26,376,709
Gilmer $0
Glascock $0
Glynn $6,871,127
Gordon $1,439,870
Grady $0
Greene $2,465,660
Gwinnett $70,241,894
Habersham $645,925
Hall $4,824,174
Hancock $0
Haralson $438,000
Harris $1,763,681
Hart $0
Heard $0
Henry $38,437,897
Houston $844,982
Irwin $0
Jackson $1,009,579
Jasper $3,492,831
Jeff Davis $0
Jefferson $3,593,850
Jenkins $0
Johnson $0
Jones $0
Lamar $2,796,703
Lanier $1,634,031
Laurens $0
Lee $0
Liberty $0
Lincoln $0
Long $0
Lowndes $0
Lumpkin $0
McDuffie $0
McIntosh $0
Macon $0
Madison $828,383
Marion $1,407,634
Meriwether $2,003,207
Miller $3,122,043
Mitchell $0
Monroe $0
Montgomery $3,147,915
Morgan $0
Murray $0
Muscogee $3,750,000
Newton $997,746
Oconee $0
Oglethorpe $0
Paulding $625,000
Peach $0
Pickens $0
Pierce $1,067,196
Pike $1,557,078
Polk $281,000
Pulaski $2,049,230
Putnam $1,787,960
Quitman $2,542,654
Rabun $0
Randolph $0
Richmond $18,444,225
Rockdale $3,050,239
Schley $1,708,599
Screven $0
Seminole $0
Spalding $2,320,707
Stephens $1,911,803
Stewart $0
Sumter $1,210,021
Talbot $0
Taliaferro $0
Tattnall $2,831,014
Taylor $2,088,691
Telfair $0
Terrell $0
Thomas $0
Tift $0
Toombs $0
Towns $498,265
Treutlen $0
Troup $30,216,797
Turner $0
Twiggs $40,202,894
Union $0
Upson $3,123,523
Walker $721,762
Walton $0
Ware $1,069,295
Warren $0
Washington $3,112,005
Wayne $0
Webster $1,817,639
Wheeler $3,699,319
White $1,807,857
Whitfield $0
Wilcox $0
Wilkes $2,458,228
Wilkinson $36,239,872
Worth $0
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for DeKalb. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
THIS PROJECT INCLUDES CONSTRUCTION OF SIDEWALKS ON BOTH SIDES OF COVINGTON HWY FROM MEMORIAL DR. TO W. AUSTIN DR FOR A TOTAL OF 1.58 MILES. PROJECT WILL BE 5' ADA COMPLIANT SIDEWALKS WITH A 2' STAMPED (Federal ID: 0002406) PRECISION 2000, INC. DeKalb Transportation Enhancements $828,966
PROJECT IS STREETSCAPE DESIGNS & INTERSECTION IMPROVEMENTS ALONG SR 154/MEMORIAL DR. FROM SR 155/CANDLER RD TO MOUNTAIN DR. FOR A TOTAL OF 3.40 MILES. SIDEWALK IMPROVEMENTS WILL INCLUDE UPGRADING EXIS (Federal ID: 0007130) CMES, INC. DeKalb Transportation Enhancements $7,637,192
PROJECT DESCRIPTION: UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENT AND PEDESTRIAN FACILITIES AT VARIOUS LOCATIONS ON CHAMBLEE TUCKER RD, CLAIRMONT RD, & NEW PEACHTREE RD. THE INTERSECTIONS ARE AS FOLLOW (Federal ID: 0009359) BROOKS-BERRY-HAYNIE & ASSOC., INC. DeKalb Safety/Traffic Management $780,233
PROJECT DESCRIPTION: UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENT AND PEDESTRIAN FACILITIES AT VARIOUS LOCATIONS ON BRIARCLIFF RD & SHALLOWFORD RD IN DEKALB COUNTY. THE INTERSECTIONS ARE AS FOLLOWS: (Federal ID: 0009360) BROOKS-BERRY-HAYNIE & ASSOC., INC. DeKalb Safety/Traffic Management $843,811
PROJECT DESCRIPTION: UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENT AND PEDESTRIAN FACILITIES AT VARIOUS LOCATIONS ON CHAMBLEE DUNWOODY RD & N.SHALLOWFORD RD IN DEKALB COUNTY. THE INTERSECTIONS ARE AS FO (Federal ID: 0009361) BROOKS-BERRY-HAYNIE & ASSOC., INC. DeKalb Safety/Traffic Management $1,640,676
PROJECT DESCRIPTION: UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENT AND PEDESTRIAN FACILITIES AT VARIOUS LOCATIONS ON LAVISTA RD, NORTHLAKE PKWY, & HENDERSON MILL RD IN DEKALB COUNTY. THE INTERSECTIONS A (Federal ID: 0009362) BROOKS-BERRY-HAYNIE & ASSOC., INC. DeKalb Safety/Traffic Management $1,729,396
THIS PROJECT IS THE MILLING AND RESURFACING OF SR 10. THIS SECTION OF SR 10 NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 10 WAS LAST RESURFACED IN 1990. (Federal ID: M003946) E. R. SNELL CONTRACTOR, INC. DeKalb Pavement Improvement $2,895,565
THIS PROJECT IS THE RESURFACING OF SR 236. THIS SECTION OF SR 236 NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 236 WAS LAST RESURFACED IN 1988. (Federal ID: M003985) C. W. MATTHEWS CONTRACTING CO., INC. DeKalb Pavement Improvement $825,382
THE PROPOSED PROJECT IS ENTIRELY CONTAINED WITHIN DEKALB COUNTY. THE PROJECT CONSISTS OF THE SOUTH AND NORTH HAIRSTON ROAD CORRIDORS FROM KENILWORTH DRIVE TO MAINSTREET PARK DRIVE. THE TOTAL PROJECT (Federal ID: 0006810) No Contractor DeKalb Safety/Traffic Management $873,025
THE PROPOSED CONSTRUCTION WILL INCLUDE STREETSCAPE IMPROVEMENTS SUCH AS SIDEWALKS, LANDSCAPE DESIGN, LIGHTING, BENCHES, AND OTHER PEDESTRIAN AMENITIES TO IMPROVE SAFETY FOR RESIDENTS AND AREA BUSINES (Federal ID: 0007131) No Contractor DeKalb Transportation Enhancements $9,165,195
DEEPDENE PARK WILL BE REHABILITATED. THE MEAD AT THE EAST END AND THE WEST LAWN AT THE WEST END OF DEEPDENE PARK WILL HAVE THE OPEN, PASTORAL CHARACTER OF THE OTHER FIVE OLMSTED PARKS AND WILL BE CONN (Federal ID: 0008115) No Contractor DeKalb Transportation Enhancements $1,250,000
THIS PROJECT INVOLVES CLEARING, GRADING, AND INSTALLING A 10' TO 12' WIDE CONCRETE TRAIL FROM MLK HIGH SCHOOL ON SNAPFINGER RD. TO THE ARABIA MOUNTAIN TRAIL AT LYONS RD. THE TRAIL IS PART OF AN EFFORT (Federal ID: 0008119) No Contractor DeKalb Transportation Enhancements $750,000
THE PROPOSED PROJECT WOULD REPLACE THE EXISTING BOX CULVERT AND WOODEN PEDESTRIAN BRIDGE ON SR 155/CANDLER ROAD AT SHOAL CREEK WITH A LARGER CONCRETE BOX CULVERT AND ADD TURN LANES ON SR 155 AT THE IN (Federal ID: 9014024) No Contractor DeKalb Bridge Replacement $1,308,637