Total # Projects: 16
Total # Contracts: 9
Total $ Projects: $62,661,186
Total $ Contracts: $24,334,362

Congressmembers

Other Congressional Districts

Project $
AR-01 $37,015,043
AR-03 $37,733,520
AR-04 $89,596,072

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for AR-02. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
CONTINUE MODIFICATION OF EXISTING INTERCHANGE (Federal ID: ARR1003) KIEWIT SOUTHERN CO. Pulaski Bridge Improvement $15,991,380
ACHM REHABILITATION OF 3.67 MILES (Federal ID: ARR1027) DELTA ASPHALT OF ARK, INC. White Pavement Improvement $1,463,875
ACHM REHABILITATION OF 2.88 MILES (Federal ID: ARR1029) DELTA ASPHALT OF ARK, INC. White Pavement Improvement $1,134,690
CONCRETE PAVEMENT PATCHING OF 1.10 MILES (Federal ID: ARR1033) REDSTONE CONSTRUCTION GROUP, INC. Pulaski Pavement Improvement $1,397,875
ACHM REHABILITATION OF 5.87 MILES (Federal ID: ARR1042) DELTA ASPHALT OF ARK, INC. Van Buren Pavement Improvement $2,099,101
ACHM REHABILITATION OF 2.68 MILES (Federal ID: ARR1043) ROGERS GROUP, INC. Faulkner Pavement Improvement $981,405
ACHM REHABILITATION OF 5.90 MILES (Federal ID: ARR1044) BLACKSTONE CONSTRUCTION, LLC Yell Pavement Improvement $1,000,280
ACHM REHABILITATION OF 0.37 MILES (Federal ID: ARR1046) ROGERS GROUP, INC. Faulkner Pavement Improvement $191,256
CONSTRUCT AND INSTALL TRAFFIC SIGNAL (Federal ID: ARR2016) CONSTRUCTION MANAGEMENT & MAINTENANCE, INC. Faulkner Pavement Improvement $74,500
CONSTRUCTION OF ROUNDABOUT, TOTAL IMPROVEMENTS INCLUDE .3 MILES OF ROADWAY (Federal ID: ARR2003) No Contractor Pulaski Pavement Widening $1,489,935
REPLACE 2 BRIDGES (Federal ID: ARR2006) No Contractor Pulaski Bridge Replacement $957,377
MAJOR WIDENING OF 1.4 MILES OF ROADWAY (2 LANES TO 4 LANES) (Federal ID: ARR2017) No Contractor Saline Other $3,976,056
PROVIDE BASE AND SURFACING TO COMPLETE 10.40 MILES OF A 4-LANE DIVIDED FACILITY ON NEW LOCATION (Federal ID: ARR2045) No Contractor Faulkner New Construction $26,739,529
CONSTRUCT RAILGRADE SEPARATION ALONG SALEM ROAD AT UPRR (Federal ID: ARR2052) No Contractor Faulkner New Bridge Construction $2,517,692
MAJOR WIDENING OF 0.7 MILES OF BROCKINGTON ROAD (2 LANES TO 4 LANES) (Federal ID: ARR2055) No Contractor Pulaski Other $1,089,660
JACKSONVILLE CATO RD. - BAYOU METO (HWY. 107) WIDEN 0.85 MILES TO 5 LANES WITH CURB AND GUTTER (Federal ID: ARR2056) No Contractor Pulaski Pavement Widening $2,856,255