Kentucky • KY-06 Congressional District
Top 10 Largest Contracts
NEWTOWN PIKE EXTENSION - PRIORITY 1: FROM... | KY / Fayette |
$11,100,000
|
FRANKFORT-LEXINGTON US 421 LEESTOWN ROAD; ... | KY / Franklin |
$10,400,000
|
Total # Projects: | 10 |
Total # Contracts: | 2 |
Total $ Projects: | $26,451,000 |
Total $ Contracts: | $21,500,000 |
Congressmembers
- Sen. Mitch McConnell (R) See Campaign Finances
- Sen. Jim Bunning (R) See Campaign Finances
- Rep. Ben Chandler (D) See Campaign Finances
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for KY-06. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
NEWTOWN PIKE EXTENSION - PRIORITY 1: FROM MAIN STREET TO VERSAILLES ROAD. (PHASE IV) (Federal ID: 0114004) | CENTRAL BRIDGE COMPANY LLC | Fayette | New Construction | $11,100,000 |
FRANKFORT-LEXINGTON US 421 LEESTOWN ROAD; WIDEN TO 5-LANES FR WEST OF US-60 TO 1600' EAST OF CHENAULT INDUSTRIAL ROAD. (SECTION 1) (Federal ID: 5196010) | L-M ASPHALT PARTNERS LTD. D/B/A ATS CONSTRUCTION | Franklin | Pavement Widening | $10,400,000 |
DEPOT STREET RENOVATION PROJECT - RESTORATION OF THE COBBLESTONE STREET, IMPROVED DRAINAGE AND INSTALLATION OF NEW LIGHTING, BENCHING AND LANDSCAPING. (Federal ID: 3000772) | No Contractor | Clark | Transportation Enhancements | $909,000 |
TRANSPORTATION MUSEUM AND WELCOME CENTER PROJECT - PURCHASE AND PROTECTION OF A HISTORIC VIEW SHED INCLUDING THE HOME OF NORFOLK SOUTHERN RAILROAD. THE 2ND FLOOR OF THE BLDG WILL BE TURNED INTO A TR (Federal ID: 3000791) | No Contractor | Jessamine | Transportation Enhancements | $463,000 |
BIG BARN TRANSPORTATION MUSEUM RESTORATION - STABILIZATION OF THE HISTORIC ?BIG BARN? FOR THE CREATION OF A VISITOR CENTER AND CARRIAGE MUSEUM WITHIN THE STRUCTURE. (Federal ID: 3003241) | No Contractor | Fayette | Transportation Enhancements | $964,000 |
WILKINSON BLVD. BIKE/PED FACILITIES - CREATION OF BICYCLE AND PEDESTRIAN FACILITIES ALONG THE KY RIVER AND WILKINSON BLVD FROM RIVERVIEW PARK TO FAIR OAKS LANE. (Federal ID: 3005014) | No Contractor | Franklin | Pavement Improvement | $314,500 |
STREETSCAPE IMPROVEMENT PROJECT PHASE III - REPLACEMENT OF DETERIORATING SIDEWALKS AND INSTALLATION OF PEDESTRIAN CROSSWALKS, CURB RAMPS, DECORATIVE LIGHT FIXTURES AND BENCHES TO BEAUTIFY THE AREA. (Federal ID: 3019006) | No Contractor | Boyle | Transportation Enhancements | $273,000 |
TATES CREEK TRAIL PROJECT- CONSTRUCT A SIDEWALK ALONG THE OLD ABANDONED RINEY B RAIL THAT RUNS ALONG KY 169. (Federal ID: 3034004) | No Contractor | Madison | Transportation Enhancements | $157,500 |
BLUEGRASS RAILROAD BACK TO THE RIVER PROJECT- PRESERVE, RESTORE AND ENHANCE PORTIONS OF THE HISTORIC RAILROAD. (Federal ID: 3036005) | No Contractor | Woodford | Transportation Enhancements | $960,000 |
US25 @ KY1156 CONSTRUCT LEFT TURN LANES (B/C=2.1) (D-DISTRICT C-CONTRACTOR) (2002BOP) (Federal ID: 5192004) | No Contractor | Madison | Safety/Traffic Management | $910,000 |