Massachusetts • Worcester County

Get Adobe Flash player

Total # Projects: 8
Total # Contracts: 3
Total $ Projects: $26,248,347
Total $ Contracts: $7,400,214

Other Counties

Project $
Barnstable $6,518,770
Berkshire $13,064,928
Bristol $79,406,076
Dukes $0
Essex $15,013,433
Franklin $4,691,189
Hampden $2,499,054
Hampshire $14,990,522
Middlesex $17,529,588
Nantucket $4,748,670
Norfolk $5,071,620
Plymouth $5,653,934
Suffolk $54,777,357
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for Worcester. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
THIS RESURFACING PROJECT CONSISTS OF 2" MILLING AND RESURFACING ON A SECTION RTE 122 AND A SECTION OF RTE 62 IN BARRE. SECTION 1 IS STATE-OWNED AND BEGINS JUST WEST OF THE INTERSECTION OF RTE 122 AND (Federal ID: 001S921) MASSACHUSETTS BROKEN STONE COMPANY Worcester Pavement Improvement $2,078,903
PROJECT CONSISTS OF 2" MILLING AND RESURFACING ON A SECTION OF ROUTE 32 (MAIN STREET). THE SECTION BEGINS AT THE WARE-NEW BRAINTREE TL MM 22.383 AND PROCEEDS NORTHERLY PAST THE NEW BRAINTREE-HARDWICK (Federal ID: 001S932) PALMER PAVING CORPORATION Worcester Pavement Improvement $578,133
THE PROJECT LIMITS ARE ROUTE 2 IN HARVARD FROM THE VICINITY OF THE LITTLETON ROAD BRIDGE OVER ROUTE 2 EASTERLY ABOUT 1 MILE TO THE LITTLETON TOWN LINE, THEN CONTINUING ANOTHER 3.4 MILES TO THE BOXBORO (Federal ID: 001S952) AGGREGATE INDUSTRIES - NORTHEAST REGION, INC. Worcester Pavement Improvement $4,743,178
THIS PROJECT WILL COMMENCE AT ROUTE 140 IN SHREWSBURY AND CONTINUE IN A WESTERLY DIRECTION TO MASSASOIT ROAD IN WORCESTER, A DISTANCE OF APPROXIMATELY 3.5 MILES. (Federal ID: 001S935) No Contractor Worcester Pavement Improvement $3,441,120
THE PROPOSED WORK UNDER THIS PROJECT CONSISTS OF BRIDGE RECONSTRUCTION, WIDENING, GUARDRAIL INSTALLATION AND ALL OTHER WORK ON WATER STREET FROM ITS INTERSECTION WITH BOLTON STREET AND HARRIS STREET T (Federal ID: 001S949) No Contractor Worcester Bridge Replacement $3,807,107
THE PROPOSED PROJECT CONSISTS OF RESURFACING AND RELATED WORK ON ROUTE 6 IN THE TOWN OF WESTPORT. BEGINNING WEST OF THE DARTMOUTHLWESTPORT TOWN LINE AT STA. 1+30� (WESTBOUND MILEMARKER 20.9�) & STA. 1 (Federal ID: 001S961) No Contractor Worcester Pavement Improvement $7,898,960
PROJECT ERP-001S(995)X & STP-001S(995)X, ROYALSTON, RECONSTRUCTION RTE 32 (ATHOL RICHMOND RD) (Federal ID: 001S995) No Contractor Worcester Pavement Improvement $1,000,000
PROJECT STP-002S(034)X & ERP-002S(034)X, SOUTHBRIDGE, RECONSTR. RTE 169 (WOODSTOCK RD) (Federal ID: 002S034) No Contractor Worcester Pavement Improvement $2,000,000